I. Preliminaries
a) Mobilization/Demobilizatiom
b) Cleaning, Hauling and Clearing
c) Representation
d) Tools and equipments
e) Material handling
f) Others =97,000
Service Vehicles
Scaffolding
II. Dismantling / Demolition Works = 38, 000
III. Installation of Cable Tray & Lighting Structured Support = 197, 950
IV. Installation of Electrical Wiring and Lightings = 179, 700
V. Installation of Feeder = 78, 000
VI. Installation of water duct grating = 68, 300
VII. Installation of Mezanine Floor Flooring = 42, 000
VIII. Plumbing: Domestic Water = 32, 9000
Note: All consumable materials are to be supplied by the client GMTI – KPS