1.0 Purpose:
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-This is an electronically generated document and does not require signature. Printed Documents, without control copy stamp in red colour,
are for Reference Only and may be out-of-date. Check the local database to ensure you have the correct revision.
PROCEDURE FOR MANAGEMENT REVIEW MEETING
QUALITY GALVANIZERS
DOCUMENT NO. ORG. ISSUE DATE REV. NO. REV. DATE PAGE NO.
To establish QMS objectives at relevant functions and levels of the organization based on the actions
identified from risk and opportunities and implement an action plan to achieve the objectives and
target.
2.0 Scope
All departments that have objectives assigned to them.
4.0 Responsibilities:
Management Representative is responsible for the overall implementation and effectiveness of this procedure.
Respective Department Heads are responsible for implementing actions to meet defined objectives.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-This is an electronically generated document and does not require signature. Printed Documents, without control copy stamp in red colour,
are for Reference Only and may be out-of-date. Check the local database to ensure you have the correct revision.
PROCEDURE FOR MANAGEMENT REVIEW MEETING
QUALITY GALVANIZERS
DOCUMENT NO. ORG. ISSUE DATE REV. NO. REV. DATE PAGE NO.
4. Target level to be achieved- Fix the target to be achieved and it shall be in line with applicable
legal and other requirements.
5. Action plan for achieving the objective, which includes, what to be done, when it will be done
and who will do it to achieve the objective and target.
6. Review- Actions are implemented and Objectives are reviewed for its achievement and details
of achievement of objectives are recorded every month in the Objective and action plan record
After achieving the target, the target is revised, and additional actions are planned and implemented
to achieve the revised target if needed. If there is no scope for further improving the target, then the
objective parameter will be taken for monitoring and measurement and acceptance criteria for the
related quality parameter will be defined based on the target achieved for the objective.
All Department wise KPI’s are monitored/evaluated by the respective department head on monthly
basis and root cause analysis & action plan QG/QA/F-07 to be initiated if KPI’s are not met as per
target. KPI performance will be reviewed during MRM meeting(QG/GE/F-01). Based on the previous
year performance all the KPIs should be revised once in year and set the target for the current
financial year with the approval of unit head.
List of departmental objectives are below and the month wise data is captured at format QG-QA-F-12
Quality objectives monitoring sheet
Number of Qty
delivered / No of
Operations Qty to be
2 OTD % 90% Monthly
head delivered as per
commited to
customer
01 Training to be
conducted per
3 HR No. of Trainings % 100% Monthly
month at a
minimum
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-This is an electronically generated document and does not require signature. Printed Documents, without control copy stamp in red colour,
are for Reference Only and may be out-of-date. Check the local database to ensure you have the correct revision.
PROCEDURE FOR MANAGEMENT REVIEW MEETING
QUALITY GALVANIZERS
DOCUMENT NO. ORG. ISSUE DATE REV. NO. REV. DATE PAGE NO.
I/H PRODUCTION
PLAN V/S
4 Production % 90% PLAN V/S Monthly
ACTUALS
ACTUAL
Number of
rejected parts /
I/H REJECTIONS (3500
5 Quality PPM Total number of Monthly
PPM (IP) PPM)
produced
parts*100
Number of
rejected parts at
6 Quality Customer PPM PPM 500 customer end / Monthly
Total number of
Shipped*100
Preventive
maintenance
Preventive done meeting
Maintenanc
7 Maintenance % 100 schedule / Total Monthly
e
Adhrence Preventive
Maintenance
scheduled
9. Abbreviation:
PPM - Parts Per Million
QA – Quality Assurance
HRD – Human Resource Department
IQC – Inward Quality Control
OTD – On Time Delivery
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
-This is an electronically generated document and does not require signature. Printed Documents, without control copy stamp in red colour,