8.6.11 - HDPE Pipelaying - Production Rates
8.6.11 - HDPE Pipelaying - Production Rates
63
to 1 Boom Truck 84 4,000.00 47.62
1 Butt-Fusion Machine 84 4,000.00 47.62
1 Electro-Fusion Machine 84 800.00 9.52
150 1 Backhoe (0.7 cu.m. size) 84 15,000.00 178.57
1 Cutter Machine 84 500.00 5.95
1,050 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
30
30
15,000.00
500.00
500.00
16.67
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 30 380.00 253.33
8 Pipe Fitter (s) 30 500.00 133.33
Operator (s)
2 30 500.00 33.33
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 30 500.00 33.33
1,150 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
30
30
15,000.00
500.00
500.00
16.67
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 30 380.00 253.33
8 Pipe Fitter (s) 30 500.00 133.33
Operator (s)
2 30 500.00 33.33
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 30 500.00 33.33
1,250 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
30
30
15,000.00
500.00
500.00
16.67
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 30 380.00 253.33
8 Pipe Fitter (s) 30 500.00 133.33
Operator (s)
2 30 500.00 33.33
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 30 500.00 33.33
1,350 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
30
30
15,000.00
500.00
500.00
16.67
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 30 380.00 253.33
8 Pipe Fitter (s) 30 500.00 133.33
Operator (s)
2 30 500.00 33.33
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 30 500.00 33.33
1,450 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
30
30
15,000.00
500.00
500.00
16.67
1,550 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
1,650 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
1,750 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
1,850 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
1,950 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
2,050 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
2,150 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
2,250 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
1 24 500.00 20.83
Butt-Fusion Machine
Operator (s)
1 Electro-Fusion Machine 24 500.00 20.83
2,350 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
2,450 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
2,550 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Table 1: MANPOWER & EQUIPMENT COST - Pipelaying Works - HDPE Pipe (Note: Excluding all earthworks costing).
Production RATE TOTAL Cost + 100%
Amount TOTAL Cost Miscellaneous, etc...
Pipe Description Rate (per
Diameter
(mm)
Item (Linear Meter) SALARY or
RENTAL
(Per Linear Meter)
(Peso)
Linear Meter)
(Peso)
(per Linear Meter) Remarks
(Peso) (Peso)
Qty Unit Per DAY Per DAY Per DAY Per DAY Per DAY
20 Laborer (s) 24 380.00 316.67
8 Pipe Fitter (s) 24 500.00 166.67
Operator (s)
2 24 500.00 41.67
Butt-Fusion Machine
Operator (s)
2 Electro-Fusion Machine 24 500.00 41.67
2,650 1
1
Backhoe (0.7 cu.m. size)
Cutter Machine
24
24
15,000.00
500.00
625.00
20.83
Others 500.00
Manpower Rates
Rate
Item Description Remarks
(Peso)
1 Laborer 380.00 Non-Skilled Worker
2 Mason 500.00 Skilled Worker
3 Carpenter 500.00 Skilled Worker
4 Pipe Fitter 500.00 Skilled Worker
Operator
5 500.00 Skilled Worker
(Butt-Fusion & Electro-Fusion Machine)
6 Technician (Machine) 500.00 Skilled Worker
7 Electrician 500.00 Skilled Worker
8 Driver (Truck) 500.00 Skilled Worker
9 Driver (Heavy Equipment) 500.00 Skilled Worker
Equipment Rates
Item Description Rate per DAY Remarks
(Peso)
1 Truck (10 wheeler) Non-Skilled Worker
2 Truck (6 Wheeler) Skilled Worker
3 Truck (4 Wheeler) Skilled Worker
4 Boom Truck 4,000.00
5 Backhoe (0.7 cu.m. size) 15,000.00 Skilled Worker
6 Dump Truck Skilled Worker
Power Generator (60 KVA)
= for use of two (2) Welding machines
7 Rental = P8,500 + 11,700.00 Skilled Worker
(P400x8=P3,200 Diesel)
= P11,700/day
Power Generator (150 KVA)
= for use of 2 Welding machines
& 1 Jack hammer at the same time
8 19,600.00 Skilled Worker
Rental = P14,000 +
(P700x8=P5,600 Deisel) =
P19,600
Air Compressor (90 KVA)
= for use 1 Jack Hammer
9 Rental = P10,000 + 14,800.00 Skilled Worker
(P600x8=P4,800 Diesel) =
P14,800
10 Butt-Fusion Machine (63mm to 600 mmm dia) 4,000.00
Butt-Fusion Machine (700mm to 1500 mmm dia) 8,000.00
Butt-Fusion Machine (1,600mm to 2,500 mmm dia) 16,000.00
Electro-Fusion Machine (63mm to 600 mmm dia) 800.00
Electro-Fusion Machine (700mm to 1500 mmm dia) 1,600.00
Electro-Fusion Machine (1,600mm to 2,500 mmm dia) 3,000.00
Cutter Machine 500.00