= 105 MldNumber of units provided = 4 nos.So, Design flow per Tube Settler = 105/4
Tube Pack Data:Shape = Hexagonal - Chevron Cross sectional area = 120 x 44 mm x mmHydraulic radius
= 0.015 mSettling area : 60° Slope = 11 m²/m³Settling area : 55° Slope = 13 m²/m³Vertical Space between
Select, Settling rate on the horizontal projected a rea of Tube Pack = 1.00 m³/m²/hApply the probability
factor,as recommended by theT ube Pack Vendor = 0.70Revised Settling rate on the horizontal projected a
20.00 °CKinematic viscosity of water at 20°C = 0.000001003 m²/sCorrection Factor for Settling rate, w.r.t.
= 0.558 m³/m²/hSelected Settling rate on the horizontal projected area of Tube Pack = 0.700
m³/m²/hSelected vertical depth of Tube Pack = 1.000Plan area of the Tube Settler = 11.4*11.4
= 121.978 m³Settling area of Tube Pack, corresponding to the inclination, = 121.978*13 based on the
Actual Settling rate on the horizontal projected a rea of Tube Pack = 1093.75 / 1585.7090.690 m³/m²/h
Check for the performance of the Tube Settler: Sedimentation takes place in the length following the
transition length and it will retain all partic leswith a settling velocity less than V s.
d = depth of water in a Tube at right angle to the direction of flow, mθ = angle of inclination of Tube Pack
Lt = 0.0288 NR .DWhere,Lt = Transition length V = Average velocity of flow in the Tubes, m³/h.m² = U /
sin θ U = Average upward velocity, m³/h.m² = Surface loading rate of the Settling Tank = Rate of flow /
Tube entrance areaν = Kinematic viscosity of water, m²/s = 0.00000086 m²/sNR = Reynolds Number
The tube entrance area is reduced due to the thick ness of the tube pack and also due to the supportin g
of 1000 mm, in a square grid.No. of supporting angles, lengthwise @ 1m c-c spacing = (11.4/1)+1
= 12.40 nos.Say = 13.00 nos.No. of supporting angles, breadthwise @ 1m c-c spacing = (11.4/1)+1
= 12.40 nos.Say = 13.00 nos.Width of supporting angle of standard size, provided = 65.000 mm
-(13*13*0.065*0.065)= 0.768 m²
Plan area lost by the thickness of the Tube Pack = 3.00 % of plan area= 3%*129.96= 3.899 m²
Total area of obstruction for flow through Tube Pack = 0.768+3.899= 4.667 m²
Average velocity of flow in the Tubes, V = U / sin θ = 8.73 / sin 55°= 10.657 m/h= 0.003 m/s
ν = 0.003*0.015/0.00000086= 51.632
Page 3
= 0.0288*51.632*0.06= 0.089 m
= 1-0.089= 0.911 m
Vs = V. k / { [sin θ + (Ls/d)cos θ ] }
Hence O.K.
Unit SizeLength / Breadth of Tube Settler provided = 11.40 mFlow per Tube Settler = 1093.75 m³/h
= 0.3038 m³/sApprox.liquid height above the top of the tube pack = 0.65 mVertical Height of Plates = 1.00
mHorizontal velocity in the clarification shall be 0 .02 to 0.03 m/s.Horizontal Velocity in the clarification
zone selected = 0.025 m/sC/S area of clarification zone required below Tube Pack = 1093.75 / 3600 / 0.025
= 1.066 mDepth of the sludge compression zone provided = 1.00 mSpace provided for sludge scrapper =
Hence O.K.
Provide V-Notch weir plates on the inner side of overflow launders.Recommended weir loading for Tube
= 128.398 mDischarge rate at design flow over the weir = 1093.75 / 128.398
= 8.52 m³/m/h= 204.44 m³/m/d< 250.00 m³/m/d
= 30000.000 m³/dDischarge rate at design Hydraulic flow over the weir = 30000 / 128.398
= 233.65 m³/m/d