AS 1289.5.1.1 RMS T111 Dry Density / Moisture Content Relationship - Standard Compaction
AS 1289.5.2.1 RMS T112 Dry Density / Moisture Content Relationship - Modified Compaction
AS 1289.2.1.1 RMS T120 Moisture Content - Oven Drying Method (Standard Method)
0.9
0.8
0.7
0.6
0.5
Load (kN)
0.4
0.3
0.2
0.1
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13
Penetration (mm)
Retained on 19.0mm Sieve (%) 0 Lab Moisture Ratio - LMR (%) 101.5 100.0
Technician
Method of Establishing Plasticity Level Assessment Lab Density Ratio - LDR (%) 98.0 98.0
Sample Curing Time (hrs) 49 hrs Dry Density - At Compaction (t/m³) 1.71 1.71
Compaction Hammer Used Standard Dry Density - After Soaking (t/m³) 1.67
Maximum Dry Density - MDD (t/m³) 1.75 Moisture Content - Top 30mm (%) 20.1
Optimum Moisture Content - OMC (%) 18.4 Moisture Content - Remainder (%) 24.2