Appendix: 4C, Issue: 4, Rev.: 0: Force 10 United Arab Emirates L.L.Cmeraki Integrated Contracting LLC.
Appendix: 4C, Issue: 4, Rev.: 0: Force 10 United Arab Emirates L.L.Cmeraki Integrated Contracting LLC.
: 0
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
Clear Cover for Footing : Bottom=50mm, Top & Sides=50mm S. Dwg Ref:CIC-HIS-SD-ST-RB-(201~220)_00
Clear Cover for Column & Walls Below Ground = 50mm, Above Ground =40mm Lap Length = 50xDia.
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT DETAILS
01] Footing-F1 2 Nos. Size : 3200 3200 550 AT GRID -[10/D2,11/C]
BOTTOM-B1 1A1 T 20 2 22 44 4000 21 450 3100 450 434.720
B2 1B1 T 20 2 22 44 3950 21 420 3100 420 429.286
TOP T2 1C1 T 12 2 17 34 3950 21 420 3100 420 119.258
T1 1D1 T 12 2 17 34 4000 21 450 3100 450 120.768
Chair bar 1CH1 T 12 2 9 18 2675 98 650 405 600 600 42.757
Column-C2A 2 Nos. Size : 250 900
Starters 1V1 T 25 2 16 32 3600 11 450 3130 443.520
Links 1L1 T 10 2 16 32 2200 99A1 170 820 100 43.437
1L2 T 10 2 48 96 875 99A1 170 165 100 51.828
1L3 T 10 2 16 32 1300 99A1 170 375 100 25.667
02] Footing-F1 1 No. Size : 3200 3200 550 AT GRID -[11/D1]
BOTTOM-B1 2A1 T 20 1 22 22 4000 21 450 3100 450 217.360
B2 2B1 T 20 1 22 22 3950 21 420 3100 420 214.643
TOP T2 2C1 T 12 1 17 17 3950 21 420 3100 420 59.629
T1 2D1 T 12 1 17 17 4000 21 450 3100 450 60.384
Chair bar 2CH1 T 16 1 9 9 2675 98 650 405 600 600 38.039
Column-C2 1 No. Size : 250 900
Starters 2V1 T 20 1 16 16 3350 11 450 2880 132.392
Links 2L1 T 10 1 20 20 2200 99A1 170 820 100 27.148
2L2 T 10 1 40 40 750 99A2 170 190 170 100 18.510
2L3 T 10 1 20 20 1150 99A1 170 305 100 14.191
2L4 T 10 1 20 20 900 99A1 170 175 100 11.106
03] Footing-F3 1 No. Size : 7750 4000 700 AT GRID -[3-5/E]
BOTTOM-B1 3A1 T 25 1 78 78 5100 21 600 3900 600 1531.530
B2 3B1 T 20 1 40 40 8800 21 570 7650 570 869.440
TOP T2 3C1 T 12 1 21 21 8800 21 570 7650 570 164.102
T1 3D1 T 12 1 40 40 5100 21 600 3900 600 181.152
Chair bar 3CH1 T 12 1 24 24 2950 98 650 550 600 600 62.870
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
3L4 T 10 1 34 34 1150 99A1 170 295 100 24.125
3L5 T 10 1 17 17 800 99A1 170 120 100 8.391
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
Wall-W3 1 No. Size : 250 1450
Starters 5V1 T 20 1 20 20 3350 11 450 2880 165.490
Links 5L1 T 10 1 16 16 3300 99A1 170 1370 100 32.578
5L2 T 10 1 16 16 2700 99A1 170 1075 100 26.654
5L3 T 10 1 16 16 2125 99A1 170 782 100 20.978
5L4 T 10 1 64 64 450 22 100 170 65 100 17.770
06] Footing-F5 5 Nos. Size : 2600 2600 650 AT GRID:REFER PLAN
BOTTOM-B1 6A1 T 20 5 18 90 3600 21 550 2500 550 800.280
B2 6B1 T 20 5 18 90 3550 21 520 2500 520 789.165
TOP T2 6C1 T 12 5 14 70 3550 21 520 2500 520 220.668
T1 6D1 T 12 5 14 70 3600 21 550 2500 550 223.776
Chair bar 6CH1 T 12 5 6 30 2875 98 650 505 600 600 76.590
Column-C1A 5 Nos. Size : 250 800
Starters 6V1 T 16 5 14 70 3150 11 450 2680 348.390
Links 6L1 T 10 5 17 85 2000 99A1 170 720 100 104.890
6L2 T 10 5 51 255 850 99A1 170 150 100 133.735
6L3 T 10 5 17 85 1075 99A1 170 260 100 56.378
07] Footing-F5 1 No. Size : 2600 2600 650 AT GRID -[4/B]
BOTTOM-B1 7A1 T 20 1 18 18 3600 21 550 2500 550 160.056
B2 7B1 T 20 1 18 18 3550 21 520 2500 520 157.833
TOP T2 7C1 T 12 1 14 14 3550 21 520 2500 520 44.134
T1 7D1 T 12 1 14 14 3600 21 550 2500 550 44.755
Chair bar 7CH1 T 12 1 6 6 2875 98 650 505 600 600 15.318
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
8L2 T 10 2 60 120 850 99A1 170 155 100 62.934
8L3 T 10 2 20 40 1525 99A1 170 485 100 37.637
8L4 T 10 2 20 40 1075 99A1 170 265 100 26.531
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
12] Footing-F9 1 No. Size : 4500 4500 700 AT GRID -[13/C]
BOTTOM-B1 12A1 T 20 1 45 45 5600 21 600 4400 600 622.440
B2 12B1 T 20 1 45 45 5550 21 570 4400 570 616.883
TOP T2 12C1 T 12 1 23 23 5550 21 570 4400 570 113.353
T1 12D1 T 12 1 23 23 5600 21 600 4400 600 114.374
Chair bar 12CH1 T 12 1 16 16 2975 98 650 555 600 600 42.269
Column-C3B 1 No. Size : 250 1000
Starters 12V1 T 32 1 4 4 3950 11 450 3480 99.698
12V2 T 25 1 22 22 3600 11 450 3130 304.920
Links 12L1 T 10 1 18 18 2400 99A1 170 920 100 26.654
12L2 T 10 1 36 36 700 99A2 170 155 130 100 15.548
12L3 T 10 1 18 18 1450 99A1 170 445 100 16.104
12L4 T 10 1 36 36 950 99A1 170 205 100 21.101
12L5 T 10 1 18 18 1125 99A1 170 285 100 12.494
12L6 T 10 1 18 18 1750 99A1 170 605 100 19.436
13] Footing-F9 1 No. Size : 4500 4500 700 AT GRID -[13/B1]
BOTTOM-B1 13A1 T 20 1 45 45 5600 21 600 4400 600 622.440
B2 13B1 T 20 1 45 45 5550 21 570 4400 570 616.883
TOP T2 13C1 T 12 1 23 23 5550 21 570 4400 570 113.353
T1 13D1 T 12 1 23 23 5600 21 600 4400 600 114.374
Chair bar 13CH1 T 12 1 16 16 2975 98 650 555 600 600 42.269
Column-C5 1 No. Size : 250 1100
Starters 13V1 T 32 1 4 4 3950 11 450 3480 99.698
13V2 T 25 1 20 20 3600 11 450 3130 277.200
Links 13L1 T 10 1 18 18 2600 99A1 170 1020 100 28.876
13L2 T 10 1 36 36 725 99A2 170 175 150 100 16.104
13L3 T 10 1 18 18 1425 99A1 170 440 100 15.826
13L4 T 10 1 18 18 1050 99A1 170 245 100 11.661
13L5 T 10 1 18 18 850 99A1 170 150 100 9.440
13L6 T 10 1 18 18 1825 99A1 170 635 100 20.268
14] Footing-F10 1 No. Size : 3500 3500 650 AT GRID -[3/D]
BOTTOM-B1 14A1 T 20 1 35 35 4500 21 550 3400 550 389.025
B2 14B1 T 20 1 35 35 4450 21 520 3400 520 384.703
TOP T2 14C1 T 12 1 18 18 4450 21 520 3400 520 71.129
T1 14D1 T 12 1 18 18 4500 21 550 3400 550 71.928
Chair bar 14CH1 T 12 1 10 10 2875 98 650 505 600 600 25.530
Column-C6 1 No. Size : 250 900
Starters 14V1 T 20 1 16 16 3350 11 450 2880 132.392
Links 14L1 T 10 1 17 17 2200 99A1 170 820 100 23.076
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
14L2 T 10 1 34 34 1075 99A1 170 265 100 22.551
14L3 T 10 1 51 51 850 99A1 170 150 100 26.747
15] Footing-F10 1 No. Size : 3500 3500 650 AT GRID -[11/B1-C]
BOTTOM-B1 15A1 T 20 1 35 35 4500 21 550 3400 550 389.025
B2 15B1 T 20 1 35 35 4450 21 520 3400 520 384.703
TOP T2 15C1 T 12 1 18 18 4450 21 520 3400 520 71.129
T1 15D1 T 12 1 18 18 4500 21 550 3400 550 71.928
Chair bar 15CH1 T 12 1 10 10 2875 98 650 505 600 600 25.530
Column-C2B 1 No. Size : 250 900
Starters 15V1 T 32 1 4 4 3950 11 450 3480 99.698
15V2 T 25 1 18 18 3600 11 450 3130 249.480
Links 15L1 T 10 1 17 17 2200 99A1 170 820 100 23.076
15L2 T 10 1 34 34 700 99A2 170 160 135 100 14.685
15L3 T 10 1 17 17 1500 99A1 170 480 100 15.734
15L4 T 10 1 34 34 1150 99A1 170 295 100 24.125
15L5 T 10 1 17 17 800 99A1 170 120 100 8.391
16] Footing-F11 1 No. Size : 3500 4100 700 AT GRID -[3/C]
BOTTOM-B1 16A1 T 20 1 34 34 4600 21 600 3400 600 386.308
B2 16B1 T 20 1 29 29 5150 21 570 4000 570 368.895
TOP T2 16C1 T 12 1 18 18 5150 21 570 4000 570 82.318
T1 16D1 T 12 1 21 21 4600 21 600 3400 600 85.781
Chair bar 16CH1 T 12 1 12 12 2975 98 650 555 600 600 31.702
Column-C4 1 No. Size : 250 1000
Starters 16V1 T 25 1 18 18 3600 11 450 3130 249.480
Links 16L1 T 10 1 20 20 2400 99A1 170 920 100 29.616
16L2 T 10 1 60 60 850 99A1 170 155 100 31.467
16L3 T 10 1 20 20 1525 99A1 170 485 100 18.819
16L4 T 10 1 20 20 1075 99A1 170 265 100 13.266
17] Footing-F11 1 No. Size : 3500 4100 700 AT GRID -[3/B]
BOTTOM-B1 17A1 T 20 1 34 34 4600 21 600 3400 600 386.308
B2 17B1 T 20 1 29 29 5150 21 570 4000 570 368.895
TOP T2 17C1 T 12 1 18 18 5150 21 570 4000 570 82.318
T1 17D1 T 12 1 21 21 4600 21 600 3400 600 85.781
Chair bar 17CH1 T 12 1 12 12 2975 98 650 555 600 600 31.702
Column-C6 1 No. Size : 250 900
Starters 17V1 T 20 1 16 16 3350 11 450 2880 132.392
Links 17L1 T 10 1 18 18 2200 99A1 170 820 100 24.433
17L2 T 10 1 36 36 1075 99A1 170 265 100 23.878
17L3 T 10 1 54 54 850 99A1 170 150 100 28.320
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
18] Footing-F16 1 No. Size : 3500 5300 650 AT GRID -[11/A1]
BOTTOM-B1 18A1 T 20 1 36 36 4500 21 550 3400 550 400.140
B2 18B1 T 20 1 24 24 6250 21 520 5200 520 370.500
TOP T2 18C1 T 12 1 18 18 6250 21 520 5200 520 99.900
T1 18D1 T 12 1 27 27 4500 21 550 3400 550 107.892
Chair bar 18CH1 T 12 1 15 15 2875 98 650 505 600 600 38.295
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
20] Footing-F17 1 No. Size : AS PER LAYOUT 550 AT GRID -[(1-2)/(A-E)]
BOTTOM-B1 20A1 T 25 1 8 8 3675 21 450 2775 450 113.190
20A2 T 25 1 192 192 5325 21 450 4425 450 3936.240
B2 20B1 T 25 1 23 23 9025 11 407 8600 799.164
20B2 T 25 1 37 37 12000 01 12000 1709.400
20B3 T 25 1 37 37 6575 11 407 6150 936.609
20B4 T 25 1 14 14 8125 11 407 7700 437.938
TOP T2 20C1 T 20 1 20 20 8025 11 407 7600 396.435
20C2 T 20 1 32 32 12000 01 12000 948.480
20C3 T 20 1 32 32 7675 11 407 7250 606.632
20C4 T 20 1 12 12 7125 11 407 6700 211.185
T1 20D1 T 20 1 7 7 3675 21 450 2775 450 63.541
20D2 T 20 1 160 160 5325 21 450 4425 450 2104.440
Chair bar 20CH1 T 20 1 84 84 2625 98 650 385 600 600 544.635
Column-C1 4 Nos. Size : 250 800
Starters 20V1 T 20 4 18 72 3350 11 450 2880 595.764
Links 20L1 T 10 4 18 72 2000 99A1 170 720 100 88.848
20L2 T 10 4 36 144 700 99A2 170 165 140 100 62.194
20L3 T 10 4 36 144 1000 99A1 170 230 100 88.848
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
R.C.C Wall-W1 1 No. Size : REFER PLAN
Starters 21V1 T 16 1 86 86 3150 11 450 2680 428.022
21V1a 25 1 24 24 3600 11 450 3130 332.640
21V2 T 20 1 5 5 4025 23 450 2030 170 49.709
21V3 T 16 1 54 54 3300 11 450 2830 281.556
21V3a T 20 1 20 20 3500 11 450 3030 172.900
Hor. 21H1 T 12 1 90 90 3550 21 1250 170 2125 283.716
21H1a T 12 1 12 12 1775 99A1 170 595 120 18.914
21H2 T 12 1 34 34 6775 21 1450 170 5135 204.551
21H3 T 12 1 34 34 3200 21 1250 170 1775 96.614
Hook's 21P1 T 10 1 756 756 450 22 100 170 65 100 209.903
22] Footing-F13 1 No. Size : REFER PLAN AT GRID -[(13-15)/(F-G)]
BOTTOM-B1 22A1 T 20 1 44 44 7200 21 600 5980 600 782.496
22A2 T 20 1 34 34 9025 21 600 7825 600 757.920
B2 22B1 T 20 1 50 50 10475 21 565 9325 565 1293.663
22B2 T 20 1 15 15 10475 21 565 9325 565
TOP T2 22C1 T 16 1 30 30 10475 21 565 9325 565 496.515
22C2 T 16 1 9 9 10475 21 565 9325 565
T1 22D1 T 16 1 27 27 7200 21 600 5980 600 307.152
22D2 T 16 1 21 21 9025 21 600 7825 600
Chair bar 22CH1 T 16 1 50 50 2950 98 650 545 600 600 233.050
R.C.C Wall-W2 1 No. Size : REFER PLAN
Starters 22V1 T 16 1 116 116 3150 11 450 2680 577.332
22V2 T 16 1 7 7 4025 23 450 1880 170 44.517
22V3 T 25 1 112 112 4025 11 450 1880 1735.580
Hor. 22H1 T 12 1 50 50 5825 21 1250 170 4395 258.630
22H1a T 12 1 6 6 4475 21 1250 170 3045 23.843
22H2 T 12 1 28 28 6325 21 1250 170 4900 157.265
Hook's 22P1 T 10 1 976 976 450 22 100 170 65 100 270.986
23] Footing-F14 1 No. Size : AS PER LAYOUT 700 AT GRID -[(1-2)/(F-G)]
BOTTOM-B1 23A1 T 20 1 64 64 10100 21 600 8900 600 1596.608
23A2 T 20 1 1 1 10075 21 600 8870 600 24.885
23A3 T 20 1 1 1 10025 21 600 8825 600 24.762
23A4 T 20 1 1 1 10000 21 600 8785 600 24.700
23A5 T 20 1 1 1 9950 21 600 8740 600 24.577
23A6 T 20 1 1 1 9900 21 600 8700 600 24.453
23A7 T 20 1 1 1 9875 21 600 8655 600 24.391
23A8 T 20 1 1 1 9825 21 600 8615 600 24.268
23A9 T 20 1 1 1 9775 21 600 8570 600 24.144
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
23A10 T 20 1 1 1 9725 21 600 8525 600 24.021
23A11 T 20 1 1 1 9650 21 600 8440 600 23.836
23A12 T 20 1 1 1 9600 21 600 8400 600 23.712
23A13 T 20 1 1 1 9575 21 600 8360 600 23.650
23A14 T 20 1 1 1 9525 21 600 8315 600 23.527
23A15 T 20 1 1 1 9475 21 600 8270 600 23.403
23A16 T 20 1 1 1 9450 21 600 8230 600 23.342
23A17 T 20 1 1 1 9400 21 600 8185 600 23.218
23A18 T 20 1 1 1 9350 21 600 8145 600 23.095
23A19 T 20 1 1 1 9300 21 600 8100 600 22.971
23A20 T 20 1 1 1 9275 21 600 8060 600 22.909
23A21 T 20 1 1 1 9225 21 600 8015 600 22.786
23A22 T 20 1 1 1 9175 21 600 7970 600 22.662
23A23 T 20 1 1 1 9100 21 600 7885 600 22.477
23A24 T 20 1 1 1 9050 21 600 7845 600 22.354
23A25 T 20 1 1 1 9000 21 600 7800 600 22.230
23A26 T 20 1 1 1 8975 21 600 7755 600 22.168
23A27 T 20 1 1 1 8925 21 600 7715 600 22.045
23A28 T 20 1 1 1 8875 21 600 7670 600 21.921
B2 23B1 T 20 1 78 78 10375 21 570 9225 570 1998.848
23B2 T 20 1 1 1 10100 21 570 8950 570 24.947
23B3 T 20 1 1 1 9825 21 570 8670 570 24.268
23B4 T 20 1 1 1 9550 21 570 8390 570 23.589
23B5 T 20 1 1 1 9250 21 570 8110 570 22.848
23B6 T 20 1 1 1 8975 21 570 7825 570 22.168
23B7 T 20 1 1 1 8700 21 570 7545 570 21.489
23B8 T 20 1 1 1 8400 21 570 7260 570 20.748
23B9 T 20 1 1 1 8125 21 570 6980 570 20.069
23B10 T 20 1 1 1 7850 21 570 6700 570 19.390
23B11 T 20 1 1 1 7525 21 570 6370 570 18.587
TOP T2 23C1 T 12 1 39 39 10375 21 570 9225 570 359.307
23C2 T 12 1 1 1 9925 21 570 8785 570 8.813
23C3 T 12 1 1 1 9450 21 570 8310 570 8.392
23C4 T 12 1 1 1 9000 21 570 7840 570 7.992
23C5 T 12 1 1 1 8525 21 570 7365 570 7.570
23C6 T 12 1 1 1 8050 21 570 6890 570 7.148
23C7 T 12 1 1 1 8050 21 570 6890 570 7.148
T1 23D1 T 12 1 33 33 10100 21 600 8900 600 295.970
23D2 T 12 1 1 1 10075 21 600 8870 600 8.947
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
23D3 T 12 1 1 1 10000 21 600 8785 600 8.880
23D4 T 12 1 1 1 9900 21 600 8700 600 8.791
23D5 T 12 1 1 1 9825 21 600 8615 600 8.725
23D6 T 12 1 1 1 9750 21 600 8530 600 8.658
23D7 T 12 1 1 1 9650 21 600 8445 600 8.569
23D8 T 12 1 1 1 9575 21 600 8357 600 8.503
23D9 T 12 1 1 1 9475 21 600 8270 600 8.414
23D10 T 12 1 1 1 9400 21 600 8190 600 8.347
23D11 T 12 1 1 1 9300 21 600 8100 600 8.258
23D12 T 12 1 1 1 9225 21 600 8015 600 8.192
23D13 T 12 1 1 1 9150 21 600 7930 600 8.125
23D14 T 12 1 1 1 9050 21 600 7845 600 8.036
23D15 T 12 1 1 1 8975 21 600 7760 600 7.970
Chair bar 23CH1 T 16 1 63 63 2975 98 650 555 600 600 296.132
R.C.C Wall-W2 1 No. Size : REFER PLAN
Starters 23V1 T 16 1 116 116 3150 11 450 2680 577.332
23V2 T 16 1 7 7 4025 23 450 1880 170 44.517
23V3 T 25 1 112 112 4025 11 450 3130 1735.580
Hor. 23H1 T 12 1 50 50 5825 21 1250 170 4395 258.630
23H1a T 12 1 6 6 4475 21 1250 170 3045 23.843
23H2 T 12 1 28 28 6325 21 1250 170 4900 157.265
Hook's 23P1 T 10 1 976 976 450 22 100 170 65 100 270.986
24.Column-C2 1 No. Size : 250 900 AT GRID -[3/A]
Starters 24V1 T 20 1 16 16 2700 00 2700 106.704
Links 24L1 T 10 1 13 13 2200 99A1 170 820 100 17.646
24L2 T 10 1 26 26 750 99A2 170 190 170 100 12.032
24L3 T 10 1 13 13 1150 99A1 170 305 100 9.224
24L4 T 10 1 13 13 900 99A1 170 175 100 7.219
25.Column-C1A 5 Nos. Size : 250 800 AT GRID -[4/A]
Starters 25V1 T 16 5 14 70 2500 00 2500 276.500
Links 25L1 T 10 5 12 60 2000 99A1 170 720 100 74.040
25L2 T 10 5 36 180 850 99A1 170 150 100 94.401
25L3 T 10 5 12 60 1075 99A1 170 260 100 39.797
26.Column-C3 1 No. Size : 250 1000 AT GRID -[15/1]
Starters 26V1 T 20 1 14 14 2700 00 2700 93.366
Links 26L1 T 10 1 12 12 2400 99A1 170 920 100 17.770
26L2 T 10 1 24 24 925 99A1 170 185 100 13.697
26L3 T 10 1 12 12 1500 99A1 170 470 100 11.106
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
27.Column-C3A 1 No. Size : 250 1000 AT GRID -[13/A1]
Starters 27V1 T 20 1 16 16 2700 00 2700 106.704
Links 27L1 T 10 1 12 12 2400 99A1 170 920 100 17.770
27L2 T 10 1 24 24 750 99A2 170 185 165 100 11.106
27L3 T 10 1 12 12 1400 99A1 170 425 100 10.366
27L4 T 10 1 12 12 900 99A1 170 170 100 6.664
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
Bottom [B1] 35B1 T 25 1 5 5 10475 21 575 9300 600 201.644
SIDE BAR 37S1 T 16 1 2 2 7600 15 5325 1325 2275 Adjust @ site 24.016
37S2 T 16 1 2 2 7525 15 5250 1315 2275 Adjust @ site 23.779
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
37S3 T 16 1 2 2 8575 15 1725 435 6850 Adjust @ site 27.097
37S4 T 16 1 2 2 8625 15 1715 430 6900 Adjust @ site 27.255
Links 38L1 T 10 1 126 126 2000 51 300 600 100 100 155.484
Size of bar T8 T10 T12 T14 T16 T20 T25 T32 T40 Total
Bar Weight (Kg/m) 0.395 0.617 0.888 1.209 1.580 2.470 3.850 6.310 9.860
Weight (Ton) 0.000 5.545 7.369 0.000 10.006 42.455 28.803 0.897 0.000 95.075
Contractor
FORCE 10 UNITED :
ARAB EMIRATES L.L.CMERAKI INTEGRATED CONTRACTING LLC. Prepared by : LST
HARTLAND INTERNATIONAL SCHOOL AL MERKADH, DUBAI
Checked by ECP
Project : UNITED ARAB EMIRATES
Schedule Reference : Revision No. DETAILS
PROPOSED SCHOOL BUILDING FOOTING & COLUMN STARTER &STRAP BEAM REINFORCEMENT :
Date Prepared : 13-Mar-23 Date Revised :
T S NO NO TOTAL LENGTH F
SHAPE CODE
WEIGHT / KG.
BAR Y I OF OF NOS. OF EACH A B C D E (or)
MEMBER MARK P Z MBRS BARS BAR RADIUS
E E IN
EACH mm** mm* mm* mm* mm* mm* mm*
A = STOCK LENGTHS.
R
A
A
A A B B
1 = SEMI-CIRCULAR
C
A
A
1
B
C
A
B
B
A C B
C
1 = SEMI-CIRCULAR
C
B
A
B
C
D
D
C
1
B B
A
E
D A
B C
C B
C
B
A A
D
D
D
D
A A
A 1 = SEMI-CIRCULAR C
A C
B
D
E
1 1
B
D
C
D
C A A
D A A
C
E
E E
B
C
B
B
D
A D
D
A B C
C
C C
A E
D
C
D
B
B
A
B
D
C E
B A A
E B
A
C
C
D
A
A
R
B
F B
B C A