Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Documents for initial review

- JORC report
- IUP OP
- CnC
- Izin Jetty (TUKS)/Perjanjian Penggunaan Jetty
- ET
- RKAB

MINE DETAILS Information

1 Name of Mine / Company owner


2 Mining License Type (CCOW or IUP)
3 Expiry date of Mining License
4 Relation between Seller and Mine owner
5 Mine Location (Regency)
6 Mine Location (coordinate)
7 Mine start production since (Year)
8 Production Capacity (Tons/month)
9 Last year production (Tons)
10 Last year Export (Tons)
11 Total Remaining Mineable Coal Reserve (Tons)
12 Apply Stripping Ratio (OB Ratio)
13 Total Mining License Area (Ha.)
14 Mine Operating Area (Ha.)
15 Remaining Area (Ha.)
16 Mining contractor name or Internal operation

COAL HAULING ROAD Information

18 Distance from Mine to Jetty (km.)


19 Who own the hauling road
20 Truck capacity (Tons/Trip)
21 Maximum Hauling capacity (Tons/Day)

STOCKPILE DETAILS Information

22 Stockpile Name / Company


23 Location (coordinate)
24 Storage Capacity (Tons)
25 Crushing Capacity (Tons/hour)
JETTY/ PORT DETAILS Information

26 Jetty Name / Company


27 Location (coordinate)
28 Loading Method (Truck or Belt Conveyor)
29 Number of Loading Belt Conveyor
30 Maximum Barge Length (Ft.)
31 Depth of the river / sea (m.)
32 Loading Rate (Ton/hour)

You might also like