PPPP III PPPP EEEEE PPPP H H A SSS EEEEE (R)

P P I P P E P P H H A A S S E
P P I P P E P P H H A A S E
PPPP I PPPP EEEE PPPP HHHHH A A SSS EEEE
P I P E P H H AAAAA S E
P I P E P H H A A S S E
P III P EEEEE P H H A A SSS EEEEE

VERSION 9.6

**************************************************************************
* *
* SUPPORT CENTERS, INVENSYS, SIMSCI-ESSCOR *
* ======================================== *
* *
* *
* For support center information refer to website *
* *
* http://www.simsci-esscor.com *
* http://www.invensys.com *
* *
* NORTH AMERICA *
* USA/Canada *
* *
* LATIN AMERICA *
* Argentina, Chile, Peru, Bolivia, Paraguay, Uruguay *
* Brasil *
* Colombia *
* Mexico *
* Venezuela *
* *
* EUROPE, MIDDLE EAST, AFRICA *
* United Kingdom *
* Germany, Austria, Switzerland *
* Italy, Greece *
* Middle East *
* *
* ASIA PACIFIC *
* Asia *
* Australia & New Zealand *
* India *
* Japan *
* Korea *
* P.R. China *
* *
* *
* *
* *
* *
**************************************************************************

(R) SIMSCI IS A TRADEMARK OF INVENSYS SYSTEMS, INC.


(R) PIPEPHASE IS A TRADEMARK OF INVENSYS SYSTEMS, INC.

(c) COPYRIGHT 1985, UPDATED 1986-2013


INVENSYS SYSTEMS, INC.
ALL RIGHTS RESERVED
R
PIPEPHASE Version 9.6 MACHINE IBMPC INPUT LISTING - PAGE 1
==============================================================================

$ SIMSCI PIPEPHASE Version 9.6.0 keyword file...


$
$ General Data Section
$
TITLE PROBLEM=EXAMPLE1, USER=SIMSCI, DATE=10/01/97
$
DESCRIPTION PUMP LIQUID SOLVENT FROM A STOCK TANK TO A HEADER TANK
$
DIMENSION ENGLISH, PRESSURE=PSIG, RATE(LV)=GPM
$
OUTDIMENSION SI, ADD
$
CALCULATION NETWORK, LIQUID, TRUEMWD
$
FCODE PIPE=HW
$
DEFAULT IDPIPE=4.026, IDTUBING=4.026, IDANNULUS=6.065, *
THKPIPE=0.2, THKINS=0, 0, *
0, 0, 0, *
CONPIPE=29, CONINS=0.015, 0.015, *
0.015, 0.015, 0.015, *
HINSIDE=0, HOUTSIDE=0, HRADIANT=0
$
PRINT INPUT=FULL, DEVICE=PART, PLOT=FULL, *
PROPERTY=FULL, FLASH=FULL, MAP=TAITEL, *
CONNECT=NONE, SUMMARY=BOTH, DATABASE=FULL, *
SIMULATOR=PART
$
SEGMENT AUTO=ON, DLHORIZ(FT)=2000, DLVERT(FT)=500
$
LIMITS PRES(MIN)=0
$
$ Network Data Section
$
NETWORK DATA
$
SOLUTION PBALANCE, FLOWAL=1
$
TOLERANCE PRESSURE=2
$
$ PVT Data Section
$
PVT PROPERTY DATA
$
SET SETNO=1, GRAV(LIQUID, API)=46.062, CP=0.525, *
VISC=32, 0.395/ 122, 0.246
$
$ Structure Data Section
$
STRUCTURE DATA
$
SOURCE NAME=FEED, IDNAME=FEED, PRIORITY=0, *
SETNO=1, PRES=0, TEMP=104, *
RATE=100, XCORD=0, YCORD=-125
$
SINK NAME=SINK, IDNAME=SINK, PRES(ESTI)=1, *
R
PIPEPHASE Version 9.6 MACHINE IBMPC INPUT LISTING - PAGE 2
==============================================================================

RATE(ESTI)=1, XCORD=1000, YCORD=-125


$
$
$
LINK NAME=LINK, FROM=FEED, TO=SINK, *
IDNAME=LINK, IDFROM=FEED, IDTO=SINK, *
PRINT
ENTRANCE NAME=EN1 , IDPIPE=3.068
PIPE NAME=PIP0, LENGTH=4, ID=3.068, *
ISOTHERMAL
PUMP NAME=PMP1, POWER=4.1, PRES(MAX)=30, *
EFF=90
PIPE NAME=PIP1, LENGTH=30, ID=3.068, *
ISOTHERMAL
VALVE NAME=GAT1, IDIN=3.068, IDOUT=3, *
KMUL=13
BEND NAME=BEN1, ID=3, KMUL=30, *
ROUGH(REL)=4.471e-004
PIPE NAME=PIP2, LENGTH=10, ECHG=10, *
ID=3.068, ISOTHERMAL
BEND NAME=BEN2, ID=3, KMUL=30, *
ROUGH(REL)=4.471e-004
PIPE NAME=PIP3, LENGTH=70, ID=3.068, *
ISOTHERMAL
BEND NAME=BEN3, ID=3, KMUL=30, *
ROUGH(REL)=4.471e-004
PIPE NAME=PIP4, LENGTH=30, ECHG=30, *
ID=3.068, ISOTHERMAL
BEND NAME=BEN4, ID=3, KMUL=30, *
ROUGH(REL)=4.471e-004
EXIT NAME=EX1 , IDPIPE=3.068
$
$ End of keyword file...
$
END

END OF PRE-PROCESSING -- NO ERRORS


-- NO WARNINGS
R
PIPEPHASE Version 9.6 INPUT PROCESSOR DIRECTORY
==============================================================================
PROJECT USER SIMSCI
PROBLEM EXAMPLE1 DATE 10/01/97

PUMP LIQUID SOLVENT FROM A STOCK TANK TO A HEADER TANK

PAGE CONTENTS
---- --------------------------------------------
1 GENERAL DATA
3 PVT DATA
3 CORRELATION SET DATA
METHODS DATA
4 SOLUTION METHODS/TOLERANCES
SOURCE DATA
5 SOURCE FEED
STRUCTURE DATA
6 LINK LINK
11 JUNCTIONS AND SINKS
12 NETWORK CONNECTIVITY
13 ERROR SUMMARY
*** WARNING *****
PRESS: ESTIMATE AND FLOW DIRECTION INCONSISTENT
FOR FOLLOWING LINKS
LINK FROM NODE PRESSURE TO NODE PRESSURE
LINK FEED 14.7 SINK 15.7
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 1
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 GENERAL DATA 10/01/97
==============================================================================

PROBLEM DESCRIPTION

PUMP LIQUID SOLVENT FROM A STOCK TANK TO A HEADER TANK

CALCULATION OPTIONS

RUN TYPE........ NETWORK


FLUID TYPE...... LIQUID

DIMENSIONAL UNITS - ENGLISH

TEMPERATURE..... DEG F PRESSURE........ PSIG


MOLAR RATE...... MOLE/HR WEIGHT RATE..... LB/HR
LIQUID RATE..... GAL/MIN VAPOR RATE...... MM FT3/HR
COARSE LENGTH... FT FINE LENGTH..... IN
DENSITY/GRAVITY. DEG API VISCOSITY....... CP
DUTY............ MM BTU/HR POWER........... HP
VELOCITY........ FT/SEC

ADDITIONAL OUTPUT UNITS - SI

DEFAULTS

FLOW EFFICIENCY............ 100.00 PERCENT


HAZEN-WILLIAMS COEFF....... 150.00
ROUGHNESS.................. 0.00180 IN
AMBIENT TEMPERATURE........ 80.00 DEG F
TEMPERATURE GRADIENT....... 1.00 DEG F/100 FT
TUBING U-FACTOR............ 1.000 BTU/HR-FT2-F
ANNULUS U-FACTOR........... 1.000 BTU/HR-FT2-F
INSIDE FILM COEFFICIENT.... 0.000 BTU/HR-FT2-F
OUTSIDE FILM COEFFICIENT... 0.000 BTU/HR-FT2-F
RADIANT COEFFICIENT........ 0.000 BTU/HR-FT2-F
INSIDE DIAMETER - PIPE..... 4.026 IN
INSIDE DIAMETER - TUBING... 4.026 IN
INSIDE DIAMETER - ANNULUS.. 6.065 IN
THICKNESS - PIPE........... 0.200 IN
CONDUCTIVITY - PIPE........ 29.000 BTU/HR-FT-F
THICKNESS - INSULATION -
LAYER 1.................. 0.000 IN
LAYER 2.................. 0.000 IN
LAYER 3.................. 0.000 IN
LAYER 4.................. 0.000 IN
LAYER 5.................. 0.000 IN
CONDUCTIVITY - INSULATION -
LAYER 1.................. 0.015 BTU/HR-FT-F
LAYER 2.................. 0.015 BTU/HR-FT-F
LAYER 3.................. 0.015 BTU/HR-FT-F
LAYER 4.................. 0.015 BTU/HR-FT-F
LAYER 5.................. 0.015 BTU/HR-FT-F
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 2
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 GENERAL DATA 10/01/97
==============================================================================

FLOW CODES

PIPE FLOW CODE IS HAZEN-WILLIAMS


REYNOLDS NUMBER(LAMINAR)..... 3000.0000
TUBING FLOW CODE IS MOODY
ANNULUS FLOW CODE IS MOODY

BASE CONDITIONS

STANDARD TEMPERATURE..... 60.00 DEG F


STANDARD PRESSURE........ 0.00 PSIG

LIMITS

MINIMUM PRESSURE......... 0.00 PSIG


MAXIMUM PRESSURE......... 24985.30 PSIG
MINIMUM TEMPERATURE...... -60.00 DEG F
MAXIMUM TEMPERATURE...... 800.00 DEG F

PRINT OPTIONS

INPUT........... GENERAL ASSAY COMPONENT


PVT FLOW TABLE METHOD
SOURCE STRUCTURE W ANALYSIS
GAS LIFT CASE STUDY
CONNECT......... FULL
PVTGEN.......... NONE
SUMMARY......... BOTH
DEVICE.......... PART
MAP............. TAITEL-DUKLER-BARNEA
PROPERTY........ FULL

SEGMENTATION OPTIONS

LENGTH CHANGE - HORIZONTAL....... 2000.0 FT


VERTICAL......... 500.0 FT
MAXIMUM NUMBER OF SEGMENTS....... 50
AUTOSEGMENT OPTION IS ................ ON
TARGET SEGMENT PRESSURE CHANGE........ 2.0000E+01 PSIG
TARGET SEGMENT TEMPERATURE CHANGE..... 5.0000E+00 DEG F
SEGMENT PRESSURE ERROR ............... 2.0000E-01 PSIG
SEGMENT ENTHALPY ERROR ............... 5.0000E-02 BTU/LB
NUMBER OF INTERNAL SEGMENT ITERATIONS. 25
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 3
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 PVT DATA 10/01/97
==============================================================================

PVT DATA SUMMARY

1 CORRELATION DATA SETS 0 ERRORS 0 WARNINGS

DEFAULT PVT METHODS OPTIONS

Z FACTOR METHOD.......... STANDING


LIQUID VISCOSITY METHOD.. FOR OIL VAZQUEZ (TUFFP)
FOR WATER BEAL

CORRELATION SET DATA

CORRELATION SET NUMBER 1

GRAVITY OF LIQUID......... 46.0620 DEG API

VISCOSITY OF LIQUID
32.00 DEG F ........ 0.3950 CP

122.00 DEG F ........ 0.2460 CP

SPECIFIC HEAT OF OIL...... 0.5250 BTU/LB-F


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 4
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 METHODS DATA 10/01/97
==============================================================================

SOLUTION METHODS/TOLERANCES

NETWORK SOLUTION METHOD IS PBAL


MAXIMUM ITERATIONS..................... 20
MAXIMUM NUMBER OF INTERVAL HALVINGS.... 3
ABSOLUTE PRESSURE TOLERANCE............ 2.000000 PSIG
RATE PERTURBATION...................... 0.010000
METHOD OF INITIAL SOLUTION ESTIMATION.. FLOW = 1
ZERO FLOW IN CHECK VALVES.............. OFF
CHOKE CRITICAL FLOW MODEL (FORTUNATI) . EXPONENTIAL
NEW ACCELERATION OPTION IS............. OFF
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 5
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 SOURCE DATA 10/01/97
==============================================================================

SOURCE FEED

(FEED)
THIS SOURCE IS ON
PVT SET NUMBER............ 1
RATE...................... 100.0000 GAL/MIN
PRESSURE.................. 0.0000 PSIG
TEMPERATURE............... 104.00 DEG F
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 6
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 STRUCTURE DATA 10/01/97
==============================================================================

LINK LINK

LINK IS FROM "FEED " TO "SINK "


"LINK" FROM "FEED" TO "SINK"

DEVICE WA001, EN1 , IS A ENTRANCE


FLOW CODE IS HOMOGENEOUS
PIPE INSIDE DIAMETER......... 3.07 IN
RESISTANCE COEFFICIENT....... 0.5000
NUMBER OF DEVICES............ 1.

DEVICE SA002, PIP0, IS A PIPE


HEAT BALANCE WILL BE TURNED OFF
FLOW CODE IS HAZEN-WILLIAMS
INSIDE DIAMETER.............. 3.0680 IN
LENGTH....................... 4.0 FT
ELEVATION CHANGE............. 0.0 FT
HAZEN-WILLIAMS COEFFICIENT... 150.00
ROUGHNESS.................... 0.00180 IN
AMBIENT TEMPERATURE.......... 80.00 DEG F
WALL THICKNESS............... 0.2000 IN
THERMAL COND. OF PIPE........ 29.000 BTU/HR-FT-F
THERMAL COND. OF SOIL........ 0.800 BTU/HR-FT-F
BURIED DEPTH TO TOP OF PIPE.. 0.0 IN
INSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
OUTSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
RADIATION HEAT TRANS. COEFF.. 0.000 BTU/HR-FT2-F
EFF. OUTSIDE HEAT TRANS COEFF 0.000 BTU/HR-FT2-F
(RELATIVE TO PIPE OUTSIDE DIAMETER)
INSULATION THICKNESS, LAYER 1 0.0000 IN
INSULATION THICKNESS, LAYER 2 0.0000 IN
INSULATION THICKNESS, LAYER 3 0.0000 IN
INSULATION THICKNESS, LAYER 4 0.0000 IN
INSULATION THICKNESS, LAYER 5 0.0000 IN
TOTAL INSULATION THICKNESS... 0.0000 IN
INSUL. THERMAL COND., LAYER 1 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 2 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 3 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 4 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 5 0.0150 BTU/HR-FT-F
EFF. INSULATION THERMAL COND. 0.0150 BTU/HR-FT-F

DEVICE SA003, PMP1, IS A PUMP


THIS IS A SURFACE DEVICE
NUMBER OF STAGES............. 1
MAXIMUM OUTLET PRESSURE...... 30.00 PSIG
POWER........................ 4.1 HP
ADIABATIC EFFICIENCY......... 90.00 PERCENT
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 7
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 STRUCTURE DATA 10/01/97
==============================================================================

LINK LINK (CONT)

DEVICE SA004, PIP1, IS A PIPE


HEAT BALANCE WILL BE TURNED OFF
FLOW CODE IS HAZEN-WILLIAMS
INSIDE DIAMETER.............. 3.0680 IN
LENGTH....................... 30.0 FT
ELEVATION CHANGE............. 0.0 FT
HAZEN-WILLIAMS COEFFICIENT... 150.00
ROUGHNESS.................... 0.00180 IN
AMBIENT TEMPERATURE.......... 80.00 DEG F
WALL THICKNESS............... 0.2000 IN
THERMAL COND. OF PIPE........ 29.000 BTU/HR-FT-F
THERMAL COND. OF SOIL........ 0.800 BTU/HR-FT-F
BURIED DEPTH TO TOP OF PIPE.. 0.0 IN
INSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
OUTSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
RADIATION HEAT TRANS. COEFF.. 0.000 BTU/HR-FT2-F
EFF. OUTSIDE HEAT TRANS COEFF 0.000 BTU/HR-FT2-F
(RELATIVE TO PIPE OUTSIDE DIAMETER)
INSULATION THICKNESS, LAYER 1 0.0000 IN
INSULATION THICKNESS, LAYER 2 0.0000 IN
INSULATION THICKNESS, LAYER 3 0.0000 IN
INSULATION THICKNESS, LAYER 4 0.0000 IN
INSULATION THICKNESS, LAYER 5 0.0000 IN
TOTAL INSULATION THICKNESS... 0.0000 IN
INSUL. THERMAL COND., LAYER 1 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 2 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 3 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 4 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 5 0.0150 BTU/HR-FT-F
EFF. INSULATION THERMAL COND. 0.0150 BTU/HR-FT-F

DEVICE WA005, GAT1, IS A VALVE


FLOW CODE IS CHISHOLM
UPSTREAM INSIDE DIAMETER..... 3.07 IN
VALVE INSIDE DIAMETER........ 3.00 IN
LAMDA (CHISHOLM PARAMETER)... 1.00000
C2 (CHISHOLM PARAMETER)...... 1.50000
RESISTANCE COEFF: MULTPLIER.. 13.0000
ROUGHNESS.................... 0.00180 IN
NUMBER OF DEVICES............ 1.

DEVICE WA006, BEN1, IS A BEND


FLOW CODE IS CHISHOLM
THIS IS A STANDARD BEND
PIPE INSIDE DIAMETER......... 3.00 IN
LAMDA (CHISHOLM PARAMETER)... 1.00000
C2 (CHISHOLM PARAMETER)...... 4.35000
RESISTANCE COEFF: MULTPLIER.. 30.0000
ROUGHNESS.................... 0.00134 IN
NUMBER OF DEVICES............ 1.
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 8
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 STRUCTURE DATA 10/01/97
==============================================================================

LINK LINK (CONT)

DEVICE SA007, PIP2, IS A PIPE


HEAT BALANCE WILL BE TURNED OFF
FLOW CODE IS HAZEN-WILLIAMS
INSIDE DIAMETER.............. 3.0680 IN
LENGTH....................... 10.0 FT
ELEVATION CHANGE............. 10.0 FT
HAZEN-WILLIAMS COEFFICIENT... 150.00
ROUGHNESS.................... 0.00180 IN
AMBIENT TEMPERATURE.......... 80.00 DEG F
WALL THICKNESS............... 0.2000 IN
THERMAL COND. OF PIPE........ 29.000 BTU/HR-FT-F
THERMAL COND. OF SOIL........ 0.800 BTU/HR-FT-F
BURIED DEPTH TO TOP OF PIPE.. 0.0 IN
INSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
OUTSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
RADIATION HEAT TRANS. COEFF.. 0.000 BTU/HR-FT2-F
EFF. OUTSIDE HEAT TRANS COEFF 0.000 BTU/HR-FT2-F
(RELATIVE TO PIPE OUTSIDE DIAMETER)
INSULATION THICKNESS, LAYER 1 0.0000 IN
INSULATION THICKNESS, LAYER 2 0.0000 IN
INSULATION THICKNESS, LAYER 3 0.0000 IN
INSULATION THICKNESS, LAYER 4 0.0000 IN
INSULATION THICKNESS, LAYER 5 0.0000 IN
TOTAL INSULATION THICKNESS... 0.0000 IN
INSUL. THERMAL COND., LAYER 1 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 2 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 3 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 4 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 5 0.0150 BTU/HR-FT-F
EFF. INSULATION THERMAL COND. 0.0150 BTU/HR-FT-F

DEVICE WA008, BEN2, IS A BEND


FLOW CODE IS CHISHOLM
THIS IS A STANDARD BEND
PIPE INSIDE DIAMETER......... 3.00 IN
LAMDA (CHISHOLM PARAMETER)... 1.00000
C2 (CHISHOLM PARAMETER)...... 4.35000
RESISTANCE COEFF: MULTPLIER.. 30.0000
ROUGHNESS.................... 0.00134 IN
NUMBER OF DEVICES............ 1.
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 9
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 STRUCTURE DATA 10/01/97
==============================================================================

LINK LINK (CONT)

DEVICE SA009, PIP3, IS A PIPE


HEAT BALANCE WILL BE TURNED OFF
FLOW CODE IS HAZEN-WILLIAMS
INSIDE DIAMETER.............. 3.0680 IN
LENGTH....................... 70.0 FT
ELEVATION CHANGE............. 0.0 FT
HAZEN-WILLIAMS COEFFICIENT... 150.00
ROUGHNESS.................... 0.00180 IN
AMBIENT TEMPERATURE.......... 80.00 DEG F
WALL THICKNESS............... 0.2000 IN
THERMAL COND. OF PIPE........ 29.000 BTU/HR-FT-F
THERMAL COND. OF SOIL........ 0.800 BTU/HR-FT-F
BURIED DEPTH TO TOP OF PIPE.. 0.0 IN
INSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
OUTSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
RADIATION HEAT TRANS. COEFF.. 0.000 BTU/HR-FT2-F
EFF. OUTSIDE HEAT TRANS COEFF 0.000 BTU/HR-FT2-F
(RELATIVE TO PIPE OUTSIDE DIAMETER)
INSULATION THICKNESS, LAYER 1 0.0000 IN
INSULATION THICKNESS, LAYER 2 0.0000 IN
INSULATION THICKNESS, LAYER 3 0.0000 IN
INSULATION THICKNESS, LAYER 4 0.0000 IN
INSULATION THICKNESS, LAYER 5 0.0000 IN
TOTAL INSULATION THICKNESS... 0.0000 IN
INSUL. THERMAL COND., LAYER 1 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 2 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 3 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 4 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 5 0.0150 BTU/HR-FT-F
EFF. INSULATION THERMAL COND. 0.0150 BTU/HR-FT-F

DEVICE WA010, BEN3, IS A BEND


FLOW CODE IS CHISHOLM
THIS IS A STANDARD BEND
PIPE INSIDE DIAMETER......... 3.00 IN
LAMDA (CHISHOLM PARAMETER)... 1.00000
C2 (CHISHOLM PARAMETER)...... 4.35000
RESISTANCE COEFF: MULTPLIER.. 30.0000
ROUGHNESS.................... 0.00134 IN
NUMBER OF DEVICES............ 1.
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 10
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 STRUCTURE DATA 10/01/97
==============================================================================

LINK LINK (CONT)

DEVICE SA011, PIP4, IS A PIPE


HEAT BALANCE WILL BE TURNED OFF
FLOW CODE IS HAZEN-WILLIAMS
INSIDE DIAMETER.............. 3.0680 IN
LENGTH....................... 30.0 FT
ELEVATION CHANGE............. 30.0 FT
HAZEN-WILLIAMS COEFFICIENT... 150.00
ROUGHNESS.................... 0.00180 IN
AMBIENT TEMPERATURE.......... 80.00 DEG F
WALL THICKNESS............... 0.2000 IN
THERMAL COND. OF PIPE........ 29.000 BTU/HR-FT-F
THERMAL COND. OF SOIL........ 0.800 BTU/HR-FT-F
BURIED DEPTH TO TOP OF PIPE.. 0.0 IN
INSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
OUTSIDE HEAT TRANS. COEFF.... 0.000 BTU/HR-FT2-F
RADIATION HEAT TRANS. COEFF.. 0.000 BTU/HR-FT2-F
EFF. OUTSIDE HEAT TRANS COEFF 0.000 BTU/HR-FT2-F
(RELATIVE TO PIPE OUTSIDE DIAMETER)
INSULATION THICKNESS, LAYER 1 0.0000 IN
INSULATION THICKNESS, LAYER 2 0.0000 IN
INSULATION THICKNESS, LAYER 3 0.0000 IN
INSULATION THICKNESS, LAYER 4 0.0000 IN
INSULATION THICKNESS, LAYER 5 0.0000 IN
TOTAL INSULATION THICKNESS... 0.0000 IN
INSUL. THERMAL COND., LAYER 1 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 2 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 3 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 4 0.0150 BTU/HR-FT-F
INSUL. THERMAL COND., LAYER 5 0.0150 BTU/HR-FT-F
EFF. INSULATION THERMAL COND. 0.0150 BTU/HR-FT-F

DEVICE WA012, BEN4, IS A BEND


FLOW CODE IS CHISHOLM
THIS IS A STANDARD BEND
PIPE INSIDE DIAMETER......... 3.00 IN
LAMDA (CHISHOLM PARAMETER)... 1.00000
C2 (CHISHOLM PARAMETER)...... 4.35000
RESISTANCE COEFF: MULTPLIER.. 30.0000
ROUGHNESS.................... 0.00134 IN
NUMBER OF DEVICES............ 1.

DEVICE WA013, EX1 , IS A EXIT


FLOW CODE IS HOMOGENEOUS
PIPE INSIDE DIAMETER......... 3.07 IN
RESISTANCE COEFFICIENT....... 1.0000
NUMBER OF DEVICES............ 1.
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 11
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 STRUCTURE DATA 10/01/97
==============================================================================

JUNCTIONS AND SINKS

SINK SINK
(SINK)
ESTIMATED RATE............ 1.0000 GAL/MIN
ESTIMATED PRESSURE........ 1.0000 PSIG
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 12
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 NETWORK CONNECTIVITY 10/01/97
==============================================================================
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 13
PROJECT INPUT SIMSCI
PROBLEM EXAMPLE1 ERROR SUMMARY 10/01/97
==============================================================================

END OF INPUT PROCESSING -- NO ERRORS


-- 1 WARNING

END OF INPUT CROSS-CHECKING -- NO ERRORS.


R
PIPEPHASE Version 9.6 NETWORK DIRECTORY
==============================================================================

PAGE CONTENTS
---- --------------------------------------------
1 SOLUTION DATA
2 NETWORK REPORT
9 LINK REPORT
18 NETWORK REPORT
25 LINK REPORT
34 ERROR SUMMARY
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 1
PROJECT OUTPUT SIMSCI
PROBLEM EXAMPLE1 SOLUTION DATA 10/01/97
==============================================================================

** WARNING ** NEW RATE ESTIMATES WERE CALCULATED

RATE RATE EST.


ESTIMATE AFTER MASS
NODE FROM INPUT BALANCE
---- -------------- --------------
SINK -34.28600 -3428.570

CONVERGENCE TOLERANCE 2.00 PSI PRESSURE IMBALANCE AT SELECTED NODES


(RMS VALUE USED FOR STEP-SIZE SELECTION)

ITERATION NUMBER 0. 0

CONVERGENCE TOLERANCE 2.00 PSI PRESSURE IMBALANCE AT SELECTED NODES


(RMS VALUE USED FOR STEP-SIZE SELECTION)

ITERATION NUMBER 0. 0

***** PROBLEM SOLUTION REACHED *****


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 2
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE
LINK SUMMARY

RATE, PRESSURE AND TEMPERATURE SUMMARY


--------------------------------------

FROM(F)
AND
TO(T) ----ACTUAL FLOW RATES***-- PRESS: ---HOLDUP**---
LINK NODE GAS OIL WATER PRESS: CHANGE TEMP: GAS LIQ
(MMCFHR) (GPM) (GPM) (PSIG) (PSIG) (F) (MM (SGAL)
SCF)
---- ------- -------- -------- -------- -------- ------- ----- ------- -------
LINK FEED(F) 0.00000 101.679 0.000 4.10E-3* 104.0
SINK(T) 0.00000 101.680 0.000 15.0 15.0 104.0 0.0000 54.

* - INDICATES KNOWN PRESSURE


** VOLUME REPORTED AT USER STANDARD CONDITIONS
*** RATE REPORTED AT ACTUAL TEMPERATURE AND PRESSURE CONDITIONS
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 3
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

NODE SUMMARY

---STANDARD FLOW RATES ---**


NODE PRES. GAS OIL WATER TEMP.
(PSIG) (MMCFHR) (GPM) (GPM) (F)
---- ------- -------- -------- -------- -------
FEED 4.10E-3* 0.00000 100.000* 0.000 104.0
SINK 15.0 0.00000 -100.000 0.000 104.0

* INDICATES KNOWN PRESSURE OR FLOW


** STANDARD FLOW RATES REPORTED AT USER STD CONDITION
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 4
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE
NODE CONTAMINANT AND GAS SUMMARY

NODE N2(%) CO2(%) H2S(%)


---- ----------- ----------- -----------
FEED 0.0000 0.0000 0.0000
SINK 0.0000 0.0000 0.0000
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 5
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

DEVICE SUMMARY

C
O ------- OUTLET ------ AVG.
LINK DEVI DEVI R INSIDE MEAS ELEV INSITU LIQ
NAME NAME TYPE R DIAM LENGTH CHNG PRESS: TEMP: GLR HOLDUP
(IN) (FT) (FT) (PSIG) (F) (CFBBL)
---- ---- ---- ---- -------- --------- ------- ------- ------ ------- ------
LINK ***SOURCE*** RATE= 100.000 (GPM) 4.10E-3 104.0
FEED 4.10E-3 104.0
EN1 ENTR HO 3.068 0.0 0.0 -4.7E-2 104.0
PIP0 PIPE HW 3.068 4.0 0.0 -7.7E-2 104.0
PMP1 PUMP XX 0.000 0.0 0.0 30.0 104.0
PIP1 PIPE HW 3.068 30.0 0.0 29.8 104.0
GAT1 VALV CH 3.068 0.0 0.0 29.8 104.0
BEN1 BEND CH 3.000 0.0 0.0 29.7 104.0
PIP2 PIPE HW 3.068 10.0 10.0 26.2 104.0
BEN2 BEND CH 3.000 0.0 0.0 26.2 104.0
PIP3 PIPE HW 3.068 70.0 0.0 25.6 104.0
BEN3 BEND CH 3.000 0.0 0.0 25.6 104.0
PIP4 PIPE HW 3.068 30.0 30.0 15.2 104.0
BEN4 BEND CH 3.000 0.0 0.0 15.1 104.0
EX1 EXIT HO 3.068 0.0 0.0 15.0 104.0
SINK *** SINK *** PRES= 15.0 (PSIG) TEMP= 104.0 (F)
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 6
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

STRUCTURE DATA SUMMARY

DEVICE DEVICE INLET DIA OUTLET DIA ELEVATION KMUL OR


LINK NAME TYPE (NOM/ID) (NOM/ID) LENGTH CHANGE K FACTOR
(IN) (IN) (FT) (FT)
---- ------ ------ --------------- --------------- --------- --------- --------
LINK EN1 ENTR 3.068 3.068 0.0 0.0 0.5
LINK PIP0 PIPE 3.068 3.068 4.0 0.0
LINK PMP1 PUMP 0.0 0.0
LINK PIP1 PIPE 3.068 3.068 30.0 0.0
LINK GAT1 VALV 3.068 3.000 0.0 0.0 13.0
LINK BEN1 BEND 3.000 0.0 0.0 30.0
LINK PIP2 PIPE 3.068 3.068 10.0 10.0
LINK BEN2 BEND 3.000 0.0 0.0 30.0
LINK PIP3 PIPE 3.068 3.068 70.0 0.0
LINK BEN3 BEND 3.000 0.0 0.0 30.0
LINK PIP4 PIPE 3.068 3.068 30.0 30.0
LINK BEN4 BEND 3.000 0.0 0.0 30.0
LINK EX1 EXIT 3.068 3.068 0.0 0.0 1.0
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 7
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

VELOCITY SUMMARY

PRESSURE
DEVICE DEVICE MIXTURE VELOCITY CRITICAL GRADIENT PRESSURE
LINK NAME TYPE (INLET/OUTLET) VELOCITY (INLET/OUTLET) CHANGE
(FPS) (FPS) (PSIFT) (PSIG)
---- ------ ------ ---------------- -------- -------------- --------
LINK EN1 ENTR
LINK PIP0 PIPE 4.41 4.41 0.00 -7.3E-3 -7.3E-3 -2.932E-2
LINK PMP1 PUMP
LINK PIP1 PIPE 4.41 4.41 0.00 -7.3E-3 -7.3E-3 -0.2
LINK GAT1 VALV
LINK BEN1 BEND
LINK PIP2 PIPE 4.41 4.41 0.00 -0.35 -0.35 -3.5
LINK BEN2 BEND
LINK PIP3 PIPE 4.41 4.41 0.00 -7.3E-3 -7.3E-3 -0.5
LINK BEN3 BEND
LINK PIP4 PIPE 4.41 4.41 0.00 -0.35 -0.35 -10.4
LINK BEN4 BEND
LINK EX1 EXIT
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 8
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

RESULTS SUMMARY

DEVICE DEVICE MIXTURE PRESSURE TEMPERATURE QUALITY


LINK NAME TYPE FLOW RATE INLET/OUTLET INLET/OUTLET INLET/OUTLET
(GPM) (PSIG) (F) (FRAC)
---- ------ ------ --------- ----------------- ----------------- ------------
LINK EN1 ENTR
LINK PIP0 PIPE 101.68 -4.72E-2 -7.66E-2 104.00 104.00 0.000 0.000
LINK PMP1 PUMP
LINK PIP1 PIPE 101.68 30.0 29.8 104.02 104.02 0.000 0.000
LINK GAT1 VALV
LINK BEN1 BEND
LINK PIP2 PIPE 101.68 29.7 26.2 104.02 104.02 0.000 0.000
LINK BEN2 BEND
LINK PIP3 PIPE 101.68 26.2 25.6 104.02 104.02 0.000 0.000
LINK BEN3 BEND
LINK PIP4 PIPE 101.68 25.6 15.2 104.02 104.02 0.000 0.000
LINK BEN4 BEND
LINK EX1 EXIT
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 9
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
LINK "LINK" DEVICE DETAIL REPORT

PRESSURE AND TEMPERATURE REPORT


-------------------------------
DEVICE MWD OR TVD
NAME LENGTH I OR
AND SEGM INSIDE FROM & ELEV CALC CALC OVERALL AMB
TYPE NO DIAM. INLET O CHNG PRESS TEMP U-FACT TEMP
(IN) (FT) (FT) (PSIG) (F) (BTU/ (F)
HRFT2F)
------ ---- ------ --------- - -------- ------- ------ ------- ------
EN1 0000 3.068 0.0 I 0.0 4.10E-3 104.0 RES COEF 2PHASE MULT FL
(ENTR) 0.0 O 0.0 -4.7E-2 104.0 0.5000 1.0000 SU
PIP0 0000 3.068 0.0 I 0.0 -4.7E-2 104.0 80.0
(PIPE) 0001 1.0 0.0 -5.5E-2 104.0 287.596 80.0
0002 2.0 0.0 -6.2E-2 104.0 287.596 80.0
0003 3.0 0.0 -6.9E-2 104.0 287.596 80.0
0004 4.0 O 0.0 -7.7E-2 104.0 287.596 80.0
PMP1 0000 0.0 I 0.0 -7.7E-2 104.0 AVG.POWER/STAGE HP
(PUMP) AVAILABLE 4.1
REQUIRED 2.0
SPEED(RPM) 0.0000
0.0 O 0.0 30.0 104.0 EFFICIENCY(FRAC) 0.90
PIP1 0000 3.068 0.0 I 0.0 30.0 104.0 80.0
(PIPE) 0001 7.5 0.0 29.9 104.0 287.622 80.0
0002 15.0 0.0 29.9 104.0 287.622 80.0
0003 22.5 0.0 29.8 104.0 287.622 80.0
0004 30.0 O 0.0 29.8 104.0 287.622 80.0
GAT1 0000 3.068 0.0 I 0.0 29.8 104.0 RES COEF 2PHASE MULT FL
(VALV) 3.000 0.0 O 0.0 29.8 104.0 0.2905 1.0000 SU
BEN1 0000 3.000 0.0 I 0.0 29.8 104.0 RES COEF 2PHASE MULT FL
(BEND) 0.0 O 0.0 29.7 104.0 0.5355 1.0000 SU
PIP2 0000 3.068 0.0 I 0.0 29.7 104.0 80.0
(PIPE) 0001 2.5 2.5 28.8 104.0 287.622 80.0
0002 5.0 2.5 28.0 104.0 287.622 80.0
0003 7.5 2.5 27.1 104.0 287.622 80.0
0004 10.0 O 2.5 26.2 104.0 287.622 80.0
BEN2 0000 3.000 0.0 I 0.0 26.2 104.0 RES COEF 2PHASE MULT FL
(BEND) 0.0 O 0.0 26.2 104.0 0.5355 1.0000 SU
PIP3 0000 3.068 0.0 I 0.0 26.2 104.0 80.0
(PIPE) 0001 17.5 0.0 26.0 104.0 287.622 80.0
0002 35.0 0.0 25.9 104.0 287.622 80.0
0003 52.5 0.0 25.8 104.0 287.622 80.0
0004 70.0 O 0.0 25.6 104.0 287.622 80.0
BEN3 0000 3.000 0.0 I 0.0 25.6 104.0 RES COEF 2PHASE MULT FL
(BEND) 0.0 O 0.0 25.6 104.0 0.5355 1.0000 SU
PIP4 0000 3.068 0.0 I 0.0 25.6 104.0 80.0
(PIPE) 0001 7.5 7.5 23.0 104.0 287.622 80.0
0002 15.0 7.5 20.4 104.0 287.622 80.0
0003 22.5 7.5 17.8 104.0 287.622 80.0
0004 30.0 O 7.5 15.2 104.0 287.622 80.0
BEN4 0000 3.000 0.0 I 0.0 15.2 104.0 RES COEF 2PHASE MULT FL
(BEND) 0.0 O 0.0 15.1 104.0 0.5355 1.0000 SU
EX1 0000 3.068 0.0 I 0.0 15.1 104.0 RES COEF 2PHASE MULT FL
(EXIT) 0.0 O 0.0 15.0 104.0 1.0000 1.0000 SU
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 10
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

SURFACE PRESSURE PLOT FOR LINK

30.0 +-PPPPPPPPPPPPP---+-----+-----+-----+-----+-----+-----+-----+
| P | P | | | |
| P | P | | | |
| P | P | | | |
27.0 + P | P | | | +
| P | PPPPPPPPPPPPPPPPPP| | |
| P | | PPPPPPPPPPP | |
| P | | | P| |
24.0 +-P---------+-----------+-----------+-----------P-----------+
| P | | | |P |
| P | | | | P |
| P | | | | P |
P 21.0 + P | | | | P +
R | P | | | | P |
E | P | | | | P |
S | P | | | | P |
S 18.0 +-P---------+-----------+-----------+-----------+------P----+
U | P | | | | P |
R | P | | | | P |
E | P | | | | P |
15.0 + P | | | | P +
| P | | | | |
| P | | | | |
| P | | | | |
P 12.0 +-P---------+-----------+-----------+-----------+-----------+
S | P | | | | |
I | P | | | | |
G | P | | | | |
9.0 + P | | | | +
| P | | | | |
| P | | | | |
| P | | | | |
6.0 +-P---------+-----------+-----------+-----------+-----------+
| P | | | | |
| P | | | | |
| P | | | | |
3.0 + P | | | | +
| P | | | | |
| P | | | | |
| P | | | | |
0.0 PPP---+-----+-----+-----+-----+-----+-----+-----+-----+-----+
0.0 30.0 60.0 90.0 120.0 150.0
DIST. FROM 1ST SURFACE DEVICE INLET FT

KEY... P - P - FLUID PRESS.


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 11
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

SURFACE TEMPERATURE PLOT FOR LINK

104.0 TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT-+
| | | | | |
| | | | | |
| | | | | |
102.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
100.0 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
| | | | | |
| | | | | |
98.0 + | | | | +
| | | | | |
T | | | | | |
E | | | | | |
M 96.0 +-----------+-----------+-----------+-----------+-----------+
P | | | | | |
E | | | | | |
R | | | | | |
A 94.0 + | | | | +
T | | | | | |
U | | | | | |
R | | | | | |
E 92.0 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
| | | | | |
| | | | | |
90.0 + | | | | +
| | | | | |
D | | | | | |
E | | | | | |
G 88.0 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
F | | | | | |
| | | | | |
86.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
84.0 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
| | | | | |
| | | | | |
82.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
80.0 AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA-+
0.0 30.0 60.0 90.0 120.0 150.0
DIST. FROM 1ST SURFACE DEVICE INLET FT

KEY... T - T - FLUID TEMP. A - A - AMB. TEMP.


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 12
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" DEVICE DETAIL REPORT

HOLDUP AND VELOCITY DETAIL REPORT


---------------------------------
DEVICE
NAME ---LIQUID HOLDUP--- SUPERFICIAL T-D
AND SEG. NO LIQ GAS MIX . FLOW FLOW SONIC
TYPE NO. SLIP SLIP TOTAL VEL VEL VEL REGM REGM VEL
(AGAL) (FPS) (FPS) (FPS) (FPS)
------ ---- ----- ----- -------- ------- ------- ------- ---- ---- -------
(ENTR) 0000
EN1 0001
PIP0 0000
(PIPE) 0001 1.00 1.00 3.840E-1 4.41 0.00 4.41 DIST 1-PH 0.00
0002 1.00 1.00 7.681E-1 4.41 0.00 4.41 DIST 1-PH 0.00
0003 1.00 1.00 1. 4.41 0.00 4.41 DIST 1-PH 0.00
0004 1.00 1.00 2. 4.41 0.00 4.41 DIST 1-PH 0.00
(PUMP) 0000
PMP1 0001
PIP1 0000
(PIPE) 0001 1.00 1.00 4. 4.41 0.00 4.41 ---- 1-PH 0.00
0002 1.00 1.00 7. 4.41 0.00 4.41 ---- 1-PH 0.00
0003 1.00 1.00 10. 4.41 0.00 4.41 ---- 1-PH 0.00
0004 1.00 1.00 13. 4.41 0.00 4.41 ---- 1-PH 0.00
(VALV) 0000
GAT1 0001
(BEND) 0000
BEN1 0001
PIP2 0000
(PIPE) 0001 1.00 1.00 14. 4.41 0.00 4.41 DIST 1-PH 0.00
0002 1.00 1.00 15. 4.41 0.00 4.41 DIST 1-PH 0.00
0003 1.00 1.00 16. 4.41 0.00 4.41 DIST 1-PH 0.00
0004 1.00 1.00 17. 4.41 0.00 4.41 DIST 1-PH 0.00
(BEND) 0000
BEN2 0001
PIP3 0000
(PIPE) 0001 1.00 1.00 24. 4.41 0.00 4.41 DIST 1-PH 0.00
0002 1.00 1.00 30. 4.41 0.00 4.41 DIST 1-PH 0.00
0003 1.00 1.00 37. 4.41 0.00 4.41 DIST 1-PH 0.00
0004 1.00 1.00 44. 4.41 0.00 4.41 DIST 1-PH 0.00
(BEND) 0000
BEN3 0001
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 13
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" DEVICE DETAIL REPORT

HOLDUP AND VELOCITY DETAIL REPORT


---------------------------------
DEVICE
NAME ---LIQUID HOLDUP--- SUPERFICIAL T-D
AND SEG. NO LIQ GAS MIX . FLOW FLOW SONIC
TYPE NO. SLIP SLIP TOTAL VEL VEL VEL REGM REGM VEL
(AGAL) (FPS) (FPS) (FPS) (FPS)
------ ---- ----- ----- -------- ------- ------- ------- ---- ---- -------
PIP4 0000
(PIPE) 0001 1.00 1.00 47. 4.41 0.00 4.41 DIST 1-PH 0.00
0002 1.00 1.00 50. 4.41 0.00 4.41 DIST 1-PH 0.00
0003 1.00 1.00 52. 4.41 0.00 4.41 DIST 1-PH 0.00
0004 1.00 1.00 55. 4.41 0.00 4.41 DIST 1-PH 0.00
(BEND) 0000
BEN4 0001
(EXIT) 0000
EX1 0001

Fortunati model used to calculate sonic velocity.

Reported Fluid Velocity is at:


(1) calculation segment mid-point (default segment method)
(2) calculation segment inlet (SHORTPIPE method)
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 14
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
LINK "LINK" PROPERTY DETAIL REPORT

VISCOSITY AND DENSITY RESULTS


-----------------------------
DEVICE
NAME
AND SEGM ----------VISCOSITY---------- ------------DENSITY------------
TYPE NO OIL LIQ VAP LIQ VAP SLIP NO-SLIP
(CP) (CP) (CP) (LB/CF) (LB/CF) (LB/CF) (LB/CF)
------ ---- --------- --------- --------- ------- ------- ------- -------
EN1 0000
(ENTR) 0001
PIP0 0000
(PIPE) 0001 0.269 0.269 0.000 48.906 0.000 48.906 48.906
0002 0.269 0.269 0.000 48.906 0.000 48.906 48.906
0003 0.269 0.269 0.000 48.906 0.000 48.906 48.906
0004 0.269 0.269 0.000 48.906 0.000 48.906 48.906
PMP1 0000
(PUMP) 0001
PIP1 0000
(PIPE) 0001 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0002 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0003 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0004 0.269 0.269 0.000 48.905 0.000 48.905 48.905
GAT1 0000
(VALV) 0001
BEN1 0000
(BEND) 0001
PIP2 0000
(PIPE) 0001 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0002 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0003 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0004 0.269 0.269 0.000 48.905 0.000 48.905 48.905
BEN2 0000
(BEND) 0001
PIP3 0000
(PIPE) 0001 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0002 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0003 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0004 0.269 0.269 0.000 48.905 0.000 48.905 48.905
BEN3 0000
(BEND) 0001
PIP4 0000
(PIPE) 0001 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0002 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0003 0.269 0.269 0.000 48.905 0.000 48.905 48.905
0004 0.269 0.269 0.000 48.905 0.000 48.905 48.905
BEN4 0000
(BEND) 0001
EX1 0000
(EXIT) 0001
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 15
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" PROPERTY DETAIL REPORT

FRICTION AND SURFACE TENSION RESULTS


------------------------------------
DEVICE
NAME LIQ
AND SEGM --------------FRICTION------------ FRIC. REYNOLDS SURFACE
TYPE NUM. DENSITY VELO ID. VISCOSITY FACTOR NUMBER TENSION
(LB/CF) (FPS) (IN) (CP) (DN/CM)
------ ---- ------- ------- -------- --------- -------- -------- --------
EN1 0000
(ENTR) 0001
PIP0 0000
(PIPE) 0001 48.906 4.41 3.068 410.8695 0.00
0002 48.906 4.41 3.068 410.8695 0.00
0003 48.906 4.41 3.068 410.8695 0.00
0004 48.906 4.41 3.068 410.8695 0.00
PMP1 0000
(PUMP) 0001
PIP1 0000
(PIPE) 0001 48.905 4.41 3.068 410.8687 0.00
0002 48.905 4.41 3.068 410.8687 0.00
0003 48.905 4.41 3.068 410.8687 0.00
0004 48.905 4.41 3.068 410.8687 0.00
GAT1 0000
(VALV) 0001
BEN1 0000
(BEND) 0001
PIP2 0000
(PIPE) 0001 48.905 4.41 3.068 410.8687 0.00
0002 48.905 4.41 3.068 410.8687 0.00
0003 48.905 4.41 3.068 410.8687 0.00
0004 48.905 4.41 3.068 410.8687 0.00
BEN2 0000
(BEND) 0001
PIP3 0000
(PIPE) 0001 48.905 4.41 3.068 410.8687 0.00
0002 48.905 4.41 3.068 410.8687 0.00
0003 48.905 4.41 3.068 410.8687 0.00
0004 48.905 4.41 3.068 410.8687 0.00
BEN3 0000
(BEND) 0001
PIP4 0000
(PIPE) 0001 48.905 4.41 3.068 410.8687 0.00
0002 48.905 4.41 3.068 410.8687 0.00
0003 48.905 4.41 3.068 410.8687 0.00
0004 48.905 4.41 3.068 410.8687 0.00
BEN4 0000
(BEND) 0001
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 16
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" PROPERTY DETAIL REPORT

FRICTION AND SURFACE TENSION RESULTS


------------------------------------
DEVICE
NAME LIQ
AND SEGM --------------FRICTION------------ FRIC. REYNOLDS SURFACE
TYPE NUM. DENSITY VELO ID. VISCOSITY FACTOR NUMBER TENSION
(LB/CF) (FPS) (IN) (CP) (DN/CM)
------ ---- ------- ------- -------- --------- -------- -------- --------
EX1 0000
(EXIT) 0001

HEAT TRANSFER CALCULATIONS


--------------------------
DEVICE FLUID
NAME THERMAL ----------THERMAL RESISTANCE-------
AND SEGM CONDUCT- INSIDE INSULAT- SURROUN-
(TYPE) NO: IVITY FILM PIPE ION DING
(BTUFTF) (HR-FT2- (HR-FT2- (HR-FT2- (HR-FT2-
F/BTU) F/BTU) F/BTU) F/BTU)
------ ---- -------- -------- -------- -------- --------
EN1 0000
(ENTR) 0001
PIP0 0000
(PIPE) 0001 0.150 0.003 5.402E-4 0.000 0.000
0002 0.150 0.003 5.402E-4 0.000 0.000
0003 0.150 0.003 5.402E-4 0.000 0.000
0004 0.150 0.003 5.402E-4 0.000 0.000
PMP1 0000
(PUMP) 0001
PIP1 0000
(PIPE) 0001 0.150 0.003 5.402E-4 0.000 0.000
0002 0.150 0.003 5.402E-4 0.000 0.000
0003 0.150 0.003 5.402E-4 0.000 0.000
0004 0.150 0.003 5.402E-4 0.000 0.000
GAT1 0000
(VALV) 0001
BEN1 0000
(BEND) 0001
PIP2 0000
(PIPE) 0001 0.150 0.003 5.402E-4 0.000 0.000
0002 0.150 0.003 5.402E-4 0.000 0.000
0003 0.150 0.003 5.402E-4 0.000 0.000
0004 0.150 0.003 5.402E-4 0.000 0.000
BEN2 0000
(BEND) 0001

Heat Transfer Resistances based on pipe ID


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 17
PROJECT OUTPUT - PRIMARY UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" PROPERTY DETAIL REPORT

HEAT TRANSFER CALCULATIONS


--------------------------
DEVICE FLUID
NAME THERMAL ----------THERMAL RESISTANCE-------
AND SEGM CONDUCT- INSIDE INSULAT- SURROUN-
(TYPE) NO: IVITY FILM PIPE ION DING
(BTUFTF) (HR-FT2- (HR-FT2- (HR-FT2- (HR-FT2-
F/BTU) F/BTU) F/BTU) F/BTU)
------ ---- -------- -------- -------- -------- --------
PIP3 0000
(PIPE) 0001 0.150 0.003 5.402E-4 0.000 0.000
0002 0.150 0.003 5.402E-4 0.000 0.000
0003 0.150 0.003 5.402E-4 0.000 0.000
0004 0.150 0.003 5.402E-4 0.000 0.000
BEN3 0000
(BEND) 0001
PIP4 0000
(PIPE) 0001 0.150 0.003 5.402E-4 0.000 0.000
0002 0.150 0.003 5.402E-4 0.000 0.000
0003 0.150 0.003 5.402E-4 0.000 0.000
0004 0.150 0.003 5.402E-4 0.000 0.000
BEN4 0000
(BEND) 0001
EX1 0000
(EXIT) 0001

Heat Transfer Resistances based on pipe ID


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 18
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE
LINK SUMMARY

RATE, PRESSURE AND TEMPERATURE SUMMARY


--------------------------------------

FROM(F)
AND
TO(T) ----ACTUAL FLOW RATES***-- PRESS: ---HOLDUP**---
LINK NODE GAS OIL WATER PRESS: CHANGE TEMP: GAS LIQ
(MMCMHR) (CMHR) (CMHR) (KPA) (KPA) (K) (MM (SCM)
SCM)
---- ------- -------- -------- -------- -------- ------- ----- ------- -------
LINK FEED(F) 0.000000 23.094 0.000 101.* 313.1
SINK(T) 0.000000 23.094 0.000 205. 104. 313.2 0.00000 0.21

* - INDICATES KNOWN PRESSURE


** VOLUME REPORTED AT USER STANDARD CONDITIONS
*** RATE REPORTED AT ACTUAL TEMPERATURE AND PRESSURE CONDITIONS
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 19
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

NODE SUMMARY

---STANDARD FLOW RATES ---**


NODE PRES. GAS OIL WATER TEMP.
(KPA) (MMCMHR) (CMHR) (CMHR) (K)
---- ------- -------- -------- -------- -------
FEED 101.* 0.000000 22.712* 0.000 313.1
SINK 205. 0.000000 -22.712 0.000 313.2

* INDICATES KNOWN PRESSURE OR FLOW


** STANDARD FLOW RATES REPORTED AT USER STD CONDITION
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 20
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE
NODE CONTAMINANT AND GAS SUMMARY

NODE N2(%) CO2(%) H2S(%)


---- ----------- ----------- -----------
FEED 0.0000 0.0000 0.0000
SINK 0.0000 0.0000 0.0000
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 21
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

DEVICE SUMMARY

C
O ------- OUTLET ------ AVG.
LINK DEVI DEVI R INSIDE MEAS ELEV INSITU LIQ
NAME NAME TYPE R DIAM LENGTH CHNG PRESS: TEMP: GLR HOLDUP
(MM) (M) (M) (KPA) (K) (M3M3)
---- ---- ---- ---- -------- --------- ------- ------- ------ ------- ------
LINK ***SOURCE*** RATE= 22.712 (CMHR) 101. 313.1
FEED 101. 313.1
EN1 ENTR HO 77.93 0.00 0.00 101. 313.1
PIP0 PIPE HW 77.93 1.22 0.00 101. 313.1
PMP1 PUMP XX 0.00 0.00 0.00 308. 313.2
PIP1 PIPE HW 77.93 9.14 0.00 307. 313.2
GAT1 VALV CH 77.93 0.00 0.00 306. 313.2
BEN1 BEND CH 76.20 0.00 0.00 306. 313.2
PIP2 PIPE HW 77.93 3.05 3.05 282. 313.2
BEN2 BEND CH 76.20 0.00 0.00 282. 313.2
PIP3 PIPE HW 77.93 21.34 0.00 278. 313.2
BEN3 BEND CH 76.20 0.00 0.00 278. 313.2
PIP4 PIPE HW 77.93 9.14 9.14 206. 313.2
BEN4 BEND CH 76.20 0.00 0.00 206. 313.2
EX1 EXIT HO 77.93 0.00 0.00 205. 313.2
SINK *** SINK *** PRES= 205. (KPA) TEMP= 313.2 (K)
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 22
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

STRUCTURE DATA SUMMARY

DEVICE DEVICE INLET DIA OUTLET DIA ELEVATION KMUL OR


LINK NAME TYPE (NOM/ID) (NOM/ID) LENGTH CHANGE K FACTOR
(MM) (MM) (M) (M)
---- ------ ------ --------------- --------------- --------- --------- --------
LINK EN1 ENTR 77.93 77.93 0.00 0.00 0.50
LINK PIP0 PIPE 77.93 77.93 1.22 0.00
LINK PMP1 PUMP 0.00 0.00
LINK PIP1 PIPE 77.93 77.93 9.14 0.00
LINK GAT1 VALV 77.93 76.20 0.00 0.00 13.00
LINK BEN1 BEND 76.20 0.00 0.00 30.00
LINK PIP2 PIPE 77.93 77.93 3.05 3.05
LINK BEN2 BEND 76.20 0.00 0.00 30.00
LINK PIP3 PIPE 77.93 77.93 21.34 0.00
LINK BEN3 BEND 76.20 0.00 0.00 30.00
LINK PIP4 PIPE 77.93 77.93 9.14 9.14
LINK BEN4 BEND 76.20 0.00 0.00 30.00
LINK EX1 EXIT 77.93 77.93 0.00 0.00 1.00
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 23
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

VELOCITY SUMMARY

PRESSURE
DEVICE DEVICE MIXTURE VELOCITY CRITICAL GRADIENT PRESSURE
LINK NAME TYPE (INLET/OUTLET) VELOCITY (INLET/OUTLET) CHANGE
(MPS) (MPS) (KPA/M) (KPA)
---- ------ ------ ---------------- -------- -------------- --------
LINK EN1 ENTR
LINK PIP0 PIPE 1.35 1.35 0.00 -0.17 -0.17 -2.022E-1
LINK PMP1 PUMP
LINK PIP1 PIPE 1.35 1.35 0.00 -0.17 -0.17 -2.
LINK GAT1 VALV
LINK BEN1 BEND
LINK PIP2 PIPE 1.35 1.35 0.00 -7.84 -7.84 -24.
LINK BEN2 BEND
LINK PIP3 PIPE 1.35 1.35 0.00 -0.17 -0.17 -4.
LINK BEN3 BEND
LINK PIP4 PIPE 1.35 1.35 0.00 -7.84 -7.84 -72.
LINK BEN4 BEND
LINK EX1 EXIT
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 24
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 NETWORK REPORT 10/01/97
==============================================================================

BASE CASE

RESULTS SUMMARY

DEVICE DEVICE MIXTURE PRESSURE TEMPERATURE QUALITY


LINK NAME TYPE FLOW RATE INLET/OUTLET INLET/OUTLET INLET/OUTLET
(CMHR) (KPA) (K) (FRAC)
---- ------ ------ --------- ----------------- ----------------- ------------
LINK EN1 ENTR
LINK PIP0 PIPE 23.09 101. 101. 313.15 313.15 0.000 0.000
LINK PMP1 PUMP
LINK PIP1 PIPE 23.09 308. 307. 313.16 313.16 0.000 0.000
LINK GAT1 VALV
LINK BEN1 BEND
LINK PIP2 PIPE 23.09 306. 282. 313.16 313.16 0.000 0.000
LINK BEN2 BEND
LINK PIP3 PIPE 23.09 282. 278. 313.16 313.16 0.000 0.000
LINK BEN3 BEND
LINK PIP4 PIPE 23.09 278. 206. 313.16 313.16 0.000 0.000
LINK BEN4 BEND
LINK EX1 EXIT
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 25
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
LINK "LINK" DEVICE DETAIL REPORT

PRESSURE AND TEMPERATURE REPORT


-------------------------------
DEVICE MWD OR TVD
NAME LENGTH I OR
AND SEGM INSIDE FROM & ELEV CALC CALC OVERALL AMB
TYPE NO DIAM. INLET O CHNG PRESS TEMP U-FACT TEMP
(MM) (M) (M) (KPA) (K) (W/M2- (K)
C)
------ ---- ------ --------- - -------- ------- ------ ------- ------
EN1 0000 77.93 0.00 I 0.00 101. 313.1 RES COEF 2PHASE MULT FL
(ENTR) 0.00 O 0.00 101. 313.1 0.5000 1.0000 SU
PIP0 0000 77.93 0.00 I 0.00 101. 313.1 299.8
(PIPE) 0001 0.30 0.00 101. 313.1 1633.05 299.8
0002 0.61 0.00 101. 313.1 1633.05 299.8
0003 0.91 0.00 101. 313.1 1633.05 299.8
0004 1.22 O 0.00 101. 313.1 1633.05 299.8
PMP1 0000 0.00 I 0.00 101. 313.1 AVG.POWER/STAGE KW
(PUMP) AVAILABLE 3.1
REQUIRED 1.5
SPEED(RPM) 0.0000
0.00 O 0.00 308. 313.2 EFFICIENCY(FRAC) 0.90
PIP1 0000 77.93 0.00 I 0.00 308. 313.2 299.8
(PIPE) 0001 2.29 0.00 308. 313.2 1633.20 299.8
0002 4.57 0.00 307. 313.2 1633.20 299.8
0003 6.86 0.00 307. 313.2 1633.20 299.8
0004 9.14 O 0.00 307. 313.2 1633.20 299.8
GAT1 0000 77.93 0.00 I 0.00 307. 313.2 RES COEF 2PHASE MULT FL
(VALV) 76.20 0.00 O 0.00 306. 313.2 0.2905 1.0000 SU
BEN1 0000 76.20 0.00 I 0.00 306. 313.2 RES COEF 2PHASE MULT FL
(BEND) 0.00 O 0.00 306. 313.2 0.5355 1.0000 SU
PIP2 0000 77.93 0.00 I 0.00 306. 313.2 299.8
(PIPE) 0001 0.76 0.76 300. 313.2 1633.20 299.8
0002 1.52 0.76 294. 313.2 1633.20 299.8
0003 2.29 0.76 288. 313.2 1633.20 299.8
0004 3.05 O 0.76 282. 313.2 1633.20 299.8
BEN2 0000 76.20 0.00 I 0.00 282. 313.2 RES COEF 2PHASE MULT FL
(BEND) 0.00 O 0.00 282. 313.2 0.5355 1.0000 SU
PIP3 0000 77.93 0.00 I 0.00 282. 313.2 299.8
(PIPE) 0001 5.33 0.00 281. 313.2 1633.20 299.8
0002 10.67 0.00 280. 313.2 1633.20 299.8
0003 16.00 0.00 279. 313.2 1633.20 299.8
0004 21.34 O 0.00 278. 313.2 1633.20 299.8
BEN3 0000 76.20 0.00 I 0.00 278. 313.2 RES COEF 2PHASE MULT FL
(BEND) 0.00 O 0.00 278. 313.2 0.5355 1.0000 SU
PIP4 0000 77.93 0.00 I 0.00 278. 313.2 299.8
(PIPE) 0001 2.29 2.29 260. 313.2 1633.20 299.8
0002 4.57 2.29 242. 313.2 1633.20 299.8
0003 6.86 2.29 224. 313.2 1633.20 299.8
0004 9.14 O 2.29 206. 313.2 1633.20 299.8
BEN4 0000 76.20 0.00 I 0.00 206. 313.2 RES COEF 2PHASE MULT FL
(BEND) 0.00 O 0.00 206. 313.2 0.5355 1.0000 SU
EX1 0000 77.93 0.00 I 0.00 206. 313.2 RES COEF 2PHASE MULT FL
(EXIT) 0.00 O 0.00 205. 313.2 1.0000 1.0000 SU
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 26
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

SURFACE PRESSURE PLOT FOR LINK

400.0 +-----+-----+-----+-----+-----+-----+-----+-----+-----+-----+
| | | | | |
| | | | | |
| | | | | |
360.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
320.0 +-----------+-----------+-----------+-----------+-----------+
|PPPPPPPPPPPP | | | |
|P |P | | | |
|P | PP | | | |
280.0 +P | PPPPPPPPPPPPPPPPPPPPPPPPPPP | +
P |P | | | P | |
R |P | | | P | |
E |P | | | PP | |
S 240.0 +P----------+-----------+-----------+----------P+-----------+
S |P | | | PP |
U |P | | | | PP |
R |P | | | | PP |
E 200.0 +P | | | | P +
|P | | | | |
|P | | | | |
|P | | | | |
160.0 +P----------+-----------+-----------+-----------+-----------+
K |P | | | | |
P |P | | | | |
A |P | | | | |
120.0 +P | | | | +
|P | | | | |
PP | | | | |
| | | | | |
80.0 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
| | | | | |
| | | | | |
40.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
0.0 +-----+-----+-----+-----+-----+-----+-----+-----+-----+-----+
0.0 10.0 20.0 30.0 40.0 50.0
DIST. FROM 1ST SURFACE DEVICE INLET M

KEY... P - P - FLUID PRESS.


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 27
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

SURFACE TEMPERATURE PLOT FOR LINK

313.5 +-----+-----+-----+-----+-----+-----+-----+-----+-----+-----+
TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT |
| | | | | |
| | | | | |
312.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
310.5 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
T | | | | | |
E | | | | | |
M 309.0 + | | | | +
P | | | | | |
E | | | | | |
R | | | | | |
A 307.5 +-----------+-----------+-----------+-----------+-----------+
T | | | | | |
U | | | | | |
R | | | | | |
E 306.0 + | | | | +
| | | | | |
| | | | | |
| | | | | |
304.5 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
D | | | | | |
E | | | | | |
G 303.0 + | | | | +
| | | | | |
K | | | | | |
| | | | | |
301.5 +-----------+-----------+-----------+-----------+-----------+
| | | | | |
| | | | | |
| | | | | |
300.0 AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA +
| | | | | |
| | | | | |
| | | | | |
298.5 +-----+-----+-----+-----+-----+-----+-----+-----+-----+-----+
0.0 10.0 20.0 30.0 40.0 50.0
DIST. FROM 1ST SURFACE DEVICE INLET M

KEY... T - T - FLUID TEMP. A - A - AMB. TEMP.


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 28
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" DEVICE DETAIL REPORT

HOLDUP AND VELOCITY DETAIL REPORT


---------------------------------
DEVICE
NAME ---LIQUID HOLDUP--- SUPERFICIAL T-D
AND SEG. NO LIQ GAS MIX . FLOW FLOW SONIC
TYPE NO. SLIP SLIP TOTAL VEL VEL VEL REGM REGM VEL
(ACM) (MPS) (MPS) (MPS) (MPS)
------ ---- ----- ----- -------- ------- ------- ------- ---- ---- -------
(ENTR) 0000
EN1 0001
PIP0 0000
(PIPE) 0001 1.00 1.00 1.454E-3 1.35 0.00 1.35 DIST 1-PH 0.00
0002 1.00 1.00 2.907E-3 1.35 0.00 1.35 DIST 1-PH 0.00
0003 1.00 1.00 4.361E-3 1.35 0.00 1.35 DIST 1-PH 0.00
0004 1.00 1.00 5.815E-3 1.35 0.00 1.35 DIST 1-PH 0.00
(PUMP) 0000
PMP1 0001
PIP1 0000
(PIPE) 0001 1.00 1.00 0.02 1.35 0.00 1.35 ---- 1-PH 0.00
0002 1.00 1.00 0.03 1.35 0.00 1.35 ---- 1-PH 0.00
0003 1.00 1.00 0.04 1.35 0.00 1.35 ---- 1-PH 0.00
0004 1.00 1.00 0.05 1.35 0.00 1.35 ---- 1-PH 0.00
(VALV) 0000
GAT1 0001
(BEND) 0000
BEN1 0001
PIP2 0000
(PIPE) 0001 1.00 1.00 0.05 1.35 0.00 1.35 DIST 1-PH 0.00
0002 1.00 1.00 0.06 1.35 0.00 1.35 DIST 1-PH 0.00
0003 1.00 1.00 0.06 1.35 0.00 1.35 DIST 1-PH 0.00
0004 1.00 1.00 0.06 1.35 0.00 1.35 DIST 1-PH 0.00
(BEND) 0000
BEN2 0001
PIP3 0000
(PIPE) 0001 1.00 1.00 0.09 1.35 0.00 1.35 DIST 1-PH 0.00
0002 1.00 1.00 0.11 1.35 0.00 1.35 DIST 1-PH 0.00
0003 1.00 1.00 0.14 1.35 0.00 1.35 DIST 1-PH 0.00
0004 1.00 1.00 0.17 1.35 0.00 1.35 DIST 1-PH 0.00
(BEND) 0000
BEN3 0001
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 29
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" DEVICE DETAIL REPORT

HOLDUP AND VELOCITY DETAIL REPORT


---------------------------------
DEVICE
NAME ---LIQUID HOLDUP--- SUPERFICIAL T-D
AND SEG. NO LIQ GAS MIX . FLOW FLOW SONIC
TYPE NO. SLIP SLIP TOTAL VEL VEL VEL REGM REGM VEL
(ACM) (MPS) (MPS) (MPS) (MPS)
------ ---- ----- ----- -------- ------- ------- ------- ---- ---- -------
PIP4 0000
(PIPE) 0001 1.00 1.00 0.18 1.35 0.00 1.35 DIST 1-PH 0.00
0002 1.00 1.00 0.19 1.35 0.00 1.35 DIST 1-PH 0.00
0003 1.00 1.00 0.20 1.35 0.00 1.35 DIST 1-PH 0.00
0004 1.00 1.00 0.21 1.35 0.00 1.35 DIST 1-PH 0.00
(BEND) 0000
BEN4 0001
(EXIT) 0000
EX1 0001

Fortunati model used to calculate sonic velocity.

Reported Fluid Velocity is at:


(1) calculation segment mid-point (default segment method)
(2) calculation segment inlet (SHORTPIPE method)
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 30
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
LINK "LINK" PROPERTY DETAIL REPORT

VISCOSITY AND DENSITY RESULTS


-----------------------------
DEVICE
NAME
AND SEGM ----------VISCOSITY---------- ------------DENSITY------------
TYPE NO OIL LIQ VAP LIQ VAP SLIP NO-SLIP
(PAS) (PAS) (PAS) (KG/M3) (KG/M3) (KG/M3) (KG/M3)
------ ---- --------- --------- --------- ------- ------- ------- -------
EN1 0000
(ENTR) 0001
PIP0 0000
(PIPE) 0001 0.000269 0.000269 0.000000 783.39 0.00 783.39 783.39
0002 0.000269 0.000269 0.000000 783.39 0.00 783.39 783.39
0003 0.000269 0.000269 0.000000 783.39 0.00 783.39 783.39
0004 0.000269 0.000269 0.000000 783.39 0.00 783.39 783.39
PMP1 0000
(PUMP) 0001
PIP1 0000
(PIPE) 0001 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0002 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0003 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0004 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
GAT1 0000
(VALV) 0001
BEN1 0000
(BEND) 0001
PIP2 0000
(PIPE) 0001 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0002 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0003 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0004 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
BEN2 0000
(BEND) 0001
PIP3 0000
(PIPE) 0001 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0002 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0003 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0004 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
BEN3 0000
(BEND) 0001
PIP4 0000
(PIPE) 0001 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0002 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0003 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
0004 0.000269 0.000269 0.000000 783.38 0.00 783.38 783.38
BEN4 0000
(BEND) 0001
EX1 0000
(EXIT) 0001
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 31
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" PROPERTY DETAIL REPORT

FRICTION AND SURFACE TENSION RESULTS


------------------------------------
DEVICE
NAME LIQ
AND SEGM --------------FRICTION------------ FRIC. REYNOLDS SURFACE
TYPE NUM. DENSITY VELO ID. VISCOSITY FACTOR NUMBER TENSION
(KG/M3) (MPS) (MM) (PAS) (NEWT/M)
------ ---- ------- ------- -------- --------- -------- -------- --------
EN1 0000
(ENTR) 0001
PIP0 0000
(PIPE) 0001 783.39 1.35 77.93 410.8695 0.00000
0002 783.39 1.35 77.93 410.8695 0.00000
0003 783.39 1.35 77.93 410.8695 0.00000
0004 783.39 1.35 77.93 410.8695 0.00000
PMP1 0000
(PUMP) 0001
PIP1 0000
(PIPE) 0001 783.38 1.35 77.93 410.8687 0.00000
0002 783.38 1.35 77.93 410.8687 0.00000
0003 783.38 1.35 77.93 410.8687 0.00000
0004 783.38 1.35 77.93 410.8687 0.00000
GAT1 0000
(VALV) 0001
BEN1 0000
(BEND) 0001
PIP2 0000
(PIPE) 0001 783.38 1.35 77.93 410.8687 0.00000
0002 783.38 1.35 77.93 410.8687 0.00000
0003 783.38 1.35 77.93 410.8687 0.00000
0004 783.38 1.35 77.93 410.8687 0.00000
BEN2 0000
(BEND) 0001
PIP3 0000
(PIPE) 0001 783.38 1.35 77.93 410.8687 0.00000
0002 783.38 1.35 77.93 410.8687 0.00000
0003 783.38 1.35 77.93 410.8687 0.00000
0004 783.38 1.35 77.93 410.8687 0.00000
BEN3 0000
(BEND) 0001
PIP4 0000
(PIPE) 0001 783.38 1.35 77.93 410.8687 0.00000
0002 783.38 1.35 77.93 410.8687 0.00000
0003 783.38 1.35 77.93 410.8687 0.00000
0004 783.38 1.35 77.93 410.8687 0.00000
BEN4 0000
(BEND) 0001
VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 32
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" PROPERTY DETAIL REPORT

FRICTION AND SURFACE TENSION RESULTS


------------------------------------
DEVICE
NAME LIQ
AND SEGM --------------FRICTION------------ FRIC. REYNOLDS SURFACE
TYPE NUM. DENSITY VELO ID. VISCOSITY FACTOR NUMBER TENSION
(KG/M3) (MPS) (MM) (PAS) (NEWT/M)
------ ---- ------- ------- -------- --------- -------- -------- --------
EX1 0000
(EXIT) 0001

HEAT TRANSFER CALCULATIONS


--------------------------
DEVICE FLUID
NAME THERMAL ----------THERMAL RESISTANCE-------
AND SEGM CONDUCT- INSIDE INSULAT- SURROUN-
(TYPE) NO: IVITY FILM PIPE ION DING
(WMC) (M2-C/ (M2-C/ (M2-C/ (M2-C/
WATT) WATT) WATT) WATT)
------ ---- -------- -------- -------- -------- --------
EN1 0000
(ENTR) 0001
PIP0 0000
(PIPE) 0001 0.260 0.0005 9.514E-5 0.0000 0.0000
0002 0.260 0.0005 9.514E-5 0.0000 0.0000
0003 0.260 0.0005 9.514E-5 0.0000 0.0000
0004 0.260 0.0005 9.514E-5 0.0000 0.0000
PMP1 0000
(PUMP) 0001
PIP1 0000
(PIPE) 0001 0.260 0.0005 9.514E-5 0.0000 0.0000
0002 0.260 0.0005 9.514E-5 0.0000 0.0000
0003 0.260 0.0005 9.514E-5 0.0000 0.0000
0004 0.260 0.0005 9.514E-5 0.0000 0.0000
GAT1 0000
(VALV) 0001
BEN1 0000
(BEND) 0001
PIP2 0000
(PIPE) 0001 0.260 0.0005 9.514E-5 0.0000 0.0000
0002 0.260 0.0005 9.514E-5 0.0000 0.0000
0003 0.260 0.0005 9.514E-5 0.0000 0.0000
0004 0.260 0.0005 9.514E-5 0.0000 0.0000
BEN2 0000
(BEND) 0001

Heat Transfer Resistances based on pipe ID


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 33
PROJECT OUTPUT - ALTERNATE UNITS SIMSCI
PROBLEM EXAMPLE1 LINK REPORT 10/01/97
==============================================================================

BASE CASE
***************************CONTINUED****************************

LINK "LINK" PROPERTY DETAIL REPORT

HEAT TRANSFER CALCULATIONS


--------------------------
DEVICE FLUID
NAME THERMAL ----------THERMAL RESISTANCE-------
AND SEGM CONDUCT- INSIDE INSULAT- SURROUN-
(TYPE) NO: IVITY FILM PIPE ION DING
(WMC) (M2-C/ (M2-C/ (M2-C/ (M2-C/
WATT) WATT) WATT) WATT)
------ ---- -------- -------- -------- -------- --------
PIP3 0000
(PIPE) 0001 0.260 0.0005 9.514E-5 0.0000 0.0000
0002 0.260 0.0005 9.514E-5 0.0000 0.0000
0003 0.260 0.0005 9.514E-5 0.0000 0.0000
0004 0.260 0.0005 9.514E-5 0.0000 0.0000
BEN3 0000
(BEND) 0001
PIP4 0000
(PIPE) 0001 0.260 0.0005 9.514E-5 0.0000 0.0000
0002 0.260 0.0005 9.514E-5 0.0000 0.0000
0003 0.260 0.0005 9.514E-5 0.0000 0.0000
0004 0.260 0.0005 9.514E-5 0.0000 0.0000
BEN4 0000
(BEND) 0001
EX1 0000
(EXIT) 0001

Heat Transfer Resistances based on pipe ID


VERSION 9.6 R
SIMULATION SCIENCES, INC. PIPEPHASE PAGE 34
PROJECT OUTPUT SIMSCI
PROBLEM EXAMPLE1 ERROR SUMMARY 10/01/97
==============================================================================

END OF NETWORK PROCESSING -- NO ERRORS


-- 1 WARNING

CALCULATION STARTED 10:49:36 04/21/23


CALCULATION FINISHED 10:49:36 04/21/23
CALCULATION RUN TIME 0 HR 0 MIN 0 SEC
NETWORK SIMULATION SOLVED