Contingency Plan

Name of Production: Producers Name: Contact Number:

Location / I. Potential II. Effect on Control Measure Existing measures


scene problem production
Dogs could run It could ruin the Shut the dogs in a room away from If they start barking In the room my
30 Alderley into the shot or shot and I’ll have where I’m shooting the scene dad will go in with them to calm
Road/scene - 1/2 start barking to redo the scene them down.
Parley common It could rain or be busy I won’t be able to get the If it rains then I will pack the I will go to parley at a more quieter
nature reserve with public shots I need if people keep camera up and wait for the rain to time so that not many people will be
3/4/5/6/7/ walking past the camera stop and then continue filming. walking their dogs so we don’t get
disturbed often