ATK ENGINEERING SERVICES

FORM-I
SL NO. DESCRIPTION QTY UNIT UNIT COST AMOUNT

A . CIVIL WORKS -BUILDING, BOUNDARY WALL, ROAD, DRAINS

1 CARCASS UTILIZATION PLANT- PLANT BUILDING 1 NOS. 8832253.16 8832253.16

2 ADMINISTRATION BUILDING 1 NOS. 922672.33 922672.33

3 SECURITY ROOM 2 NOS. 197834.93 395669.86

4 TOILET 2 NOS. 154004.47 308008.94

5 ELECTRICAL ROOM 1 NOS. 217026.76 217026.76

6 BOUNDARY WALL 290.75 METER 7867 2287330.25

7 ROAD 1 NOS. 3026396.25 3026396.25

8 DRAIN (300 X 450) -180 METER 1 NOS. 448259.31 448259.31

9 DRAIN (350 X 500) - 70 METER 1 NOS. 233667.34 233667.34

10 DRAIN (250 X 300) - 75 METER 1 NOS. 169001.03 169001.03

B. CIVIL WORKS -WATER SUPPLY , SANITARY WORKS, UG TANK, SEPTIC TANK, ETP

11 WATER SUPPLY & SANITARY WORKS 1 NOS. 301064.25 301064.25

12 UNDERGROUND WATER TANK -10000 LITRE 1 NOS. 191862.15 191862.15

13 SEPTIC TANK 2 NOS. 48022.38 96044.76

14 ETP 1 NOS 235613.00 235613.00

TOTAL COST 17664869.39


ADD 5% CONTINGENCIES 883243

GRAND TOTAL 18,548,112.00

ABSTRACT
ATK ENGINEERING SERVICES

DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.

639 Cum. 13.3 8498.7


Area of the Plant 1 4260 0.15 639
TOTAL 639

Excavation in Foundation in ordinary soil (Loam


clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

301.08 Cum. 127 38237.16


F1 20 1.65 1.65 1.5 81.675
F2 14 2 2 1.5 84
F3 2 2 2 1.5 12
F4 11 2.5 2.5 1.5 103.125
F5 2 2.6 2.6 1.5 20.28
TOTAL 301.08

Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

469.87515 Cum. 108.4 50934.46626


E/W in filling in foundation 99.3564
E/W in filling in plinth (Processing Unit) 1 30 15 0.6 270
1 19.7 5 0.25 24.625
1 17.5 5 0.6 52.5
1 12.23 5 0.125 7.64375
1 7 5 0.45 15.75
TOTAL 469.87515

Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

144.8225 Cum. 1212.2 175553.8345


sand filling in plinth 1 30 15 0.15 67.5
1 19.7 5 0.15 14.775
1 17.5 5 0.15 13.125
1 12.23 5 0.15 9.1725
1 7 5 1.15 40.25
TOTAL 144.8225

MAIN PLANT
ATK ENGINEERING SERVICES

CONCRETE WORK
Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
69.96525 Cum. 3898.5 272759.527125
Below footing
F1 20 1.65 1.65 0.075 4.08375
F2 14 2 2 0.075 4.2
F3 2 2 2 0.075 0.6
F4 11 2.5 2.5 0.075 5.15625
F5 2 2.6 2.6 0.075 1.014
Under floor 1 30 15 0.075 33.75
1 19.7 5 0.075 7.3875
1 17.5 5 0.075 6.5625
1 12.23 5 0.075 4.58625
1 7 5 0.075 2.625
TOTAL 69.96525

R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

80.46631 Cum. 6217 500259.04927


FOOTING
F1 20 1.65 1.65 0.25 13.6125
F2 14 2 2 0.3 16.8
F3 2 2 2 0.3 2.4
F4 11 2.5 2.5 0.35 24.0625
F5 2 2.6 2.6 0.35 4.732
TOTAL 61.607

TIE BEAM 1 130.99 0.23 0.3 9.03831


17 5 0.23 0.35 6.8425
2 15 0.23 0.35 2.415
1 7 0.23 0.35 0.5635
TOTAL 18.85931

R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in R.C.C. T beam and
slab roofs and R.C.C. columns. excluding supply
of reinforcement and its binding but including
its fixing and binding the same with 24 B.W.G.G.I
binding wire and including necessary centering
and shuttering etc. and also including supply of
all materials, Iabour& T&P etc. required for
proper completion of the work. Binding wire
cost being included in the item.

90.964315 Cum. 7771 706883.691865


COLUMN
COLUMN C1 10 0.3 0.23 5.4 3.726
15 0.3 0.23 9.4 9.729
3 0.3 0.23 7.25 1.50075
7 0.3 0.23 6.15 2.97045
COLUMN C2 12 0.3 0.35 9.4 11.844
4 0.3 0.35 7.25 3.045
29.7702
SLAB
SL1 1 30.73 5.61 0.125 21.5494125

MAIN PLANT
ATK ENGINEERING SERVICES

SL2 1 20.45 5.61 0.125 14.3405625


35.889975
BEAM 1 175 0.23 0.35 14.0875
1 30 0.23 0.35 2.415
1 127.56 0.23 0.3 8.80164
25.30414

MAIN PLANT
ATK ENGINEERING SERVICES

R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in lintels of doors and
windows excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

3.174 Cum. 6484.6 20582.1204


30 2 0.23 0.23 3.174

Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

278.96893 Qtl 6863.2 1914619.560376


FOOTING 61.607 @Qtl/cum 1.4 86.2498
COLUMN/ PEDESTAL 29.7702 @Qtl/cum 2.25 66.98295
BEAM 44.16345 @Qtl/cum 1.8 79.49421
SLAB 35.88998 @Qtl/cum 1.2 43.06797
LINTEL 3.174 @Qtl/cum 1 3.174
TOTAL 278.96893

BRICKWORK
First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
34.445835 Cum. 5726.8 197264.407878
3 29.97 0.23 0.9 18.61137
1 19.7 0.23 0.45 2.03895
2 4.73 0.23 0.9 1.95822
2 25.46 0.23 0.9 10.54044
1 6.265 0.23 0.9 1.296855
TOTAL 34.445835

Providing and laying damp proof course 2.5 cm


thick with cement concrete 1:2:4 (1 cement:2
coarse sand:4 graded stone aggregate 10 mm
nominalsize) and curing complete

40.53865 Sqm. 297.7 12068.356105


3 29.97 0.23 20.6793
1 19.7 0.23 4.531
2 4.73 0.23 2.1758
2 25.46 0.23 11.7116
1 6.265 0.23 1.44095
TOTAL 40.53865

First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of one brick cum thick

188.33872 Cum. 5951.6 1120916.725952


1 29.97 0.23 2.65 18.266715
1 29.97 0.23 3.85 26.538435
2 44.97 0.23 6.35 131.35737
2 15 0.23 3 10.35
MAIN PLANT
ATK ENGINEERING SERVICES

1 17 0.23 5 9.775
DEDUCT 12 1.2 0.23 2.4 -7.9488
TOTAL 188.33872

MAIN PLANT
ATK ENGINEERING SERVICES

First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of half brick (4 1/2") thick

8.285175 Cum. 6288.8 52103.80854


1 29.7 0.115 2.85 9.734175
deduct 8 0.75 0.115 2.1 -1.449
TOTAL 8.285175

PLASTER WORK
12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(III) 1 Cement : 6 fine sand 1289.424 Sqm. 126.1 162596.3664


leather & horn & hooves room 2 6 5 3.6 158.4
electrical room 1 3 5 3 48
tool room 1 4 5 3 54
locker 1 3.6 1.66 3 31.56
fuel store 1 9.115 5 4.2 118.566
boiler room 1 10.345 5 4.2 128.898
post morterm area 1 7 5 5 120
main plant 1 30 15 7 630
TOTAL 1289.424

12 mm Cement plaster in single coat on fair side


of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(II) 1 Cement : 4 fine sand 242.3 Sqm. 140.2 33970.46


leather & horn & hooves room 2 6 5 60
electrical room 1 3 5 15
tool room 1 4 5 20
toilet block 1 10 5 50
fuel store 1 9.115 5 45.575
boiler room 1 10.345 5 51.725
TOTAL 242.3

15 mm Cement plaster in single coat on rough


side of single or half brick wall for interior
plastering upto floor two level including internal
rounded angles chamfers, and rounded angles
not exceeding 80 mm. In girth and finished even
and smooth.

(III) 1 Cement : 6 fine sand 531 Sqm. 157.6 83685.6


1 72 4.2 302.4
1 52 4.95 257.4
Deduc 10 1.2 2.4 -28.8
TOTAL 531

MAIN PLANT
ATK ENGINEERING SERVICES

FLOORING
Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)

815.3 Sqm. 313.5 255596.55


leather & horn & hooves room 2 6 5 60
electrical room 1 3 5 15
tool room 1 4 5 20
toilet block 1 10 5 50
fuel store 1 9.115 5 45.575
boiler room 1 10.345 5 51.725
postmortem area 1 6 5.5 33
main plant 1 30 15 450
dumping area 1 8 6 48
1 7 6 42
TOTAL 815.3

Providing & Laying of 8 to 10 mm thick Ivory or


light Sqm. shade Vitrified tiles of 600 mm X
600 mm size In flooring or skirting laid with
1:3 cement mortar (1 cement : 3 coarse sand)
finishing with cement slurry & with pigment
grouting & polishing complete 1/c supply of all
materials, labour T& P required for proper
completion of work.

145 Sqm. 1653 239685


leather & horn & hooves room 2 6 5 60
electrical room 1 3 5 15
tool room 1 4 5 20
toilet block 1 10 5 50
TOTAL 145

Providing and fixing Ist quality ceramic glazed


wall tiles conforming to IS: 15622 (thickness to
be specified by the manufacturer), of approved
make, in all colours, shades except burgundy,
bottle green, black of any size as approved by
Engineer-in-Charge, in skirting, risers of steps
and dados, over 12 mm thick bed of cement
mortar 1:3 (1 cement : 3 coarse sand) and
jointing with grey cement slurry @ 3.3kg per
sqm, including pointing in white cement mixed
with pigment of matching shade complete. (DSR
ITEM)

133.329 Sqm. 744.8 99303.4392


bath 3 1.35 1.15 2.1 31.5
toilet 3 1.475 2.3 2.1 47.565
urinal 1 2.35 1.7 2.1 17.01
wash 1 6.335 2.535 2.1 37.254
TOTAL 133.329

MAIN PLANT
ATK ENGINEERING SERVICES

52 mm thick cement concrete flooring with


concrete hardener topping, under layer 40 mm
thick cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal
size) and top layer 12 mm thick cement
hardener consisting of mix 1:2 (1 cement
hardener mix : 2 graded stone aggregate 6 mm
nominal size) by volume, hardening compound
mixed @ 2 litre per 50 kg of cement or as per
manufacturer's specifications. This includes cost
of cement slurry, but excluding the cost of
nosing of steps etc. complete. (DSR ITEM)

450 Sqm. 555.25 249862.5


main plant 1 15 30 450

Finishing with Epoxy paint (two or more coats)


at all locations prepared and applied as per
manufacturer's specifications including
appropriate priming coat, preparation of
surface, etc. complete.

On concrete work (DSR ITEM) 450 Sqm. 124.5 56025

DOOR - WINDOW
Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.

9.81 Cum. 57990.8 568889.748


10 6 0.1 0.075 0.45
6 5.2 0.75 0.4 9.36
TOTAL 9.81

Supply & fixing of commercial quality (Kanju)


Sitapur ply or other approved ply wood flush
shutters 30 mm. (1 1/4") thick fully panneled
door and window shutters including supply and
fixing of wooden cleats and stops and Including
fixing and adjustment of hinges, bolts, locks,
handles, springs, and/or other fitting but
excluding their supply and including painting
Wlth two coats of Black Japan on all iron fittings
if necessary & includirg fixing tbe glass panes
with putty & brad. Glass to be 0.64 kg. (21 oz)
Fittings With necessary screws to be supplied
departmentally.

106.35 Sqm. 1243.4 132235.59


D 6 1.2 12 86.4
D1 5 1 2.1 10.5
D2 6 0.75 2.1 9.45
TOTAL 106.35

Supply of Approved M.S. Z-section windows


and ventilators excluding cost of glass panes
but including supply of all material its
fabrication nuts and bolt, hole fast for proper
completion of work as per direction of
engineer-in-charge and also including
cost of handle stays rod etc. and one coat of
red oxide paint complete in the respect site of
work

4.6296 Qtl 7049.7 32637.29112


17 2.1 0.75 4.284
6 0.6 0.6 0.3456

MAIN PLANT
ATK ENGINEERING SERVICES

Supplying and fixing rolling shutters of approved


make of 80 x 125 mm. (3”x3 1/2’) guage cold
rolled M.S. latha inter locked tbroughout their
entire length and joined together at the end by
cold locks and mounted on specially designed
pipe shaft with brackets, side guides and
arrangements for inside and outside locking
with push and pull operations complete but
excluding the ccst of top cover and spring.

25.92 sqm. 1005 26049.6


3 3.6 2.4 25.92

Providing & fixing glass panes with putty and


glazing clips in steel doors, windows, clerestory
windows, all complete with :
4.0 mm thick glass panes 1.944 Sqm. 689.05 1339.5132
6 0.6 0.6 1.944

Painting or Varnlshing on iron works In small


areas or new wood work with one coat of ready
mlxed primlng palnt & one coat of approved
superlor qualité ready mixed paint of clear
synthetlc varnlsh including supply of all
materials, labour and T&P etc. required för
proper completion of the work. Paint to be
used should confirm to the I.S.I.No. 103 1950

130.764 Sqm. 63.8 8342.7432


D 6 1.2 2.1 30.24
D1 5 1 2.1 8.4
D2 6 0.75 2.1 22.68
V 17 2.1 0.75 64.26
V1 6 0.6 0.6 5.184
TOTAL 130.764
Finishing walls with water proofing cement paint
of approved make and quality on new work with
two coat to give to give an even shade. Including
supply of all material, labour and T&P etc.
required for proper completion of the work.

2062.724 Sqm. 51.3 105817.7412


internal plaster 1531.724
external plaster 531
TOTAL 2062.724

Painting top of roofs with bitumen of approved


quality 1 7 Kg per SqM. With a coat of coarse
sand @ 0.60 Cu.M per 100 Sq. meter including
cleaning the slab surface with a place of clv(h
littely soaked in Kerosene oil complete

295.8204 Sqm. 176 52064.3904


1 30.73 5.78 177.6194
1 20.45 5.78 118.201
TOTAL 295.8204

MAIN PLANT
ATK ENGINEERING SERVICES

Mild steel or iron work in havy sizes such as


trusses ; builts up gates, door frames, record
racks roof work, glltes etc. wrought to required
form including drilling holes ; rivetting or
welding where necessary, and also including
supply of steel, bolts, nuts etc.& their fixing
required for proper completion of the work.

158.62 qtl 7832.9 1242454.598


Truss 1 6 @600 kg / truss 36
Truss 2 2 @ 300 kg/truss 6
purlin 20 31 105.4
12 5.5 11.22
158.62

Providing and fixing precoated galvanised iron


profile sheets (size, shape and pitch of
corrugation as approved by Engineer-in-charge)
0.50 mm (+ 0.05 %) total coated thickness with
zinc coating 120 grams per sqm as per IS: 277, in
240 mpa steel grade, 5-7 microns epoxy primer
on both side of the sheet and polyester top coat
15-18
microns. Sheet should have protective guard
film of 25 microns minimum to avoid scratches
during transportation and should be supplied in
single length upto 12 metre or as desired by
Engineerin- charge. The sheet shall be fixed
using self drilling /self tapping screws of size
(5.5x 55 mm) with EPDM seal, complete upto
any pitch in horizontal/ vertical or curved
surfaces, excluding the cost of purlins, rafters
and trusses and including cutting to size and
shape wherever required.

613.8 Sqm 550.4 337835.52

Providing and fixing precoated galvanised steel


sheet roofing accessories 0.50 mm (+ 0.05 %)
total coated thickness, Zinc coating 120 grams
per sqm as per IS: 277, in 240 mpa steel grade,
5-7 microns epoxy primer on both side of the
sheet and polyester top coat 15-18 microns
using self drilling/ self tapping screws complete :

Ridges plain (500 - 600mm) 1 32 32 mtr 360.45 11534.4

Gutter .(600 mm over all girth) 2 37 74 mtr 833.05 61645.7

TOTAL 8832253.16

MAIN PLANT
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

26.136 Cum. 127 3319.272


F1 8 1.65 1.65 1.2 26.136
TOTAL 26.136

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

20.96988 Cum. 108.4 2273.134992


E/W in filling in foundation 8.62488
E/W in filling in plinth 1 8.23 5 0.3 12.345
TOTAL 20.96988

3 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

6.1725 Cum. 1212.2 7482.3045


sand filling in plinth 1 8.23 5 0.15 6.1725
TOTAL 6.1725

CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
4.71975 Cum. 3898.5 18399.945375
Below footing
F1 8 1.65 1.65 0.075 1.6335
Under floor 1 8.23 5 0.075 3.08625
TOTAL 4.71975

ADMIN BUILDING Page 12 of 58


ATK ENGINEERING SERVICES

5 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

6.91314 Cum. 6217 42978.99138


FOOTING
F1 8 1.65 1.65 0.2 4.356
TOTAL 4.356

TIE BEAM 2 8.23 0.23 0.3 1.13574


4 5 0.23 0.3 1.38
1 1.2 0.115 0.3 0.0414
TOTAL 2.55714

6 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in R.C.C. T beam and
slab roofs and R.C.C. columns. excluding supply
of reinforcement and its binding but including
its fixing and binding the same with 24 B.W.G.G.I
binding wire and including necessary centering
and shuttering etc. and also including supply of
all materials, Iabour& T&P etc. required for
proper completion of the work. Binding wire
cost being included in the item.

12.789905 Cum. 7771 99390.351755


COLUMN
COLUMN C1 8 0.35 0.23 4.25 2.737
PEDESTAL 8 0.45 0.45 0.5 0.81
3.547
SLAB
SL1 1 8.9 5.67 0.125 6.307875
6.307875
BEAM 2 8.23 0.23 0.35 1.32503
4 5 0.23 0.35 1.61
2.93503

7 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in lintels of doors and
windows excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

1.058 Cum. 6484.6 6860.7068


10 2 0.23 0.23 1.058

ADMIN BUILDING Page 13 of 58


ATK ENGINEERING SERVICES

8 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

32.592506 Qtl 6863.2 223688.8871792


FOOTING 4.356 @Qtl/cum 1.4 6.0984
COLUMN/ PEDESTAL 3.547 @Qtl/cum 2.25 7.98075
BEAM 5.49217 @Qtl/cum 1.8 9.885906
SLAB 6.30788 @Qtl/cum 1.2 7.56945
LINTEL 1.058 @Qtl/cum 1 1.058
TOTAL 32.592506

BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
2.73861 Cum. 5726.8 15683.471748
2 8.23 0.23 0.45 1.70361
2 5 0.23 0.45 1.035
TOTAL 2.73861

10 Providing and laying damp proof course 2.5 cm


thick with cement concrete 1:2:4 (1 cement:2
coarse sand:4 graded stone aggregate 10 mm
nominalsize) and curing complete

6.0858 Sqm. 297.7 1811.74266


2 8.23 0.23 3.7858
2 5 0.23 2.3
TOTAL 6.0858

11 First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of one brick cum thick

14.63076 Cum. 5951.6 87076.431216


2 8.23 0.23 2.95 11.16811
2 5 0.23 2.95 6.785
DEDUCT 1 1.8 0.23 2.4 -0.9936
5 1.5 0.23 1.35 -2.32875
TOTAL 14.63076

12 First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of half brick (4 1/2") thick

4.12275 Cum. 6288.8 25927.1502


3 5 0.115 2.95 5.08875
deduct 4 1 0.115 2.1 -0.966
TOTAL 4.12275

ADMIN BUILDING Page 14 of 58


ATK ENGINEERING SERVICES

PLASTER WORK
13 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(III) 1 Cement : 6 fine sand 158.54475 Sqm. 126.1 19992.492975


meeting room 1 3.685 3.1 3.175 43.08475
office 1 5 3.1 3.175 51.435
lobby 1 1.8 3.9 3.175 36.195
toilet 1 2.5 1.2 3.175 23.495
store 1 2.4 1.2 3.175 22.86
deduct/ door 4 1 2.1 -8.4
window 5 1.5 1.35 -10.125
TOTAL 158.54475

14 12 mm Cement plaster in single coat on fair side


of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(II) 1 Cement : 4 fine sand 39.8235 Sqm. 140.2 5583.2547


meeting room 1 3.685 3.1 11.4235
office 1 5 3.1 15.5
lobby 1 1.8 3.9 7.02
toilet 1 2.5 1.2 3
store 1 2.4 1.2 2.88
TOTAL 39.8235

15 15 mm Cement plaster in single coat on rough


side of single or half brick wall for interior
plastering upto floor two level including internal
rounded angles chamfers, and rounded angles
not exceeding 80 mm. In girth and finished even
and smooth.

(III) 1 Cement : 6 fine sand 138.592 Sqm. 157.6 21842.0992


outer plaster 2 8.7 4.88 84.912
2 5.5 4.88 53.68
TOTAL 138.592

FLOORING
16 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)

39.8235 Sqm. 313.5 12484.66725


meeting room 1 3.685 3.1 11.4235
office 1 5 3.1 15.5
lobby 1 1.8 3.9 7.02
toilet 1 2.5 1.2 3
store 1 2.4 1.2 2.88
TOTAL 39.8235

17 Providing & Laying of 8 to 10 mm thick Ivory or


light Sqm. shade Vitrified tiles of 600 mm X
600 mm size In flooring or skirting laid with
1:3 cement mortar (1 cement : 3 coarse sand)
finishing with cement slurry & with pigment
grouting & polishing complete 1/c supply of all
materials, labour T& P required for proper
completion of work.

39.8235 Sqm. 1653 65828.2455


meeting room 1 3.685 3.1 11.4235
office 1 5 3.1 15.5
lobby 1 1.8 3.9 7.02
toilet 1 2.5 1.2 3
store 1 2.4 1.2 2.88

ADMIN BUILDING Page 15 of 58


ATK ENGINEERING SERVICES

TOTAL 39.8235

18 Providing and fixing Ist quality ceramic glazed


wall tiles conforming to IS: 15622 (thickness to
be specified by the manufacturer), of approved
make, in all colours, shades except burgundy,
bottle green, black of any size as approved by
Engineer-in-Charge, in skirting, risers of steps
and dados, over 12 mm thick bed of cement
mortar 1:3 (1 cement : 3 coarse sand) and
jointing with grey cement slurry @ 3.3kg per
sqm, including pointing in white cement mixed
with pigment of matching shade complete. (DSR
ITEM)

15.54 Sqm. 744.8 11574.192


toilet 1 2.5 1.2 2.1 15.54
TOTAL 15.54

DOOR - WINDOW
19 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.
3.252 Cum. 57990.8 188586.0816
2 5.4 0.1 0.075 0.081
1 6.8 0.1 0.075 0.051
2 5.2 0.75 0.4 3.12
TOTAL 3.252

20 Supply & fixing of commercial quality (Kanju)


Sitapur ply or other approved ply wood flush
shutters 30 mm. (1 1/4") thick fully panneled
door and window shutters including supply and
fixing of wooden cleats and stops and Including
fixing and adjustment of hinges, bolts, locks,
handles, springs, and/or other fitting but
excluding their supply and including painting
Wlth two coats of Black Japan on all iron fittings
if necessary & includirg fixing tbe glass panes
with putty & brad. Glass to be 0.64 kg. (21 oz)
Fittings With necessary screws to be supplied
departmentally.

11.67 Sqm. 1243.4 14510.478


2 1 2.1 4.2
2 0.75 2.1 3.15
1 1.8 2.4 4.32
TOTAL 11.67

21 Supply of Approved M.S. Z-section windows


and ventilators excluding cost of glass panes
but including supply of all material its
fabrication nuts and bolt, hole fast for proper
completion of work as per direction of
engineer-in-charge and also including
cost of handle stays rod etc. and one coat of
red oxide paint complete in the respect site of
work

1.7928 Qtl 7049.7 12638.70216


5 1.5 1.35 1.62
2 0.6 0.9 0.1728
TOTAL 1.7928

22 Providing & fixing glass panes with putty and


glazing clips in steel doors, windows, clerestory
windows, all complete with :
4.0 mm thick glass panes 9.1125 Sqm. 689.05 6278.968125
5 1.5 1.35 9.1125

ADMIN BUILDING Page 16 of 58


ATK ENGINEERING SERVICES

23 Painting or Varnlshing on iron works In small


areas or new wood work with one coat of ready
mlxed primlng palnt & one coat of approved
superlor qualité ready mixed paint of clear
synthetlc varnlsh including supply of all
materials, labour and T&P etc. required för
proper completion of the work. Paint to be
used should confirm to the I.S.I.No. 103 1950

32.304 Sqm. 63.8 2060.9952


1 1.8 2.4 8.64
2 1 2.1 8.4
2 0.75 2.1 6.3
5 1.5 1.35 8.1
2 0.6 0.9 0.864
TOTAL 32.304

24 Finishing walls with water proofing cement paint


of approved make and quality on new work with
two coat to give to give an even shade. Including
supply of all material, labour and T&P etc.
required for proper completion of the work.

336.96025 Sqm. 51.3 17286.060825


internal plaster 198.36825
external plaster 138.592
TOTAL 336.96025

25 Painting top of roofs with bitumen of approved


quality 1 7 Kg per SqM. With a coat of coarse
sand @ 0.60 Cu.M per 100 Sq. meter including
cleaning the slab surface with a place of clv(h
littely soaked in Kerosene oil complete

51.7824 Sqm. 176 9113.7024


1 8.99 5.76 51.7824
TOTAL 51.7824

TOTAL 922,672.33

ADMIN BUILDING Page 17 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

10.8 Cum. 127 1371.6


F1 4 1.5 1.5 1.2 10.8
TOTAL 10.8

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

5.439 Cum. 108.4 589.5876


E/W in filling in foundation 3.564
E/W in filling in plinth 1 2.5 2.5 0.3 1.875
TOTAL 5.439

3 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

0.9375 Cum. 1212.2 1136.4375


sand filling in plinth 1 2.5 2.5 0.15 0.9375
TOTAL 0.9375

CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.14375 Cum. 3898.5 4458.909375
Below footing
F1 4 1.5 1.5 0.075 0.675
Under floor 1 2.5 2.5 0.075 0.46875
TOTAL 1.14375

SECURITY ROOM Page 18 of 58


ATK ENGINEERING SERVICES

5 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

2.49 Cum. 6217 15480.33


FOOTING
F1 4 1.5 1.5 0.2 1.8
TOTAL 1.8

TIE BEAM 4 2.5 0.23 0.3 0.69


TOTAL 0.69

6 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in R.C.C. T beam and
slab roofs and R.C.C. columns. excluding supply
of reinforcement and its binding but including
its fixing and binding the same with 24 B.W.G.G.I
binding wire and including necessary centering
and shuttering etc. and also including supply of
all materials, Iabour& T&P etc. required for
proper completion of the work. Binding wire
cost being included in the item.

3.30159 Cum. 7771 25656.65589


COLUMN
COLUMN C1 4 0.23 0.23 4.15 0.87814
PEDESTAL 4 0.45 0.45 0.5 0.405
1.28314
SLAB
SL1 1 3.26 3.26 0.125 1.32845
1.32845
BEAM 4 2.5 0.23 0.3 0.69
0.69

7 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in lintels of doors and
windows excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

0.2116 Cum. 6484.6 1372.14136


2 2 0.23 0.23 0.2116

8 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

9.696805 Qtl 6863.2 66551.112076


FOOTING 1.8 @Qtl/cum 1.4 2.52
COLUMN/ PEDESTAL 1.28314 @Qtl/cum 2.25 2.887065
BEAM 1.38 @Qtl/cum 1.8 2.484
SLAB 1.32845 @Qtl/cum 1.2 1.59414
LINTEL 0.2116 @Qtl/cum 1 0.2116
TOTAL 9.696805

SECURITY ROOM Page 19 of 58


ATK ENGINEERING SERVICES

BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
1.035 Cum. 5726.8 5927.238
4 2.5 0.23 0.45 1.035
TOTAL 1.035

10 Providing and laying damp proof course 2.5 cm


thick with cement concrete 1:2:4 (1 cement:2
coarse sand:4 graded stone aggregate 10 mm
nominalsize) and curing complete

2.3 Sqm. 297.7 684.71


4 2.5 0.23 2.3
TOTAL 2.3

11 First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of one brick cum thick

5.72125 Cum. 5951.6 34050.5915


4 2.5 0.23 2.9 6.67
DEDUCT 1 1 0.23 2.1 -0.483
1 1.5 0.23 1.35 -0.46575
TOTAL 5.72125

PLASTER WORK
12 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(III) 1 Cement : 6 fine sand 27.875 Sqm. 126.1 3515.0375


room 1 2.5 2.5 3.2 32
deduct/ door 1 1 2.1 -2.1
window 1 1.5 1.35 -2.025
TOTAL 27.875

13 12 mm Cement plaster in single coat on fair side


of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(II) 1 Cement : 4 fine sand 6.25 Sqm. 140.2 876.25


room 1 2.5 2.5 6.25
TOTAL 6.25

14 15 mm Cement plaster in single coat on rough


side of single or half brick wall for interior
plastering upto floor two level including internal
rounded angles chamfers, and rounded angles
not exceeding 80 mm. In girth and finished even
and smooth.

(III) 1 Cement : 6 fine sand 54.2272 Sqm. 157.6 8546.20672


outer plaster 4 2.96 4.58 54.2272

SECURITY ROOM Page 20 of 58


ATK ENGINEERING SERVICES

TOTAL 54.2272

SECURITY ROOM Page 21 of 58


ATK ENGINEERING SERVICES

FLOORING
15 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)

6.25 Sqm. 313.5 1959.375


room 1 2.5 2.5 6.25
TOTAL 6.25

16 Providing & Laying of 8 to 10 mm thick Ivory or


light Sqm. shade Vitrified tiles of 600 mm X
600 mm size In flooring or skirting laid with
1:3 cement mortar (1 cement : 3 coarse sand)
finishing with cement slurry & with pigment
grouting & polishing complete 1/c supply of all
materials, labour T& P required for proper
completion of work.

6.25 Sqm. 1653 10331.25


room 1 2.5 2.5 6.25
TOTAL 6.25

DOOR - WINDOW
17 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.

0.0405 Cum. 57990.8 2348.6274


1 5.4 0.1 0.075 0.0405
TOTAL 0.0405

18 Supply & fixing of commercial quality (Kanju)


Sitapur ply or other approved ply wood flush
shutters 30 mm. (1 1/4") thick fully panneled
door and window shutters including supply and
fixing of wooden cleats and stops and Including
fixing and adjustment of hinges, bolts, locks,
handles, springs, and/or other fitting but
excluding their supply and including painting
Wlth two coats of Black Japan on all iron fittings
if necessary & includirg fixing tbe glass panes
with putty & brad. Glass to be 0.64 kg. (21 oz)
Fittings With necessary screws to be supplied
departmentally.

2.1 Sqm. 1243.4 2611.14


1 1 2.1 2.1
TOTAL 2.1

19 Supply of Approved M.S. Z-section windows


and ventilators excluding cost of glass panes
but including supply of all material its
fabrication nuts and bolt, hole fast for proper
completion of work as per direction of
engineer-in-charge and also including
cost of handle stays rod etc. and one coat of
red oxide paint complete in the respect site of
work

0.324 Qtl 7049.7 2284.1028


1 1.5 1.35 0.324
TOTAL 0.324

20 Providing & fixing glass panes with putty and


glazing clips in steel doors, windows, clerestory
windows, all complete with :

SECURITY ROOM Page 22 of 58


ATK ENGINEERING SERVICES

4.0 mm thick glass panes 1.8225 Sqm. 689.05 1255.793625


1 1.5 1.35 1.8225

SECURITY ROOM Page 23 of 58


ATK ENGINEERING SERVICES

21 Painting or Varnlshing on iron works In small


areas or new wood work with one coat of ready
mlxed primlng palnt & one coat of approved
superlor qualité ready mixed paint of clear
synthetlc varnlsh including supply of all
materials, labour and T&P etc. required för
proper completion of the work. Paint to be
used should confirm to the I.S.I.No. 103 1950

6.66 Sqm. 63.8 424.908


1 1.2 2.1 5.04
1 1.5 1.35 1.62
TOTAL 6.66

22 Finishing walls with water proofing cement paint


of approved make and quality on new work with
two coat to give to give an even shade. Including
supply of all material, labour and T&P etc.
required for proper completion of the work.

88.3522 Sqm. 51.3 4532.46786


internal plaster 34.125
external plaster 54.2272
TOTAL 88.3522

23 Painting top of roofs with bitumen of approved


quality 1 7 Kg per SqM. With a coat of coarse
sand @ 0.60 Cu.M per 100 Sq. meter including
cleaning the slab surface with a place of clv(h
littely soaked in Kerosene oil complete

10.6276 Sqm. 176 1870.4576


1 3.26 3.26 10.6276
TOTAL 10.6276

TOTAL 197834.93

SECURITY ROOM Page 24 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

5.808 Cum. 127 737.616


F1 4 1.1 1.1 1.2 5.808
TOTAL 5.808

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

3.19164 Cum. 108.4 345.973776


E/W in filling in foundation 1.91664
E/W in filling in plinth 1 1.7 2.5 0.3 1.275
TOTAL 3.19164

3 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

0.6375 Cum. 1212.2 772.7775


sand filling in plinth 1 1.7 2.5 0.15 0.6375
TOTAL 0.6375

CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
0.68175 Cum. 3898.5 2657.802375
Below footing
F1 4 1.1 1.1 0.075 0.363
Under floor 1 1.7 2.5 0.075 0.31875
TOTAL 0.68175

TOILET Page 25 of 58
ATK ENGINEERING SERVICES

5 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

1.61108 Cum. 6217 10016.08436


FOOTING
F1 4 1.1 1.1 0.2 0.968
TOTAL 0.968

TIE BEAM 2 4.66 0.23 0.3 0.64308


TOTAL 0.64308

6 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in R.C.C. T beam and
slab roofs and R.C.C. columns. excluding supply
of reinforcement and its binding but including
its fixing and binding the same with 24 B.W.G.G.I
binding wire and including necessary centering
and shuttering etc. and also including supply of
all materials, Iabour& T&P etc. required for
proper completion of the work. Binding wire
cost being included in the item.

2.774414 Cum. 7771 21559.971194


COLUMN
COLUMN C1 4 0.23 0.23 3.8 0.80408
PEDESTAL 4 0.45 0.45 0.5 0.405
1.20908
SLAB
SL1 1 3.26 2.46 0.115 0.922254
0.922254
BEAM 2 4.66 0.23 0.3 0.64308
0.64308

7 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in lintels of doors and
windows excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

0.2116 Cum. 6484.6 1372.14136


2 2 0.23 0.23 0.2116

TOILET Page 26 of 58
ATK ENGINEERING SERVICES

8 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

7.7090228 Qtl 6863.2 52908.565281


FOOTING 0.968 @Qtl/cum 1.4 1.3552
COLUMN/ PEDESTAL 1.20908 @Qtl/cum 2.25 2.72043
BEAM 1.28616 @Qtl/cum 1.8 2.315088
SLAB 0.92225 @Qtl/cum 1.2 1.1067048
LINTEL 0.2116 @Qtl/cum 1 0.2116
TOTAL 7.7090228

BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
0.96462 Cum. 5726.8 5524.185816
2 4.66 0.23 0.45 0.96462
TOTAL 0.96462

10 Providing and laying damp proof course 2.5 cm


thick with cement concrete 1:2:4 (1 cement:2
coarse sand:4 graded stone aggregate 10 mm
nominalsize) and curing complete

2.1436 Sqm. 297.7 638.14972


2 4.66 0.23 2.1436
TOTAL 2.1436

11 First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of one brick cum thick

4.90038 Cum. 5951.6 29165.101608


2 4.66 0.23 2.55 5.46618
DEDUCT 1 1 0.23 2.1 -0.483
1 0.6 0.23 0.6 -0.0828
TOTAL 4.90038

PLASTER WORK
12 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(III) 1 Cement : 6 fine sand 22.74 Sqm. 126.1 2867.514


room 1 2.5 1.7 3 25.2
deduct/ door 1 1 2.1 -2.1
window 1 0.6 0.6 -0.36
TOTAL 22.74

TOILET Page 27 of 58
ATK ENGINEERING SERVICES

13 12 mm Cement plaster in single coat on fair side


of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(II) 1 Cement : 4 fine sand 4.25 Sqm. 140.2 595.85


room 1 2.5 1.7 4.25
TOTAL 4.25

14 15 mm Cement plaster in single coat on rough


side of single or half brick wall for interior
plastering upto floor two level including internal
rounded angles chamfers, and rounded angles
not exceeding 80 mm. In girth and finished even
and smooth.

(III) 1 Cement : 6 fine sand 34.95 Sqm. 157.6 5508.12


outer plaster 2 4.66 3.75 34.95
TOTAL 34.95

FLOORING
15 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)

4.25 Sqm. 313.5 1332.375


room 1 2.5 1.7 4.25
TOTAL 4.25

16 Providing & Laying of 8 to 10 mm thick Ivory or


light Sqm. shade Vitrified tiles of 600 mm X
600 mm size In flooring or skirting laid with
1:3 cement mortar (1 cement : 3 coarse sand)
finishing with cement slurry & with pigment
grouting & polishing complete 1/c supply of all
materials, labour T& P required for proper
completion of work.

4.25 Sqm. 1653 7025.25


room 1 2.5 1.7 4.25
TOTAL 4.25

DOOR - WINDOW
17 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.

0.0405 Cum. 57990.8 2348.6274


1 5.4 0.1 0.075 0.0405
TOTAL 0.0405

TOILET Page 28 of 58
ATK ENGINEERING SERVICES

18 Supply & fixing of commercial quality (Kanju)


Sitapur ply or other approved ply wood flush
shutters 30 mm. (1 1/4") thick fully panneled
door and window shutters including supply and
fixing of wooden cleats and stops and Including
fixing and adjustment of hinges, bolts, locks,
handles, springs, and/or other fitting but
excluding their supply and including painting
Wlth two coats of Black Japan on all iron fittings
if necessary & includirg fixing tbe glass panes
with putty & brad. Glass to be 0.64 kg. (21 oz)
Fittings With necessary screws to be supplied
departmentally.

2.1 Sqm. 1243.4 2611.14


1 1 2.1 2.1
TOTAL 2.1

19 Supply of Approved M.S. Z-section windows


and ventilators excluding cost of glass panes
but including supply of all material its
fabrication nuts and bolt, hole fast for proper
completion of work as per direction of
engineer-in-charge and also including
cost of handle stays rod etc. and one coat of
red oxide paint complete in the respect site of
work

0.0576 Qtl 7049.7 406.06272


1 0.6 0.6 0.0576
TOTAL 0.0576

20 Providing & fixing glass panes with putty and


glazing clips in steel doors, windows, clerestory
windows, all complete with :
4.0 mm thick glass panes 0.324 Sqm. 689.05 223.2522
1 0.6 0.6 0.324

21 Painting or Varnlshing on iron works In small


areas or new wood work with one coat of ready
mlxed primlng palnt & one coat of approved
superlor qualité ready mixed paint of clear
synthetlc varnlsh including supply of all
materials, labour and T&P etc. required för
proper completion of the work. Paint to be
used should confirm to the I.S.I.No. 103 1950

5.328 Sqm. 63.8 339.9264


1 1.2 2.1 5.04
1 0.6 0.6 0.288
TOTAL 5.328

TOILET Page 29 of 58
ATK ENGINEERING SERVICES

22 Finishing walls with water proofing cement paint


of approved make and quality on new work with
two coat to give to give an even shade. Including
supply of all material, labour and T&P etc.
required for proper completion of the work.

61.94 Sqm. 51.3 3177.522


internal plaster 26.99
external plaster 34.95
TOTAL 61.94

23 Painting top of roofs with bitumen of approved


quality 1 7 Kg per SqM. With a coat of coarse
sand @ 0.60 Cu.M per 100 Sq. meter including
cleaning the slab surface with a place of clv(h
littely soaked in Kerosene oil complete

10.6276 Sqm. 176 1870.4576


1 3.26 3.26 10.6276
TOTAL 10.6276

TOTAL 154004.47

TOILET Page 30 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

10.8 Cum. 127 1371.6


F1 4 1.5 1.5 1.2 10.8
TOTAL 10.8

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

5.439 Cum. 108.4 589.5876


E/W in filling in foundation 3.564
E/W in filling in plinth 1 2.5 2.5 0.3 1.875
TOTAL 5.439

3 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

0.9375 Cum. 1212.2 1136.4375


sand filling in plinth 1 2.5 2.5 0.15 0.9375
TOTAL 0.9375

CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.14375 Cum. 3898.5 4458.909375
Below footing
F1 4 1.5 1.5 0.075 0.675
Under floor 1 2.5 2.5 0.075 0.46875
TOTAL 1.14375

5 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

2.49 Cum. 6217 15480.33


FOOTING

ELECTRICAL ROOM Page 31 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
F1 4 1.5 1.5 0.2 1.8
TOTAL 1.8

ELECTRICAL ROOM Page 32 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

TIE BEAM 4 2.5 0.23 0.3 0.69


TOTAL 0.69

6 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in R.C.C. T beam and
slab roofs and R.C.C. columns. excluding supply
of reinforcement and its binding but including
its fixing and binding the same with 24 B.W.G.G.I
binding wire and including necessary centering
and shuttering etc. and also including supply of
all materials, Iabour& T&P etc. required for
proper completion of the work. Binding wire
cost being included in the item.

3.38623 Cum. 7771 26314.39333


COLUMN
COLUMN C1 4 0.23 0.23 4.55 0.96278
PEDESTAL 4 0.45 0.45 0.5 0.405
1.36778
SLAB
SL1 1 3.26 3.26 0.125 1.32845
1.32845
BEAM 4 2.5 0.23 0.3 0.69
0.69

7 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in lintels of doors and
windows excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

0.2116 Cum. 6484.6 1372.14136


2 2 0.23 0.23 0.2116

8 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

9.887245 Qtl 6863.2 67858.139884


FOOTING 1.8 @Qtl/cum 1.4 2.52
COLUMN/ PEDESTAL 1.36778 @Qtl/cum 2.25 3.077505
BEAM 1.38 @Qtl/cum 1.8 2.484
SLAB 1.32845 @Qtl/cum 1.2 1.59414
LINTEL 0.2116 @Qtl/cum 1 0.2116
TOTAL 9.887245

BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
1.035 Cum. 5726.8 5927.238
4 2.5 0.23 0.45 1.035
TOTAL 1.035

ELECTRICAL ROOM Page 33 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

10 Providing and laying damp proof course 2.5 cm


thick with cement concrete 1:2:4 (1 cement:2
coarse sand:4 graded stone aggregate 10 mm
nominalsize) and curing complete

2.3 Sqm. 297.7 684.71


4 2.5 0.23 2.3
TOTAL 2.3

11 First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of one brick cum thick

6.64125 Cum. 5951.6 39526.0635


4 2.5 0.23 3.3 7.59
DEDUCT 1 1 0.23 2.1 -0.483
1 1.5 0.23 1.35 -0.46575
TOTAL 6.64125

PLASTER WORK
12 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(III) 1 Cement : 6 fine sand 28.875 Sqm. 126.1 3641.1375


room 1 2.5 2.5 3.3 33
deduct/ door 1 1 2.1 -2.1
window 1 1.5 1.35 -2.025
TOTAL 28.875

13 12 mm Cement plaster in single coat on fair side


of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(II) 1 Cement : 4 fine sand 6.25 Sqm. 140.2 876.25


room 1 2.5 2.5 6.25
TOTAL 6.25

14 15 mm Cement plaster in single coat on rough


side of single or half brick wall for interior
plastering upto floor two level including internal
rounded angles chamfers, and rounded angles
not exceeding 80 mm. In girth and finished even
and smooth.

(III) 1 Cement : 6 fine sand 54.2272 Sqm. 157.6 8546.20672


outer plaster 4 2.96 4.58 54.2272
TOTAL 54.2272

ELECTRICAL ROOM Page 34 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
FLOORING
15 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)

6.25 Sqm. 313.5 1959.375


room 1 2.5 2.5 6.25
TOTAL 6.25

16 Providing & Laying of 8 to 10 mm thick Ivory or


light Sqm. shade Vitrified tiles of 600 mm X
600 mm size In flooring or skirting laid with
1:3 cement mortar (1 cement : 3 coarse sand)
finishing with cement slurry & with pigment
grouting & polishing complete 1/c supply of all
materials, labour T& P required for proper
completion of work.

6.25 Sqm. 1653 10331.25


room 1 2.5 2.5 6.25
TOTAL 6.25

17 Providing and fixing Ist quality ceramic glazed


wall tiles conforming to IS: 15622 (thickness to
be specified by the manufacturer), of approved
make, in all colours, shades except burgundy,
bottle green, black of any size as approved by
Engineer-in-Charge, in skirting, risers of steps
and dados, over 12 mm thick bed of cement
mortar 1:3 (1 cement : 3 coarse sand) and
jointing with grey cement slurry @ 3.3kg per
sqm, including pointing in white cement mixed
with pigment of matching shade complete. (DSR
ITEM)

15.54 Sqm. 744.8 11574.192


1 2.5 1.2 2.1 15.54
TOTAL 15.54

DOOR - WINDOW
17 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.

0.0405 Cum. 57990.8 2348.6274


1 5.4 0.1 0.075 0.0405
TOTAL 0.0405

18 Supply & fixing of commercial quality (Kanju)


Sitapur ply or other approved ply wood flush
shutters 30 mm. (1 1/4") thick fully panneled
door and window shutters including supply and
fixing of wooden cleats and stops and Including
fixing and adjustment of hinges, bolts, locks,
handles, springs, and/or other fitting but
excluding their supply and including painting
Wlth two coats of Black Japan on all iron fittings
if necessary & includirg fixing tbe glass panes
with putty & brad. Glass to be 0.64 kg. (21 oz)
Fittings With necessary screws to be supplied
departmentally.

2.1 Sqm. 1243.4 2611.14


1 1 2.1 2.1
TOTAL 2.1

ELECTRICAL ROOM Page 35 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

19 Supply of Approved M.S. Z-section windows


and ventilators excluding cost of glass panes
but including supply of all material its
fabrication nuts and bolt, hole fast for proper
completion of work as per direction of
engineer-in-charge and also including
cost of handle stays rod etc. and one coat of
red oxide paint complete in the respect site of
work

0.324 Qtl 7049.7 2284.1028


1 1.5 1.35 0.324
TOTAL 0.324

20 Providing & fixing glass panes with putty and


glazing clips in steel doors, windows, clerestory
windows, all complete with :
4.0 mm thick glass panes 1.8225 Sqm. 689.05 1255.793625
1 1.5 1.35 1.8225

21 Painting or Varnlshing on iron works In small


areas or new wood work with one coat of ready
mlxed primlng palnt & one coat of approved
superlor qualité ready mixed paint of clear
synthetlc varnlsh including supply of all
materials, labour and T&P etc. required för
proper completion of the work. Paint to be
used should confirm to the I.S.I.No. 103 1950

6.66 Sqm. 63.8 424.908


1 1.2 2.1 5.04
1 1.5 1.35 1.62
TOTAL 6.66

22 Finishing walls with water proofing cement paint


of approved make and quality on new work with
two coat to give to give an even shade. Including
supply of all material, labour and T&P etc.
required for proper completion of the work.

89.3522 Sqm. 51.3 4583.76786


internal plaster 35.125
external plaster 54.2272
TOTAL 89.3522

23 Painting top of roofs with bitumen of approved


quality 1 7 Kg per SqM. With a coat of coarse
sand @ 0.60 Cu.M per 100 Sq. meter including
cleaning the slab surface with a place of clv(h
littely soaked in Kerosene oil complete

10.6276 Sqm. 176 1870.4576


1 3.26 3.26 10.6276
TOTAL 10.6276

TOTAL 217026.76

ELECTRICAL ROOM Page 36 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

6.912 Cum. 127 877.824


F1 4 1.2 1.2 1.2 6.912
TOTAL 6.912

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

2.28096 Cum. 108.4 247.256064


E/W in filling in foundation 2.28096
TOTAL 2.28096

CONCRETE WORK
3 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
0.432 Cum. 3898.5 1684.152
Below footing
F1 4 1.2 1.2 0.075 0.432
TOTAL 0.432

4 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

1.6281 Cum. 6217 10121.8977


FOOTING
F1 4 1.2 1.2 0.2 1.152
TOTAL 1.152

TIE BEAM 1 9 0.23 0.23 0.4761


TOTAL 0.4761

COMPOUND WALL Page 37 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

5 R.C.C work with cement approved coarse sand


and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:1.5:3 in R.C.C. T beam and
slab roofs and R.C.C. columns. excluding supply
of reinforcement and its binding but including
its fixing and binding the same with 24 B.W.G.G.I
binding wire and including necessary centering
and shuttering etc. and also including supply of
all materials, Iabour& T&P etc. required for
proper completion of the work. Binding wire
cost being included in the item.

0.774 Cum. 7771 6014.754


COLUMN
COLUMN C1 4 0.23 0.23 2.5 0.529
PEDESTAL 4 0.35 0.35 0.5 0.245
0.774

6 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

3.255525 Qtl 6863.2 22343.31918


FOOTING 1.152 @Qtl/cum 1.1 1.2672
COLUMN/ PEDESTAL 0.774 @Qtl/cum 1.8 1.3932
BEAM 0.4761 @Qtl/cum 1.25 0.595125
TOTAL 3.255525

BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
0.860085 Cum. 5726.8 4925.534778
3 2.77 0.23 0.45 0.860085
TOTAL 0.860085

8 First class brick work in 1:6 cement and fine


sand of 1.25 FM. mortar in superstructure
including necessary cutting and moulding of
bricks as required and also - including hcney
comb brick work, supply of all materials, labour
and T & P etc. required for proper completion of
the work.
wall of one brick cum thick

2.962515 Cum. 5951.6 17631.704274


3 2.77 0.23 1.55 2.962515
TOTAL 2.962515

COMPOUND WALL Page 38 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
PLASTER WORK
9 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.

(III) 1 Cement : 6 fine sand 18 Sqm. 126.1 2269.8


1 9 2 18
TOTAL 18

10 15 mm Cement plaster in single coat on rough


side of single or half brick wall for interior
plastering upto floor two level including internal
rounded angles chamfers, and rounded angles
not exceeding 80 mm. In girth and finished even
and smooth.

(III) 1 Cement : 6 fine sand 18 Sqm. 157.6 2836.8


1 9 2 18
TOTAL 18
1 1 2.1 2.1
TOTAL 2.1

11 Finishing walls with water proofing cement paint


of approved make and quality on new work with
two coat to give to give an even shade. Including
supply of all material, labour and T&P etc.
required for proper completion of the work.

36 Sqm. 51.3 1846.8


internal plaster 18
external plaster 18
TOTAL 36

TOTAL 70799.842
PER METER COST OF BOUNDARY WALL
7866.649

COMPOUND WALL Page 39 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Preparation and consolidation of sub grade with
power road roller of 8 to 12 tonne capacity after
excavating earth to an average of 22.5 cm
depth, dressing to camber and consolidating
with road roller including making good the
undulations etc. and re-rolling the sub grade
and disposal of surplus earth with lead upto 50
metres.
1 225 5 1125 Sqm. 90.1 101362.5

2 Brick on edge flooring with bricks of class


designation 7.5 on a bed of 12 mm cement
mortar, including filling the joints with same
mortar, with common burnt clay non modular
bricks:

1:6 (1cement : 6 coarse sand) 1 225 5 1125 Sqm. 638 717750

CONCRETE WORK

3 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

168.75 Cum. 6217 1049118.75


1 225 5 0.15 168.75
TOTAL 168.75

4 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

168.75 Qtl 6863.2 1158165


168.75 @Qtl/cum 1 168.75
TOTAL 168.75

TOTAL 3026396.25

ROAD Page 40 of 58
ATK ENGINEERING SERVICES

DRAIN SIZE 300 X 450


LENGTH OF DRAIN 180 MTR
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.

27 Cum. 13.3 359.1


1 180 1 0.15 27
TOTAL 27

2 Excavation in Foundation in ordinary soil (Loam


clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

108 Cum. 127 13716


TRENCH 1 180 0.75 0.8 108
TOTAL 108

3 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

21.6 Cum. 108.4 2341.44


E/W in filling in foundation 180 21.6
TOTAL 21.6

4 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

10.125 Cum. 1212.2 12273.525


sand filling in plinth 1 180 0.75 0.075 10.125
TOTAL 10.125

CONCRETE WORK
5 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
10.125 Cum. 3898.5 39472.3125
Below footing
TRENCH 1 180 0.75 0.075 10.125
TOTAL 10.125

DRAIN Page 41 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
6 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
20.52 Cum. 4608 94556.16
1 180 0.76 0.15 20.52

BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
37.26 Cum. 5726.8 213380.568
2 180 0.23 0.45 37.26
TOTAL 37.26

PLASTER WORK
8 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 298.8 Sqm. 241.5 72160.2
2 180 0.83 298.8
TOTAL 298.8

TOTAL 448259.31

DRAIN Page 42 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

DRAIN SIZE 350 X 500


LENGTH OF DRAIN 70 MTR
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.

15.75 Cum. 13.3 209.475


1 70 1.5 0.15 15.75
TOTAL 15.75

1 Excavation in Foundation in ordinary soil (Loam


clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

60.095 Cum. 127 7632.065


TRENCH 1 70 1.01 0.85 60.095
TOTAL 60.095

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

12.019 Cum. 108.4 1302.8596


E/W in filling in foundation 12.019
TOTAL 12.019

3 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

5.3025 Cum. 1212.2 6427.6905


sand filling in plinth 1 70 1.01 0.075 5.3025
TOTAL 5.3025

CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
5.3025 Cum. 3898.5 20671.79625
Below footing
TRENCH 1 70 1.01 0.075 5.3025
TOTAL 5.3025

DRAIN Page 43 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

DRAIN Page 44 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
5 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
14.14 Cum. 4608 65157.12
1 70 1.01 0.2 14.14

BRICKWORK
6 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
16.1 Cum. 5726.8 92201.48
2 70 0.23 0.5 16.1
TOTAL 16.1

PLASTER WORK
7 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 165.9 Sqm. 241.5 40064.85
2 70 1.185 165.9
TOTAL 165.9

TOTAL 233667.34

DRAIN Page 45 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

DRAIN SIZE 250 X 300


LENGTH OF DRAIN 75 MTR
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.

5.625 Cum. 13.3 74.8125


1 75 0.5 0.15 5.625
TOTAL 5.625

2 Excavation in Foundation in ordinary soil (Loam


clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

26.625 Cum. 127 3381.375


TRENCH 1 75 0.71 0.5 26.625
TOTAL 26.625

3 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

5.325 Cum. 108.4 577.23


E/W in filling in foundation 5.325
TOTAL 5.325

4 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

2.6625 Cum. 1212.2 3227.4825


sand filling in plinth 1 75 0.71 0.05 2.6625
TOTAL 2.6625

CONCRETE WORK
5 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
3.99375 Cum. 3898.5 15569.634375
Below footing
TRENCH 1 75 0.71 0.075 3.99375
TOTAL 3.99375

DRAIN Page 46 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

DRAIN Page 47 of 58
ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
6 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
3.99375 Cum. 4608 18403.2
1 75 0.71 0.075 3.99375

BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
17.25 Cum. 5726.8 98787.3
2 75 0.23 0.5 17.25
TOTAL 17.25

PLASTER WORK
8 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 120 Sqm. 241.5 28980
2 75 0.8 120
TOTAL 120

TOTAL 169001.03

DRAIN Page 48 of 58
ATK ENGINEERING SERVICES

ESTIMATE FOR WATER SUPPLY & SANITARY WORK


SL. DESCRIPTION OF ITEM QUANTITY UNIT RATE AMOUNT
NO.
1 Supplying & Fixing of the following sizes of G.I. pipe B class
Jindal/J.T.C. make with G.I. fittings I.S.I. marked and clamps
including making good ceilling and Floor including supply of all
materials,labour,T&P etc required for proper completion of the
work

(e) 40 mm dia 55 Meter 328.75 18081.25

2 Supplying & Fixing of the following sizes of G.I. pipe B class


Jindal/J.T.C. make with G.I. fittings I.S.I. marked and clamps
including making good ceilling and Floor including supply of all
materials,labour,T&P etc required for proper completion of the
work

© 25 mm dia 45 Meter 226.25 10181.25

3 Supplying & Fixing of the following sizes of G.I. pipe B class


Jindal/J.T.C. make with G.I. fittings I.S.I. marked and clamps
including making good ceilling and Floor including supply of all
materials,labour,T&P etc required for proper completion of the
work

a)15 mm dia 65 Meter 148.75 9668.75

4 S/F brass bib cock/stop cock 15mm dia I.S.I marked of 400gm. 22 Each 570 12540
Weight including supply of all materials,labour T & P etc and
including threading the pipe if required for proper completion of
the work

5 Supplying & Fixing 15mm PVC connection.Heavy quality with 22 Each 95 2090
brass union including supply of all materials,labour,T & P etc. and
for proper completion of the work

6 Supplying & fixing C.P. angle valve 20 Each 545 10900

7 Supplying & fixing P.V.C. waste pipe for W.H.B./Sink 32 mm dia 12 Each 50 600

8 Supplying & fixing Chlorinated Polyvinyl- chloride (CPVC) pipe- 22 Meter 2980 65560
150 mm dia

9 Supplying & fixing Chlorinated Polyvinyl- chloride (CPVC) pipe-75 50 Meter 1060 53000
mm dia

10 supplying fitting & Fixing European type white glazed earthen 7 Each 1506 10542
ware W.C.pan (Indian Make) of approved 1st quality I.S.I.marked
back lite seat cover & lid with c.P. Brass hinges and rubber
buffers

11 Suplying & Fixing 10 Lts flushing cistren with C.I. or M.S. bracket 7 Each 1750 12250
complete with fitting such as syphonic arrangement,15mm
normal size brass ball valve with polythene float C.P. brass
handle unions & coupllings for connection with inlet outlet and
oveflow pipes,40mm dia.Pore enamelled flush band, including
cutting holes in walls and making the same and connecting the
flush band with cistern and closd. (a) High Level I.S.I. Marked.

WATER SUPPLY SANITARY WORKS Page 49 of 58


ATK ENGINEERING SERVICES

SL. DESCRIPTION OF ITEM QUANTITY UNIT RATE AMOUNT


NO.

12 supplying fitting & fixing Flat back or angular front lipper urinal 5 Each 1055 5275
basin of white glazed earthen ware 465x355x265mm

13 supplying fitting & fixing Wash hand basin 550x400 mm size of 8 Each 1142 9136
white glazed earthen ware (22"x16")

14 supplying fitting & fixing C.P. Brass towel rail 750x20mm 10 Each 527 5270
together with pair of C.P. Brass brackets to fit the towel rail.

15 supplying fitting & fixing S.W. gully trap 150x100mm dia 10 Each 347 3470

16 Providing and placing on terrace (at all floor levels) polyethylene water
storage tank, IS : 12701 marked, with cover and suitable locking
arrangement and making necessary holes for inlet, outlet and overflow
pipes but without fittings and the base support for tank.
Rectangular tank 10000 Litre 7.25 72500

TOTAL 301064.25

WATER SUPPLY SANITARY WORKS Page 50 of 58


ATK ENGINEERING SERVICES

ESTIMATE FOR UG RESERVOIR


CAPACITY OF TANK 30000 LITRE
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

27.09375 Cum. 127 3440.90625


1 4.25 4.25 1.5 27.09375
TOTAL 27.09375

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

8.9409375 Cum. 108.4 969.197625


E/W in filling in foundation 8.9409375
TOTAL 8.9409375

CONCRETE WORK
3 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.3546875 Cum. 3898.5 5281.24921875

1 4.25 4.25 0.075 1.3546875


TOTAL 1.3546875

4 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

10.4275 Cum. 6217 64827.7675


FOOTING
BASE 1 4.1 4.1 0.25 4.2025
WALL 2 3.5 0.25 1.5 2.625
2 3 0.25 1.5 2.25
SLAB 1 3 3 0.15 1.35
TOTAL 10.4275

UG WATER TANK Page 51 of 58


ATK ENGINEERING SERVICES

SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
5 Mild steel or iron in plain work such as
reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

15.64125 Qtl 6863.2 107349.027


FOOTING 10.4275 @Qtl/cum 1.5 15.64125
TOTAL 15.64125

PLASTER WORK
6 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 30 Sqm. 241.5 7245
1 3.5 3 1.5 19.5
1 3.5 3 10.5
TOTAL 30

7 Supplying and fixing C.I. cover without frame for


manholes :
500 mm diameter C.I. cover (medium duty) the
weight of the cover to be not less than 58 kg

1 EACH 2749 2749

TOTAL 191862.15

UG WATER TANK Page 52 of 58


ATK ENGINEERING SERVICES
SEPTIC TANK
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)

22.5 Cum. 127 2857.5


1 5 3 1.5 22.5
TOTAL 22.5

2 Earth work in cutting or in Filling in ordinary


soil, excavation to be in the form of regular pits
not exceeding 1/2 metre (20") in depth and
earthwork in embankment to be in 20 cm(8")
layers, including ramming & dressing the surface
to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100') lead. The
earth from cutting to be used in mahing filling
or to be deposited as spoil banks within 30
metres (100 fts) distance as directed by
Engineer-in- charge. (Rate is Including Royality)

9 Cum. 108.4 975.6


E/W in filling in foundation 9
TOTAL 9

3 Sand filling in plinth including supply of


necessary quantity of sand from a distance not
exceeding 8 km.(5 miles) from the site of work
and including watering, dressing etc. Rate to
include cost of alt materials, labour and T&P etc.
required for proper completion of the work.
(Rate is Including Royality)

1.125 Cum. 1212.2 1363.725


sand filling in plinth 1 5 3 0.075 1.125
TOTAL 1.125

CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.125 Cum. 3898.5 4385.8125
Below footing
1 5 3 0.075 1.125
TOTAL 1.125

5 Cement concrete with 4 cm (1.5”) gauge


approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.43592 Cum. 4608 6616.71936
1 3.86 1.86 0.2 1.43592

6 R.C.C work with cement approved coarse sand


and 4 cm. (1.5") gauge approved stone ballast
in the proportion of 1:1.5:3 at foundation and
footing excluding supply of reinforcement and
its binding but including its fixing and binding
the same with 24 B.W.G.G.I binding wire and
including necessary centering and shuttering
etc. and also including supply of all materials,
Iabour& T&P etc. required for proper
completion of the work. Binding wire cost being
included in the item.

0.50516 Cum. 6217 3140.57972


1 3.46 1.46 0.1 0.50516
TOTAL 0.50516

SEPTIC TANK Page 53 of 58


ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT

7 Mild steel or iron in plain work such as


reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.

0.50516 Qtl 6863.2 3467.014112


0.50516 @Qtl/cum 1 0.50516
TOTAL 0.50516

BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
2.66708 Cum. 5726.8 15273.833744
2 3.46 0.23 1.3 2.06908
2 1 0.23 1.3 0.598
TOTAL 2.66708

PLASTER WORK
8 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 18.4 Sqm. 241.5 4443.6
1 3 1 1.3 10.4
1 3 1 8
TOTAL 18.4
9 Supplying and fixing C.I. cover without frame for
manholes :
500 mm diameter C.I. cover (medium duty) the
weight of the cover to be not less than 58 kg

2 EACH 2749 5498

TOTAL 48022.38

SEPTIC TANK Page 54 of 58


ATK ENGINEERING SERVICES

ESTIMATE OF EFFLUENT TREATMENT PLANT


SL. DSR
NO. REF. DESCRIPTION OF ITEM NO. LENGTH BREADTH HEIGHT QTY UNIT RATE AMOUNT
NO.
EARTH WORK
1 2.8 Earth work in excavation by mechanical
means (Hydraulic excavator) / manual
means in foundation trenches or drains
(not exceeding 1.5 m in width or 10
sqm on plan), including dressing of
sides and ramming of bottoms, lift upto
1.5 m, including getting out the
excavated soil and disposal of surplus
excavated
soil as directed, within a lead of 50 m.

2.8.1 All kinds of soil 43.39 Cum. 166.40 7220.83


1 5.74 4.2 1.8 43.39
TOTAL 43.39

2 2.25 Filling available excavated earth


(excluding rock) in trenches, plinth,
sides of
foundations etc. in layers not exceeding
20cm in depth, consolidating each
deposited layer by ramming and
watering, lead up to 50 m and lift upto
1.5 m.

8.41 Cum. 125.75 211.41


2.26.1 All kinds of soil 1.68 Cum 51.75 87.00
BRICK WORK 4.16 Sq.M 4751.65 19766.86
Brick Wall 1 3.2 1.3 4.16
CONCRETE WORK
3 4.1 Providing and laying in position cement
concrete of specified grade excluding
the cost of centering and shuttering -
All work up to plinth level :

2.63 Cum. 4814.55 12661.79


4.1.6 1:3:6 (1 Cement : 3 coarse sand (zone-
III): 6 graded stone aggregate 40 mm
nominal size).

Bottom of Tank 1 5.39 4.4 0.1 2.37


Bottom of Small Tank 1 4.1 0.63 0.1 0.26
TOTAL 2.63

4 5.1 Providing and laying in position


specified grade of reinforced cement
concrete,
excluding the cost of centering,
shuttering, finishing and reinforcement
- All work up to plinth level :

5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand


(zone-III): 3 graded stone aggregate 20
mm nominal size).
12.60 Cum. 6215.35 78354.12
Bottom of Tank 1 4.405 3.6 0.35 5.55
Long Wall of Tank 4 3.2 0.2 1.5 3.84
Short Wall of Tank 1 8.31 0.2 1.5 2.49
Bottom of Small Tank 1 4.1 0.53 0.25 0.54
Column above Top Slab 4 0.3 0.3 0.5 0.18
TOTAL 12.60

ETP Page 55 of 58
ATK ENGINEERING SERVICES

5 5.3 Reinforced cement concrete work in


beams, suspended floors, roofs having
slope up to 15° landings, balconies,
shelves, chajjas, lintels, bands, plain
window sills, staircases and spiral stair
cases above plinth level up to floor five
level, excluding the cost of centering,
shuttering, finishing and reinforcement,
with 1:1.5:3 (1 cement : 1.5 coarse sand
(zone-III) : 3 graded stone aggregate
20 mm nominal size).

1.86 Cum. 7390.8 13720.28


Top Slab 1 3.64 3.4 0.15 1.86
TOTAL 1.86

ETP Page 56 of 58
ATK ENGINEERING SERVICES

6 5.9 Centering and shuttering including


strutting, propping etc. and removal of
form
for all heights :

5.9.1 Foundations, footings, bases of


columns, etc. for mass concrete 5.60 Sqm. 193.95 1086.80
Bottom of Tank 1 4.405 3.6 0.35 5.60
TOTAL 5.60

7 5.9.3 Suspended floors, roofs, landings, 14.49 Sqm. 422.3 6118.28


balconies and access platform
Top Slab 1 3.64 3.4 0.15 14.49
TOT 14.49
AL

8 5.9.6 Columns, Pillars, Piers, Abutments, 38.40 Sqm. 467.85 17965.44


Posts and Struts
Long Wall of Tank 4 3.2 1.5 38.40
TOTAL 38.40
STEEL WORKS
9 5.22 Steel reinforcement for R.C.C. work
including straightening, cutting,
bending,
placing in position and binding all
complete upto plinth level.

5.22.3 Cold twisted bars 1157.04 Kg 56.6 65488.24


Reinforcement in Tank = @ 80 Kg/ Cum 1157.00
TOTAL 1157.04
PLASTER WORK
10 13.1 12 mm cement plaster of mix :
53.15 Sqm. 160.35 8522.04
13.1.2 1:6 (1 cement: 6 fine sand)
1 27.51 1.85 50.89
1 7.51 0.3 2.25
TOTAL 53.15

11 13.18 Neat cement punning Same as Plaaster Area 53.15 Sqm. 42.6 2264.04

12 19.19 Providing and fixing in position pre-cast


R.C.C. manhole cover and frame of
required shape and approved quality

2 2.00 Nos. 1073.05 2146.10


19.19. LD-2.5
4
19.19.4. 19.19.1.1 Rectangular shape 600x450
1 mm internal dimensions

TOTAL COST OF ETP = 235613.00

ETP Page 57 of 58
FORM - I

SL NO. DESCRIPTION QTY UNIT UNIT COST AMOUNT

A . CIVIL WORKS -BUILDING, BOUNDARY WALL, ROAD, DRAINS

CARCASS UTILIZATION PLANT-


1 PLANT BUILDING 1 NOS. 8832253.16 8832253.16

2 ADMINISTRATION BUILDING 1 NOS. 922672.33 922672.33

3 SECURITY ROOM 2 NOS. 197834.93 395669.86

4 TOILET 2 NOS. 154004.47 308008.94

5 ELECTRICAL ROOM 1 NOS. 217026.76 217026.76

6 BOUNDARY WALL 290.75 METER 7867 2287330.25

7 ROAD 1 NOS. 3026396.25 3026396.25

8 DRAIN (300 X 450) -180 METER 1 NOS. 448259.31 448259.31

9 DRAIN (350 X 500) - 70 METER 1 NOS. 233667.34 233667.34

10 DRAIN (250 X 300) - 75 METER 1 NOS. 169001.03 169001.03

B. CIVIL WORKS -WATER SUPPLY , SANITARY WORKS, UG TANK, SEPTIC TANK, ETP

WATER SUPPLY & SANITARY


11 WORKS 1 NOS. 301064.25 301064.25

12 UNDERGROUND WATER TANK -1000 1 NOS. 191862.15 191862.15

13 SEPTIC TANK 2 NOS. 48022.38 96044.76

14 ETP 1 NOS 235613.00 235613.00

TOTAL COST 17664869.39


ADD 5% CONTINGENCIES 883243

GRAND TOTAL 18,548,112.00