PetroChina Halfaya / Initial HSE Notification Form

PCHALL
WorkHSE-Events including Observations, Life-Saving Rules, Unsafe Act/ Condition, Near-Miss, All Incidents - V3.3 (Mar-2021)
Related

A- REPORTING DETAILS SN.:


(Yes / No) Yes 2 Accountable Party: PCH-Contractor PCH 2 PCH Accountable Department
P
Account.
A Reported by (PCH / Contractor) PCH 2
Contractor Anton-O&M
8 Well Ser/ WO-Rig 8
R
T Time of Incident
Reporting Person (Full Name) Position / Job Title Date of Incident (dd-mmm-yyyy) Primary Incident Location
(hh:mm) 24H
A
Mohammed Yahia FSC 07:15 10-Dec-2022 Warehouse 32
Event Category / Type
Notification Tittle / Location Antonoil Chemical WH BC Site (Confirmed by HSE-Dept. 24
Unsafe Act/ Condition
(Plant / Wellpad No., Area)
Manager)
B- NOTIFICATION - INITIAL CLASSIFICATION (Final Classification to be confirmed by PCH HSE MANAGER).
Line Strike
High Potential Loss of Primary (OHTL,
Fatality 1 1 1 1 Near Miss 1
Incident Containment Underground
Process Safety Facility) Unsafe Act
P LTI 1 Aviation 1 Event
1 Asset Damage 1
Category
1
A
R Restricted Work Severe Vehicle Well Control or Unsafe Condition
T Case 1 Accident
1
Well Integrity
1 Fire / Explosion 1
Category Waste management,
21 inadeq
HFY 10 LSR
B Medical Minor Vehicle
1 Leak Period 1 Env. Incident 1 (Life-Saving 1
Treatment Case 1 Accident
Rules)
Occupational Vol. Env.SPILL
First Aid Case 1 1 Spill material 1 COVID-19 1
Illness (Bbls)
Notes: For Injuries communicate immediately with PCH (email, phone); For LOPC & Spills indicate leaking period & estimated spill volume.
C- INCIDENT DESCRIPTION - PCH-SCC (Security Control Center) Phone: 078 3495 8257 / 078 2200 8022 - Desk: 50911, 60911.
C1 Brief Waste Storage Management
Summary (02
Lines Max.)
C2- DETAILED DESCRIPTION
P During our fire safety survey within base camp contractors facilities Antonoil chemical WH we observed:
A
R 1. The storage of the empty chemical drums is a cause for concern. The system in place replicates that used in the
T warehouse. 2. Improper
C waste management within the WH this is a cause for concern. The existing system is a mirror image of that used in
the contractor’s warehouse that was destroyed by fire in July 2014. 3. The housekeeping in
the warehouse area can be considerably enhanced by re arranging the storage process and introducing a neat stacking
system.

D- PRELIMINARY CAUSE(S)
Lack of attention
S
E
C Lack of situational
T awareness.
I
O
N

E- IMMEDIATE ACTION TAKEN


HSE representative been informed to take action within 6 days to comply with the findings in the report and rectify
immediately.It is also strongly advised that the large stack be broken down into smaller units. The area should be
marked.
P
A
R
T
E

STOP Work Authority used for observed unsafe condition / behaviour


1 Priority: L / M / H and TH (Team-H) H 4
(Select):