SITE NAME: SHELL TEMERLOH

RATE 2020
S/N Description UOM Qty Amount (RM)
(RM)

1.00 PRELIMINARIES

1.01 Transportation & mobilization:


Regions :-
a. Central per trip 500.00
b. Northern per trip 1,000.00
c. Southern per trip 1,100.00 -
d. Eastern per trip 1,200.00 2.00 2,400.00
m
1.02 Skylift for perimeter light replacement & monolith day 650.00 5.00 3,250.00
enhancement work.
1.03 Scaffolding for GC Works RVIe - Provided site -
-
-
-
2.00 DISPENSER (PUMP) - TO INCLUDE -
REPLACEMENT OF BROKEN / DAMAGED
RIVET & FASTENERS
-
2.01 Labour & material to spray paint existing dispenser pump pump 800.00 2.00 1,600.00
body & panels c/w necessary preparation work & surface
treatment.
-
2.02 Install new nozzle jacket - 95,97, Euro nos 15.00 7.00 105.00

-
-
-
cont'd -
cont'd -
-
2.03 Supply & install V-Power nozzle jacket Scuffguard red and nos 15.00 -
EK 097 SNS Nose with Splashguard red

-
2.04 Install pump sticker: -
a. Installation only, pump body livery 3M Transparent stickers -
at bottom panel (SHELL logo, yellow & red stickers) c/w
coating to deter vandalism for :-
- for 2& 4 pumps sets 40.00 1.00 40.00
- for 6 pumps sets 48.00 1.00 48.00
b. Installation only, pump number 3M Opaque sticker piece 2.00 7.00 14.00
c. Installation only, product 3M Normal stickers (Nozzle stickers) piece 2.00 7.00 14.00

d. Supply & install pump product stickers (vertically) at one side piece 2.00 7.00 14.00
of panels
-
2.05 Making good OPT unit as below: -
a. Labour & tools for general cleaning plastic casing around nos 5.00 8.00 40.00
existing OPT unit
b. Installation only, Keypad Sticker Neo Sunny (By Tatsuno) piece -
c. Installation only, Display Sticker (By Tatsuno) piece -
d. Installation only, Keypad Sticker (By Tatsuno) piece -
e. Installation only, 16key sheet (By Tatsuno) piece -
f. Installation only, 10 key sheet (By Tatsuno) piece -
-
-
3.00 REFRESH ISLAND FURNITURE -
-
3.01 Installation only, new Customer Service Unit (CSU) c/w nos 20.00 2.00 40.00
dismantle & cart away exisitng unit
-
3.02 Installation only, new Merchandising Unit (MDU) c/w nos 20.00 -
diamantle & cart away existing unit
-
-
-
-
-
-
cont'd -
cont'd -
-
3.03 Leader Board -
a. Installation only, new Leader Board (ABS material) to receive nos 15.00 3.00 45.00
product stickers (in opaque material) c/w dismantle & cart
away existing
b. Installation only, new product sticker (in opaque material) to nos 13.00 -
existing Leader Board c/w general cleaning.
-
3.04 Installation only, new Stanchion Poster unit at canopy nos 15.00 6.00 90.00
column c/w dismantle & cart away existing unit
-
3.05 Installation only, new product sticker & cut out Shell logo piece 15.00 6.00 90.00
sticker (in opaque material) to existing Spreader Signage
c/w general cleaning.
-
3.06 Installation only, new Column Pump Number (double nos 15.00 6.00 90.00
sided in nubering sticker) c/w dismatle cart away existing
unit.
-
3.07 Making good Canopy Column as below: -
a. Labour & material to paint existing canopy column c/w skim lot/column 240.00 3.00 720.00
coat column surface (inclusive skirting in grey paint)
b. Supply & install new sticker for column wrapping. lot/column 30.00 1.00 30.00
-
3.08 Making good Dog Bone Platform as below: -
a. Hack exisiting & replace with new tile to overall unit dog -
bone platform as below:
(i) Size: ±3500mm (max Lngth) x ±1100mm (max Width) lot 350.00 -
(ii) Size: ±6000mm (max Lngth) x ±1100mm (max Width) lot 800.00 -

b. Replace broken 150mm x 150mm tiles at dog bone platform -


c/w hacking work as below:
(i) Not exceeding 5 pieces lot 20.00 -
(ii) 6 - 10 pieces lot 35.00 3.00 105.00
(ii) >10 <15 pieces lot N/A

c. Replace broken 20mm x 20mm cork tiles at dog bone m 20.00 10.00 200.00
platform c/w hacking work.
-
-
cont'd -
cont'd -
-
d. Replace broken 200mm x 100mm parking bay tiles near dog -
bone platform c/w hacking work.
(i) Not exceeding 5 pieces lot 40.00 -
(ii) 6 - 10 pieces lot 70.00 14.00 980.00

e. Labour & material to paint existing parking bay line using lot/bay 150.00 3.00 450.00
normal paint (no warranty on peeling off) at pump dispenser

f. Labour & material to relaminte Dog Bone Platform with FRP lot/island 1,300.00 -
(Standard island 1m x 3m)
-
-
-
4.00 REFRESH OF CANOPY CEILING, RVIE AND / -
OR MONOLITH
-
4.01 Install new Canopy Fascia c/w dismantle & cart away -
existing :-
a. Installation only, Duo color 1.40m -fix set 25.00 5.00 125.00
b. Installation only, Duo color 2.70m Standard -fix set 25.00 7.00 175.00
c. Installation only, Duo color 2.7m -Adjustable set 25.00 4.00 100.00
d. Installation ACM Red set 4.00 -
e. To terminate existing power driver set 25.00 1.00 25.00
-
4.02 Making good Canopy Fascia as below: -
a. Supply & apply white paint for the canopy fascia top capping m 7.00 100.00 700.00
(including necessary surface preparation prior repainting)

b. Supply & apply (yellow/red/white) paint for the canopy fascia m 7.00 -
Level 2 panel
(including necessary surface preparation prior repainting)
c. Labour & tools to clean Canopy Fascia with water jet. m 4.00 110.00 440.00
d. Supply & install yellow & red sticker for existing canopy m 20.00 -
fascia RVIE/RVI Level 2 (w/o LED red bar) c/w tear down
existing sticker & preparation to receive new.
-
-
-
-
cont'd -
cont'd -
-
4.03 Making Good Canopy Pecten as below: -
a. Installation only, new sticker (iluminated type) for existing piece 45.00 1.00 45.00
Canopy Pecten c/w tear down existing and surface treatment
if necessary.
b. Labour & tools for general cleaning of existing Canopy lot 25.00 1.00 25.00
Pecten
c. Supply & install new lighting to existing LED Pecten c/w lot 80.00 1.00 80.00
dismantle existing.
-
4.04 Making good works for Canopy False Ceiling as below: -
a. Labour & tools to clean existing canopy false ceiling using m2 4.00 405.00 1,620.00
water jet for both Luxalon & V-Crimp type.
b. Labour & tools to clean existing canopy false ceiling using m2 4.00 -
dry cleaning method for both Luxalon & V-Crimp type.
c. Supply & apply paint under canopy false ceiling (Luxalon) m2 8.00 -
c/w necessary surface preparation prior repainting.
d. Supply & apply paint under canopy false ceiling (V-Crimp) m2 8.00 -
c/w necessary surface preparation prior repainting.
e. Labour & material to patch rusted canopy ceiling unit 50.00 -
-
4.05 Installationa only, new signages c/w sticker (reflective type). -
Note: inclusive diasmantle & cart away existing (GFA items)
a. Ingress nos 15.00 1.00 15.00
b. Egress nos 15.00 1.00 15.00
c. Air balancer nos 15.00 1.00 15.00
d. Directional signages nos 15.00 1.00 15.00
e. Surface Mounted Fix nos 15.00 -
-
4.06 Making Good Existing Signage -
Supply & apply spray paint to existing signage feature with
surface tratment if necessary c/w new sticker (reflective
type).
a. Ingress nos 50.00 -
b. Egress nos 50.00 -
c. Air balancer nos 50.00 -
d. Directional signages nos 50.00 1.00 50.00
e. Repaint Select Portico nos -
-
cont'd -
cont'd -
-
4.07 Making good Monolith as below :- -
a. Labour & tools to clean Monolith with water jet. lot/monolith 200.00 1.00 200.00
b. Repaint existing monolith footing with selected colour paint lot/monolith 200.00 -
c/w necessary surface treatment prior painting works.
c. Installation only, new Shell Logo Sticker (illuminated type) to pieces 50.00 2.00 100.00
existing Pecten
d. Installation only, new Message Sticker Small (1840mm x pieces 50.00 4.00 200.00
480mm)
e. Installation only, new Message Sticker Large(1840mm x pieces 50.00 2.00 100.00
1094mm)
f. Installation only, new Sticker Seperator (2000mm x 170mm) pieces 50.00 2.00 100.00

g. Installation only, Acrylic Small (1840mm x 480mm) pieces 50.00 -


h. Installation only, Acrylic Large(1840mm x 1094mm) pieces 50.00 -
i Supply & install new LED Strip light c/w tear down existing -
light tube):
- Monolith pecten lot/monolith 150.00 1.00 150.00
- 0.6m Poster single panel lot/monolith 150.00 -
- 1.2m Poster double panel lot/monolith 150.00 1.00 150.00
k. Supply & install Blank Panel pieces 150.00 1.00 150.00
-
4.08 Installation only, new Carwash Fascia/Signage (RVIE item) -
c/w dismantle & cart away existing:
a. Carwash Panel set -
b. Standard Panel set -
c. Left Panel set -
d. Right Panel set -
e. Labour to dismantle existing panel m -
-
4.09 Installation only, new Helix Service Centre Fascia/Signage -
(Rvie item) c/w dismantle & cart away exisitng:
a. Helix Panel set -
b. Standard Panel set -
c. Left Panel set -
d. Right Panel set -
e. Labour to dismantle existing panel m -
-
-
cont'd -
cont'd -
-
5.00 LUCI LED LIGHTING -
-
5.01 Lighting Works for Canopy (UCL): -
a. Installation of Lighting Unit (UCL) each 70.00 -
b. To Modify & Install UCL c/w Neccesary Plating each 90.00 -
c. Relocation Works of Lighting Unit (UCL) each -
-
5.02 Perimeter / Street Lighting (Compound light): -
a. Installation of Lighting Unit (Street Light) each 70.00 -
b. To Modify & Install Street Light c/w Neccesary Plating each -
-
5.03 Photo Sensor Installation unit 300.00 -
-
-
-
6.00 DRIVEWAY OR FORECOURT PAVEMENT -
IMPROVEMENT
-
6.01 Labour & tools to clean affected concrete surface (with m2 4.00 300.00 1,200.00
grease & oil spillage) using water jet & detergent.
-
6.02 Making good VPR/E5 (Driveway Marking) bays: -
a. Supply & apply epoxy paint to VPR/E5 (Driveway Marking) bay -
bays c/w necessary surface preparation prior rpainting work
- within Klang Valley

b. Supply & apply epoxy paint to VPR/E5 (Driveway Marking) bay -


bays c/w necessary surface preparation prior painting work
- outside Klang Valley but within Peninsular

c. To fabricate VPR/E5 (Driveway Marking) bays with epoxy bay -


paint c/w necessary surface preparation prior painting work
- within Klang Valley

d. To fabricate VPR/E5 (Driveway Marking) bays with epoxy bay -


paint c/w including necessary surface preparation prior
painting work
- out of klang valley but within Peninsular
e. Repaint yellow lines / driveway marking (including necessary lot -
surface preparation prior repainting)
-
-
cont'd -
cont'd -
-
6.03 Bollard Poles: -
a. Supply & apply paint to bollard poles (island & decantation each 50.00 5.00 250.00
platform) c/w necessary surface preparation prior painting
work
b. Supply & install new Bollard Pole -shop front unit -
6.04 Supply & install new Guard Rail m -
6.05 Vent stacks/pipes & goose neck: -
a. Supply & apply paint to vent stacks c/w necessary surface pipe 50.00 5.00 250.00
preparation prior painting work
b. Supply & apply paint to goose neck & floor marking c/w per 15.00 5.00 75.00
necessary surface preparation prior painting work.
c. Install new vent pipes signage c/w dismantle & cart away each 15.00 1.00 15.00
existing unit.
-
6.06 Tanker Bay: -
a. Replace broken 200mm x 100mm tanker parking bay tiles -
c/w hacking work.
(i) Not exceeding 5 pieces lot 60.00 -
(ii) 6 - 10 pieces lot 100.00 -

b. Hack, remove and cart away existing tiles & lay cement m2 100.00 -
render at tanker discharge area:
c. Hack, remove and cart away existing tiles & lay cement lot 100.00 -
render at tanker discharge area
-
6.07 Road Kerb: -
a. Supply & apply paint to existing surrounding road kerb c/w m 13.00 45.00 585.00
necessary surface preparation prior painting work.
b. Repair/Make good existing surrounding road kerb m 35.00 25.00 875.00
c. To construct new road kerb at damage area m 90.00 6.00 540.00
-
-
-
cont'd -
cont'd -
-
6.08 Flag Pole: -
a. To repaint Flag pole nos 50.00 -
b. To Remove damage flag pole and replace with new flag pole nos -

7 NON CONTRACT ITEM


a To dismantle existing lighting pole, construct new base and nos 1,200.00 3.00 3,600.00
install new lighting pole including wire reconnection
b To supply and apply 3M anti soil coating at RVIE m2 35.00 25.00 875.00
c To install 3M Overlaminate film nos 2.00 3.00 6.00

TOTAL AMOUNT (RM) 23,231.00