L&T CONSTRUCTION QUALITY MANAGEMENT SYSTEM

IRRIGATION INDUSTRIAL & INFRASTRUCTURE SBG PROJECT QUALITY MANUAL

POST POUR CARD LTCD/III/PQM/IT/F02 Issue-A Rev-0 Sheet 02 of 02

Report No. Date :


Package Name: Contract Agreement No. :
Mix Design for RFI Ref:
concrete: Nominal /Design
Area / Bldg / structure Start Time:
( Exact Location if
rquire attach drawing):
Grade of Concrete Finish Time
Description of Work / Drg Ref.
Description Items / Check Required Actual Remarks

1. Compaction type
2. Vibrators
3. Quantity of concrete
A. During Pouring
4. Cement consumption
5. Slump

1. Mix code
2. Quantity
3. Measuring box for manual
B. Sampling concrete
4. Batch Sheet For RMC & Weigh
Batcher
5. No. of samples& Identity
1. Observation for honeycombing.

2. Line & Level


3. Surface finish.
4. Cracks and pores
5. Method of Curing
6. Checked for stripping/Removing
of formwork support etc. after
specified duration of stripping time

C. Post Pour

7. Checked for Position of


embedment
8.Repair and finish all surface defects
by specification / approved method

9. Surface of part of structure is


alright and allowed for subsequent
activity / backfilling
10. Others if any

L&T Construction - Execution L&T Construction - QA&QC Client / TPI

© LARSEN & TOUBRO LIMITED – CONSTRUCTION 2015– ALL RIGHTS RESERVED

# Sensitivity: LNT Construction Internal Use