HVAC Load Analysis: Prepared by

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

HVAC Load Analysis

for

Prepared By:

Friday, March 31, 2023


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 2

General Project Data Input


General Project Information
Project file name: load.CHV
Project date: Friday, March 31, 2023
Weather reference city: NOUAKCHOTT, MAURITANIA
Barometric pressure: 980.800 mbar
Altitude: 250 meters
Latitude: 18 Degrees
Mean daily temperature range: 12.7778 Degrees
Starting & ending time for HVAC load calculations: 1am - 12am
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Both heating and cooling loads
Lighting requirements: 20.00 Watts per square meter
Equipment requirements: 10.00 Watts per square meter
People sensible load multiplier: 0 Watts per person
People latent load multiplier: 0 Watts per person
Zone sensible safety factor: 0 %
Zone latent safety factor: 0 %
Zone heating safety factor: 0 %
People diversity factor: 100 %
Lighting profile number: 0
Equipment profile number: 0
People profile number: 0
Building default ceiling height: 0.00 meters
Building default wall height: 0.00 meters

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 C C C C C C C C C C C C C C C C C C C C C C C C
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions

Design Outdoor Outdoor Indoor Indoor Grams In/Outdoor


Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
August 50 21 50% 65 -87.12 -25
Winter 10 20

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 1 0.500 Yes No
Roof #1 Description: EXTERNAL CEILING (WITH GRAVEL)

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 G 0.516 D
Wall #1 Description: EXTERNAL WALLS (CONCRETE WALL - THIKNESS : 15+5+10 CM)

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 2.100 20 11
Partition #1 Description: INTERNAL PARTITION WALLS
2 1.910 20 11
Partition #2 Description: INTERNAL CEILING (WITH TILING)
3 2.350 20 11
Partition #3 Description: INTERNAL FLOOR (WITH TILING)
4 5.800 0 0
Partition #4 Description: INTERNAL GLASS (DISABLED)
5 5.800 20 11
Partition #5 Description: INTERNAL GLASS

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.900 1.900 0.250 2 0.000
Glass #1 Description: REGULAR GLASS

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 4

Building Summary Loads


Building peaks in August at 3pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 70 348 26.50 0 617 617 3599.47
Wall 187 966 73.50 0 -602 -602 -3511.94
Glass 0 0 0.00 0 0 0 0.00
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 1,315 100.00 0 15 15 87.53
Lighting 1 0 0.00 0 1 1 5.83
Equipment 1 0 0.00 0 1 1 5.83
People 0 0 0.00 0 0 0 0.00
Partition 0 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 0 0 0.00 0 0 0 0.00
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 0 0 0.81
Blow-Thru Fan 0 0 0.00 0 0 0 0.00
Reserve Cap. 0 0 0.00 0 0 0 0.00
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 1,315 100.00 0 17 17 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 0 0 0 0.00
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 1,315 100.00 0 17 17 99.19
Plenum Loads 0 0.00 0 0 0 0.00
Fan/Duct/Misc Loads 0 0.00 0 0 0 0.81
Building Totals 1,315 100.00 0 17 17 100.00

Check Figures
Total Building Supply Air (based on a 14° TD): 1 L/s
Total Building Vent. Air (0.00% of Supply): 0 L/s
Total Conditioned Air Space: 70 Sq.m
Supply Air Per Unit Area: 0.0147 L/s/Sq.m
Area Per Cooling Capacity: 4,062.1000 Sq.m/kW 14,285.8 Sq.m/Ton
Cooling Capacity Per Area: 0.0002 kW/Sq.m 0.0001 Tons/Sq.m
Heating Capacity Per Area: 18.87 Watts/Sq.m
Total Heating Required With Outside Air: 1.31 kW
Total Cooling With Outside Air: 0.02 kW 0.00 Tons

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 5

Air Handler #1 - AHU - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Zone Peak Time People Htg.L/s Clg.L/s S.Exh Req.L/s Req.L/s
Volume L/s/Sqm L/s/Sqm W.Exh Act.L/s Act.L/s
1 Hang 70 1,315 17 0 None None
3pm August 0 280 1 0 0 0
355 4.02 0.01 0 0 0
Zone Peak Totals: 70 1,315 17 0
Total Zones: 1 0 280 1 0 0 0
Unique Zones: 1 355 4.02 0.01 0 0 0

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 6

Air Handler #1 - AHU - Total Load Summary


Air Handler Description: AHU Constant Volume - Sum of Peaks
Supply Air Fan: Draw-Thru with program estimated horsepower of 0.00 kW
Fan Input: 0% motor and fan efficiency with 0 kPa across the fan
Sensible Heat Ratio: 1.00 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 3pm in August.
Outdoor Conditions: Clg: 50° DB, 21° WB, 3.55 grams moisture per kg dry air, Htg: 10° DB
Indoor Conditions: Clg: 65° DB, 50% RH, Htg: 20° DB
Summer: Exhaust controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 1,315 Watts
Infiltration sensible loss: 0 Watts 0 L/s
Outside Air sensible loss: 0 Watts 0 L/s
Supply Duct sensible loss: 0 Watts
Return Duct sensible loss: 0 Watts
Return Plenum sensible loss: 0 Watts
Total System sensible loss: 1,315 Watts
Heating Supply Air: 1,315 / (.971 X 1.21 X 4) = 280 L/s
Winter Vent Outside Air (0.0% of supply) = 0 L/s
Zone space sensible gain: 17 Watts
Infiltration sensible gain: 0 Watts
Draw-thru fan sensible gain: 0 Watts
Supply duct sensible gain: 0 Watts
Reserve sensible gain: 0 Watts
Total sensible gain on supply side of coil: 17 Watts
Cooling Supply Air: 17 / (.971 X 1.23 X 14) = 1 L/s
Summer Vent Outside Air (0.0% of supply) = 0 L/s
Return duct sensible gain: 0 Watts
Return plenum sensible gain: 0 Watts
Outside air sensible gain: 0 Watts 0 L/s
Blow-thru fan sensible gain: 0 Watts
Total sensible gain on return side of coil: 0 Watts
Total sensible gain on air handling system: 17 Watts
Zone space latent gain: 0 Watts
Infiltration latent gain: 0 Watts
Outside air latent gain: 0 Watts
Total latent gain on air handling system: 0 Watts
Total system sensible and latent gain: 17 Watts

Check Figures
Total Air Handler Supply Air (based on a 14° TD): 1 L/s
Total Air Handler Vent. Air (0.00% of Supply): 0 L/s
Total Conditioned Air Space: 70 Sq.m
Supply Air Per Unit Area: 0.0147 L/s/Sq.m
Area Per Cooling Capacity: 4,062.1000 Sq.m/kW 14,285.8 Sq.m/Ton
Cooling Capacity Per Area: 0.0002 kW/Sq.m 0.0001 Tons/Sq.m
Heating Capacity Per Area: 18.87 Watts/Sq.m
Total Heating Required With Outside Air: 1.31 kW
Total Cooling With Outside Air: 0.02 kW 0.00 Tons

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 7

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-Hang peaks (sensible) in August at 3pm, Air Handler 1 (AHU), Group 0, 13.0 x 5.4, Construction
Type: 1 (Light)
Roof-1-1-No.Clg-D 70 1.00 17.7 0.500 617 5.000 348
Wall-1-N-G-D 66 1 -12.5 0.516 -429 5.160 342
Wall-2-S-G-D 66 1 -4.0 0.516 -138 5.160 342
Wall-3-E-G-D 27 1 -8.3 0.516 -117 5.160 141
Wall-4-W-G-D 27 1 5.7 0.516 81 5.160 141
Lights-Prof=0 1 1.000 1
Equipment-Prof=0 1 1.000 1 0
Sub-total 17 0 1,315
Safety factors: +0% +0% +0%
--------- --------- ---------
Total w/ safety factors: 17 0 1,315

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 8

Air System #1 (AHU) Psychrometric Analysis


System Load Analysis Latent Grams Sensible Temp L/s
Leaving Coil Condition 90.956 51.000
Draw-Thru Fan 0 0.113 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 0 0.000 17 13.888 1
Sensible Reserve 0 0.000 0
Zone Condition 0 90.956 17 65.000 1
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 0 L/s 0 0.000 0 0.000
Blow-Thru Fan 0 0.000
Entering Coil Condition 0 90.956 17 65.000 1

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 1010.387)
TSH = PR x 1.23 x L/s x (DB entering - DB leaving)
TLH = PR x 2.96 x L/s x (g/kg entering - g/kg leaving)
GTH = PR x 1.20 x L/s x (Enthalpy entering - Enthalpy leaving)

TSH = 0.971 x 1.23 x 1 x( 65.000 - 51.000 )= 17 Watts


TLH = 0.971 x 2.96 x 1 x( 90.956 - 90.956 )= 0 Watts
----------
SUM = 17 Watts
GTH = 0.971 x 1.20 x 1 x( 303.907 - 287.472 )= 20 Watts
Total System Load = 17 Watts

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling L/s = 20 / ( 5.50 x 4,179 ) = 0.0 L/s
Heating L/s = 1,315 / ( 0.00 x 4,179 ) = 0.0 L/s
Steam Req. = 1,315 / 970 = 1.36 kg./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 65.00 Dry bulb temperature: 20.00
Wet bulb temperature: 51.55
Relative humidity: 50.15
Enthalpy: 303.91 kJ/kg

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 51.00 Dry bulb temperature: 24.00
Wet bulb temperature: 50.39
Relative humidity: 96.75
Enthalpy: 287.47 kJ/kg

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 9

Building Pie Charts


Building peaks in August at 3pm.

Draw-Thru Fan - 0.81%


Equipment - 5.83%
Lighting - 5.83%

Building
Net Gain
17 Watts

Roof - 3599.47%

Roof - 26.50%

Building
Loss 1,315
Watts

Wall - 73.50%

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr
Page 10

Air Handler #1 - AHU - Pie Charts


Air Handler #1 peaks in August at 3pm.

Draw-Thru Fan - 0.81%


Equipment - 5.83%
Lighting - 5.83%

Air Handler
#1
Net Gain
17 Watts

Roof - 3599.47%

Roof - 26.50%

Air Handler
#1
Loss 1,315
Watts

Wall - 73.50%

D:\mt\Google Drive\[Work PC]\[Documents]\(Personal Work)\I. Karam\Hangar\load.CHV Friday, March 31, 2023, 09:10 AM