ANALISA VOLUME PEMBANGUNAN RUMAH 2 LANTAI

NO ITEM PEKERJAAN URAIAN PERHITUNGAN Jumlah Total Satuan


I PEKERJAAN PERSIAPAN
A Pekerjaan Persiapan Lapangan
1 Pekerjaan Pembersihan Lahan Panjang (a) = 12 m
Lebar (b) = 10 m

Luas (A) = axb 1 120.000
= 12 X 10 m²
= 120 m²

2 Pekerjaan Pemasangan BouwPlank Panjang (a) = 11 m


Lebar (b) = 9 m
m
2a + 2b
Keliling = 1 40.000
= 2(11) + 2(9) m
= 40 m
3 Pekerjaan Bedeng

Panjang (P) = 3 m 1 9 m²
Lebar (L) = 3 m
Luas (A) = PxL
= 9 m²
=
4 Pagar Proyek Panjang = 12 m
Lebar = 10 m
m
Keliling = 2a + 2b 1 44.000
= 2(12) + 2(10) m
= 44 m

II PEKERJAAN TANAH
A Pekerjaan Galian
1 Pekerjaan Pondasi Telapak
a = 1.6 m 16 36.86
b = 1.2 m

V = a x b^2
= 1.6 x 1.2^2
= 2.304 m3

2 Pekerjaan Pondasi Batu Kali


Sisi Bawah (B) = 0.9 m 1 53.86 m3
Sisi Atas (A) = 1.0 m
Tinggi (H) = 0.9 m
Panjang = 63

Volume (V) = {0,5 x (B+A) x H} x L


53.86 m3
3 Pekerjaan Pondasi Teras
a = 1.0 m 1 3.29 m3
b = 1.0 m
p = 3.29 m

V = axbxp
3.29 m3

4 Pekerjaan Galian Septictank


a = 3 m 1 18
b = 3 m
t = 2 m

V = axbxt
18 m3

B PEKERJAAN TIMBUNAN
1 Pekerjaan timbunan Tanah
A Pekerjaan Timbunan Telapak v galian = 2.304 16 35.25
v pondasi = 0.1008

V urugan = v galian - v pondasi


= 2.20 m3

B Pekerjaan Timbunan Batu Kali V galian = 53.86 1 53.71


V pondasi = 0.15

V urugan = V galian - V pondasi


53.71 m3

C Pekerjaan Timbunan Septick Tank d = 2.5 1 9.81


t = 2
∏ = 3.14

V
= 0.25 x ∏ x d² x t
9.81

D Pemadatan Volume Pemadatan = Volume seluruh timbunan 1 65.72


= 65.722
III Pekerjaan Struktur Bawah
A Pekerjaan Pondasi Telapak
1 Pekerjaan Telapak Pondasi Panjang (a) = 1.6 m
Lebar (b) = 1.2 m
Tinggi (t) = 0.35 m 16 10.75

Volume (v) = axbxt

= 0.672

2 Pekerjaan Lantai Kerja Panjang (a) = 1.6 m


Lebar (b) = 1.2 m
Tinggi (t) = 0.15 m 16 15.36
Volume (v) = axbxt
= 0.288 m3
Vtotal Telapak = Vtelapak +Vlantai Kerja m3
Vtotal Telapak = 0.96 m3

3 Pekerjaan Pembesian Telapak Diameter Tulangan (D) = 0.012 m 16 2437.55


Lebar Telapak (B) = 1.2 m
Tinggi Telapak (H) = 0.35 m
Tebal Selimut Beton (sb) = 0.04 m
Jarak Antar Rangkaian (j) = 0.200 m
Berat Jenis Baja (BJ) = 7850 Kg/m
Jumlah Rangkaian (n) = 5.000

Tulangan X = 2(B-2sb)+2(H-2sb)
= 2.51 m

Tulangan y = 2(B-2sb)+2(H-2sb)
= 2.51 m

Luas Tulangan (As) = 0,25 x 3.142 x D x D


= 0.113112 m²

Panjang 1 Rangkaian (P) = n.x + n.y

= 25.1 m

Volume (V) = As x P
= 2.84 m3

Massa (M) = V x BJ

= 71 Kg

Waste (W) = 3% x M

= 2.14 Kg

Masa Total (Mtot) = M+W


Kg
= 152.346858638469 Kg

4 Pekerjaan Bekisting Lebar Telapak (B) = 1.2 m 16 0.50


Tinggi Telapak (H) = 0.35 m

Luas Total = Sisi Atas + 4 x sisi samping

= 3.12

2 Pekerjaan Pondasi Bagian Tiang


* Pekerjaan Pembesian Tiang Tulang Utama 16 163.27
Diameter tulangan (D)= 0.012 m
Panjang Tulangan (P)= 1.2 m
Jumlah Tulangan (N)= 8 m
Total Panjang (Pu)= 0.85 m
= 9.6 m
Luas Tulangan (As)= 0.25 x 3.14 x D x D
= 0.25 x 3.14 x 0,016 x 0,016
= 0.00011

Volume (V)= As x Pu
= 0,00020 x 0,85
= 0.00109 m³

Masa (M)= V x BJ
0,00145 x 7850
= 8.52 kg

Waste (W)= 3% x M
3% x 11,36
= 0.26 kg

Masa Total (M tot)= M+W


= 11,36 x 0,34
= 8.77 kg

Tulangan Sengkang
Panjang Tiang (b)= 0.08 m
Lebar Tiang (h)= 0.66 m
Selimut Beton (sb)= 0.04 m
Jarak Antar Sengkang (r)= 0.200 m
Jumlah Sengkang (n)= 8
Panjang Sengkang (P)= 2(b-2SB) + 2(h-2SB)
= 2(0,08 - 2 x 0,04) + 2(0,3 - 2 x 0,04)
= 0.44 m

Luas Tulangan (As)= 0.25 x 3.14 x D x D


= 0,25 x 3,14 x 0,08 x 0,08
= 0.00005

Volume (V)= As x n.P


= 0,00005 x 8 x 0,44
= 0.0002

Masa (M)= V x BJ
= 0,0002 x 7850
= 1.3882 kg

Waste (W)= 3% x M
= 3% x 1,3882
= 0.0416
kg
Masa Total (M tot)= M+W
= 1,3882 + 0,0416
= 1.4299 kg

Masa Total Tulangan Pada Tiang Telapak


M total = Masa Tulangan Utama + Masa Tulangan sengkang
= 10.2041 kg

* Pekerjaan Pemasangan Bekisting Tiang Jumlah sisi yang ditutupi bekisting (n)= 4 m 16 30.72
Lebar (b)= 0.3 m
Tinggi (t)= 1.6 m
Luas (A)= bxt
= 0.3 x 1.6
= 0.48 m²
Luas Total (Atot)= Axn
= 0.36 x 4 m²
= 1.92

* Pekerjaan Pengecoran Tiang Tinggi (t)= 1.2 m 16 6.91 m³


Lebar (b)= 0.3 m
Panjang (a)= 1.2 m
Volume (V)= axbxt
= 1,2 x 0,3 x 1,2
0.432 m³
B Pekerjaan Pondasi Batu Kali
1 Pekerjaan Lantai Kerja Panjang (a) = 1.0 m 1 0.87
Lebar (b) = 1.0 m
Tinggi (t) = 0.20 m
Volume (v) = axbxt
= 0.2
Vtotal Telapak = Vtelapak +Vlantai Kerja
Vtotal Telapak = 0.872

2 Pekerjaan Anstampang
Tinggi (a) = 0.2 m 1 12.598
Lebar (b) = 1 m
Panjang (L) = 62.99 m
Volume (V) = axbxL
12.598

3 Pemasangan Batu Kali m³


Tiinggi (a) = 0.7 m 1 18.74
Lebar atas (b) = 0.15 m
Lebar bawah c = 0.7 m
Panjang (L) = 62.99 m

V = 0.5 x (b+c)a x L
18.74 m

b Pekerjaan Sloof
1 Pekerjaan Sloof 30 x 40
* Pekerjaan Pembesian sloof Panjang (p)= 0.3 m 1 219.52 kg
Lebar (l)= 0.4 m
Selimut Beton (SB)= 0.04 m
Berat Jenis (BJ)= 7850 kg/m³
Jumlah Tulangan Utama(n)= 6 m
Panjang Tulangan Utama (t)= 31.08 m
Diameter Tulangan Utama (Du)= 0.012 m
Diameter Tulangan Sengkang (Ds)= 0.008 m
Jarak Antar Sengkang Tumpuan (Ast)= 0.1 m
Jarak Antar Sengkang Lapangan (Asl)= 0.2 m
Analisa Tulangan Utama
volume tulangan utama (Vu)= luas lapangan x t x n
= 0.0017 m³
Massa tulangan utama (Mu)= Vu x BJ
= 13.7018 kg
Analisa Tulangan Sengkang
Panjang sengkang (Ps)= 2(p-2SB)+2(1-2SB)
= 1.08 m
Jumlah tulangan sengkang tumpuan (Jtu)= 1/2(t/Ast)+1
= 156.4 m
Jumlah tulangan sengkang lapangan (Jtl)= 1/2(t/Asl)
= 77.7 m
Jumlah tulangan total (N)= Jtu + Jtl
= 234.1 m
Volume tulangan sengkang (Vs)= Luas lapangan x Ps x N
= 0.0254 m³
Massa Tulangan sengkang (Ms)= Vs x bj
= 199.4226
Total pembesian
Mt= Mu + Ms
= 213.1244 kg
Waste= 3% x Mt
= 6.3937 kg
V bersih / Koefisien Total= Mt + Waste
= 219.5182 kg

* Pemasangan bekisting sloof Jumlah sisi yang ditutupi bekisting (n)= 2 1 18.65
lebar(b)= 0.3 m
panjang tulangan utama(t)= 31.08 m
Luas(A)= bxt
= 0,3 x 31,08
= 9.324 m²
Luas Total (Atot)= Axn
= 18.648 m²

* Pekerjaan Pengecoran Sloof Tinggi (a)= 0.4 m 1 3.73


Lebar (b)= 0.3 m
Panjang (L)= 31.08
Volume (V)= axbxL
= 0,4 x 0,30 x 31,08
3.73 m

1 Pekerjaan Sloof 15 x 20
* Pekerjaan Pembesian sloof Panjang (p)= 0.2 m 1 81.6808 kg
Lebar (l)= 0.15 m
Selimut Beton (SB)= 0.04 m
Berat Jenis (BJ)= 7850 kg/m³
Jumlah Tulangan Utama(n)= 4 m
Panjang Tulangan Utama (t)= 31.08 m
Diameter Tulangan Utama (Du)= 0.012 m
Diameter Tulangan Sengkang (Ds)= 0.008 m
Jarak Antar Sengkang Tumpuan (Ast)= 0.1 m
Jarak Antar Sengkang Lapangan (Asl)= 0.2 m
Analisa Tulangan Utama
volume tulangan utama (Vu)= luas lapangan x t x n
= 0.0012 m³
Massa tulangan utama (Mu)= Vu x BJ
= 9.1345 kg
Analisa Tulangan Sengkang
Panjang sengkang (Ps)= 2(p-2SB)+2(1-2SB)
= 0.38 m
Jumlah tulangan sengkang tumpuan (Jtu)= 1/2(t/Ast)+1
= 156.4 m
Jumlah tulangan sengkang lapangan (Jtl)= 1/2(t/Asl)
= 77.7 m
Jumlah tulangan total (N)= Jtu + Jtl
= 234.1 m
Volume tulangan sengkang (Vs)= Luas lapangan x Ps x N
= 0.0089 m³
Massa Tulangan sengkang (Ms)= Vs x bj
= 70.1672
Total pembesian
Mt= Mu + Ms
= 79.3018 kg
Waste= 3% x Mt
= 2.3791 kg
V bersih / Koefisien Total= Mt + Waste
= 81.6808 kg

* Pemasangan bekisting sloof Jumlah sisi yang ditutupi bekisting (n)= 2 1 9.32
lebar(b)= 0.15 m
panjang tulangan utama(t)= 31.08 m
Luas(A)= bxt
= 0,3 x 31,08
= 4.662 m²
Luas Total (Atot)= Axn
= 9.32 m²

* Pekerjaan Pengecoran Sloof Tinggi (a)= 0.2 1 0.93


Lebar (b)= 0.15
Panjang (L)= 31.08
Volume (V)= axbxL
= 0,15 x 0,30 x 75,5
0.93

IV PEKERJAAN STRUKTUR ATAS


A Pekerjaan Kolom
1 Pekerjaan Kolom Utama 30 X 30
* Pekerjaan Pembesian kolom Panjang (p)= 0.3 m 18 1339.16
Lebar (l)= 0.3 m
Selimut Beton (SB)= 0.04 m
Berat Jenis (Bj)= 7850 kg/m³
Jumlah tulangan utama (n)= 8
Panjang tulangan utama (t)= 3.7 m
Diameter tulangan utama (Du)= 0.012 m
Diameter Tulangan Sengkang (Ds)= 0.08 m
Jarak Antar Sengkang Tumpuan (Ast)= 0.1 m
Analisa Tulangan Utama m
volume tulangan utama (Vu)= luas tulangan x t x n
= 0.003345984
Massa tulangan utama (Mu)= Vu x Bj
= 26.2659744 kg
Analisa Tulangan Sengkang
Panjang sengkang (Ps)= 2(p-2SB)+(1-2SB)
= 1.36 m
Jumlah tulangan sengkang tumpuan (Jtu)= 1/2(t/Ast)+1
= 19.5 m
Jumlah tulangan total (N)= jtu
= 19.5 m
Volume (Vs)= luas tulangan sengkang x Ps x N
= 0.0029978208
Massa Tulangan sengkang (Ms)= Vs x Bj
= 23.53289328 kg
Total pembesian
Mt= Mu + Ms
= 49.79886768 kg
Waste= 3% x Mt
= 1.4939660304 kg
V bersih / Koefisien Total= Mt + Waste
= 74.3978166663045 kg
* Bekisting Kolom Jumlah sisi yang ditutupi bekistisng (n)= 4 18 79.92
Lebar (b)= 0.3 m
Tinggi (t)= 3.70 m
Luas (A)= bxt
= 0,3 x 3,50
= 1.11
Luas total (Atot)= Axn
= 1,05 x 4
= 4.44

* Pengecoran Kolom Tinggi (a)= 0.3 m 18 5.99


Luas (b)= 0.3 m
Panjang (L)= 3.70 m
Volume (V)= axbxL
= 0.333

2 Pekerjaan Kolom Praktis 15 X 15


* Pekerjaan Pembesian kolom Panjang (p)= 0.15 m 4 375.72
Lebar (l)= 0.15 m
Selimut Beton (SB)= 0.04 m
Berat Jenis (Bj)= 7850 kg/m³
Jumlah tulangan utama (n)= 4
Panjang tulangan utama (t)= 3.7 m
Diameter tulangan utama (Du)= 0.016 m
Diameter Tulangan Sengkang (Ds)= 0.08 m
Jarak Antar Sengkang Tumpuan (Ast)= 0.1 m
Analisa Tulangan Utama m
volume tulangan utama (Vu)= luas tulangan x t x n
= 0.002974208
Massa tulangan utama (Mu)= Vu x Bj
= 23.3475328 kg
Analisa Tulangan Sengkang
Panjang sengkang (Ps)= 2(p-2SB)+(1-2SB)
= 1.06 m
Jumlah tulangan sengkang tumpuan (Jtu)= 1/2(t/Ast)+1
= 19.5 m
Jumlah tulangan total (N)= jtu
= 19.5 m
Volume (Vs)= luas tulangan sengkang x Ps x N
= 0.0041538432
Massa Tulangan sengkang (Ms)= Vs x Bj
= 32.60766912 kg
Total pembesian
Mt= Mu + Ms
= 55.95520192 kg
Waste= 3% x Mt
= 1.6786560576 kg
V bersih / Koefisien Total= Mt + Waste
= 93.9295386572391 kg

* Bekisting Kolom Jumlah sisi yang ditutupi bekistisng (n)= 4 4 8.88


Lebar (b)= 0.15 m
Tinggi (t)= 3.70 m
Luas (A)= bxt
= 0,3 x 3,50
= 0.555
Luas total (Atot)= Axn
= 1,05 x 4
= 2.22

* Pengecoran Kolom Tinggi (a)= 0.15 m 4 0.333


Luas (b)= 0.15 m
Panjang (L)= 3.70 m
Volume (V)= axbxL
= 0.08325

B Pekerjaan Balok
1 Pekerjaan Balok Induk 30 x 40
* Pekerjaan Balok Induk Panjang (p)= 0.4 m 1 1472.48 kg
Lebar (l)= 0.3 m
Selimut Beton (SB)= 0.04 m
Berat Jenis (Bj)= 7850 kg/m³
Jumlah tulangan utama (n)= 8
Panjang tulangan utama (t)= 81.7 m
Diameter tulangan utama (Du)= 0.012 m
Diameter Tulangan Sengkang (Ds)= 0.08 m
Jarak Antar Sengkang Tumpuan (Ast)= 0.1 m
Jarak Antar Sengkang Lapangan (Asl)= 0.2 m
Analisa Tulangan Utama
volume tulangan utama (Vu)= luas lapangan x t x n
= 0.073882944
Massa tulangan utama (Mu)= Vu x Bj
= 579.9811104 kg
Analisa Tulangan Sengkang
Panjang sengkang (Ps)= 2(p-2SB)+(1-2SB)
= 1.56 m
Jumlah tulangan sengkang tumpuan (Jtu)= 1/2(t/Ast)+1
= 409.5 m
Jumlah tulangan sengkang lapangan (Jtl)= 1/2(t/Asl)
= 204.25 m
Jumlah tulangan total (N)= jtu + jtl
= 613.75 m
Volume tulangan sengkang (Vs)= luas lapangan x Ps x N
= 0.108230148
Massa Tulangan sengkang (Ms)= Vs x Bj
= 849.6066618 kg
Total pembesian
Mt= Mu + Ms
= 1429.5877722 kg
Waste= 3% x Mt
= 42.887633166 kg
V bersih / Koefisien Total= Mt + Waste
= 1472.48 kg

* Pemasangan Bekisting Jumlah sisi yang ditutupi bekisting (n)= 3 1 73.53
Lebar (b1)= 0.3 m
Lebar (b2)= 0.4 m
Panjang (P)= 81.7 m
Luas (A1)= bxP
= 0,3 x 81,7
= 24.51
Luas Total (Atot)= Axn
= 24,51 x 3
= 73.53

* Pengecoran Balok Tinggi (a)= 0.3 m 1 9.804
Lebar (b)= 0.4 m
Panjang (L)= 81.7 m
Volume (V)= axbxL
= 0,3 x 0,4 x 81,7
= 9.804

2 Pekerjaan Balok Anak 15 x 20


Panjang (p)= 0.2 m 1 1248.09 kg
Lebar (l)= 0.15 m
Selimut Beton (SB)= 0.04 m
Berat Jenis (Bj)= 7850 kg/m³
Jumlah tulangan utama (n)= 8
Panjang tulangan utama (t)= 81.7 m
Diameter tulangan utama (Du)= 0.012 m
Diameter Tulangan Sengkang (Ds)= 0.08 m
Jarak Antar Sengkang Tumpuan (Ast)= 0.1 m
Jarak Antar Sengkang Lapangan (Asl)= 0.2 m
Analisa Tulangan Utama
volume tulangan utama (Vu)= luas lapangan x t x n
= 0.073882944
Massa tulangan utama (Mu)= Vu x Bj
= 579.9811104 kg
Analisa Tulangan Sengkang
Panjang sengkang (Ps)= 2(p-2SB)+(1-2SB)
= 1.16 m
Jumlah tulangan sengkang tumpuan (Jtu)= 1/2(t/Ast)+1
= 409.5 m
Jumlah tulangan sengkang lapangan (Jtl)= 1/2(t/Asl)
= 204.25 m
Jumlah tulangan total (N)= jtu + jtl
= 613.75 m
Volume tulangan sengkang (Vs)= luas lapangan x Ps x N
= 0.080478828
Massa Tulangan sengkang (Ms)= Vs x Bj
= 631.7587998 kg
Total pembesian
Mt= Mu + Ms
= 1211.7399102 kg
Waste= 3% x Mt
= 36.352197306 kg
V bersih / Koefisien Total= Mt + Waste
= 1248.09 kg

* Pemasangan Bekisting Jumlah sisi yang ditutupi bekisting (n)= 3 1 36.765
Lebar (b1)= 0.15 m
Lebar (b2)= 0.2 m
Panjang (P)= 81.7 m
Luas (A1)= bxP
= 0,3 x 81,7
= 12.255
Luas Total (Atot)= Axn
= 24,51 x 3
= 36.765

* Pengecoran Balok Tinggi (a)= 0.15 m 1 2.451
Lebar (b)= 0.2 m
Panjang (L)= 81.7 m
Volume (V)= axbxL
= 0,3 x 0,4 x 81,7
= 2.451

C Pekerjaan Plat
1 Pekerjaan Plat Lantai

* Pekerjaan Wiremesh Luas Plat Lantai (A)= 73.3929 1 12.9440740740741

Ukuran Wiremesh (Aw)= 5,4 x 2,1


= 11.34

Jumlah Total Wiremesh = 2(A/Aw)


= 2 (73.3929/11,34)
= 12.9440740740741


* Pekerjaan Bekisting Luas Plat Lantai (A) = 73.3929 1 73.3929
Jumlah sisi yang ditutupi bekisting (n)= 1

Luas Plat Lantai 2


Luas= Axn
= 73.3929 x 1
= 73.3929


* Pekerjaan Pengecoran Luas Plat Lantai= 73.3929 1 8.807148

t= 0.12
V= Luas x t
= 73.3929 x 0,12
= 8.807148

2 Pengerjaan Dak Beton


* Wiremesh Dak Beton Luas dak beton = 18.39 1 3.243 lbr

Aw= 5,4 x 2,1


= 11.34

Jumlah total wiremesh= 2(A/Aw)


= 3.24338624338624 lbr
* Pekerjaan Bekisting Dak Beton 1 1 18.39 m²
Panjang (p)= 6.31 m
Lebar (l)= 1 m
Luas Dak Beton (A1)= pxl m²
= 6.31

Dak Beton 2
Panjang (p)= 4 m
Lebar (l)= 3.02 m
Luas Dak Beton (A2)= pxl m²
= 12.08

Total Bekistin Dak Beton= A1 +A2


= 18.39 m²

* Pengerjaan Pengecoran Dak Beton 1 18.39 m³

Tebal (t)= 1 m

V= Luas x t
= 18.39 m³

D Pekerjaan Tangga
1 Pekerjaan Anak tangga
* Pembesian Anak Tangga Panjang Tulangan x = 0.2 m 1 85.29 kg
Panjang Tulangan y = 0.3 m
Seimut Beton (SB) = 0.04 m
Jarak antar tulangan (jst) = 0.15 m
Lebar Tangga = 1 m
Diameter tulangan (d) = 0.012 m
mencari npt
npt = (lebar tangga-2 x SB)/jst)+1
= 6.13333333333333
=

Panjang tulangan (P) = 2 x ((X^2 + y^2)^0.5) x npt x 2


= 3.18933333333333 m

luas penampang = 0.25 x d x d phi m²


= 0.00015072

Volume plat anak tangga = Panjang tulangan x luas penampang


= P x 1/4 phi d^2 m³
= 0.00036052224

Jumlah anak tangga (N) = 20


Massa Plat Anak Tangga
= volume plat anak tangga x berat jenis kg
= 2.830099584

Tulangan sengkang
Going (B)= 0.39 m
Raise (H)= 0.28 m
Diameter sengkang = 0.012 m
Panjang tulangan sengkang (p) = B+H
= 0.67
Volume tulangan sengkang = panjang tulangan x luas penampang x npt x N m³
= 0.0123871744
Massa tulangan sengkang = volume tulangan sengkang x berat jenis
= 97.23931904 m³

Tulangan Utama Anak Tangga


Panjang tulangan = lebar tangga - (2 x SB)
= 0.92
Jumlah tulangan utama (n)
Volume tulangan utama = Panjang tulangan utama x n x luas penampang
= 0.002773248 m³
Massa tulangan utama (Mt) = Volume tulangan utamax berat jenis
= 21.7699968 m³

Pembesian total anak tangga


massa (M)=Massa plat anak tangga + massa tul sengkang + massa tul utama
= 121.839415424 kg

Waste (W) = 3% x M
= 36.5518246272 kg

Massa total pembesia = Massa - Waste


= 85.2875907968 kg

* Pekerjaan Bekisting Panjang tangga (pt)= 7.26 m 1 1.13 m²


Jumlah tangga (n)= 11
Going (B)= 0.3 m
Raise(H)= 0.2 m
Lebar tangga (l)= 1 m
m
Luas plat (Lp)= Pt x l
= 7.26 m²

Luas Raise (lr) = Hxlxn


= 2.2 m²

Samping
a= 0.47 m
b= 0.36 m

Luas Samping (ls) = 2 x (b x a/2) x n m²


= 1.8612

Total Bekisting = lp + lr + ls
= 11.3212 m²

* Pekerjaan Pengecoran Luas Anak Tangga 1 1.69 m³


a= 0.47 m
b= 0.36 m

Luas (A) = 1/2 (bxa) m²


= 0.0846

Volume anak tangga (V)


Lebar (L) = 1
jumlah (n) = 20
V1= AxLxn
= 1.692 m

Total Volume Anak Tangga = 1.692 m

2 Pekerjaan Plat Bordes


* Pekerjaan Pembesian Panjang Tulangan Horizontal (Ph) = X x Nh 1 21.94 kg
= 14.4 m
Panjang Tulangan Vertikal (Pv) = Y x Ny
= 2.88 m
Panjang Tulangan (P) = 34.56 m

Volume Tulangan (Vb) = 0.00271296 m3

Massa (M) = 21.296736 kg

Waste (W) = 0.63890208 kg

Massa Total Pembesian = 21.93563808 kg


* Pekerjaan Bekisting Bekisting
x= 1.2 m 1 3.6 m³
y= 2.4 m

Luas Bekisting (A1) = (x x y)


= 2.88 m2
Tebal Bordes (h) = 0.15 m2

Luas Bekisting 2 (A2) = 2 x (y x h )


= 0.72 m2

Total Luas Bekisting = A1 + A2


= 3.6 m2

* Pekerjaan Pengecoran Ketebalan (k) = 0.15 1 0.432 m³


a= 2.4
b= 1.2
Total Luas bekisting =
= 0.432

3 Pekerjaan Balok Bordes


* Pekerjaan pembesian Panjang (p) = 0.25 1 188.17 m3
Lebar (l) = 0.2
S. Beton (sb) = 0.04
Berat Jenis (BJ) = 7850

Diameter Tulangan Utama (Du) = 0.012


Jarak antar Sengkang Tumpuan (Jst) = 0.1
Jarak antar Sengkang Lapangan (Jsl) = 0.15
Diameter Sengkang (d) = 0.008
Jumlah Tulangan Utama (n) = 8

Panjang (t) 22.8 m

Analisis Tulangan Utama


Analisa Tulangan Utama (Vu) = 0.020618496

Masa Tulangan Utama (Mu) = 161.8551936

Analisa Tulangan Sengkang


Panjang Sengkang (Ps) = 0.676

Jumlah Tulangan Sengkang Tumpuan (nst) = 2.14

Jumlah Tulangan Sengkang Lapangan (ntl) = 76

Jumlah Sengkang (Js) = 78.14

Volume sengkang (Vs) = 0.0026538094336 m3

Masa Tulangan (Ms) = 20.83240405376 kg

Total Pembesian
Masa Total (Mt) = 182.68759765376 kg

Waste = 5.4806279296128 kg

V bersih/ koefisien total = 188.168225583373 kg

* Pekerjaan Bekisting Panjang (p) = 2.23 1 1.83 m3


a= 0.23
b= 0.2

Luas Bekisting 1 (A1) = 1.784


=

Luas Bekistng 2 (A2) = 0.046


=

Total Bekisting = 1.83

* Pengecoran Bekisting Panjang (p) = 0.23 1 0.11 m3


Lebar (l) = 0.2
Luas (A) = pxl
0.046

L= 2.4
V= 0.1104
V PEKERJAAN ARSITEKTUR
A Pekerjaan Dinding
1 Pekerjaan Dinding Lantai 1
* Pemasangan dinding bata Tinggi (h)= 3.5 m 1 169.9650 m²
Panjang (P)= 61 m
Luas (A1)= Pxh
= 61.00 x 3,5
= 213.5
Luas Pintu
Pintu 1= 1(1.2 x 2.00)

= 2.4000
Pintu 2= 3(0.8 x 2)

= 4.8
Pintu 3= 2(0.7 x 1.8)

= 3.78
Luas Jendela
Jendela 1= 6(0.6 x 1.4)

= 5.04
jendela 2= 6(0.6 x 1.4)

= 5.04
jendela 3= 5(1.2*1.8)

10.8
Luas Kolom
Kolom 1= 16(0.3 x 3.5)

= 16.8
kolom 2= 7(0.15 x 3.5)

= 3.675

Luas Ventilasi

V= 25(0.20 x 0.40)
= 2

Luas Total Dinding


Lt= A1-P1-P2-P3-J1-J2-J3-K1-K2-V

= 169.9650

* Pengerjaan Plesteran L Plesteran= 2 x Luas Dinding Bersih 1 339.93 m²


= 339.93
= 339.93 m²

* Pemasangan Acian Luas Acian= L Plesteran - L Keramik wc 1 321.555 m²


= 321.555 m²

L Keramik wc = 6.125X3
= 18.375
2 Pekerjaan Dinding Lantai 2
* Pemasangan Dinding Bata Tinggi (h)= 3.5 m 1 160.7650 m²
Panjang (P)= 61 m
Luas (A1)= Pxh
= 61.00 x 3,5
= 213.5
Luas Pintu
Pintu 1= 1(1.2 x 2.00)

= 2.4000
Pintu 2= 2(0.8 x 2)

= 3.2
Pintu 3= 3(0.7 x 1.8)

= 3.78
Luas Jendela
Jendela 1= 6(0.6 x 1.4)

= 5.04
jendela 2= 6(0.6 x 1.4)

= 5.04
jendela 3= 5(1.2*1.8)

10.8
Luas Kolom
Kolom 1= 16(0.3 x 3.5)

= 16.8
kolom 2= 7(0.15 x 3.5)

= 3.675

Luas Ventilasi

V= 25(0.20 x 0.40)
= 2

Luas Total Dinding


Lt= A1-P1-P2-P3-J1-J2-J3-K1-K2-V
= 160.7650

* Pemasangan Plesteran 1 171.5650


Luas Total Dinding
Lt= A1-P1-P2-P3-J1-J2-J3-K1-K2-V
= 171.5650

* Pemasangan Acian L Acian Luas Plester - L Keramik Wc 1 165.4400


= 165.4400

B Pekerjaan Kusen
1 Pekerjaan Kusen Pintu Lantai 1
* Pemasangan Kusen Pintu Kayu 1 Lebar (b)= 0.05 m 1 0.015 m³
Tinggi (t)= 0.15 m
Panjang (a)= 2
Volume (V)= bxtxa
= 0.015 m²

* Pemasangan Kusen Pintu Kayu 2 Lebar (b)= 0.03 m 2 0.018 m³


Tinggi (t)= 0.15 m
Panjang (a)= 2
Volume (V)= bxtxa
= 0.009 m²

2 Pekerjaan Pintu Lantai 2


* Pemasangan Kusen Pintu Kayu 2 Lebar (b)= 0.05 m 1 0.015 m³
Tinggi (t)= 0.15 m
Panjang (a)= 2
Volume (V)= bxtxa
= 0.015 m²

3 Pekerjaan Kusen Jendela Lantai 1


* Pemasangan Kusen Jendela 1 Lebar (b)= 0.05 m 1 0.0135 m³
Tinggi (t)= 0.15 m
Panjang (a)= 1.8
Volume (V)= bxtxa
= 0.0135 m²

* Pemasangan Kusen Jendela 2 Lebar (b)= 0.05 m 3 0.0315 m³


Tinggi (t)= 0.15 m
Panjang (a)= 1.4
Volume (V)= bxtxa
= 0.0105 m²
4 Pekerjaan Kusen Jendela Lantai 2
* Pemasangan Kusen Jendela 1 Lebar (b)= 0.03 m 2 0.0162 m³
Tinggi (t)= 0.15 m
Panjang (a)= 1.8
Volume (V)= bxtxa
= 0.0081 m²

* Pemasangan Kusen Jendela 2 Lebar (b)= 0.03 m 2 0.0126 m³


Tinggi (t)= 0.15 m
Panjang (a)= 1.4
Volume (V)= bxtxa m²
= 0.0063

* Pemasangan Kusen Jendela 3 Lebar (b)= 0.03 m 1 0.0063 m³


Tinggi (t)= 0.15 m
Panjang (a)= 1.4
Volume (V)= bxtxa
= 0.0063 m²

C Pekerjaan Pemasangan Pintu


1 Pekerjaan Pemasangan Pintu Kayu 1
* Pemasangan Aksesoris Pintu Aksesoris Pintu Kayu 1

Gagang = 1 unit 1 1 unit


Engsel = 1 unit 2 2 unit

* Pemasangan Daun Pintu Panjang (p)= 2 m 1 2.4 m³


Lebar (l)= 1.2 m
Luas Daun Pintu= pxl
= 2.4 m²

2 Pekerjaan Pemasangan Pintu Kayu 2


* Pemasangan Aksesoris Pintu Aksesoris Pintu Kayu 2

Gagang = 1 unit 7 7
Engsel = 1 unit 14 14

* Pemasangan Daun Pintu Panjang (p)= 2 m 7 11.2 m³


Lebar (l)= 0.8 m
Luas Daun Pintu= pxl
= 1.6 m²

3 Pekerjaan Pemasangan Pintu Fiber


* Pemasangan Aksesoris Pintu Aksesoris Pintu Fiber =

Engsel = 1 6 6 unit
Pengunci Pintu = 1 3 3 unit
Gagang Pintu = 1 3 3 unit

* Pemasangan Daun Pintu Daun Pintu = 1 unit 3 3 unit

D Pekerjaan Pemasangan Jendela


1 Pekerjaan pemasangan Jendela 1
* Pemasangan Daun Jendela Luas Kayu 3 1.68 m²
Tinggi (P)= 1.8 m
Lebar (L)= 1.2 m
Luas (A1)= PxL m²
= 2.16

Luas Kaca
Tinggi (P)= 1.6 m
Lebar (L)= 1 m
Luas (A2)= PxL
= 1.6 m²

Luas Daun Jendela


L= A1 - A2
= 0.56 m²

* Pemasangan Aksesoris Jendela Aksesoris Jendela 1 = 1 unit 6 6 unit

* Pemasangan Kaca Jendela Luas Kaca 6 9.6 m²


Tinggi (P)= 1.6 m
Lebar (L)= 1 m
Luas (A2) = PxL
= 1.6 m²

2 Pekerjaan Pemasangan jendela 2


* Pemasangan Daun Jendela Luas Kayu 4 1.44 m²
Tinggi (P)= 1.4 m
Lebar (L)= 0.6 m
Luas (A1)= PxL
= 0.84 m²

Luas Kaca
Tinggi (P)= 1.2 m
Lebar (L)= 0.4 m
Luas (A2)= PxL
= 0.48 m²

Luas Daun Jendel


L= A1 - A2
= 0.36 m²

* Pemasangan Aksesoris Jendela Aksesoris Jendela 1 = 1 unit 8 8 unit

* Pemasangan Kaca Jendela Luas Kaca 4 1.92 m²


Tinggi (P)= 1.2 m
Lebar (L)= 0.4 m
Luas (A2) = PxL
= 0.48 m²
F Pekerjaan Lantai
* Pekerjaan Beton Tumbuk Tinggi = 0.07 1 5.631241 m²
Luas = 80.4463
5.631241

G Pekerjaan Ventilasi
* Pemasangan Kusen ventilasi Bouven Luas = 0.006613 28 0.185164 m²

* Pemasangan Ventilasi kaca Tinggi = 0.5 3 0.1575 m²


Panjang = 0.7
Lebar = 0.15

VI PEKERJAAN ATAP
A Pekerjaan Rangka Atap
* Pekerjaan Pemasangan Kuda - kuda kayu 1 Kaki Kuda-Kuda 5 0.08316 m³
Panjang = 2.31
Tinggi = 0.06
Lebar = 0.12
0.016632
Balok Apit 10 1.1 m³
Panjang = 2.2
Tinggi = 0.1
Lebar = 0.05
0.11

Kasau
Panjang = 3.11 10 0.10885 m³
Tinggi = 0.07
Lebar = 0.05
0.010885
Tiang Kuda-Kuda 5 0.0429 m³
Panjang = 1.43
Lebar = 0.05
Tinggi = 0.12
0.00858

Papan Ruter 1 0.03 m³


Panjang = 4
Lebar = 0.03
Tinggi = 0.25

Balok Tarik
Panjang = 4.67 5 0.16812 m³
Tinggi = 0.12
Lebar = 0.06
0.033624
* Pekerjaan Pemasangan Kuda - kuda kayu 1 Kaki Kuda-Kuda 2 0.042912 m³
Panjang = 2.98
Tinggi = 0.06
Lebar = 0.12
0.021456
Balok Apit 4 0.44 m³
Panjang = 3.2
Tinggi = 0.1
Lebar = 0.05
0.11

Kasau
Panjang = 3.73 4 0.05222 m³
Tinggi = 0.07
Lebar = 0.05
0.013055
Tiang Kuda-Kuda 2 0.02184 m³
Panjang = 1.82
Lebar = 0.05
Tinggi = 0.12
0.01092

Papan Ruter 1 0.015 m³


Panjang = 2
Lebar = 0.03
Tinggi = 0.25

Balok Tarik
Panjang = 5.77 2 0.083088 m³
Tinggi = 0.12
Lebar = 0.06
0.041544

Jumlah Volume Kuda-Kuda 2.18809


B Pekerjaan Penutup Atap 1 77.8708210217958 m³
* Pemasangan Atap Seng Luas Area 75.3893
Tinggi = 2.18
Sudut = 35⁰

* Pemasangan Lisplank
Panjang = 37.96 1 0.51246 m³
Tinggi = 0.3
Lebar = 0.03
0.34164

Panjang = 37.96
Tinggi = 0.15
Lebar = 0.03
0.17082

* Pemasangan Bubungan
Panjang = 32.241 m 1 32.241 m

VII Pekerjaan Elektrikal dan Plumbing


A Pekerjaan Elektrikal
1 Pekerjaan Pemasangan Intalasi Listrik
* Pekerjaan Pemasangan Sekring
a 1 unit 1 1 unit
* Pekerjaan Pemasangan Stop Kontak
a 1 unit 14 14 unit

* Pekerjaan Pemasangan Saklar


a 1 unit 17 17 unit

* Pekerjaan Pemasangan Titik Lampu a 1 unit 15 15 unit


B Pekerjaan Plumbing
1 Pekerjaan Air Bersih
* Pekerjaan Pemasangan Pipa Galvanis a 30 unit 1 30 unit

* Pekerjaan Pemasangan Kran Air a 1 unit 4 4 unit

2 Pekerjaan Air Kotor


* Pekerjaan Pemasangan Pipa Kotoran PVC 3" a 30 unit 1 20 unit

* Pekerjaan Pemasangan Pipa Kotoran PVC 4" a 40 unit 1 30 unit

* Pekerjaan Pemasangan Floor Drain a 1 unit 3 3 unit

* Pekerjaan Pemasangan Kloset a 1 unit 3 3 unit

* Pekerjaan Pemasangan wastafel a 1 unit 1 1 unit

* Pekerjaan Pemasangan Roof Drain a 1 unit 2 2 unit

VIII Pekerjaan Finishing


A Pengerjaan Pengecatan
1 Pengerjaan Dinding Lantai 1 dan 2
* Pengerjaan Pengecatan Dinding Luas Dinding = 330.7300 1 661.46 m²
= 661.46 m²

B Pekerjaan Kayu
* Pekerjaan Pengecatan Pintu 20.88 m² 1 20.88 m²

* Pekerjaan Pengecatan Jendela 9.38 m² 1 9.38 m²

C Pekerjaan Keramik
1 Pekerjaan Keramik Lantai 1
* Pekerjaan Keramik Lantai WC 20X20 Luas Lantai wc 1 1 9.625 m²
L wc (A1) = 1.75 x 1.755
= 3.0625 m²

Luas Lantai wc 2
L wc (A2) = 1.75 x 2
3.5 m²

Luas Total = 2A1 + A2


9.625 m²

* Pekerjaan Keramik Lantai WC 20X20


Luas dinding wc 1
Lebar 1.75 m 1 16.625 m²
Panjang 2 m
tinggi 1 m
Luas (A1) = 3.5 m²

Luas dinding wc 2
Lebar 1.75 m
Panjang 2 m
tinggi 1.75 m²
Luas (A2) = 6.125 m²

Ltotal = 3A1 + A2
16.625 m²

* Pekerjaan Keramik Lantai 50X50 Luas bersih lantai 1 (A1) = 79.441 m² 1 85.566 m²
Luas wc Lt.1 (A2) = 2(1.75x1.75)
6.125 m²

Luas total = A1 + A2
85.566 m²

2 Pekerjaan Keramik Lantai 2


* Pekerjaan Keramik Lantai WC 20X20 Luas Lantai wc 1 1 9.625 m²
L wc (A1) = 1.75 x 1.755
= 3.0625 m²

Luas Lantai wc 2
L wc (A2) = 1.75 x 2
3.5 m²

Luas Total = 2A1 + A2


9.625 m²

* Pekerjaan Keramik Dinding WC 20X20 Luas dinding wc 1


Lebar 1.75 m 1 16.625 m²
Panjang 2 m
tinggi 1 m
Luas (A1) = 3.5 m²

Luas dinding wc 2
Lebar 1.75 m
Panjang 2 m
tinggi 1.75 m²
Luas (A2) = 6.125 m²

Ltotal = 3A1 + A2
16.625 m²

* Pekerjaan Keramik Lantai 50X50 Luas bersih lantai 2 (A1) = 90.6894 m² 1 96.8144 m²
Luas wc Lt.1 (A2) = 2(1.75x1.75)
6.125 m²

Luas total = A1 + A2
96.8144 m²

3 Pemasangan Railing
* Railing Tangga Panjang 2.84 m 1 2.84 m
Rekapitulasi Volume Pekerjaan
Pembangunan Rumah Dua Lantai
HARGA SATUAN PEKE

PEKERJAAN PERSIA
No
I
A

4
PEKERJAAN TANA
I
1

II
A
1

5
B
1

I
1

II
A
1
2

B
1
2

PEKERJAAN BETON BER


I
A
1

2
3

II
A
1

3
B
1

III
A
1
2

B
1

2
3

B
1

3
B
1

VI
A
1
2

B
1

2
3

B
1

3
VII
A
1

PEKERJAAN ATA
I
1

II
1

2
3

PEKERJAAN MEKANIKAL ELECTRIC


I
1

II
A
1

B
1

3
4

PEKERJAAN ARSITEK
I
A
1

2
3

B
1

II
A
1
2

B
1

2
C
1

D
1
2

III
A
1

2
3

B
1

2
3

C
1

PEKERJAAN FINISH
I
A
1
B
1

II
A
1

2
3

B
1

3
II
1
HARGA SATUAN PEKERJAAN

PEKERJAAN PERSIAPAN
Item Pekerjaan
Pekerjaan Persiapan
Pembersihan 1 m2 lapangan dan perataan
Tenaga
Mandor
Pekerja
Jumlah
Pembuatan 1 m² bedeng pekerja
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Dolken kayu diameter 8-10/400 cm
Kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang
Plywood 4mm
Jumlah
Pengukuran dan Pemasangan 1 m Bouwplank
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu Balok 5/7
Paku 2"-3"
Kayu Papan 3/20
Jumlah
Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Dolken kayu diameter 8-10/400 cm
Semen Portland
Seng gelombang
Pasir beton
Koral beton
Kayu 5/7
Paku biasa 2"- 5"
Meni besi
Jumlah
PEKERJAAN TANAH
Pekerjaan Galian
Penggalian 1 m³ tanah biasa sedalam 1 m (Pondasi Batu Kali)
Tenaga
Mandor
Pekerja
Jumlah
Penggalian 1 m³ tanah biasa sedalam 2 m (Pondasi Telapak)
Tenaga
Mandor
Pekerja
Jumlah
Penggalian 1 m³ tanah biasa sedalam 1 m (Septic Tank)
Tenaga
Mandor
Pekerja
Jumlah
Pekerjaan Urugan
Pekerjaan Urugan Tanah
Pengurugan tanah kembali 1 m³ galian tanah (Batu Kali)
Tenaga
Mandor
Pekerja
Jumlah
Pengurugan tanah kembali 1 m³ galian tanah (Pondasi Telapak)
Tenaga
Mandor
Pekerja
Jumlah
Pekerjaan 1 m³ Timbunan Tanah Lantai
Tenaga
Mandor
Pekerja
Jumlah
Pekerjaan 1 m³ Timbunan Septictank
Tenaga
Mandor
Pekerja
Jumlah
Pekerjaan 1 m³ Timbunan Pemadatan
Tenaga
Mandor
Pekerja
Jumlah
Bahan
Pasir urug
Jumlah
Pekerjaan Urugan Pasir
Pengurugan tanah kembali 1 m³ galian tanah (Batu Kali)
Tenaga
Mandor
Pekerja
Jumlah
Bahan
Pasir urug
Jumlah
Pekerjaan Pondasi Batu Kali
Membuat 1 m³ lantai kerja beton mutu f'c = 7,4 Mpa (K 100)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pemasangan 1 m³ batu kosong (anstampang)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Batu belah
Pasir urug
Jumlah
Pemasangan 1 m³ pondasi batu belah
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Batu belah
Semen Portland
Pasir Pasang
Jumlah
Pekerjaan Pondasi Telapak
Pekerjaan Telapak Pondasi
Membuat 1 m³ lantai kerja beton mutu f'c = 7,4 Mpa (K 100)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Pembesian10 kg
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton Ulir
Kawat Beton
Jumlah
Membuat 1 m³ beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan 1 m² Bekisting
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu Kelas III
Paku 5-10cm
Minyak Bekisting
Jumlah

Pekerjaan Tiang
Pekerjaan Pembesian10 kg
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton Ulir
Kawat Beton
Jumlah
Pekerjaan 1 m² Bekisting
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu Kelas IV
Paku 5-10cm
Minyak Bekisting
Jumlah
Pengecoran 1 m³ beton mutu fc = 14,5 Mpa (K175)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir beton
Kerikil (Maksimum 30mm)
Air
Jumlah
PEKERJAAN BETON BERTULANG
Pekerjaan Sloof
Pekerjaan Sloof (15 cm x 35 cm)
Pembesian 10 kg dengan besi polos atau besi ulir
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk sloof
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-10 cm
Minyak bekisting
Jumlah
Membuat 1 m³ beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Kolom
Pekerjaan Kolom Lantai 1 (15 cm x 40cm)
Pembesian 10 kg dengan besi polos atau besi ulir
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk kolom
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Kolom Praktis (15 cm x 15 cm)
Pembesian 10 kg dengan besi polos atau besi ulir
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Tukang Kayu
Tukang Batu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Besi beton polos
kawat beton
Semen Portland
Pasir Beton
Kerikil
Jumlah
Pemasangan 1 m² bekisting untuk kolom
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Tenaga
Mandor
Kepala Tukang
Tukang batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Balok
Pekerjaan Balok (30 cm x 25 cm)
Pembesian10 kg dengan besi polos atau besi ulir
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk Balok
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 175)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Balok Anak(20 cm x 15 cm)
Pembesian10 kg dengan besi polos atau besi ulir
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk Balok
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 175)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Plat
Pembesian 10 kg dengan Jaring kawat
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Jaring kawat baja
kawat ikat
Jumlah
Pemasangan 1 m² bekisting
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 125)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Dak Beton
Pembesian 10 kg dengan besi polos atau besi ulir
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 8,333 m² bekisting untuk Dak Beton
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 9,8 Mpa (K 125), slump (12 ± 2) cm, w/c = 0,78
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Tangga
Pekerjaan Anak Tangga
Pembesian 10 kg
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk tangga
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 125)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Plat Bordes
Pembesian 10 kg
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk balok bordes
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 125)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
Pekerjaan Balok Bordes
Pembesian 10 kg
Tenaga
Mandor
Kepala Tukang
Tukang Besi
Pekerja
Bahan
Besi Beton U-24
Kawat Beton
Jumlah
Pemasangan 1 m² bekisting untuk balok bordes
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kayu kelas III
Paku 5-12 cm
Minyak bekisting
Balok kayu kelas II
Plywood 9 mm
Dolken kayu diameter 8-10/400 cm
Jumlah
Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 125)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah

Pekerjaan Lantai Dasar


Pekerjaan Beton tumbuk
Membuat 1 m³ beton mutu f'c = 14,5
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Semen Portland
Pasir Beton
Kerikil (Maksimum 30mm)
Air
Jumlah
PEKERJAAN ATAP
Pekerjaan Rangka Atap
Pemasangan 1 kg rangka kuda-kuda kayu
Tenaga
Mandor
Kepala Tukang
Tukang Las Konstruksi
Pekerja
Bahan
Besi baja IWF
Jumlah
Pekerjaan Penutup Atap
Pemasangan 1 m² genteng metal
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Genteng metal
Paku biasa 1/2"- 1"
Jumlah
Pemasangan 1 kg besi profil
Tenaga
Mandor
Kepala Tukang
Tukang Las Konstruksi
Pekerja
Bahan
Baja profil C
Jumlah
Pemasangan 1 m' bubung stel gelombang 0,92 m
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Bubung stel gel
Paku skrup 3,5"
Jumlah
Pemasangan 1 m' listplank ukuran ( 3 x 20 ) cm, kayu kelas II
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Papan kayu
Paku 5 dan 7cm
Jumlah
PEKERJAAN MEKANIKAL ELECTRICAL DAN PLUMBING
Pekerjaan Electrical
Pekerjaan Pemasangan Sekring
Tenaga
Pekerja
Bahan
Sekring
Jumlah
Pekerjaan Pemasangan Stop Kontak
Tenaga
Pekerja
Bahan
Stop Kontak
Jumlah
Pekerjaan Pemasangan Saklar
Tenaga
Pekerja
Bahan
Saklar
Jumlah
Pekerjaan Pemasangan Titik Lampu
Tenaga
Pekerja
Bahan
Titik Lampu
Jumlah
Pekerjaan Plumbing
Pekerjaan Instalasi Air Bersih
Pemasangan 1 m' pipa galvanis diameter 1,5"
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Pipa galvanis 1/2"
Perlengkapan
Jumlah
Pemasangan 1 buah kran diameter 1/2" atau 3/4"
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Kran air
Sealtape
Jumlah
Pekerjaan Instalasi Air Kotor
Pemasangan 1 m' pipa PVC tipe AW diameter 3"
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Pipa PVC 3"
Perlengkapan
Jumlah
Pemasangan 1 m' pipa PVC tipe AW diameter 4"
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Pipa PVC 3"
Perlengkapan
Jumlah
Pemasangan 1 buah floor drain
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Floor drain
Jumlah
Pemasangan 1 buah closet jongkok porselen
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Closet jongkok
Semen Portland
Pasir Pasang
Jumlah
Pemasangan 1 buah wastafel
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Wastafel
Semen Portland
Pasir Pasang
Perlengkapan
Jumlah
Pemasangan 1 buah roof drain
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Roof drain
Jumlah
PEKERJAAN ARSITEKTUR
Pekerjaan Lantai 1
Pekerjaan Dinding
Pemasangan 1 m² dinding bata merah (5x11x22) m tebal 1/2 batu campuran 1SP:4Pasir Pasang
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Bata merah
Semen Portland
Pasir Pasang
Jumlah
Pemasangan 1 m² plesteran ciprat 1SP:8Pasir Pasang tebal 15mm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Pasang
Jumlah
Pemasangan 1 m² acian
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Jumlah
Pekerjaan Kusen
Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III (Pintu 1)
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Balok kayu
Paku 10 cm
Lem Kayu
Jumlah
Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III (Pintu 2)
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Balok kayu
Paku 10 cm
Lem Kayu
Jumlah
Pekerjaan Lantai 2
Pekerjaan Dinding
Pemasangan 1 m² dinding bata merah (5x11x22) m tebal 1/2 batu campuran 1SP:4Pasir Pasang
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Bata merah
Semen Portland
Pasir Pasang
Jumlah
Pemasangan 1 m² plesteran ciprat 1SP:8Pasir Pasang tebal 15mm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Pasir Pasang
Jumlah
Pemasangan 1 m² acian
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Semen Portland
Jumlah
Pekerjaan Kusen
Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III (Pintu 2)
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Balok kayu
Paku 10 cm
Lem Kayu
Jumlah
Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III (Jendela 1)
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Balok kayu
Paku 10 cm
Lem Kayu
Jumlah
Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela, kayu kelas II atau III (Jendela 2)
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Balok kayu
Paku 10 cm
Lem Kayu
Jumlah
Pekerjaan Jendela 1
Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kelas II
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Papan kayu
Lem Kayu
Jumlah
Pemasangan 1 buah engsel jendela kupu-kupu
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Engsel kupu-kupu
Jumlah
Pemasangan 1 buah Handle
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Handle
Jumlah
Pemasangan 1 m2 kaca tebal 3 mm
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kaca Tebal 3 mm
Sealant
Jumlah
Pekerjaan Jendela 2
Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kelas II
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Papan kayu
Lem Kayu
Jumlah
Pemasangan 1 buah engsel jendela kupu-kupu
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Engsel kupu-kupu
Jumlah
Pemasangan 1 buah Handle
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Handle
Jumlah
Pemasangan 1 m2 kaca tebal 3 mm
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Kaca Tebal 3 mm
Sealant
Jumlah
Jumlah
Pekerjaan Pintu
Pekerjaan Pintu 1
Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas II
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja
Bahan
Papan Kayu
Lem Kayu
Jumlah
Pemasangan 1 buah engsel pintu
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Engsel pintu
Jumlah
Pemasangan 1 buah Handle
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Handle
Jumlah
Pemasangan 1 buah grandle
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Grandle
Jumlah
Pemasangan 1 buah kunci tanam biasa
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Kunci tanam biasa
Jumlah
Pekerjaan Pintu 2
Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas II
Tenaga
Mandor
Kepala Tukang
Tukang Kayu
Pekerja

Papan Kayu
Lem Kayu
Jumlah
Pemasangan 1 buah engsel pintu
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Engsel pintu
Jumlah
Pemasangan 1 buah Handle
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Handle
Jumlah
Pemasangan 1 buah grandle
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Grandle
Jumlah
Pemasangan 1 buah kunci tanam biasa
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Kunci tanam biasa
Jumlah
Pekerjaan Pintu Fiber
Pembuatan dan pemasangan 1 m² daun pintu PVC
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Pintu PVC
Jumlah
PEKERJAAN FINISHING
Pekerjaan Pengecatan
Pekerjaan Dinding
Pengecetan 1 m² tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Pelamuur
Cat dasar
Cat penutup
Jumlah
Pekerjaan Kayu
Pengecetan 1 m² bidang kayu baru ( 1lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 'Pintu'
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Cat manie
Pelamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Jumlah
Pengecetan 1 m² bidang kayu baru ( 1lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) 'Jendela'
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Cat manie
Pelamuur
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Jumlah
Pekerjaan Keramik
Pekerjaan Keramik Lantai 1
Pemansangan 1 m² Dinding keramik ukuran 20 x 20cm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Keramik Artistik
Semen Portland
Pasir pasang
Semen warna
Jumlah
Pemansangan 1 m² lantai keramik ukuran 20 x 20cm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Ubin keramik
Semen Portland
Pasir pasang
Semen warna
Jumlah
Pemansangan 1 m² lantai keramik ukuran 50 x 50cm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Ubin keramik
Semen Portland
Pasir pasang
Semen warna
Jumlah
Pekerjaan Keramik Lantai 2
Pemansangan 1 m² Dinding keramik ukuran 20 x 20cm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Keramik Artistik
Semen Portland
Pasir pasang
Semen warna
Jumlah
Pemansangan 1 m² lantai keramik ukuran 20 x 20cm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Ubin keramik
Semen Portland
Pasir pasang
Semen warna
Jumlah
Pemansangan 1 m² lantai keramik ukuran 50 x 50cm
Tenaga
Mandor
Kepala Tukang
Tukang Batu
Pekerja
Bahan
Ubin keramik
Semen Portland
Pasir pasang
Semen warna
Jumlah
Pekerjaan Railling
Pemasangan 1 m' railling tangga
Tenaga
Pekerja
Bahan
railling
Jumlah
N PEKERJAAN

PERSIAPAN
Satuan Koefisien Harga Satuan Jumlah Upah Jumlah Bahan Total

OH 0.050 Rp 140,000 Rp 7,000


OH 0.100 Rp 100,000 Rp 10,000
Rp 17,000 Rp 17,000

OH 0.050 Rp 140,000 Rp 7,000


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.100 Rp 100,000 Rp 10,000

Batang 1.250 Rp 34,100 Rp 42,625


m³ 0.186 Rp 1,962,100 Rp 364,951
kg 0.300 Rp 16,700 Rp 5,010
kg 18.000 Rp 1,600 Rp 28,800
m³ 0.030 Rp 159,500 Rp 4,785
m³ 0.050 Rp 159,500 Rp 7,975
Lbr 1.500 Rp 47,000 Rp 70,500
Lbr 1.350 Rp 80,700 Rp 108,945
Rp 30,800 Rp 633,591 Rp 664,391

OH 0.005 Rp 140,000 Rp 700


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.100 Rp 100,000 Rp 10,000

m³ 0.012 Rp 1,962,100 Rp 23,545


kg 0.020 Rp 16,700 Rp 334
m³ 0.007 Rp 1,890,600 Rp 13,234
Rp 24,500 Rp 37,113 Rp 61,613

OH 0.020 Rp 140,000 Rp 2,800


OH 0.020 Rp 130,000 Rp 2,600
OH 0.400 Rp 125,000 Rp 50,000
OH 0.200 Rp 100,000 Rp 20,000

Batang 1.250 Rp 34,100 Rp 42,625


kg 2.500 Rp 1,600 Rp 4,000
Lbr 1.200 Rp 47,000 Rp 56,400
m³ 0.005 Rp 159,500 Rp 798
m³ 0.009 Rp 159,500 Rp 1,436
m³ 0.072 Rp 1,962,100 Rp 141,271
Kg 0.060 Rp 16,700 Rp 1,002
Liter 0.450 Rp 33,800 Rp 15,210
Rp 75,400 Rp 262,741 Rp 338,141
N TANAH

OH 0.025 Rp 140,000 Rp 3,500


OH 0.750 Rp 100,000 Rp 75,000
Rp 78,500 Rp 78,500

OH 0.045 Rp 140,000 Rp 6,300


OH 0.900 Rp 100,000 Rp 90,000
Rp 96,300 Rp 96,300

OH 0.025 Rp 140,000 Rp 3,500


OH 0.750 Rp 100,000 Rp 75,000
Rp 78,500 Rp 78,500

OH 0.050 Rp 140,000 Rp 7,000


OH 0.500 Rp 100,000 Rp 50,000
Rp 57,000 Rp 57,000

OH 0.050 Rp 140,000 Rp 7,000


OH 0.500 Rp 100,000 Rp 50,000
Rp 57,000 Rp 57,000

OH 0.050 Rp 140,000 Rp 7,000


OH 0.500 Rp 100,000 Rp 50,000
Rp 57,000 Rp 57,000

OH 0.050 Rp 140,000 Rp 7,000


OH 0.500 Rp 100,000 Rp 50,000
Rp 57,000 Rp 57,000

OH 0.050 Rp 140,000 Rp 7,000


OH 0.500 Rp 100,000 Rp 50,000
Rp 57,000 Rp 57,000
m³ 1.200 Rp 110,400 Rp 132,480
Rp 57,000 Rp 132,480 Rp 189,480

OH 0.010 Rp 140,000 Rp 1,400


OH 0.300 Rp 100,000 Rp 30,000
Rp 31,400

m³ 1.200 Rp 110,400 Rp 132,480


Rp 61,400 Rp 132,480 Rp 193,880

OH 0.060 Rp 140,000 Rp 8,400


OH 0.020 Rp 130,000 Rp 2,600
OH 0.200 Rp 125,000 Rp 25,000
OH 1.200 Rp 100,000 Rp 120,000

kg 230.000 Rp 1,600 Rp 368,000


m³ 0.496 Rp 159,500 Rp 79,112
m³ 0.571 Rp 145,000 Rp 82,731
m³ 0.200 Rp 18,000 Rp 3,600
Rp 156,000 Rp 533,443 Rp 689,443

OH 0.039 Rp 140,000 Rp 5,460


OH 0.039 Rp 130,000 Rp 5,070
OH 0.390 Rp 125,000 Rp 48,750
OH 0.780 Rp 100,000 Rp 78,000

m³ 1.200 Rp 162,400 Rp 194,880


m³ 0.432 Rp 110,400 Rp 47,693
Rp 137,280 Rp 242,573 Rp 379,853

OH 0.075 Rp 140,000 Rp 10,500


OH 0.075 Rp 130,000 Rp 9,750
OH 0.750 Rp 125,000 Rp 93,750
OH 1.500 Rp 100,000 Rp 150,000

m³ 1.200 Rp 162,400 Rp 194,880


kg 202.000 Rp 1,600 Rp 323,200
m³ 0.485 Rp 159,500 Rp 77,358
Rp 264,000 Rp 595,438 Rp 859,438

OH 0.060 Rp 140,000 Rp 8,400


OH 0.020 Rp 130,000 Rp 2,600
OH 0.200 Rp 125,000 Rp 25,000
OH 1.200 Rp 100,000 Rp 120,000

kg 230.000 Rp 1,600 Rp 368,000


m³ 0.638 Rp 159,500 Rp 101,738
m³ 0.571 Rp 145,000 Rp 82,731
m³ 0.200 Rp 18,000 Rp 3,600
Rp 156,000 Rp 556,069 Rp 712,069

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 18,700 Rp 281
Rp 1,722 Rp 12,881 Rp 14,603

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 276.000 Rp 1,600 Rp 441,600


m³ 0.591 Rp 159,500 Rp 94,333
m³ 0.562 Rp 145,000 Rp 81,522
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 621,325 Rp 835,960

OH 0.026 Rp 140,000 Rp 3,640


OH 0.026 Rp 130,000 Rp 3,380
OH 0.260 Rp 125,000 Rp 32,500
OH 0.520 Rp 100,000 Rp 52,000

m³ 0.040 Rp 1,600 Rp 64
kg 0.300 Rp 159,500 Rp 47,850
m³ 0.100 Rp 145,000 Rp 14,500
Rp 91,520 Rp 62,414 Rp 153,934

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700
kg 1.050 Rp 12,000 Rp 12,600
kg 0.015 Rp 18,700 Rp 281
Rp 1,722 Rp 12,881 Rp 14,603

OH 0.026 Rp 140,000 Rp 3,640


OH 0.026 Rp 130,000 Rp 3,380
OH 0.260 Rp 125,000 Rp 32,500
OH 0.520 Rp 100,000 Rp 52,000

m³ 0.040 Rp 1,600 Rp 64
kg 0.300 Rp 159,500 Rp 47,850
m³ 0.100 Rp 145,000 Rp 14,500
Rp 91,520 Rp 62,414 Rp 153,934

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 140,000 Rp 45,640,000


m³ 0.422 Rp 130,000 Rp 54,860
m³ 0.572 Rp 125,000 Rp 71,500
m³ 0.215 Rp 100,000 Rp 21,500
Rp 214,635 Rp 45,787,860 Rp 46,002,495
ON BERTULANG

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.026 Rp 140,000 Rp 3,640


OH 0.026 Rp 130,000 Rp 3,380
OH 0.260 Rp 125,000 Rp 32,500
OH 0.520 Rp 100,000 Rp 52,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.300 Rp 16,700 Rp 5,010
Liter 0.100 Rp 13,800 Rp 1,380
Rp 91,520 Rp 103,454 Rp 194,974

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 276.000 Rp 1,600 Rp 441,600


m³ 0.591 Rp 159,500 Rp 94,333
m³ 0.562 Rp 145,000 Rp 81,522
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 621,325 Rp 835,960

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 276.000 Rp 1,600 Rp 441,600


m³ 0.591 Rp 159,500 Rp 94,333
m³ 0.562 Rp 145,000 Rp 81,522
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 621,325 Rp 835,960

OH 0.009 Rp 140,000 Rp 1,260


OH 0.006 Rp 130,000 Rp 780
OH 0.020 Rp 125,000 Rp 2,500
OH 0.020 Rp 125,000 Rp 2,000
OH 0.020 Rp 125,000 Rp 2,500
OH 0.180 Rp 100,000 Rp 18,000

m³ 0.002 Rp 2,582,700 Rp 5,165


kg 0.010 Rp 18,800 Rp 188
liter 1.099 Rp 17,400 Rp 19,123
kg 3.000 Rp 11,100 Rp 33,300
kg 0.450 Rp 18,700 Rp 8,415
kg 4.000 Rp 1,248 Rp 4,990
m³ 0.006 Rp 179,800 Rp 1,079
m³ 0.009 Rp 174,500 Rp 1,571
Rp 27,040 Rp 73,830 Rp 100,870

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 276.000 Rp 1,600 Rp 441,600


m³ 0.591 Rp 159,500 Rp 94,333
m³ 0.562 Rp 145,000 Rp 81,522
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 621,325 Rp 835,960
OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.422 Rp 159,500 Rp 67,309
m³ 0.572 Rp 145,000 Rp 82,940
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 675,719 Rp 890,354

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.422 Rp 159,500 Rp 67,309
m³ 0.572 Rp 145,000 Rp 82,940
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 675,719 Rp 890,354

OH 0.010 Rp 140,000 Rp 1,400


OH 0.250 Rp 130,000 Rp 32,500
OH 0.250 Rp 125,000 Rp 31,250
OH 0.250 Rp 100,000 Rp 25,000

kg 10.200 Rp 12,000 Rp 122,400


kg 0.500 Rp 16,900 Rp 8,450
Rp 90,150 Rp 130,850 Rp 221,000

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 6.000 Rp 34,100 Rp 204,600
Rp 116,160 Rp 399,031 Rp 515,191

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.422 Rp 159,500 Rp 67,309
m³ 0.572 Rp 145,000 Rp 82,940
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 675,719 Rp 890,354

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 6.000 Rp 34,100 Rp 204,600
Rp 116,160 Rp 399,031 Rp 515,191

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 276.000 Rp 1,600 Rp 441,600


m³ 0.591 Rp 159,500 Rp 94,333
m³ 0.562 Rp 145,000 Rp 81,522
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 621,325 Rp 835,960

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.422 Rp 159,500 Rp 67,309
m³ 0.572 Rp 145,000 Rp 82,940
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 675,719 Rp 890,354

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000
m³ 0.040 Rp 2,426,600 Rp 97,064
kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.422 Rp 159,500 Rp 67,309
m³ 0.572 Rp 145,000 Rp 82,940
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 675,719 Rp 890,354

OH 0.0004 Rp 140,000 Rp 56
OH 0.0007 Rp 130,000 Rp 91
OH 0.007 Rp 125,000 Rp 875
OH 0.007 Rp 100,000 Rp 700

kg 1.050 Rp 12,000 Rp 12,600


kg 0.015 Rp 16,900 Rp 254
Rp 1,722 Rp 12,854 Rp 14,576

OH 0.033 Rp 140,000 Rp 4,620


OH 0.033 Rp 130,000 Rp 4,290
OH 0.330 Rp 125,000 Rp 41,250
OH 0.660 Rp 100,000 Rp 66,000

m³ 0.040 Rp 2,426,600 Rp 97,064


kg 0.400 Rp 16,700 Rp 6,680
Liter 0.200 Rp 13,800 Rp 2,760
m³ 0.015 Rp 3,029,100 Rp 45,437
Lbr 0.350 Rp 121,400 Rp 42,490
Batang 2.000 Rp 34,100 Rp 68,200
Rp 116,160 Rp 262,631 Rp 378,791

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.422 Rp 159,500 Rp 67,309
m³ 0.572 Rp 145,000 Rp 82,940
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 675,719 Rp 890,354

OH 0.083 Rp 140,000 Rp 11,620


OH 0.028 Rp 130,000 Rp 3,640
OH 0.275 Rp 125,000 Rp 34,375
OH 1.650 Rp 100,000 Rp 165,000

kg 326.000 Rp 1,600 Rp 521,600


m³ 0.621 Rp 159,500 Rp 99,004
m³ 0.555 Rp 145,000 Rp 80,475
m³ 0.215 Rp 18,000 Rp 3,870
Rp 214,635 Rp 704,949 Rp 919,584
N ATAP

OH 0.003 Rp 140,000 Rp 420


OH 0.006 Rp 130,000 Rp 780
OH 0.060 Rp 125,000 Rp 7,500
OH 0.060 Rp 100,000 Rp 6,000

kg 1.150 Rp 14,500 Rp 16,675


Rp 14,700 Rp 16,675 Rp 31,375

OH 0.001 Rp 140,000 Rp 140


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.200 Rp 100,000 Rp 20,000

LBr 1.020 Rp 57,500 Rp 58,650


kg 0.200 Rp 16,700 Rp 3,340
Rp 33,940 Rp 61,990 Rp 95,930

OH 0.003 Rp 140,000 Rp 420


OH 0.006 Rp 130,000 Rp 780
OH 0.060 Rp 125,000 Rp 7,500
OH 0.060 Rp 100,000 Rp 6,000
kg 1.150 Rp 14,500 Rp 16,675
Rp 14,700 Rp 16,675 Rp 31,375

OH 0.004 Rp 140,000 Rp 560


OH 0.013 Rp 130,000 Rp 1,690
OH 0.125 Rp 125,000 Rp 15,625
OH 0.084 Rp 100,000 Rp 8,400

Lbr 2.400 Rp 30,000 Rp 72,000


Bh 6.000 Rp 200 Rp 1,200
Rp 26,275 Rp 73,200 Rp 99,475

OH 0.005 Rp 140,000 Rp 700


OH 0.020 Rp 130,000 Rp 2,600
OH 0.200 Rp 125,000 Rp 25,000
OH 0.100 Rp 100,000 Rp 10,000

m³ 0.011 Rp 3,105,800 Rp 33,543


kg 0.100 Rp 16,700 Rp 1,670
Rp 38,300 Rp 35,213 Rp 73,513
ECTRICAL DAN PLUMBING

OH 0.500 Rp 100,000 Rp 50,000

Unit 1.000 Rp 30,000 Rp 30,000


Rp 50,000 Rp 30,000 Rp 80,000

OH 0.500 Rp 100,000 Rp 50,000

Unit 1.000 Rp 21,500 Rp 21,500


Rp 50,000 Rp 21,500 Rp 71,500

OH 0.500 Rp 100,000 Rp 50,000

Unit 1.000 Rp 16,000 Rp 16,000


Rp 50,000 Rp 16,000 Rp 66,000

OH 0.500 Rp 100,000 Rp 50,000

Unit 1.000 Rp 10,000 Rp 10,000


Rp 50,000 Rp 10,000 Rp 60,000
OH 0.005 Rp 140,000 Rp 700
OH 0.018 Rp 130,000 Rp 2,340
OH 0.180 Rp 125,000 Rp 22,500
OH 0.108 Rp 100,000 Rp 10,800

m 1.200 Rp 39,000 Rp 46,800


% 35.000 Rp 16,380
Rp 36,340 Rp 63,180 Rp 99,520

OH 0.005 Rp 140,000 Rp 700


OH 0.040 Rp 130,000 Rp 5,200
OH 0.400 Rp 125,000 Rp 50,000
OH 0.010 Rp 100,000 Rp 1,000

m 1.000 Rp 75,000 Rp 75,000


Buah 0.025 Rp 10,000 Rp 250
Rp 56,900 Rp 75,250 Rp 132,150

OH 0.004 Rp 140,000 Rp 560


OH 0.014 Rp 130,000 Rp 1,755
OH 0.135 Rp 125,000 Rp 16,875
OH 0.081 Rp 100,000 Rp 8,100

m 1.200 Rp 35,200 Rp 42,240


% 35.000 Rp 14,784
Rp 27,290 Rp 57,024 Rp 84,314

OH 0.004 Rp 140,000 Rp 560


OH 0.014 Rp 130,000 Rp 1,820
OH 0.135 Rp 125,000 Rp 16,875
OH 0.081 Rp 100,000 Rp 8,100

m 1.200 Rp 35,200 Rp 42,240


% 35.000 Rp 14,784
Rp 27,355 Rp 57,024 Rp 84,379

OH 0.005 Rp 140,000 Rp 700


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Unit 1.000 Rp 94,100 Rp 94,100


Rp 15,500 Rp 94,100 Rp 109,600

OH 0.160 Rp 140,000 Rp 22,400


OH 0.150 Rp 130,000 Rp 19,500
OH 1.500 Rp 125,000 Rp 187,500
OH 1.000 Rp 100,000 Rp 100,000

Unit 1.000 Rp 175,000 Rp 175,000


kg 6.000 Rp 1,600 Rp 9,600
m³ 0.010 Rp 159,500 Rp 1,595
Rp 329,400 Rp 186,195 Rp 515,595

OH 0.060 Rp 140,000 Rp 8,400


OH 0.150 Rp 130,000 Rp 19,500
OH 1.450 Rp 125,000 Rp 181,250
OH 1.200 Rp 100,000 Rp 120,000

Unit 1.200 Rp 854,000 Rp 1,024,800


kg 6.000 Rp 1,600 Rp 9,600
m³ 0.010 Rp 159,500 Rp 1,595
% 12.000 Rp 124,319
Rp 329,150 Rp 1,160,314 Rp 1,489,464

OH 0.005 Rp 140,000 Rp 700


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Unit 1.000 Rp 98,400 Rp 98,400


Rp 15,500 Rp 98,400 Rp 113,900
RSITEKTUR

OH 0.015 Rp 140,000 Rp 2,100


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.300 Rp 100,000 Rp 30,000

m³ 70.000 Rp 700 Rp 49,000


kg 11.500 Rp 1,600 Rp 18,400
m³ 0.043 Rp 159,500 Rp 6,859
Rp 45,900 Rp 74,259 Rp 120,159

OH 0.015 Rp 140,000 Rp 2,100


OH 0.015 Rp 130,000 Rp 1,950
OH 0.150 Rp 125,000 Rp 18,750
OH 0.300 Rp 100,000 Rp 30,000

kg 3.456 Rp 1,600 Rp 5,530


m³ 0.029 Rp 159,500 Rp 4,626
Rp 52,800 Rp 10,155 Rp 62,955

OH 0.010 Rp 140,000 Rp 1,400


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.200 Rp 100,000 Rp 20,000

kg 3.250 Rp 1,600 Rp 5,200


Rp 35,200 Rp 5,200 Rp 40,400

OH 0.300 Rp 140,000 Rp 42,000


OH 1.800 Rp 130,000 Rp 234,000
OH 18.000 Rp 125,000 Rp 2,250,000
OH 6.000 Rp 100,000 Rp 600,000

m³ 1.200 Rp 1,962,100 Rp 2,354,520


kg 1.250 Rp 16,700 Rp 20,875
kg 1.000 Rp 16,900 Rp 16,900
Rp 3,126,000 Rp 2,392,295 Rp 5,518,295

OH 0.300 Rp 140,000 Rp 42,000


OH 1.800 Rp 130,000 Rp 234,000
OH 18.000 Rp 125,000 Rp 2,250,000
OH 6.000 Rp 100,000 Rp 600,000

m³ 1.200 Rp 1,962,100 Rp 2,354,520


kg 1.250 Rp 16,700 Rp 20,875
kg 1.000 Rp 16,900 Rp 16,900
Rp 3,126,000 Rp 2,392,295 Rp 5,518,295

OH 0.015 Rp 140,000 Rp 2,100


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.300 Rp 100,000 Rp 30,000

m³ 70.000 Rp 700 Rp 49,000


kg 11.500 Rp 1,600 Rp 18,400
m³ 0.043 Rp 159,500 Rp 6,859
Rp 45,900 Rp 74,259 Rp 120,159

OH 0.015 Rp 140,000 Rp 2,100


OH 0.015 Rp 130,000 Rp 1,950
OH 0.150 Rp 125,000 Rp 18,750
OH 0.300 Rp 100,000 Rp 30,000

kg 3.456 Rp 1,600 Rp 5,530


m³ 0.029 Rp 159,500 Rp 4,626
Rp 52,800 Rp 10,155 Rp 62,955

OH 0.010 Rp 140,000 Rp 1,400


OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.200 Rp 100,000 Rp 20,000

kg 3.250 Rp 1,600 Rp 5,200


Rp 35,200 Rp 5,200 Rp 40,400

OH 0.300 Rp 140,000 Rp 42,000


OH 1.800 Rp 130,000 Rp 234,000
OH 18.000 Rp 125,000 Rp 2,250,000
OH 6.000 Rp 100,000 Rp 600,000

m³ 1.200 Rp 1,962,100 Rp 2,354,520


kg 1.250 Rp 16,700 Rp 20,875
kg 1.000 Rp 16,900 Rp 16,900
Rp 3,126,000 Rp 2,392,295 Rp 5,518,295

OH 0.300 Rp 140,000 Rp 42,000


OH 1.800 Rp 130,000 Rp 234,000
OH 18.000 Rp 125,000 Rp 2,250,000
OH 6.000 Rp 100,000 Rp 600,000

m³ 1.200 Rp 1,962,100 Rp 2,354,520


kg 1.250 Rp 16,700 Rp 20,875
kg 1.000 Rp 16,900 Rp 16,900
Rp 3,126,000 Rp 2,392,295 Rp 5,518,295

OH 0.300 Rp 140,000 Rp 42,000


OH 1.800 Rp 130,000 Rp 234,000
OH 18.000 Rp 125,000 Rp 2,250,000
OH 6.000 Rp 100,000 Rp 600,000
m³ 1.200 Rp 1,962,100 Rp 2,354,520
kg 1.250 Rp 16,700 Rp 20,875
kg 1.000 Rp 16,900 Rp 16,900
Rp 3,126,000 Rp 2,392,295 Rp 5,518,295

OH 0.040 Rp 140,000 Rp 5,600


OH 0.240 Rp 130,000 Rp 31,200
OH 2.400 Rp 125,000 Rp 300,000
OH 0.800 Rp 100,000 Rp 80,000

m³ 0.024 Rp 3,105,800 Rp 74,539


kg 0.300 Rp 16,900 Rp 5,070
Rp 416,800 Rp 79,609 Rp 496,409

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 13,900 Rp 13,900


Rp 14,870 Rp 13,900 Rp 28,770

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 100,000 Rp 100,000


Rp 14,870 Rp 100,000 Rp 114,870

OH 0.001 Rp 140,000 Rp 112


OH 0.015 Rp 130,000 Rp 1,950
OH 0.150 Rp 125,000 Rp 18,750
OH 0.015 Rp 100,000 Rp 1,500

m2 1.100 Rp 77,400 Rp 85,140


kg 0.050 Rp 8,000 Rp 400
Rp 22,312 Rp 85,540 Rp 107,852

OH 0.040 Rp 140,000 Rp 5,600


OH 0.240 Rp 130,000 Rp 31,200
OH 2.400 Rp 125,000 Rp 300,000
OH 0.800 Rp 100,000 Rp 80,000

m³ 0.024 Rp 3,105,800 Rp 74,539


kg 0.300 Rp 16,900 Rp 5,070
Rp 416,800 Rp 79,609 Rp 496,409

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 13,900 Rp 13,900


Rp 14,870 Rp 13,900 Rp 28,770

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 100,000 Rp 100,000


Rp 14,870 Rp 100,000 Rp 114,870

OH 0.001 Rp 140,000 Rp 112


OH 0.015 Rp 130,000 Rp 1,950
OH 0.150 Rp 125,000 Rp 18,750
OH 0.015 Rp 100,000 Rp 1,500

m2 1.100 Rp 77,400 Rp 85,140


kg 0.050 Rp 8,000 Rp 400
Rp 85,540
Rp 22,312 Rp 171,080 Rp 193,392

OH 0.050 Rp 140,000 Rp 7,000


OH 0.300 Rp 130,000 Rp 39,000
OH 3.000 Rp 125,000 Rp 375,000
OH 1.000 Rp 100,000 Rp 100,000

m³ 0.040 Rp 3,105,800 Rp 124,232


kg 0.500 Rp 16,900 Rp 8,450
Rp 521,000 Rp 132,682 Rp 653,682

OH 0.001 Rp 140,000 Rp 112


OH 0.015 Rp 130,000 Rp 1,950
OH 0.150 Rp 125,000 Rp 18,750
OH 0.015 Rp 100,000 Rp 1,500

Bh 1.000 Rp 13,900 Rp 13,900


Rp 20,812 Rp 13,900 Rp 34,712

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 100,000 Rp 100,000


Rp 14,870 Rp 100,000 Rp 114,870

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 14,400 Rp 14,400


Rp 14,870 Rp 14,400 Rp 29,270

OH 0.005 Rp 140,000 Rp 700


OH 0.050 Rp 130,000 Rp 6,500
OH 0.500 Rp 125,000 Rp 62,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 90,300 Rp 90,300


Rp 70,700 Rp 90,300 Rp 161,000

OH 0.050 Rp 140,000 Rp 7,000


OH 0.300 Rp 130,000 Rp 39,000
OH 3.000 Rp 125,000 Rp 375,000
OH 1.000 Rp 100,000 Rp 100,000

m³ 0.040 Rp 3,105,800 Rp 124,232


kg 0.500 Rp 16,900 Rp 8,450
Rp 521,000 Rp 132,682 Rp 653,682

OH 0.001 Rp 140,000 Rp 112


OH 0.015 Rp 130,000 Rp 1,950
OH 0.150 Rp 125,000 Rp 18,750
OH 0.015 Rp 100,000 Rp 1,500
Bh 1.000 Rp 13,900 Rp 13,900
Rp 20,812 Rp 13,900 Rp 34,712

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 100,000 Rp 100,000


Rp 14,870 Rp 100,000 Rp 114,870

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 14,400 Rp 14,400


Rp 14,870 Rp 14,400 Rp 29,270

OH 0.005 Rp 140,000 Rp 700


OH 0.050 Rp 130,000 Rp 6,500
OH 0.500 Rp 125,000 Rp 62,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 90,300 Rp 90,300


Rp 70,700 Rp 90,300 Rp 161,000

OH 0.001 Rp 140,000 Rp 70
OH 0.010 Rp 130,000 Rp 1,300
OH 0.100 Rp 125,000 Rp 12,500
OH 0.010 Rp 100,000 Rp 1,000

Bh 1.000 Rp 175,000 Rp 175,000


Rp 14,870 Rp 175,000 Rp 189,870
FINISHING

OH 0.003 Rp 140,000 Rp 420


OH 0.006 Rp 130,000 Rp 819
OH 0.063 Rp 125,000 Rp 7,875
OH 0.020 Rp 100,000 Rp 2,000

kg 0.100 Rp 20,800 Rp 2,080


kg 0.100 Rp 28,500 Rp 2,850
kg 0.260 Rp 22,900 Rp 5,954
Rp 11,114 Rp 10,884 Rp 21,998

OH 0.003 Rp 140,000 Rp 420


OH 0.004 Rp 130,000 Rp 520
OH 0.105 Rp 125,000 Rp 13,125
OH 0.070 Rp 100,000 Rp 7,000

kg 0.200 Rp 31,000 Rp 6,200


kg 0.150 Rp 27,600 Rp 4,140
kg 0.170 Rp 28,500 Rp 4,845
kg 0.350 Rp 22,900 Rp 8,015
Bh 0.010 Rp 18,900 Rp 189
kg 0.030 Rp 19,700 Rp 591
Lbr 0.200 Rp 5,474 Rp 1,095
Rp 21,065 Rp 25,075 Rp 46,140

OH 0.003 Rp 140,000 Rp 420


OH 0.004 Rp 130,000 Rp 520
OH 0.105 Rp 125,000 Rp 13,125
OH 0.070 Rp 100,000 Rp 7,000

kg 0.200 Rp 31,000 Rp 6,200


kg 0.150 Rp 27,600 Rp 4,140
kg 0.170 Rp 28,500 Rp 4,845
kg 0.350 Rp 22,900 Rp 8,015
Bh 0.010 Rp 18,900 Rp 189
kg 0.030 Rp 19,700 Rp 591
Lbr 0.200 Rp 5,474 Rp 1,095
Rp 21,065 Rp 25,075 Rp 46,140

OH 0.045 Rp 140,000 Rp 6,300


OH 0.045 Rp 130,000 Rp 5,850
OH 0.450 Rp 125,000 Rp 56,250
OH 0.900 Rp 100,000 Rp 90,000

Bh 26.500 Rp 3,900 Rp 103,350


kg 9.300 Rp 1,600 Rp 14,880
m³ 0.018 Rp 159,500 Rp 2,871
kg 1.940 Rp 10,600 Rp 20,564
Rp 158,400 Rp 141,665 Rp 300,065
OH 0.035 Rp 140,000 Rp 4,900
OH 0.035 Rp 130,000 Rp 4,550
OH 0.350 Rp 125,000 Rp 43,750
OH 0.700 Rp 100,000 Rp 70,000

Bh 26.500 Rp 3,600 Rp 95,400


kg 10.400 Rp 1,600 Rp 16,640
m³ 0.045 Rp 159,500 Rp 7,178
kg 1.620 Rp 10,600 Rp 17,172
Rp 123,200 Rp 136,390 Rp 259,590

OH 0.035 Rp 140,000 Rp 4,900


OH 0.035 Rp 130,000 Rp 4,550
OH 0.350 Rp 125,000 Rp 43,750
OH 0.700 Rp 100,000 Rp 70,000

Bh 11.870 Rp 13,100 Rp 155,497


kg 10.000 Rp 1,600 Rp 16,000
m³ 0.045 Rp 159,500 Rp 7,178
kg 1.500 Rp 10,600 Rp 15,900
Rp 123,200 Rp 194,575 Rp 317,775

OH 0.045 Rp 140,000 Rp 6,300


OH 0.045 Rp 130,000 Rp 5,850
OH 0.450 Rp 125,000 Rp 56,250
OH 0.900 Rp 100,000 Rp 90,000

Bh 26.500 Rp 3,900 Rp 103,350


kg 9.300 Rp 1,600 Rp 14,880
m³ 0.018 Rp 159,500 Rp 2,871
kg 1.940 Rp 10,600 Rp 20,564
Rp 158,400 Rp 141,665 Rp 300,065

OH 0.035 Rp 140,000 Rp 4,900


OH 0.035 Rp 130,000 Rp 4,550
OH 0.350 Rp 125,000 Rp 43,750
OH 0.700 Rp 100,000 Rp 70,000

Bh 26.500 Rp 3,600 Rp 95,400


kg 10.400 Rp 1,600 Rp 16,640
m³ 0.045 Rp 159,500 Rp 7,178
kg 1.620 Rp 10,600 Rp 17,172
Rp 123,200 Rp 136,390 Rp 259,590

OH 0.035 Rp 140,000 Rp 4,900


OH 0.035 Rp 130,000 Rp 4,550
OH 0.350 Rp 125,000 Rp 43,750
OH 0.700 Rp 100,000 Rp 70,000

Bh 11.870 Rp 13,100 Rp 155,497


kg 10.000 Rp 1,600 Rp 16,000
m³ 0.045 Rp 159,500 Rp 7,178
kg 1.500 Rp 10,600 Rp 15,900
Rp 123,200 Rp 194,575 Rp 317,775

OH 0.040 Rp 100,000 Rp 4,000

m 1.000 Rp 300,000 Rp 300,000


Rp 4,000 Rp 300,000 Rp 304,000
No. Item Pekerjaan Satuan Volume

I PEKERJAAN PERSIAPAN
A Pekerjaan Persiapan Lahan
* Pekerjaan Pembersiahan Lahan m² 120 m²
* Pekerjaan Pembuatan Bowplank m² 40 m²
* Pekerjaan Pembuatan Pagar Proyek m² 44 m²
* Pekerjaan Pembuatan Bedeng m² 9 m²

II PEKERJAAN TANAH
A Pekerjaan Galian
* Pekerjaan Galian Pondasi Batu Kali m³ 36.86 m³
* Pekerjaan Galian Pondasi Telapak m³ 53.86 m³
* Pekerjaan Galian Pondasi Teras m³ 3.29 m³
* Pekerjaan Galian Septictank m³ 18 m³
B Pekerjaan Timbunan
1 Pekerjaan Timbunan Tanah
* Pekerjaan Timbunan Pondasi Batu Kali m² 53.71 m²
* Pekerjaan Timbunan Pondasi Telapak m³ 35.25 m³
* Pekerjaan Timbunan Septic Tank m³ 9.81 m³
* Pekerjaan Pemadatan m³ 65.72 m³

III PEKERJAAN STRUKTUR BAWAH


A Pekerjaan Pondasi Telapak
1 Pekerjaan Pondasi Bagian Telapak
* Pekerjaan Telapak Pondasi m³ 10.75 m³
* Pekerjaan Lantai Kerja m³ 15.36 m³
* Pekerjaan Pembesian Telapak kg 2437.55 kg
* Pekerjaan Bekisting m² 0.50 m²
2 Pekerjaan Pondasi Bagian Tiang
* Pekerjaan pembesian Tiang kg 163.27 kg
* Pekerjaan Pemasangan Bekisting Tiang m² 30.72 m²
* Pekerjaan Pengecoran Tiang m³ 6.91 m³
B Pekerjaan Pondasi Batu Kali
1 Pekerjaan Lantai Kerja m³ 0.87 m³
2 Pekerjaan Aanstampang m³ 12.598 m³
3 Pekerjaan Pasang Batu kali m³ 18.74 m³

C PEKERJAAN SLOOF
1 Pekerjaan Sloof 30 x 40
* Pekerjaan Pembesian Sloof kg 219.52 kg
* Pekerjaan Bekisting Sloof m² 18.65 m²
* Pekerjaan Pengecoran m³ 3.73 m³
2 Pekerjaan Sloof 15 x 20
* Pekerjaan Pembesian Sloof kg 81.68 kg
* Pekerjaan Bekisting Sloof m² 9.32 m²
* Pekerjaan Pengecoran m³ 0.93 m³

IV Pekerjaan Struktur Atas


A PEKERJAAN KOLOM
1 Pekerjaan Kolom Utama 30 x 30 cm
* Pekerjaan Pembesian Kolom Utama kg 1339.16 kg
* Bekisting Kolom Utama m² 79.92 m²
* Pengecoran Kolom Utama m³ 5.99 m³
2 Pekerjaan Kolom Praktis15 x 15 cm
* Pekerjaan Pembesian Kolom Praktis kg 375.72 kg
* Bekisting Kolom Praktis m² 8.88 m²
* Pengecoran Kolom Praktis m³ 0.333 m³
B PEKERJAAN BALOK
1 Pekerjaan Balok Induk 30X30
* Pekerjaan Pembesian Balok Induk kg 1472.48 kg
* Pekerjaan Bekisting m² 73.53 m²
* Pekerjaan Pengecoran m³ 9.804 m³
2 Pekerjaan Balok Anak 15 x 20
* Pekerjaan Pembesian Balok Induk kg 1248.09 kg
* Pekerjaan Bekisting m² 36.765 m²
* Pekerjaan Pengecoran m³ 2.451 m³

C PEKERJAAN PLAT
1 Pekerjaan Plat Lantai
* Pekerjaan Wiremesh lbr 12.94407 lbr
* Pekerjaan Bekisting m² 73.3929 m²
* Pekerjaan Pengecoran m³ 8.807148 m³
2 Pekerjaan Dak Beton
* Wiremesh Dak Beton lbr 3.243386 lbr
* Pekerjaan Bekisting m² 18.39 m²
* Pekerjaan Pengecoran m³ 18.39 m³
D PEKERJAAN TANGGA
1 Pekerjaan Anak Tangga
* Pekerjaan Pembesian tangga 85.29
* Pekerjaan Bekisting Tangga 1.13
* Pekerjaan Pengecoran Tangga 1.69
2 Pekerjaan Plat Bordes 15 cm
* Pekerjaan Pembesian 21.94
* Pekerjaan Bekisting 3.6
* Pekerjaan Pengecoran 0.432
3 Pekerjaan balok Bordes
* Pekerjaan Pembesian 188.17
* Pekerjaan Bekisting 1.83
* Pekerjaan Pengecoran 0.11
V PEKERJAAN ARSITEKTUR
A Pekerjaan Dinding
1 Pekerjaan Dinding Lantai 1
* Pemasangan Dinding Bata m² 169.965 m²
* Pemasangan Plasteran m² 339.93 m²
* Pemasangan Acian m² 321.555 m²
2 Pekerjaan Dinding Lantai 2
* Pemasangan Dinding Bata m² 160.765 m²
* Pemasangan Plasteran m² 171.565 m²
* Pemasangan Acian m² 165.44 m²
B Pekerjaan Kusen
1 Pekerjaan Kusen Pintu Lantai 1
* Pemasangan Kusen Pintu Kayu 1 m³ 0.015 m³
* Pemasangan Kusen Pintu Kayu 2 m³ 0.018 m³
2 Pekerjaan Kusen Pintu Lantai 2
* Pemasangan Kusen Pintu Kayu 2 m³ 0.015 m³
3 Pekerjaan Kusen Jendela Lantai 1
* Pekerjaan Kusen Jendela 1 m³ 0.0135 m³
* Pekerjaan Kusen Jendela 2 m³ 0.0315 m³
4 Pekerjaan Kusen Jendela Lantai 2
* Pekerjaan Kusen Jendela 1 m³ 0.0162 m³
* Pekerjaan Kusen Jendela 2 m³ 0.0126 m³
* Pekerjaan Kusen Jendela 3 m³ 0.0063 m³

C Pekerjaaan Pemasangan Pintu


1 Pekerjaaan Pemasangan Pintu kayu 1
* Engsel Pintu Unit 2 Unit
* Ganggang Pintu Unit 1 Unit
* Pemasangan daun pintu m³ 2.4 m³
2 Pekerjaaan Pemasangan Pintu kayu 2
* Engsel Pintu Unit 14 Unit
* Ganggang Pintu Unit 7 Unit
* Pemasangan daun pintu m³ 11.2 m³
3 Pekerjaaan Pemasangan Pintu Fiber
* Engsel Pintu Unit 6 Unit
* Pengunci Pintu Unit 3 Unit
* Gagang Pintu Unit 3 Unit
* Pemasangan daun pintu Unit 3 Unit
D Pekerjaan Pemasangan Jendela
1 Pekerjaan Pemasangan Jendela 1
* Pemasangan Daun Jendela m² 1.68 m²
* Pemasangan aksesoris jendela Unit 6 Unit
* Pemasangan kaca jendela m² 9.6 m²
2 Pekerjaan Pemasangan Jendela 2
* Pemasangan Daun Jendela m² 1.44 m²
* Pemasangan aksesoris jendela Unit 8 Unit
* Pemasangan kaca jendela m² 1.92 m²
E Pekerjaan Lantai
1 Pekerjaan Beton Tumbuk m² 5.631241 m²
F Pekerjaan Ventilasi
1 Ventilasi Bouven m² 0.185164 m²
2 Ventilasi Kaca m² 0.1575 m²
VI Pekerjaan Atap
A Pekerjaan Rangka atap
* Pekerjaan Pemasangan Kuda - kuda m² 2.18809 m²
B Pekerjaan Penutup Atap
* Pemasangan Atap genteng metal m² 77.87082 m²
* Pemasangan lisplank m 0.51246 m
* Pemasangan bubungan m 32.241 m
VII Pekerjaan Elektrikal dan plumbing
A Pekerjaan Elektrikal
1 Pekerjaan Pemasangan Instalasi Listrik
* Pemasangan Sekring Unit 1 Unit
* Pemasangan Saklar Unit 17 Unit
* Pemasangan Stop Kontak Unit 14 Unit
* Pemasangan Titik Lampu Unit 15 Unit
B Pekerjaan Plumbing
1 Pekerjaan Instalasi air bersih
* Pemasangan pipa galvanis 1,5' m 30 m
* Pemasangan kran air Unit 4 Unit
2 Pekerjaan Air Kotor
* Pemasangan Floor Drain Unit 3 Unit
* Pemasangan Roof Drain Unit 2 Unit
* Pemasangan pipa PVC 3 Unit 20 Unit
* Pemasangan pipa PVC 4 Unit 30 Unit
* Pemasangan Kloset Unit 3 Unit
* Pemasangan Wastafel Unit 1 Unit
VIII Finishing
A Pengecatan
1 Pekerjaan Pengecatan dinding
* Pekerjaan Pengecatan dinding Lantai 1 m² 169.965 m²
* Pekerjaan Pengecatan dinding Lantai 2 m² 160.765 m²
2 Pekerjaan Pengecatan Kayu
* Pekerjaan Pengecatan Jendela m² 9.38 m²
* Pekerjaan Pengecatan Pintu m² 20.88 m²
B Pekerjaan Keramik
1 Pekerjaan Keramik Lantai 1
* Pemasangan Keramik 50 x 50 m² 85.566 m²
* Pemasangan Keramik Lantai wc 20 x 20 m² 16.625 m²
* Pemasangan dinding Keramik 20 x 20 m² 9.625 m²
2 Pekerjaan Keramik Lantai 2
* Pemasangan Keramik 50 x 50 m² 96.8144 m²
* Pemasangan Keramik Lantai wc 20 x 20 m² 9.625 m²
* Pemasangan dinding Keramik 20 x 20 m² 16.625 m²
C Pekerjaan Railling
* Pemasangan Railing Tangga m 2.84 m
AHSP BOQ

Rp17,000 Rp2,040,000
Rp61,613 Rp2,464,536
Rp338,141 Rp14,878,213
Rp664,391 Rp5,979,515 Rp25,362,264

Rp78,500 Rp2,893,824
Rp96,300 Rp5,186,376
Rp57,000 Rp187,530
Rp78,500 Rp1,413,000

Rp57,000 Rp3,061,268
Rp57,000 Rp2,009,318
Rp57,000 Rp559,313
Rp57,000 Rp3,746,163
Rp19,056,791

Rp835,960 Rp8,988,243
Rp712,069 Rp10,937,376
Rp14,603 Rp35,594,320
Rp153,934 Rp76,844

Rp14,603 Rp2,384,094
Rp153,934 Rp4,728,852
Rp46,002,495 Rp317,969,245

Rp689,443 Rp601,194
Rp379,853 Rp4,785,386
Rp859,438 Rp16,105,451

Rp14,576 Rp3,199,587
Rp194,974 Rp3,635,875
Rp835,960 Rp3,117,797

Rp14,576 Rp1,190,539
Rp194,974 Rp1,817,938
Rp835,960 Rp779,449
Rp415,912,189

Rp14,576 Rp19,518,937
Rp378,791 Rp30,272,937
Rp835,960 Rp5,010,745

Rp100,870 Rp37,898,803
Rp378,791 Rp3,363,660
Rp835,960 Rp278,375

Rp14,576 Rp21,462,065
Rp378,791 Rp27,852,465
Rp890,354 Rp8,729,031

Rp14,576 Rp18,191,567
Rp378,791 Rp13,926,233
Rp890,354 Rp2,182,258

Rp221,000 Rp2,860,640
Rp515,191 Rp37,811,325
Rp890,354 Rp7,841,479

Rp14,576 Rp47,274
Rp515,191 Rp9,474,353
Rp835,960 Rp15,373,306

Rp14,576 Rp1,243,109
Rp378,791 Rp428,836
Rp890,354 Rp1,506,479

Rp14,576 Rp319,723
Rp378,791 Rp1,363,646
Rp890,354 Rp384,633
Rp14,576 Rp2,742,646
Rp378,791 Rp693,187
Rp890,354 Rp98,295 Rp270,876,005

Rp120,159 Rp20,422,739
Rp62,955 Rp21,400,327
Rp40,400 Rp12,990,822

Rp120,159 Rp19,317,281
Rp62,955 Rp10,800,892
Rp40,400 Rp6,683,776

Rp5,518,295 Rp82,774
Rp5,518,295 Rp99,329

Rp5,518,295 Rp82,774

Rp5,518,295 Rp74,497
Rp5,518,295 Rp173,826

Rp5,518,295 Rp89,396
Rp5,518,295 Rp69,531
Rp5,518,295 Rp34,765

Rp34,712 Rp69,424
Rp114,870 Rp114,870
Rp653,682 Rp1,568,837

Rp34,712 Rp485,968
Rp114,870 Rp804,090
Rp653,682 Rp7,321,238

Rp34,712 Rp208,272
Rp29,270 Rp87,810
Rp114,870 Rp344,610
Rp189,870 Rp569,610

Rp496,409 Rp833,967
Rp143,640 Rp861,840
Rp107,852 Rp1,035,379

Rp496,409 Rp714,829
Rp143,640 Rp1,149,120
Rp107,852 Rp207,075.84

Rp919,584 Rp5,178,399

Rp496,409 Rp91,917
Rp496,409 Rp78,184 Rp114,048,172

Rp31,375 Rp68,651

Rp95,930 Rp7,470,148
Rp73,513 Rp37,672
Rp99,475 Rp3,207,173 Rp10,783,645

Rp80,000 Rp80,000
Rp66,000 Rp1,122,000
Rp71,500 Rp1,001,000
Rp60,000 Rp900,000

Rp99,520 Rp2,985,600
Rp132,150 Rp528,600

Rp109,600 Rp328,800
Rp113,900 Rp227,800
Rp84,314 Rp1,686,280
Rp84,379 Rp2,531,370
Rp515,595 Rp1,546,785
Rp1,489,464 Rp1,489,464 Rp14,427,699

Rp21,998 Rp3,738,890
Rp21,998 Rp3,536,508

Rp46,140 Rp432,791
Rp46,140 Rp963,399
Rp317,775 Rp27,190,693
Rp300,065 Rp4,988,581
Rp259,590 Rp2,498,549

Rp317,775 Rp30,765,148
Rp259,590 Rp2,498,549
Rp300,065 Rp4,988,581

Rp304,000 Rp863,360 Rp82,465,048


Total Rp952,931,815
REKAPITULASI
NO ITEM PEKERJAAN BOQ
1 PEKERJAAN PERSIAPAN Rp 25,362,264
2 PEKERJAAN TANAH Rp 19,056,791
3 PEKERJAAN STRUKTUR BAWAH Rp 415,912,189
4 Pekerjaan Struktur Atas Rp 270,876,005
5 PEKERJAAN ARSITEKTUR Rp 114,048,172
6 Pekerjaan Atap Rp 10,783,645
7 Pekerjaan Elektrikal dan plumbing Rp 14,427,699
8 Finishing Rp 82,465,048
TOTAL BOQ Rp 952,931,815
PPN (10%) Rp 95,293,182
TOTAL BOQ Rp 1,048,224,997
Terbilang : Sembilan Ratus Lima Puluh Dua Juta
Sembilan Ratus Tiga Puluh Ribu Rupiah
No. Item Pekerjaan Hari Kerja

I PEKERJAAN PERSIAPAN
A Pekerjaan Persiapan Lahan
* Pekerjaan Pembersiahan Lahan 3
* Pekerjaan Pembuatan Bowplank 1
* Pekerjaan Pembuatan Pagar Proyek 2
* Pekerjaan Pembuatan Bedeng 1
II PEKERJAAN TANAH
A Pekerjaan Galian
* Pekerjaan Galian Pondasi Batu Kali 11
* Pekerjaan Galian Pondasi Telapak 12
* Pekerjaan Galian Teras 2
* Pekerjaan Galian Septictank 5
B Pekerjaan Timbunan
1 Pekerjaan Urugan Tanah
* Pekerjaan Timbunan Pondasi Batu Kali 2
* Pekerjaan Timbunan Pondasi Telapak 6
* Pekerjaan Timbunan Septic Tank 1
* Pekerjaan Pemadatan 1
III PEKERJAAN STRUKTUR BAWAH
A Pekerjaan Pondasi Telapak
1 Pekerjaan Pondasi Bagian Telapak
* Pekerjaan Telapak Pondasi 1
* Pekerjaan Lantai Kerja 1
* Pekerjaan Pembesian Telapak 1
* Pekerjaan Bekisting 1
2 Pekerjaan Pondasi Bagian Tiang
* Pekerjaan pembesian Tiang 1
* Pekerjaan Pemasangan Bekisting Tiang 1
* Pekerjaan Pengecoran Tiang 1
B Pekerjaan Pondasi Batu Kali
1 Pekerjaan Lantai Kerja 1
2 Pekerjaan Aanstampang 1
3 Pekerjaan Pasang Batu kali 3

C PEKERJAAN SLOOF
1 Pekerjaan Sloof 30 x 40
* Pekerjaan Pembesian Sloof 1
* Pekerjaan Bekisting Sloof 1
* Pekerjaan Pengecoran 1
2 Pekerjaan Sloof 15x20
* Pekerjaan Pembesian Sloof 2
* Pekerjaan Bekisting Sloof 2
* Pekerjaan Pengecoran Sloof 2
IV Pekerjaan Struktur Atas
A PEKERJAAN KOLOM
1 Pekerjaan Kolom Utama 30 x 30 cm
* Pekerjaan Pembesian Kolom Utama 2
* Bekisting Kolom Utama 2
* Pengecoran Kolom Utama 2
2 Pekerjaan Kolom Praktis15 x 15 cm
* Pekerjaan Pembesian Kolom Praktis 1
* Bekisting Kolom Praktis 1
* Pengecoran Kolom Praktis 1
B PEKERJAAN BALOK
1 Pekerjaan Balok Induk 30X30
* Pekerjaan Pembesian Balok Induk 2
* Pekerjaan Bekisting 2
* Pekerjaan Pengecoran 2
2 Pekerjaan Balok Anak 15x20
* Pekerjaan Pembesian 1
* Pekerjaan Bekisting 1
* Pekerjaan Pengecoran 1
C PEKERJAAN PLAT
1 Pekerjaan Plat Lantai
* Pekerjaan Wiremesh 2
* Pekerjaan Bekisting 2
* Pekerjaan Pengecoran 1
2 Pekerjaan Dak Beton
* Wiremesh Dak Beton 1
* Pekerjaan Bekisting 1
* Pekerjaan Pengecoran 1
D PEKERJAAN TANGGA
1 Pekerjaan Anak Tangga
* Pekerjaan Pembesian tangga 2
* Pekerjaan Bekisting Tangga 2
* Pekerjaan Pengecoran Tangga 2
2 Pekerjaan Plat Bordes 15 cm
* Pekerjaan Pembesian 2
* Pekerjaan Bekisting 2
* Pekerjaan Pengecoran 2
3 Pekerjaan balok Bordes
* Pekerjaan Pembesian 2
* Pekerjaan Bekisting 2
* Pekerjaan Pengecoran 2
V PEKERJAAN ARSITEKTUR
A Pekerjaan Dinding
1 Pekerjaan Dinding Lantai 1
* Pemasangan Dinding Bata 5
* Pemasangan Plasteran 8
* Pemasangan Acian 8
2 Pekerjaan Dinding Lantai 2
* Pemasangan Dinding Bata 4
* Pemasangan Plasteran 7
* Pemasangan Acian 7
B Pekerjaan Kusen
1 Pekerjaan Kusen Pintu Lantai 1
* Pemasangan Kusen Pintu Kayu 1 1
* Pemasangan Kusen Pintu Kayu 2 1
2 Pekerjaan Kusen Pintu Lantai 2
* Pemasangan Kusen Pintu Kayu 1 1
3 Pekerjaan Kusen Jendela Lantai 1
* Pekerjaan Kusen Jendela 1 1
* Pekerjaan Kusen Jendela 2 1
4 Pekerjaan Kusen Jendela Lantai 2
* Pekerjaan Kusen Jendela 1 1
* Pekerjaan Kusen Jendela 2 1
* Pekerjaan Kusen Jendela 3 1
C Pekerjaaan Pemasangan Pintu
1 Pekerjaaan Pemasangan Pintu kayu 1
* Engsel Pintu 1
* Ganggang Pintu 1
* Pemasangan daun pintu 1
2 Pekerjaaan Pemasangan Pintu kayu 2
* Engsel Pintu 1
* Ganggang Pintu 1
* Pemasangan daun pintu 1
3 Pekerjaaan Pemasangan Pintu Fiber
* Engsel Pintu,Pengunci Pintu & Pemasangan daun pintu 1
D Pekerjaan Pemasangan Jendela
1 Pekerjaan Pemasangan Jendela 1 Tipe 1
* Pemasangan Daun Jendela 1
* Pemasangan aksesoris jendela 1
* Pemasangan kaca jendela 1
2 Pekerjaan Pemasangan Jendela 2 tipe 1
* Pemasangan Daun Jendela 1
* Pemasangan aksesoris jendela 1
* Pemasangan kaca jendela 1
F Pekerjaan Lantai
1 Pekerjaan Beton Tumbuk 1
G Pekerjaan Ventilasi
* Ventilasi Bouven 1
* Ventilasi Kaca 1
VI Pekerjaan Atap
A Pekerjaan Rangka atap
* Pekerjaan Pemasangan Kuda - kuda 3
B Pekerjaan Penutup Atap
* Pemasangan Atap genteng metal 8
* Pemasangan lisplank 5
* Pemasangan bubungan 2
VII Pekerjaan Elektrikal dan plumbing
A Pekerjaan Elektrikal
1 Pekerjaan Pemasangan Instalasi Listrik
* Pemasangan Sekring 1
* Pemasangan Stop Kontak 6
* Pemasangan Titik Lampu 1
B Pekerjaan Plumbing
1 Pekerjaan Instalasi air bersih
* Pemasangan pipa galvanis 1,5' 1
* Pemasangan kran air 1
2 Pekerjaan Air Kotor
* Pemasangan Floor Drain 1
* Pemasangan Roof Drain 1
* Pemasangan pipa PVC 3 4
* Pemasangan pipa PVC 4 5
* Pemasangan Kloset 6
* Pemasangan Wastafel 2
VIII Finishing
A Pengecatan
1 Pekerjaan Pengecatan dinding
* Pekerjaan Pengecatan dinding Lantai 1 1
* Pekerjaan Pengecatan dinding Lantai 2 1
2 Pekerjaan Pengecatan Kayu
* Pekerjaan Pengecatan Jendela 1
* Pekerjaan Pengecatan Pintu 1
B Pekerjaan Keramik
1 Pekerjaan Keramik Lantai 1
* Pemasangan Keramik 50 x 50 9
* Pemasangan Keramik Lantai wc 20 x 20 6
* Pemasangan dinding Keramik 20 x 20 9
2 Pekerjaan Keramik Lantai 2
* Pemasangan Keramik 50 x 500 9
* Pemasangan Keramik Lantai wc 20 x 20 2
* Pemasangan dinding Keramik 20 x 20 3
C Pekerjaan Railling
* Pemasangan Railing Tangga 1
Bobot Rencana
Bobot Kumulatif Rencana
BOQ BOBOT
(RP) % 1 2 3 4 5 6 7

Rp 2,040,000 0.215715 0.071905 0.071905 0.071905


Rp 2,464,536 0.260607 0.260607
Rp 14,878,213 1.573264 0.786632
Rp 5,979,515 0.632291 0.632291

Rp 2,893,824 0.306001 0.027818 0.027818


Rp 5,186,376 0.548422
Rp 187,530 0.01983
Rp 1,413,000 0.149415

Rp 3,061,268 0.323707
Rp 2,009,318 0.212471
Rp 559,313 0.059143
Rp 3,746,163 0.39613

Rp 8,988,243 0.950442
Rp 10,937,376 1.156549
Rp 35,594,320 3.763842
Rp 76,844 0.008126

Rp 2,384,094 0.252101
Rp 4,728,852 0.500042
Rp 317,969,245 33.62295

Rp 601,194 0.063572
Rp 4,785,386 0.50602
Rp 16,105,451 1.703035

Rp 3,199,587 0.338333
Rp 3,635,875 0.384468
Rp 3,117,797 0.329684

Rp 1,190,539 0.125891
Rp 1,817,938 0.192234
Rp 779,449 0.082421

Rp 19,518,937 2.063987
Rp 30,272,937 3.201145
Rp 5,010,745 0.52985

Rp 18,191,567 1.923627
Rp 13,926,233 1.472599
Rp 2,182,258 0.230758

Rp 21,462,065 2.269458
Rp 27,852,465 2.945197
Rp 8,729,031 0.923032

Rp 18,191,567 1.923627
Rp 13,926,233 1.472599
Rp 2,182,258 0.230758

Rp 2,860,640 0.302492
Rp 37,811,325 3.998275
Rp 7,841,479 0.82918

Rp 47,274 0.004999
Rp 9,474,353 1.001844
Rp 15,373,306 1.625616

Rp 1,243,109 0.13145
Rp 428,836 0.045346
Rp 1,506,479 0.159299

Rp 319,723 0.033808
Rp 1,363,646 0.144196
Rp 384,633 0.040672

Rp 2,742,646 0.290015
Rp 693,187 0.073299
Rp 98,295 0.010394
Rp 20,422,739 2.159557
Rp 21,400,327 2.26293
Rp 12,990,822 1.373686

Rp 19,317,281 2.042663
Rp 10,800,892 1.142116
Rp 6,683,776 0.706761

Rp 82,774 0.008753
Rp 99,329 0.010503

Rp 82,774 0.008753

Rp 74,497 0.007878
Rp 173,826 0.018381

Rp 89,396 0.009453
Rp 69,531 0.007352
Rp 34,765 0.003676

Rp 69,424 0.007341
Rp 114,870 0.012147
Rp 1,568,837 0.165893

Rp 485,968 0.051388
Rp 804,090 0.085027
Rp 7,321,238 0.774168

Rp 1,210,302 0.127981

Rp 833,967 0.088186
Rp 861,840 0.091133
Rp 1,035,379 0.109484

Rp 714,829 0.075588
Rp 1,149,120 0.121511
Rp 207,076 0.021897

Rp 5,178,399 0.547578

Rp 91,917 0.00972
Rp 78,184 0.008267

Rp 68,651 0.007259

Rp 7,470,148 0.789914
Rp 37,672 0.003984
Rp 3,207,173 0.339135

Rp 80,000 0.008459
Rp 2,123,000 0.224492
Rp 900,000 0.095169

Rp 2,985,600 0.315706
Rp 528,600 0.055896

Rp 328,800 0.034768
Rp 227,800 0.024088
Rp 1,686,280 0.178312
Rp 2,531,370 0.267674
Rp 1,546,785 0.163561
Rp 1,489,464 0.1575

Rp 3,738,890 0.395361
Rp 3,536,508 0.37396

Rp 432,791 0.045765
Rp 963,399 0.101872

Rp 27,190,693 2.875219
Rp 4,988,581 0.527506
Rp 2,498,549 0.264204

Rp 30,765,148 3.253192
Rp 2,498,549 0.264204
Rp 4,988,581 0.527506

Rp 863,360 0.091294
Rp 945,691,035 100
0.1 0.1 0.1 1.7 0.0 0.0 0.0
0.1 0.1 0.2 1.9 1.9 1.9 2.0
8 9 10 11 12 13 14 15 16 17

0.027818 0.027818 0.027818 0.027818 0.027818 0.027818 0.027818 0.027818 0.027818


0.045702 0.045702 0.045702 0.045702 0.045702 0.045702 0.045702 0.045702 0.045702 0.045702
0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0
2.0 2.1 2.2 2.2 2.3 2.4 2.5 2.5 2.6 2.7
18 19 20 21 22 23 24 25 26 27

0.045702 0.045702
0.009915 0.009915
0.03 0.03 0.03 0.03 0.03

0.161853 0.161853
0.035412 0.035412 0.035412 0.035412 0.035412 0.035412
0.059143
0.39613

0.950442
1.156549

0.252101
0.500042

0.063572
0.50602
0.567678 0.567678
0.2 0.2 0.0 0.5 0.1 0.0 0.0 0.0 1.2 3.4
2.9 3.1 3.2 3.7 4.0 4.0 4.1 4.1 5.5 8.9
Hari Ke-
28 29 30 31 32 33 34 34 36 37

3.763842
0.008126

33.62295

0.567678

0.338333
0.384468
0.329684

0.062945 0.062945
0.096117 0.096117
0.041211 0.041211

1.031993 1.031993
1.600572 1.600572
0.264925 0.264925

1.923627
1.472599
0.230758

1.134729 1.134729
1.472599 1.472599

1.923627
1.472599
0.230758
38.0 0.9 0.5 0.0 6.1 2.9 0.3 0.3 6.0 2.8
46.9 47.8 48.2 48.3 54.4 57.2 57.5 57.7 63.7 66.6
Hari Ke-
38 39 40 41 42 43 44 45 46 47
0.461516 0.461516

0.151246 0.151246
1.999137 1.999137
0.82918

0.004999
1.001844
1.625616

0.065725 0.065725
0.022673 0.022673
0.07965 0.07965

0.016904 0.016904
0.072098 0.072098
0.020336 0.020336

0.145008 0.145008
0.03665 0.03665
0.005197 0.005197
0.431911 0.431911
0.282866

0.547578
0.00242 0.00242

0.315706

0.044578
0.5 2.6 3.2 2.5 0.4 0.4 0.7 0.1 0.4 1.1
67.0 69.7 72.8 75.3 75.6 76.0 76.6 76.7 77.2 78.3
48 49 50 51 52 53 54 55 56 57
0.431911 0.431911 0.431911
0.282866 0.282866 0.282866 0.282866 0.282866 0.282866 0.282866
0.171711 0.171711 0.171711 0.171711 0.171711 0.171711 0.171711 0.171711

0.510666 0.510666 0.510666 0.510666


0.163159 0.163159 0.163159 0.163159 0.163159 0.163159
0.100966 0.100966 0.100966 0.100966
0.00242

0.098739 0.098739 0.098739 0.098739 0.098739 0.098739 0.098739 0.098739


0.000797 0.000797 0.000797 0.000797 0.000797
0.169568

0.008459
0.037415

0.044578 0.044578 0.044578


0.053535 0.053535 0.053535 0.053535 0.053535
0.02726 0.02726 0.02726 0.02726 0.02726
0.8 1.1 1.1 1.1 1.3 1.3 1.4 0.6 0.6 0.5
79.1 80.2 81.2 82.6 83.9 85.1 86.5 87.0 87.6 88.1
58 59 60 61 62 63 64 65 66 67
0.163159
0.100966 0.100966 0.100966

0.008753
0.010503

0.008753

0.007341
0.012147
0.165893

0.051388
0.085027
0.774168

0.127981

0.088186
0.091133
0.109484

0.00972
0.008267

0.169568

0.037415 0.037415 0.037415 0.037415 0.037415


0.095169

0.02726
0.07875 0.07875

0.395361
0.37396

0.045765
0.101872

0.319469 0.319469 0.319469 0.319469 0.319469 0.319469


0.087918
0.087918 0.087918 0.087918

0.361466 0.361466

0.175835
0.5 0.2 0.2 0.0 0.3 0.8 0.7 1.8 0.9 1.3
88.6 88.8 89.0 89.0 89.3 90.1 90.8 92.6 93.5 94.8
68 69 70 71 72 73 74 75
0.007878
0.018381

0.075588
0.121511
0.021897
0.319469 0.319469 0.319469
0.087918 0.087918 0.087918 0.087918 0.087918
0.087918 0.087918 0.087918 0.087918 0.087918 0.087918

0.361466 0.361466 0.361466 0.361466 0.361466 0.361466 0.361466


0.132102 0.132102
0.175835 0.175835

0.091294
1.3 1.0 1.0 0.7 0.5 0.4 0.4 0.1
96.1 97.2 98.1 98.8 99.4 99.8 100.2 100.3