Name of Personnel : GAEA CHRISTIE N. JABON


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: Week 4: May 24-28 & May 31, 2021

Alternative Work Arrangement


Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)

1. Reminded the school heads to submit their liquidation


documents.

2. Virtual coaching / mentoring to the newly-hired


Bookkeeper.

HOME QUARANTINE
3. Virtually checked liquidations of various schools.

4. Provide virtual technical assistance to School Heads

Submitted by: Approved by:

GAEA CHRISTIE N. JABON JESSIE ROSE B. CABAÑERO


ADAS III Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

(Enclosure No. 3 to Office Memorandum No. 18 series 2021)

WORK-WEEK PLAN
For the Month of ___________________, 2021

DATE PLANNED WORK FOR THE MONTH


Week 1
Day 1 Typhoon DANTE
Day 2 Received DTR & other documents from GNHS Provisional Teachers for the
month of May 2021
Day 3
Day 4
Day 5
Week 1
Day 1
Day 2
Day 3
Day 4
Day 5
Week 1
Day 1
Day 2
Day 3
Day 4
Day 5
Week 1
Day 1
Day 2
Day 3
Day 4
Day 5

Prepared by:

ROWENA P. RAQUIZA
ADAS II
Noted:

JESSIE ROSE B. CABAÑERO


Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

(Enclosure No. 3 to Office Memorandum No. 18, series 2021)

WORK-WEEK PLAN
For the month of February, 2022

DATE
PLANNED WORK FOR THE MONTH
Week 1
Tuesday, February 1, 2022 > Received & Checked documents as to completeness of the requirements

Wednesday, February 2, 2022


> Prepares Disbursement Vouchers (MOOE/PS)
Thursday, February 3, 2022 > Posted to the Index of Payment & Salary Breakdown for update
Friday, February 4, 2022 > Prepares Certificate of Creditable Tax Witheld at Source
> Forward documents to ASDS Office for signature
Week 2
Monday, February 7, 2022 > Received & Checked documents as to completeness of the requirements
Tuesday, February 8, 2022 > Prepares Disbursement Vouchers (MOOE/PS)

Wednesday, February 9, 2022


> Posted to the Index of Payment & Salary Breakdown for update
Thursday, February 10, 2022 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, February 11, 2022 > Forward documents to ASDS Office for signature
Week 3
Monday, February 14, 2022 > Received & Checked documents as to completeness of the requirements
Tuesday, February 15, 2022 > Prepares Disbursement Vouchers (MOOE/PS)

Wednesday, February 16, 2022 > Posted to the Index of Payment & Salary Breakdown for update

Thursday, February 17, 2022 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, February 18, 2022 > Forward documents to ASDS Office for signature
Week 4
Monday, February 21, 2022 > Received & Checked documents as to completeness of the requirements
Tuesday, February 22, 2022 > Prepares Disbursement Vouchers (MOOE/PS)

Wednesday, February 23, 2022 > Posted to the Index of Payment & Salary Breakdown for update

Thursday, February 24, 2022 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, February 25, 2022 > Forward documents to ASDS Office for signature
Week 5
Monday, February 28, 2022 > Received & Checked documents as to completeness of the requirements

> Prepares Disbursement Vouchers (MOOE/PS)


> Posted to the Index of Payment & Salary Breakdown for update
> Prepares Certificate of Creditable Tax Witheld at Source
> Forward documents to ASDS Office for signature

Prepared by:

ROWENA P. RAQUIZA
Employee

Noted:

JESSIE ROSE B. CABAÑERO


Chief/Section/Unit Head

Telefax: (005) 251-3196/(005) 530-0175


Email: depedcatbalogancitydivision15@gmail.com

Republic of the Philippines


Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: May 27-31, 2021

Alternative Work Arrangement Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)
05/27/2021 Follow-up lacking documents of Multi-Grade Teachers from different
Time-in: 8:00 AM schools
Time out: 5:00 PM

05/28/2021
*Work From Home Time-in: 8:00 AM Follow-up returned documents (lacking) to BAC & Supply Office
Time out: 5:00 PM

05/31/2021
Time-in: 8:00 AM Followed directives from the Accountant
Time out: 5:00 PM
Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

(Enclosure No. 3 to Office Memorandum No. 18, series 2021)

WORK-WEEK PLAN
For the month of February, 2022

DATE
PLANNED WORK FOR THE MONTH
Week 1
Tuesday, February 1, 2022 > Submit documents to DBP, Bureau of Treasury

Wednesday, February 2, 2022 > Deposit collections to DBP Catbalogan Branch

Thursday, February 3, 2022 > Sorted Payrolls & Payslips with dry sealed

Friday, February 4, 2022 > Released Payslip to PSDS


> Facilitate signing of payrolls to all districts
Week 2
Monday, February 7, 2022 > Submit documents to DBP, Bureau of Treasury
Tuesday, February 8, 2022 > Deposit collections to DBP Catbalogan Branch

Wednesday, February 9, 2022 > Sorted Payrolls & Payslips with dry sealed

Thursday, February 10, 2022 > Released Payslip to PSDS


Friday, February 11, 2022 > Facilitate signing of payrolls to all districts
Week 3
Monday, February 14, 2022 > Submit documents to DBP, Bureau of Treasury
Tuesday, February 15, 2022 > Deposit collections to DBP Catbalogan Branch

Wednesday, February 16, 2022 > Sorted Payrolls & Payslips with dry sealed

Thursday, February 17, 2022 > Released Payslip to PSDS


Friday, February 18, 2022 > Facilitate signing of payrolls to all districts
Week 4
Monday, February 21, 2022 > Submit documents to DBP, Bureau of Treasury
Tuesday, February 22, 2022 > Deposit collections to DBP Catbalogan Branch

Wednesday, February 23, 2022 > Sorted Payrolls & Payslips with dry sealed

Thursday, February 24, 2022 > Released Payslip to PSDS


Friday, February 25, 2022 > Facilitate signing of payrolls to all districts
Week 5
Monday, February 28, 2022 > Submit documents to DBP, Bureau of Treasury
> Deposit collections to DBP Catbalogan Branch
> Sorted Payrolls & Payslips with dry sealed

> Released Payslip to PSDS


> Submit documents to GSIS & Philhealth
> Facilitate signing of payrolls to all districts

Prepared by:

JUANA P. SABIO
Employee

Noted:

CATHERINE T. GALLEGAR
Chief/Section/Unit Head

Telefax: (005) 251-3196/(005) 530-0175


Email: depedcatbalogancitydivision15@gmail.com

Republic of the Philippines


Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: May 27-31, 2021

Alternative Work Arrangement


(*Indicate if 2-week shift) Date and Actual Time Logs Actual Accomplishments

05/27/2021 Follow-up lacking documents of Multi-Grade Teachers from different


Time-in: 8:00 AM schools
Time out: 5:00 PM

05/28/2021
*Work From Home Time-in: 8:00 AM Follow-up returned documents (lacking) to BAC & Supply Office
Time out: 5:00 PM
*Work From Home

05/31/2021
Time-in: 8:00 AM Followed directives from the Accountant
Time out: 5:00 PM

Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
F+F89or the month of Ju+A81:C99
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

(Enclosure No. 3 to Office Memorandum No. 18, series 2021)

WORK-WEEK PLAN
For the month of February, 2022

DATE
PLANNED WORK FOR THE MONTH
Week 1
Tuesday, February 1, 2022 > Provide transport service to Schools Division Superintendent & Employees

Wednesday, February 2, 2022 > Maintain service vehicle in good condition & perform maintenance activities if needed

> Recommends repair or replacement of damaged parts to Administrative/General Services Unit & follows up
Thursday, February 3, 2022
to ensure vehicle serviceability at all times

Friday, February 4, 2022 > Prepares/encode fuel, oil consumption and distance traveled & submit to Accounting Office

> Assist in routing documents to assigned office


Week 2
Monday, February 7, 2022 > Provide service transport to Schools Division Superintendent & Employees

Tuesday, February 8, 2022 > Maintain service vehicle in good condition & perform maintenance activities if needed

> Recommends repair or replacement of damaged parts to Administrative/General Services Unit & follows up
Wednesday, February 9, 2022
to ensure vehicle serviceability at all times

Thursday, February 10, 2022 > Prepares/encode fuel, oil consumption and distance traveled & submit to Accounting Office

Friday, February 11, 2022 > Assist in routing documents to assigned office
Week 3
Monday, February 14, 2022 > Provide service transport to Schools Division Superintendent & Employees

Tuesday, February 15, 2022 > Maintain service vehicle in good condition & perform maintenance activities if needed

> Recommends repair or replacement of damaged parts to Administrative/General Services Unit & follows up
Wednesday, February 16, 2022
to ensure vehicle serviceability at all times

Thursday, February 17, 2022 > Prepares/encode fuel, oil consumption and distance traveled & submit to Accounting Office

Friday, February 18, 2022 > Assist in routing documents to assigned office
Week 4
Monday, February 21, 2022 > Provide service transport to Schools Division Superintendent & Employees

Tuesday, February 22, 2022 > Maintain service vehicle in good condition & perform maintenance activities if needed

> Recommends repair or replacement of damaged parts to Administrative/General Services Unit & follows up
Wednesday, February 23, 2022
to ensure vehicle serviceability at all times

Thursday, February 24, 2022 > Prepares/encode fuel, oil consumption and distance traveled & submit to Accounting Office

Friday, February 25, 2022 > Assist in routing documents to assigned office
Week 5
Monday, February 28, 2022 > Provide service transport to Schools Division Superintendent & Employees

> Maintain service vehicle in good condition & perform maintenance activities if needed

> Recommends repair or replacement of damaged parts to Administrative/General Services Unit & follows up
to ensure vehicle serviceability at all times

> Prepares/encode fuel, oil consumption and distance traveled & submit to Accounting Office

> Assist in routing documents to assigned office

VENERANDO E. UY
Employee

Noted:

MICHAEL G. CABAÑERO
Chief/Section/Unit Head
Telefax: (005) 251-3196/(005) 530-0175
Email: depedcatbalogancitydivision15@gmail.com

Republic of the Philippines


Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: May 27-31, 2021

Alternative Work Arrangement Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)
05/27/2021 Follow-up lacking documents of Multi-Grade Teachers from different
Time-in: 8:00 AM schools
Time out: 5:00 PM

05/28/2021
*Work From Home Time-in: 8:00 AM Follow-up returned documents (lacking) to BAC & Supply Office
Time out: 5:00 PM

05/31/2021
Time-in: 8:00 AM Followed directives from the Accountant
Time out: 5:00 PM

Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
F+F89or the month of Ju+A81:C99
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

(Enclosure No. 3 to Office Memorandum No. 18, series 2021)

WORK-WEEK PLAN
For the month of July, 2021

DATE
PLANNED WORK FOR THE MONTH
Week 1
Thursday, July 1, 2021 > Received & Checked documents as to completeness of the requirements
Friday, July 2, 2021 > Prepares Disbursement Vouchers (MOOE/PS)

> Posted to the Index of Payment & Salary Breakdown for update
> Prepares Certificate of Creditable Tax Witheld at Source
> Forward documents to ASDS Office for signature
Week 2
Monday, July 5, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, July 6, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, July 7, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, July 8, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, July 9, 2021 > Forward documents to ASDS Office for signature
Week 3
Monday, July 12, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, July 13, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, July 14, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, July 15, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, July 16, 2021 > Forward documents to ASDS Office for signature
Week 4
Monday, July 19, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, July 20, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, July 21, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, July 22, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, July 23, 2021 > Forward documents to ASDS Office for signature
Week 5
Monday, July 26, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, July 27, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, July 28, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, July 29, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, July 30, 2021 > Forward documents to ASDS Office for signature

Prepared by:

ROWENA P. RAQUIZA
Employee

Noted:

JESSIE ROSE B. CABAÑERO


Chief/Section/Unit Head

Telefax: (005) 251-3196/(005) 530-0175


Email: depedcatbalogancitydivision15@gmail.com
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: May 27-31, 2021

Alternative Work Arrangement


Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)
05/27/2021 Follow-up lacking documents of Multi-Grade Teachers from different
Time-in: 8:00 AM schools
Time out: 5:00 PM

05/28/2021
*Work From Home Time-in: 8:00 AM Follow-up returned documents (lacking) to BAC & Supply Office
Time out: 5:00 PM

05/31/2021
Time-in: 8:00 AM Followed directives from the Accountant
Time out: 5:00 PM

Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

(Enclosure No. 3 to Office Memorandum No. 18, series 2021)

WORK-WEEK PLAN
For the month of June, 2021

DATE
PLANNED WORK FOR THE MONTH
Week 1
Tuesday, June 1, 2021 > Received & Checked documents as to completeness of the requirements
Wednesday, June 2, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Thursday, June 3, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Friday, June 4, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
> Forward documents to ASDS Office for signature
Week 2
Monday, June 7, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, June 8, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, June 9, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, June 10, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, June 11, 2021 > Forward documents to ASDS Office for signature
Week 3
Monday, June 14, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, June 15, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, June 16, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, June 17, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, June 18, 2021 > Forward documents to ASDS Office for signature
Week 4
Monday, June 21, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, June 22, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, June 23, 2021 > Posted to the Index of Payment & Salary Breakdown for update
Thursday, June 24, 2021 > Prepares Certificate of Creditable Tax Witheld at Source
Friday, June 25, 2021 > Forward documents to ASDS Office for signature
Week 5
Monday, June 28, 2021 > Received & Checked documents as to completeness of the requirements
Tuesday, June 29, 2021 > Prepares Disbursement Vouchers (MOOE/PS)
Wednesday, June 30, 2021 > Posted to the Index of Payment & Salary Breakdown for update
> Prepares Certificate of Creditable Tax Witheld at Source
> Forward documents to ASDS Office for signature

Prepared by:

ROWENA P. RAQUIZA
Employee

Noted:

JESSIE ROSE B. CABAÑERO


Chief/Section/Unit Head

Telefax: (005) 251-3196/(005) 530-0175


Email: depedcatbalogancitydivision15@gmail.com
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: May 27-31, 2021

Alternative Work Arrangement


Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)
05/27/2021 Follow-up lacking documents of Multi-Grade Teachers from different
Time-in: 8:00 AM schools
Time out: 5:00 PM

05/28/2021
*Work From Home Time-in: 8:00 AM Follow-up returned documents (lacking) to BAC & Supply Office
Time out: 5:00 PM

05/31/2021
Time-in: 8:00 AM Followed directives from the Accountant
Time out: 5:00 PM

Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
F+F89or the month of Ju+A81:C99
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: April 05 - 30, 2021

Alternative Work Arrangement


Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)

04/05/2021
Time-in: 8:00 AM Received DTR's and Accomplishment Report from A. Macaspag &
R. Dacallos for the month of March 2021
Time out: 5:09 PM

04/06/2021
*Work From Home Time-in: 7:59 AM Follow up lacking requirements of V. Balibalos (substitute) for her
salary claim
Time out: 5:07 PM

04/07/2021
Time-in: 7:59 AM Received documents from R. Dabuet for the month of March
2021 for his salary claim
Time out: 5:07 PM

04/08/2021 1.Prepared Disbursement Vouchers (MOOE & PS)


Time-in: 8:18 AM
Time out: 5:04 PM 2. Posted to the Index of Payment
3. Salary Breakdown Posted
04/12/2021 1.Prepared Disbursement Vouchers (MOOE & PS)
Time-in: 8:18 AM 2. Posted to the Index of Payment
Skeleton Work Force Time out: 5:04 PM 3. Salary Breakdown Posted
04/13/2021 1.Prepared Disbursement Vouchers (MOOE & PS)
Time-in: 8:18 AM 2. Posted to the Index of Payment
Time out: 5:04 PM 3. Salary Breakdown Posted
04/14/2021 1.Prepared Disbursement Vouchers (MOOE & PS)
Time-in: 8:18 AM 2. Posted to the Index of Payment
Time out: 5:04 PM 3. Salary Breakdown Posted

04/15/2021
Time-in: 8:13 AM Followed directives of the Accountant
Time out: 5:04 PM
*Work From Home
04/16/2021
Time-in: 7:52 AM Followed directives of the Accountant
Time out: 5:03 PM

Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : ROWENA P. RAQUIZA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: April 05 - 30, 2021
Alternative Work
Arrangement
Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week
shift)
04/19/2021 Follow up lacking documents for salary
Time-in: 8:00 AM
claim
Time out: 5:09 PM

04/202021
Answered querries of teachers thru
*Work From Home Time-in: 7:59 AM messages for their salaries
Time out: 5:07 PM

04/21/2021 Follow up lacking documents thru


Time-in: 7:59 AM
messages
Time out: 5:07 PM
1.Prepared Disbursement Vouchers
04/22/2021 (MOOE & PS)
Time-in: 7:41 AM
Time out: 5:05 PM 2. Posted to the Index of Payment
3. Salary Breakdown Posted
1.Prepared Disbursement Vouchers
04/23/2021 (MOOE & PS)
Time-in: 8:23 AM
Time out: 5:01 PM 2. Posted to the Index of Payment
3. Salary Breakdown Posted
1.Prepared Disbursement Vouchers
04/26/2021 (MOOE & PS)
Skeleton Work Force Time-in: 7:41 AM
Time out: 5:06PM 2. Posted to the Index of Payment
3. Salary Breakdown Posted
Skeleton Work Force

1.Prepared Disbursement Vouchers


04/27/2021 (MOOE & PS)
Time-in: 8:18 AM
Time out: 5:01 PM 2. Posted to the Index of Payment
3. Salary Breakdown Posted
1.Prepared Disbursement Vouchers
04/28/2021 (MOOE & PS)
Time-in: 8:01 AM
Time out: 5:13 PM 2. Posted to the Index of Payment
3. Salary Breakdown Posted
04/29/2021
Answered & Follow up lacking
Time-in: 8:13 AM
documents for payments
*Work From Home Time out: 5:04 PM

04/30/2021
Answered & Follow up lacking
Time-in: 7:52 AM
documents for payments
Time out: 5:13 PM

Submitted by: Approved by:

ROWENA P. RAQUIZA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : YOLANDA M. ARIZALA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: May 03 - 31, 2021

Alternative Work Arrangement Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)
05/03/2021
Time-in: 8:00 AM 1. Prepared disbursement vouchers (MOOE & PS)
Time out: 5:09 PM 2. Printed 2316 CY 2020
3. Online payment of EFPS
05/04/2021 for the remittance of tax withheld month of April
Time-in: 7:59 AM
Time out: 5:07 PM 4. Posted liquidation report of elementary, secondary &
Skeleton Work Force
senior high
5. Posted MOOE downloading to the
different schools 6.
05/05/2021 Posted disbursement vouchers to the Summary of Utilization
Time-in: 7:59 AM 7. Prepared
Time out: 5:07 PM reports to RO

04/08/2021
Time-in: 9:13 AM
Time out: 5:10 PM
1. Arranged 2316 based on Alphalist of Elementary,
Secondary, Senior High School & Newly Hired CY 2020
04/12/2021 2. Prepared Certification (ANNEX F) for
*Work From Home Time-in: 9:30 AM
the substituted filing
Time out: 5:00 PM 3. Notarized the Certification (ANNEX F)
04/13/2021
Time-in: 9:26 AM
Time out: 5:10 PM

04/15/2021
Time-in: 8:13 AM
Time out: 5:04 PM 1. Prepared disbursement vouchers (MOOE & PS)
2. Posted liquidation report of elementary,
secondary & senior high
04/16/2021
Skeleton Work Force Time-in: 7:52 AM
Time out: 5:03 PM 3. Posted MOOE downloading to the different schools
4. Posted disbursement
vouchers to the Summary of Utilization
04/21/2021 5. Checked petty cash fund
Time-in: 8:49 AM
Time out: 5:04 PM

04/22/2021
Provided technical assistance to the bookkeeper of GNHS
Time-in: 8:30 AM
Time out: 5:15 PM thru messages regarding their school MOOE

04/23/2021
Time-in: 8:15 AM Answered querries to the bookkeeper of AGTNHS thru
Time out: 5:00 PM messages regarding the salaries of the newly hired teachers

04/26/2021
Answered querries to the Provisional teachers of SNS thru
*Work From Home Time-in: 8:20 AM
Time out: 5:15 PM messages for their salaries

04/27/2021
Time-in: 8:30 AM Answered querries to the Provisional teachers of GNHS thru
messages for their salaries
Time out: 5:15 PM

04/28/2021
Provided technical assistance to the bookkeeper of AGTNHS
Time-in: 8:15 AM
thru messages regarding their school MOOE
Time out: 5:00 PM

Submitted by: Approved by:


YOLANDA M. ARIZALA JESSIE ROSE B. CABAÑERO
ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : YOLANDA M. ARIZALA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: March 15 - 17, 2021

Alternative Work Arrangement


(*Indicate if 2-week shift) Date and Actual Time Logs Actual Accomplishments

03/15/2021
Sent messages to the bookkeepers regarding the 2316/W2 of
Time-in: 8:10 AM the teachers are already available and ready for released.
Time out: 5:00 PM

03/16/2021
Time-in: 8:00 AM Provided technical assistance to the bookkeeper of CNCHS thru
Work From Home messages on how to print the 2316 in a new version
Time out: 5:10 PM

03/17/2021
Time-in: 8:20 AM Provided technical assistance to the bookkeeper of CNCHS thru
messages regarding the Annex F of the BIR
Time out: 5:00 PM

Submitted by: Approved by:

YOLANDA M. ARIZALA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : YOLANDA M. ARIZALA


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: March 29 - 31, 2021

Alternative Work Arrangement Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)

02/25/2021 Answered all querries to the bookkeeper of AGTNHS thru


Time-in: 8:25 AM
messages regarding the salaries of their newly hired teachers
Time out: 5:10 PM

02/26/2021 Provided technical assistance to the bookkeeper of CNCHS thru


Work From Home Time-in: 8:15 AM
messages on how to convert the data to dat.file
Time out: 5:06 PM

03/31/2021 Answered all querries to the provisional teachers GNHS thru


Time-in: 8:30 AM
Time out: 5:05 PM messages regarding their salaries.

Submitted by: Approved by:

YOLANDA M. ARIZALA JESSIE ROSE B. CABAÑERO


ADAS II Accountant III
Republic of the Philippines
Department of Education
REGION VIII – EASTERN VISAYAS
SCHOOLS DIVISION OF CATBALOGAN CITY

Office of the Schools Division Superintendent

INDIVIDUAL DAILY LOGS AND ACCOMPLISHMENT REPORT

Name of Personnel : GAEA CHRISTIE N. JABON


Division: DepEd, Division of Catbalogan City
Bureau/Service: Accounting
Date/s Covered: Week 4: May 24-28 & May 31, 2021

Alternative Work Arrangement


Date and Actual Time Logs Actual Accomplishments
(*Indicate if 2-week shift)

1. Reminded the school heads to submit their liquidation


documents.

2. Virtual coaching / mentoring to the newly-hired


Bookkeeper.

HOME QUARANTINE
3. Virtually checked liquidations of various schools.

4. Provide virtual technical assistance to School Heads

Submitted by: Approved by:

GAEA CHRISTIE N. JABON JESSIE ROSE B. CABAÑERO


ADAS III Accountant III

You might also like