Institution of Surveyors Malaysia Building Cost Information Centre
Institution of Surveyors Malaysia Building Cost Information Centre
Floor Space NOT Enclosed 1,444 m2 Above Ground Floor m 3.00 e) ___ Storey %
Construction
Roof Area 11,810 m2
(Structural & Plant Rooms)
Brief Cost Information
Contract Sums RM 29,287,358.82 Functional Unit Costs excluding external works &
Provisional Sums RMRM 100,000.00 Provisional Sum :RM 25,922,812.82 per 25,654m2 GFA
Prime Cost Sums RMRM -
Preliminaries RM 1,087,500.00 being 3.71% of remainder
Contingencies RMRM - being % Contract Sum
Contract Sums Less Contingencies R RM 29,287,358.82
INSTITUTION OF SURVEYOR MALAYSIA (AS CONTRACT)
BUILDING COST INFORMATION CENTRE
8-Residential Building
Elemental Cost Analysis- Form 2
Total Cost Cost per m2 Element Element Element Reinforced Reinforce- Formwork
5. Services
Note :-
3 Finishes
3A Internal Wall Finishes Full height ceramic wall tiles at toilet and 1500mm height at kitchen; plaster and paint to other area.
3B Internal Floor Finishes Ceramic tiles to kitchen,bedroom and family hall, porcelain tile to living, dining and master bedroom,
non-ceramic tiles to toilets
3C Internal Ceiling Finishes Skim coat to ground floor and fibrous plaster ceiling to first floor
3D External Finishes Concrete broom finish to driveway; non-slp heavy duty porcelian tiles to porch and non-ceramic
tiles to terrace and balcony.
fibrous plaster ceiling to porch
6 External Works
6A Site Work Mild steel gate, brick fencing with hollow section railing at front and sides, chain link fencing to
rear boundary and refuse bin stand and half round preacst concrete drain within lot boundary
6B External Services Infrastructure work, local infrastructure work ie. Road, drainage, sewerage and water reticulation
works,Retaining Wall, Turfing, Fencing and External M & E
6D Ancillary Buildings TNB Sub-station