Professional Documents
Culture Documents
Baldau New Resume PDF
Baldau New Resume PDF
Experience
i) INCOTEC ENERGY LTD. (GMR 685x2 MW) THERMAL POEWR PLANT
RAIKHEDA TILDA - as a SHIFT CHEMIST
From 4th Aug. 2014 to till date.
ii) INDOCHEM PVT. LTD., (250x2 MW) THERMAL POWER PLANT
POWER PLANT III UNDER N.S.P.C.L. - as a SHIFT CHEMIST
From 5th Jan. 2014 to 30th July 2014
iii) TRIVENI ENGINEERING (74 MW) Thermal Power Plant, Power Plant II
NSPCL Bhliai - as a SHIFT CHEMIST
From 26th Oct. 2012 to 24th Dec. 2013.
iv) ION Exchange India Ltd. (74 MW) Thermal Power Plant, Power Plant II
NSPCL Bhliai - as a SHIFT CHEMIST
From 1st Jan. 2011 to 25th Oct. 2012
v) DROLIA ELECTROSTEEL PVT. LTD., Siltara, Raipur as a Chemist (12
MW) Power Plant
From 10th Dec. 2007 to 20th Dec. 2010.
Job Details Boiler Water, CW, DM Water, Coal, Oil, Hydrogen and Flue Gas,
Fly and Bottom Ash Analysis
DECLARATION
I hereby declare that all above information are given by me is true to the best of my
knowledge and belief.
Date :
Place : Bhilai (BALDAOO NETAM)