To,
Encl: As above
Thanking you
ANNEXRURE-I
SPECIFICATIONS OF WORK
Ground Floor
❖ Ground Floor Only Construction Work, R:C:C & Brick Work
First Floor
❖ First Floor Only Construction Work, R:C:C & Brick Work
Structure:
Common facilities:
QUOTATION
1.The cost of labour, tools and machinery required for execution of the whole
project as per Layout plan & detailed design and drawings to be approved, specifications
etc.
is within the scope of this work.
2.The work started after drawing and specification approved by the client.
3.Work to be executed as per Plinth Area Rate as given below:
4.Deviated/Extra Item is to be extra charge applicable.