BPC Risk Assesment 1

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

BPC MEDIA – RISK ASSESMENT FORM

PRODUCTION TITLE: Office


DATE OF FILMING: 02/05/2023
LOCATION North road college BH140LS
ADDRESS:
DESCRIPTION OF Will be recording in the studio because I will need the
ACTIVITY/ greenscreen.
PRODUCTION:

PERSONS TAKING Brian collis- director and producer


PART: Harvey gerring- actor
EG Oskar Wach- actor
STUDENTS
ACTORS Rebecca Cutler- actor
CREW
NON-STUDENTS
Sienna Williams- actor

In the box below tick any of the hazards that you may come into contact with while
recording your production, if the hazard is not on the list please tick other.

HAZARD CHECKLIST
NUMBE HAZARD TICK
R
1 Trip hazards yes
2 Proximity to water no
3 Risk of fire yes
4 Live electrical equipment yes
5 Vehicles / modes of transport no
6 Machinery proximity no
7 Weather conditions no
8 Members of public at location no
9 Access to location yes
10 Props yes
11 First Aid medical requirements no
12 Falling objects no
13 Working at height / Working near a drop no
14 Others (Please specify) no

REVISED OCTOBER 2019


BPC MEDIA – RISK ASSESMENT FORM

Below you must detail the hazard number from the check list, identify where the hazard is
coming from and detail how you will limit the risk of the hazards you have identified.
HAZARD HAZARD DETAILS HOW WILL YOU LIMIT THE
NUMBER RISKS
1 Wires in studio I will make sure all wires are
out of the actor's way and
there is no chance that
anyone could trip over them

Below you must sign off that you accept the risks and will adhere to safe working practice.
On some assignments staff with need to sign your risk assessment for you to hire out kit.
STUDENT NAME: Brian collis STUDENT
(PRINT) (10650053) SIGNATURE:
STAFF NAME: STAFF SIGNATURE:
(PRINT)

REVISED OCTOBER 2019

You might also like