Date: 09 01 2019
Validity: Three years from the date of approval or till completion of the specified activity.
Facility / Job Location : Specify the Activity to be assesed:- Assessment team member Signature
Department:
3 Mr.Netaji
4 Mr.Satheesh Kumar
Reviewed By (Marafiq coordinating Dept.) Reviewed By ( Marafiq OHS Section ) Approved By (Marafiq Operations Dept.)
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
Table – a: Risk Heat Map Table Table – b: Risk Bands / Risk Levels
Likelihood Risk Bands Score Range (RPN) Risk Level
1–4 1 Low
Critical
5 Expected Medium (5) High (10) High (15) Critical (20)
5–9 2 Medium
(25)
Critical 10 – 19 3 High
4 Highly likely Low (4) Medium (8) High (12) High (16)
(20) 20 – 25 4 Critical
3 Likely Low (3) Medium (6) Medium (9) High (12) High (15)
Medium
2 Slight Low (2) Low (4) Medium (6)
(8)
High (10) Table – d: Environmental Impact Scale
Medium Score Description Environment
1 Not Likely Low (1) Low (2) Low (3) Low (4)
(5) Environmental catastrophe
Minor Moderate Important Material Severe Long-term environmental damage (require >5 years to recover)
5 Severe
Impact 1 2 3 4 5 Require SAR >40 million to restore or rectify
Revoke of EPO
Significant environmental damage
Table – c: Mitigation strategies of the Risk Level Table Medium-term environmental damage (require >1-5 years to recover)
4 Material
Score Risk Level Typical Mitigation Strategies Require SAR >4 million up to 40 million to restore or rectify
Range RCER Class III violations (continuous environmental violation)
1–4 Low (1) Accept and continually monitor the risk. Short-term environmental damage (require >24 hours but <1 year to
recover)
5–9 Reduce/transfer the risk to acceptable level based on some 3 Important
Require SAR >400,000 up to 4 million to restore or rectify
Medium (2) logical analysis (preferably cost-benefit analysis). Otherwise RCER Class II violations (frequent environmental violation)
accept and continually monitor the risk.
Marginal environmental damage which can be corrected within 24
hours
10 – 19 Reduce/transfer/avoid the risk to acceptable level – priority 2 Moderate
High (3) Require SAR >100,000 up to 400,000 to restore or rectify
action/decision required.
RCER Class I violations
20 – 25 Critical (4) Reduce/transfer/avoid the risk to acceptable level – high Negligible environmental damage which can be corrected within 2
priority or immediate action/decision required. hours
1 Minor
Require SAR 40,000 up to 100,000 to restore or rectify
RCER Class 0 violations
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
The Initial and Residual risks shall be calculated as per the rating criteria detailed in tables d, e, f & g above to decide on at Risk Priority Number (RPN)
from the table b.
RPN is calculated as ‘RPN=Impact X Likelihood’.
Use table ‘a’, the 5x5 Risk Heat Map to identify the rate for the Impact and likelihood.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
Sr. JOB STEPS POTENTIAL HAZARD SEVERITY / EXISTING CONTROL Initial Risk Additional Control Residua
# (What can cause harm?) CONSEQUENCES MEASURES
(What can go wrong
(Risk Level) Measures l risk
to who?) (Risk
Level)
1 Site mobilization Work crew injure while Physical injury Comply with the RPN=IMPACT Use correct manual
Site mobilization moving equipment’s, to the worker if Marafiq OHSMS *likelihood handling technique
for arranging arranging tools. they trip over Procedure Share or split loads
tools, equipment, objects and slip (Manual with other operatives. 2(l)*1(L)
safety items and on spillages or Handling) Use correct gloves to
barricade to the Improper lifting and manual wet area. Comply with 3(I)*2L protect from sharp
work area. handling technique Workers may Marafiq OHSMS edges.
get injure (Good Remove trip hazards
suffering body Housekeeping around site; store
and muscle Comply with the materials in designated
Road Hazards strain and back Marafiq OHSMS areas
pain. Procedure Only trained and RPN=2
Traffic Accident (Defensive competent personnel to
and properties Driving) RPN=6 use equipment
damage. Comply with the Personal hygiene
Marafiq OHSMS levels must be
Procedure maintained at all times.
(PTWC) Hand to mouth contact
Comply with the must be avoided as
Marafiq OHSMS much as possible, and
Procedure when necessary hands
(ISOLATION) must be cleaned or
Obtain LEVEL LEVEL
washed.
Clearances from 2 1
Follow road safety and
other utility traffic rules.
services –
Electrical –
Irrigation
Roads - RC
Timely work
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
instruction and
good supervision
before start the
work.
Area must be free
any materials to
prevent from
tripping and
slipping hazards.
Secure the load,
reduce the weight
by using
mechanical
devices.
Barricade the work
area by using
barricade, warning
tape.
And safety cone to
prevent authorized
person to enter.
Installed safety
signboard to warm
people
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
3 Entry & working Incorrect information on Serious Comply with Ensure potential
in Confined permit/clearance. Physical injury OHSMS (Confined sources of fumes from
space or fatality the spaces). Comply 4(I)*2(L) generators/vehicles 3(l)*1(L)
Probable presence of any work crew with the Marafiq that could enter any
Entry of the Wet toxic gas Lack of Oxygen. resulting from OHSMS (Gas confined space are
Well Pit fire or testing) Comply keep clear of openings
(Confined Space explosion / with the Marafiq Consider reducing
& same time burst happens. OHSMS (Ladder exposure time for
work at height) Left confined space and Scaffolding
Burns if fire crews in the confined
unattended for Re-Entry.
Entering the erupts. safety) RPN=8 space RPN=3
Pit using a Asphyxiation Comply with the Reliefs may have to be
Lack of Emergency due to lack of Marafiq OHSMS on a one team out one
ladder to erect (Work at Height)
oxygen and team in approach
and use inhalation of dependent on access,
Scaffolding Toxic gas / co2 form toxic gases Timely work egress and working
(Depth: 8meter equipment’s/sources. Death or fatality instruction and condition
approx.) due to fall from proper Any equipment/tools
Unsecured ladder that lead height. supervision taken into or used in a
to Falling of personnel’s before start the LEVEL confined space must be LEVEL
work. 2 appropriate to the risk, 1
Gas test must be suitable for the task,
taken by Masa and not introduce
Unstable scaffolding falling
Authorized gas further risks
injury.
tester to monitor Make sure A Standby
the presence of attended should be
oxygen, assign all the time at
flammable gas, work in confine space
toxic gas etc. Make sure the
Before entering atmosphere of confined
the confined space tested by a
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
4 Installation and Dust during PVC/FRP Pipe Personal Comply with the
repair GRP pipe, cutting. Injury/fatality Marafiq OHSMS Operate tools according
performing Hot Defective hand tools. Property (Hot work comply 4(I)*2(L) to manufactures 3(l)*1(L)
Work Fire hazard during cutting Damage. with Marafiq instruction
a. Using Grinder pipe by the portable Burying of OHSMS (Hand and Before cutting make
for cutting the generator personnel and Portable power sure no one will be
pipe. Falling of pipe piece during physical injury tools) Comply with affected by flying
b. Removal of lifting. resulting of soil the Marafiq OHSMS objects
damaged collapse. (PPE) Operative involved to
portion Explosion/ Fire. Portable power RPN=8 wear appropriate PPE RPN
installing of tools) Comply with (goggles additional to
Spool GRP the Marafiq OHSMS mandatory PPE)
Pipe and (Hazardous Segregate area from
Coupling. Chemical and others, only personnel
Substance) involved in this activity
Trained & will enter.
experienced Keep electrical
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
5 Shuttering: Falling Hazard. Personal Comply with the Make sure Shoring to
Atmospheric Hazards. injury Marafiq OHSMS be installed by a
Hitting pipes. Property Excavation Safety 4(l)*2(L) competent operative. 3(l)*1(L)
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
6 Back filling and Moving equipment hitting Personal Injury Comply with the Make sure to engage
Restoration the pipe lines. Property Marafiq OHSMS 3(l)*2(L) skilled workers for the 2(l)*1(L)
Back filling and Poor supervision damage Excavation Safety) work
Compaction: Comply with the Inspect all the tools
Marafiq OHSMS and discards the
(Mobile Equipment) damaged ones
Timely work Ensure that all
instruction and RPN=6 workers know use of RPN=2
good supervision tools/ compactor
while executing the Ensure effective
job. supervision and
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
7 Demobilizing Poor housekeeping Personal injury Comply Marafiq Make sure all access
tools Slip and trip & falls. Body pain. OHSMS Manual to be clear for
Removing of Improper handling or lifting Muscles pain handling 3(l)*2(L) transport/ materials/ 2(l)*1(L)
tools and of materials due to improper Proper manual loading / unloading
equipment lifting. handling to be make sure not to lift
follow when the load beyond the
shifting the capacity of the
materials from one equipment.
place to another RPN=6 All material must be RPN=2
and close arranged in proper
supervision must place after finishing
be maintained. the job
Ensure materials Ensure proper plan to
properly arrange to transport and loaded
prevent from LEVEL material. LEVEL
tripping of the 2 Equipment to be 1
workers. operated by
experienced and
licensed
operator/drivers.
Make sure all
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
workers will be
ensured to use PPE
8 Housekeeping Pinching against objects Poor Comply with Marafiq Ensure to perform good
housekeeping - OHSMS # house-keeping in the
Slip and trip & (Housekeeping) work area during the
fall Comply with the time of work and after
Personnel Marafiq OHSMS # completing the work.
injury (PPE) 3(l)*2(L) Ensure unwanted 2(l)*1(L)
Maintain good materials should not be
Housekeeping pile at the work area.
during and after the ensure There are no
task unnecessary items in the
Do not rush to work area.
complete RPN=6 No item is placed around RPN=2
housekeeping in a emergency equipment
shortcut way. (e.g., fire extinguishers,
Use proper PPE first aid kits)
Dispose the waste
materials at the
designated place
Ensure good LEVEL LEVEL
housekeeping in 2 1
the area after the
activity and
removed unwanted
materials and
dispose to the
designated area.
9 Emergency Fire Comply with the Ensure All employers
arrangements: Explosion Marafiq OHSMS are obligated trained
Death or Fatality (Emergency in workplace
Evacuation) 3(l)*2(L) emergency 2(l)*1(L)
Conduct TBM and procedures.
information to all ensure that if an
personnel in case actual emergency
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
Sr. Tools and other work equipment Qty Sr. Safety and Emergency items Qty
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
The purpose of this form is to enable the significant findings of risk assessments to be recorded and communicated. The reason for this is that
control measures are selected for this unique situation to reduce the level of risk for each hazard to an acceptable level of risk, failing that, to a
tolerable level of risk. Under no circumstances may the activity proceed where there is an unacceptable level of risk.
Section 1
Name of Marafiq Department / contractor – who intends to undertake work activity in Marafiq areas
Date – on which it is prepared
Facility / Department – Area in which the intended work activity will be performed
Job Location – Exact workplace where the intended work activity will be performed
Specify Work Activity to be assessed - Actual work
Assessment team member – Team comprising of competent personnel from management, supervisor and employee intending to undertake
work activity
Signature – signatures of team members
Job steps involved in the work activity –should be listed
Potential hazard –should be identified against each job step and recorded
Severity / consequences –which are likely to occur should be specified
Control measures –to eliminate or reduce the risks associated with identified hazards should be specified clearly
Marafiq Department or the contractor who intends to undertake activity on completion of Section 1 and 2 of the risk assessment shall:
get it reviewed by Marafiq coordinating department and Marafiq OHS Section on first page in Section 1 and
further approved by Marafiq operations department
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
Marafiq coordinating department who is either directly undertaking the activity, or coordinating with the contractor assigned to undertake the activity,
shall review the risk assessment, give comments accordingly and ensure the following:
i. job steps involved in the work activity – are identified and correctly listed
ii. potential hazard –against each job step is identified and recorded
iii. severity / consequences – likely to occur on exposure are specified
iv. control measures –to eliminate or reduce the risks associated with identified hazards are specified clearly
v. List of material – All tools, work equipment, safety and emergency items are listed
Marafiq Operations department / BU Owner (Manager or superintendent or lead engineer) shall approve the risk assessment and acknowledge the
same.
II) Safety and emergency items used for protection of employees against hazards or mitigating effects from tolerable residual risks. Examples
include:
Personal protective equipment – helmets, safety shoes, goggles, face shields, full body harness, respirators, special clothing, etc.
Emergency items – Emergency rescue arrangement – tripod and winch assembly, firefighting equipment, etc.
Section 3 – Information to Employees
On review and approval of risk assessment, Authorized Permit Receiver / Supervisor of Marafiq department or the contractor intending to perform
the activity in Marafiq areas, shall:
PROPRIETARY NOTICE Reviewed By DC: Stamp Control
THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.
IMPORTANT
Only documents with stamps are considered official.
Classified as MARAFIQ Internal Use Document ID No : MEHF-1-SF- 018
Power and Water Utility Company for Jubail and Yanbu
Page 1 of 1
Date: 09 01 2019
i. Give information on details of job, hazards, risks and safety precautions to all personnel involved in the job, and
ii. Acknowledge the same with Name of the employee, Profession, ID No, Signature prior to obtaining Permit to Work Certificate.
Submission of Risk Assessment
Prior to obtaining Permit to Work Certificate, Marafiq Department or the contractor shall:
i. Ensure that all the control measures identified in the risk assessment and safe method of work are in place before work commences.
ii. Arrange, inspect and ensure that all tools, work equipment, safety and emergency items are in a safe working condition before bringing them
to the workplace
iii. Ensure personnel who will be performing work are trained and competent to do the job safely using listed tools, work equipment, safety and
emergency items
iv. Submit all copies of risk assessment to operations department / Area owner
IMPORTANT