Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 14

DAO NATIONAL HIGH SCHOOL

TLE Department
Poblacion Ilaya, Dao, Capiz

TRAINEE’S RECORD BOOK

I.D.
Instructions:
This Trainees’ Record Book (TRE) is intended to serve as
Trainee’s No.116887 record of all accomplishment/task/activities while undergoing
training in the industry. It will eventually become evidence
that can be submitted for portfolio assessment and for
whatever purpose it will serve you. It is therefore important
that all its contents are viably entered by both the trainees
NAME: KAREN EBRON
and instructor.
QUALIFICATION: COOKERY NC II
The Trainee’s Record Book contains all the required
TRAINING DURATION:__________392 Hours_____________ competencies in your chosen qualification. All you have to do
is to fill in the column “Task required” and “Date
Accomplished” with all the activities in accordance with the
TRAINER: AIKKA ESPARTERO training program and to be taken up in school and with the
guidance of the instructor. The instructor likewise indicates
his/her remarks on the “Instructor’s Remarks” column
regarding the outcome of the task accomplished by the
trainees. Be sure that the trainee will personally accomplish
the task and confirmed by the instructor.
It is of great importance that the content should be written
legibly on ink. Avoid any corrections or erasures and maintain
the cleanliness of this record. This will be collected by your __________________________________________________________
trainer and submit the same to the Instruction Supervisor __________________________________________________________
and shall form part of the permanent trainee’s document on
file. __________________________________________________________
Thank You __________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________

NOTES:
__________________________________________________________
__________________________________________________________
__________________________________________________________
Basic Competency document  Calculte basic Edgar Sia Crizamae
mathematical Untayao
Unit of Competency: 1. Participate in workplace process
communication  Participat  Interpret and Complete Complete
e in implement a d d
NC Level II workplace meetings.
Learning Task/Activity Date Supervised by/ meeting  Conduct a
Maricel Aikka
Outcome Required Accomplishe and workplace Escutin Espartero
Remarks discussion interaction
d Equinan

Industry In School
Maricel Aikka __________________ ___________________
Escutin Espartero
Equinan Trainee’s Signature Trainer’s Signature
 Obtain  Accessed
and convey relevant Complete Complete
workplace information d d Unit of Competency: 2.Work in a team environment
information from
appropriate NC Level II
sources Learning Task/Activity Date Trainers
 Identified the
Outcome Required Accomplishe
Appropriate Remarks
lines of
d
communicatio Industry In
n with School
supervisors
 Describe  Identified the Complete Complete
and colleagues.
and identify role and d d
 Defined
workplace team role objective of a
procedures for and team
Edgar Sia Crizamae
the location responsibilit  Identified Untayao
and storage of y team
information paramenter,
are used reporting
relationships
and
 Complete  Complete Complete Complete responsibilitie
relevant range of form d d s
work- accurately and  Describe  Observed Complete Complete
related legibly. work as a protocols in d d
team reporting
member using
standard
operating Maricel Aikka
procedures Equinan Espartero
 Developed a
team work
plans based Unit of Competency: 3. Practice career professionalism
on an
understanding NC Level II
of team’s role Learning Task/ Date Trainers
and objectives Outcome Activity Accomplishe
and individual Remarks
Required d
competencies
of the Industry In School
members.
Maricel Aikka
 Identify  Identified Complete Complete
Equinan Espartero
own role and individual role d d
responsibilit and  Integrate  Demonstrat Complete Complete
y within resposibilty. personal e how to d d
Maricel Aikka objectives commit on
team  Identified Equinan Espartero
role and with the
Maricel Aikka
responsibility organizationa organizationa
Equinan Espartero
of other and l goals. l goal and
the team. objective
 Set and  Utilize Complete Complete
meet work resources d d
priorities. efficiently
 Practice use
____________________ ______________________ of economic
Maricel Aikka
Equinan Espartero
Trainee’s Signature Trainer’s Signature maintenance
 Maintain  Identified Complete Complete
professional carrier d d
growth and training and
development. opportunities
Maricel Aikka
 Recognize Equinan Espartero
the
importance of
licenses and
certification.
 Control  Know how to Completed Complete
follow OHS d
hazards and
__________________ ___________________ risks. procedure.
 Determine Edgar Sia
Trainee’s Signature Trainer’s Signature Crizamae
how to use Untayao
Personal
protective
equipment.
 Maintain  Participate Completed Complete
in emergency d
occupational
Unit of Competency: 4. Practice occupational health and health and training drill.
 Complete Edgar Sia
safety procedures safety Crizamae
awareness. the OHS Untayao
NC Level II personal
record
Learning Task/Activity Date Trainers
Outcome Required Accomplished
Remarks
Industry In School
____________________ ______________________
 Identify  Identify and Completed Complete
hazards and explain the d Trainee’s Signature Trainer’s Signature
risks. safety
regulation Edgar Sia
Crizamae
 Know what Untayao
are the
contingency
procedure in Prepared by:
case of
emergency. Crizamae V. Untayao
 Evaluate  Identified Completed Complete
hazards and the terms of d Trainer
risks. maximum
tolerability. Edgar Sia
Crizamae
 Determine Untayao
the effect of
the hazard.
Checked by:
 Identified
OHS Glenda D. Cartujano
concerned
TLE Coordinator
Approved:

Melanie F. Corpuz

Head Teacher III


Common Competency
Unit of Competency: 1. Apply quality standards Unit of Competency: 2. Perform computer operations
NC Level II NC Level II
Learning Task/ Date Trainers Learning Task/Activity Date Trainers
Outcome Activity Accomplish Outcome Required Accomplished
Remarks Remarks
Required ed
Industry In School
Industry In School
 Plan and  Determine Completed Completed
 Assess  Check Completed Completed
quality of material prepare for the
received according to tasks to be requirement
undertaken on the desired Maricel Aikka
materials standard Maricel Aikka
Equinan Espartero
Equinan Espartero output.
 Identify
faults and  Applied
report to required
proper security
authority. guidelines.
Completed Completed  Followed
 Assess own  Identified
OHS
work error and Maricel Aikka procedure.
isolate. Equinan Espartero
 Input data  Enter data Completed Completed
 Check work
according to into into computer
standard. computer using
appropriate Maricel Aikka
 Engage in  Participate Completed Completed Equinan Espartero
program of
quality in procedure
application.
improvemen improvement.
Maricel Aikka  Check
t  Monitor
Equinan Espartero accuracy of
performance
information.
operation.
 Input data
into storage
__________________ ___________________ medium
according to
Trainee’s Signature Trainer’s Signature requirements.
 Access  Select Completed Completed
information correct
using program
application Maricel Aikka
computer
base on the Equinan Espartero checks are
requirement. implemented
 Open a in accordance
correct with standard
desktop operating
application. procedures.
 Carried out  Implement
correct basic file
keyboard maintenance
technique. procedure.
 Produce  Entered data Completed Completed
output/datd are processed
using using ____________________ ______________________
appropriate Maricel Aikka
computer Equinan Espartero Trainee’s Signature Trainer’s Signature
system software
commands.
 Print out
data using Unit of Competency: 3. Perform mensuration and
correct calculation
peripherals.
 Transfer
data on two NC Level II
or more
media Learning Task/Activity Date Trainers
storage. Outcome Required Accomplished
 Lunch a Completed Completed Remarks
 Use basic
functions of browser Industry In School
a web  Search
Maricel Aikka  Select  Identified Complete Completed
browser to correct data
Equinan Espartero measuring Object or d
locate using search
engine. instruments component to
information Aikka
 Follow be measured
Maricel Espartero
relevant link.  obtained Equinan
Correct
specifications
 Maintain  Ensure Completed Completed are from
computer security of relevant
equipment data, source
including Maricel Aikka
and systems  Measuring
Equinan Espartero
regular back- tools in line
ups and virus with job
requirements  Select
 Carry out  Achieve Complete Completed correct
measurements Appropriate d technical
drawing.
and measuring
Aikka  Interpret  Recogniz Completed Completed
calculation instrument
Maricel Espartero technical e
 Calculate drawing Componen
Equinan
basic ts, Maricel Aikka
mathematical assemblies Equinan Espartero
operation. or objects
 Maintain  Clean Complete Completed  Check
measuring instrument d drawing
instruments before and for
Aikka correctnes
after using.
Maricel Esparetero s
 Store  Prepare/  Draw Completed Completed
Equinan
instrument make changes electronic
properly. on schematic.
electrical/elect  Identified Maricel Aikka
ronic correct Equinan Espartero
__________________ ___________________ schematics drawing.
and drawings
Trainee’s Signature Trainer’s Signature  Store  Technical Completed Completed
technical drawings
drawings and are
equipment recorded Maricel Aikka
/instruments and Equinan Espartero
inventory
Unit of Competency: 4. Prepare and interpret technical is
drawing prepared
in
NC Level II accordanc
e with
Learning Task/ Date Trainers
company
Outcome Activity Accompl
Remarks procedures
Required ished
 Care and
Industry In School maintenan
ce of
 Identify  segregate Completed Completed drawings
different kinds in are
of technical accordanc undertake
drawings e with the Maricel Aikka n
types and Equinan Espartero according
kinds of to
drawings company
procedures must be follow Maricel Espartero
Equinan

____________________ ______________________
Trainee’s Signature Trainer’s Signature __________________ ___________________
Trainee’s Signature Trainer’s Signature

Unit of Competency: 5. Use hand tools Unit of Competency: 6. Terminate and connect electrical
wiring and electronic circuits
NC Level II
NC Level II
Learning Task/Activity Date Trainers
Outcome Required Accomplished Learning Task/Activity Date Trainers
Remarks
Outcome Required Accomplish
Industry In School Remarks
ed
 Plan and  Identified Complete Completed
Industry In School
prepare for task to take. d
tasks to be  Identified  Plan and  Check material Completed Completed
undertaken appropriate Aikka
prepare for according to
Maricel Espartero
hand tools. termination/co specification.
Equinan Maricel Aikka
nnection of  Select
 Prepare  Check hand Complete Completed Equinan Espartero
electrical appropriate tools
hand tools tools for d wiring/electron and equipment.
Aikka
proper Maricel Espartero ics circuits  Prepared
operation. Equinan electrical circuit
 Identified correctly.
faulty hand  Terminate/  Observe Completed Completed
tools. connect procedure using
 Use  Use hand Complete Completed wiring/electron PPE
appropriate tools properly. d ic circuits Maricel Crizamae
 Correct
hand tools  Use PPE Equinan Untayao
sequence of
and test Aikka
Maricel Espartero
operation is
equipment followed.
Equinan
  Test  Check wiring Completed Completed
 Maintain  Proper used Complete Completed termination/co and connection
hand tools of tools d nnections of according to
 Maintenance electrical specification. Edgar Sia Crizamae
procedure Aikka Untayao
wiring/electron  Respond to
ics circuits unplanned
event.
____________________ ______________________ Core Competency
Trainee’s Signature Trainer’s Signature Unit of Competency: 1.Install computer systems and
networks
NC Level II
Prepared by:
Learning Task/ Date Trainers
Outcome Activity Accomplish
Crizamae V. Untayao Remarks
Required ed
Trainer Industry In School
 Plan and  Plan Completed Completed
prepare for installation
installation according
Checked by: OHS policies Edgar Sia Crizamae
Untayao
 Obtain
Glenda D. Cartujano device/syste
m in
TLE Coordinator accordance to
procedure.
 Obtain
necessary
material
Approved: needed.
 Obtain tool
Melanie F. Corpuz needed.
 Install  Followed Completed Completed
Head Teacher III equipment/devic OHS polices
e system and
procedure. Edgar Sia Crizamae
Untayao
 Response to
unplanned
event.
 Implement systems and material
appropriate to use in
contingency diagnosis.
plan.  Check
 Conduct test  Check Completed Completed computer
circuit and system
system for against job
testing Edgar Sia Crizamae requirements.
Untayao Completed Completed
procedure.  Diagnose  Use PPE in
 Response to faults of line with
unplanned computer standard.
event. systems  Diagnose Edgar Sia Crizamae
Untayao
 Prepare fault using the
system for standard
testing procedure.
procedure.  Manage
contingency
according to
__________________ ___________________ establish
procedure.
Trainee’s Signature Trainer’s Signature  Repair  Replace Completed Completed
defects in defective
computer components
systems properly. Edgar Sia Crizamae
Untayao
and  Respond to
networks unplanned
Unit of Competency: 2. Diagnose and troubleshoot event.
computer systems
 Test  Test Completed Completed
NC Level II systems computer
Learning Task/Activity Date Trainers and system and
networks network. Edgar Sia Crizamae
Outcome Required Accomplished Untayao
Remarks  Respond to
Industry In School unplanned
event.
 Plan and  Plan and Completed Completed
prepare for prepare
diagnosis requirement
of faults of for diagnostic. Edgar Sia Crizamae
Untayao ____________________ ______________________
computer  Obtain tools
Trainee’s Signature Trainer’s Signature computer configuration done Edgar Sia Crizamae
systems and on the systems and Untayao
networks networks conforms
with the
manufacturer’s
instruction/manua
l
Unit of Competency: 3. Configure computer systems and  Check computer
networks system and
NC Level II network for safe
operation.
Learning Task/Activity Date Trainers  Prepared a report
Outcome Required Accompli according to
Remarks
shed standard.
Industry In School

 Plan and  Identified Completed Completed _____________________ ______________________


prepare for computer system
Trainee’s Signature Trainer’s Signature
configuratio to configure.
n  Followed OHS Edgar Sia Crizamae
Untayao
procedure and
policies.
Obtain necessary
Unit of Competency: 4. Maintain computer systems and
tools and material networks
for the operation.
 Configure  Check normal Completed Completed NC Level II
computer operation of
systems and computer system Learning Task/Activity Date Trainers
networks and network. Edgar Sia Crizamae Outcome Required Accompli
Untayao Remarks
 Configure shed
computer system Industry In School
and network
according to  Plan and  Prepared a Completed Completed
standard prepare for maintenance plan
procedure. the and with OHS
 Diagnose fault maintenance policies and Edgar Sia Crizamae
problem Untayao
of computer procedures.
 Inspect and  Final inspections Completed Completed systems and  The materials, tools,
test are undertaken to networks equipment’s and
configured ensure that the testing devices are
obtained and company regulations.
checked.
 Computer systems
and networks are
checked, identified
and maintained with
specifications and
requirements to
conform to
manufacturers.
Completed Completed
_____________________ ____________________
 Maintain  The normal
computer functions of Trainee’s Signature Trainer’s Signature
systems and computer systems
network and network are Edgar Sia Crizamae
Untayao
checked and tested.
Prepared by:
 The
scheduled/periodic Crizamae V. Untayao
maintenance and
cleaning are Trainer
performed.
 Response to
repairs/replacements
and sudden
breakdowns in Checked by:
accordance with
established Glenda D. Cartujano
procedures.
TLE Coordinator
 Inspect and  Computer system Completed Completed
test and network are
configured/r checked to ensure
epaired safe operation Edgar Sia Crizamae Approved:
Untayao
computer  Final inspection and
system and testing taken to Melanie F. Corpuz
networks conform to
manufacturer Head Teacher III
specifications.
 Reports are
prepared and
completed to

You might also like