Form-I: A - Civil Works - Building, Boundary Wall, Road, Drains
Form-I: A - Civil Works - Building, Boundary Wall, Road, Drains
FORM-I
SL NO. DESCRIPTION QTY UNIT UNIT COST AMOUNT
B. CIVIL WORKS -WATER SUPPLY , SANITARY WORKS, UG TANK, SEPTIC TANK, ETP
ABSTRACT
ATK ENGINEERING SERVICES
EARTH WORK
Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.
MAIN PLANT
ATK ENGINEERING SERVICES
CONCRETE WORK
Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
69.96525 Cum. 3898.5 272759.527125
Below footing
F1 20 1.65 1.65 0.075 4.08375
F2 14 2 2 0.075 4.2
F3 2 2 2 0.075 0.6
F4 11 2.5 2.5 0.075 5.15625
F5 2 2.6 2.6 0.075 1.014
Under floor 1 30 15 0.075 33.75
1 19.7 5 0.075 7.3875
1 17.5 5 0.075 6.5625
1 12.23 5 0.075 4.58625
1 7 5 0.075 2.625
TOTAL 69.96525
MAIN PLANT
ATK ENGINEERING SERVICES
MAIN PLANT
ATK ENGINEERING SERVICES
BRICKWORK
First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
34.445835 Cum. 5726.8 197264.407878
3 29.97 0.23 0.9 18.61137
1 19.7 0.23 0.45 2.03895
2 4.73 0.23 0.9 1.95822
2 25.46 0.23 0.9 10.54044
1 6.265 0.23 0.9 1.296855
TOTAL 34.445835
1 17 0.23 5 9.775
DEDUCT 12 1.2 0.23 2.4 -7.9488
TOTAL 188.33872
MAIN PLANT
ATK ENGINEERING SERVICES
PLASTER WORK
12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.
MAIN PLANT
ATK ENGINEERING SERVICES
FLOORING
Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)
MAIN PLANT
ATK ENGINEERING SERVICES
DOOR - WINDOW
Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.
MAIN PLANT
ATK ENGINEERING SERVICES
MAIN PLANT
ATK ENGINEERING SERVICES
TOTAL 8832253.16
MAIN PLANT
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
4.71975 Cum. 3898.5 18399.945375
Below footing
F1 8 1.65 1.65 0.075 1.6335
Under floor 1 8.23 5 0.075 3.08625
TOTAL 4.71975
BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
2.73861 Cum. 5726.8 15683.471748
2 8.23 0.23 0.45 1.70361
2 5 0.23 0.45 1.035
TOTAL 2.73861
PLASTER WORK
13 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.
FLOORING
16 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)
TOTAL 39.8235
DOOR - WINDOW
19 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.
3.252 Cum. 57990.8 188586.0816
2 5.4 0.1 0.075 0.081
1 6.8 0.1 0.075 0.051
2 5.2 0.75 0.4 3.12
TOTAL 3.252
TOTAL 922,672.33
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.14375 Cum. 3898.5 4458.909375
Below footing
F1 4 1.5 1.5 0.075 0.675
Under floor 1 2.5 2.5 0.075 0.46875
TOTAL 1.14375
BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
1.035 Cum. 5726.8 5927.238
4 2.5 0.23 0.45 1.035
TOTAL 1.035
PLASTER WORK
12 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.
TOTAL 54.2272
FLOORING
15 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)
DOOR - WINDOW
17 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.
TOTAL 197834.93
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
0.68175 Cum. 3898.5 2657.802375
Below footing
F1 4 1.1 1.1 0.075 0.363
Under floor 1 1.7 2.5 0.075 0.31875
TOTAL 0.68175
TOILET Page 25 of 58
ATK ENGINEERING SERVICES
TOILET Page 26 of 58
ATK ENGINEERING SERVICES
BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
0.96462 Cum. 5726.8 5524.185816
2 4.66 0.23 0.45 0.96462
TOTAL 0.96462
PLASTER WORK
12 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.
TOILET Page 27 of 58
ATK ENGINEERING SERVICES
FLOORING
15 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)
DOOR - WINDOW
17 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.
TOILET Page 28 of 58
ATK ENGINEERING SERVICES
TOILET Page 29 of 58
ATK ENGINEERING SERVICES
TOTAL 154004.47
TOILET Page 30 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.14375 Cum. 3898.5 4458.909375
Below footing
F1 4 1.5 1.5 0.075 0.675
Under floor 1 2.5 2.5 0.075 0.46875
TOTAL 1.14375
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
F1 4 1.5 1.5 0.2 1.8
TOTAL 1.8
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
BRICKWORK
9 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
1.035 Cum. 5726.8 5927.238
4 2.5 0.23 0.45 1.035
TOTAL 1.035
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
PLASTER WORK
12 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
FLOORING
15 Cement concrete flooring 1:2:4(1 cement :2
coarse sand: 4 graded stone aggregate of size 20
mm nominal size) laid in one layer finished with
floating cost of neat cement(40 mm thick floor)
DOOR - WINDOW
17 Indian sal wood wrought framed and fixed
including simple mouldings. straight works as in
Chaukhats, including supply all materials, labour
and T & P etc. required for proper completion of
the work.
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
TOTAL 217026.76
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
3 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
0.432 Cum. 3898.5 1684.152
Below footing
F1 4 1.2 1.2 0.075 0.432
TOTAL 0.432
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
0.860085 Cum. 5726.8 4925.534778
3 2.77 0.23 0.45 0.860085
TOTAL 0.860085
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
PLASTER WORK
9 12 mm Cement plaster in single coat on fair side
of single or half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80 mm. In girth and finished even and
smooth. No extra for mixing any additive.
TOTAL 70799.842
PER METER COST OF BOUNDARY WALL
7866.649
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Preparation and consolidation of sub grade with
power road roller of 8 to 12 tonne capacity after
excavating earth to an average of 22.5 cm
depth, dressing to camber and consolidating
with road roller including making good the
undulations etc. and re-rolling the sub grade
and disposal of surplus earth with lead upto 50
metres.
1 225 5 1125 Sqm. 90.1 101362.5
CONCRETE WORK
TOTAL 3026396.25
ROAD Page 40 of 58
ATK ENGINEERING SERVICES
EARTH WORK
1 Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.
CONCRETE WORK
5 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
10.125 Cum. 3898.5 39472.3125
Below footing
TRENCH 1 180 0.75 0.075 10.125
TOTAL 10.125
DRAIN Page 41 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
6 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
20.52 Cum. 4608 94556.16
1 180 0.76 0.15 20.52
BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
37.26 Cum. 5726.8 213380.568
2 180 0.23 0.45 37.26
TOTAL 37.26
PLASTER WORK
8 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 298.8 Sqm. 241.5 72160.2
2 180 0.83 298.8
TOTAL 298.8
TOTAL 448259.31
DRAIN Page 42 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.
CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
5.3025 Cum. 3898.5 20671.79625
Below footing
TRENCH 1 70 1.01 0.075 5.3025
TOTAL 5.3025
DRAIN Page 43 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
DRAIN Page 44 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
5 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
14.14 Cum. 4608 65157.12
1 70 1.01 0.2 14.14
BRICKWORK
6 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
16.1 Cum. 5726.8 92201.48
2 70 0.23 0.5 16.1
TOTAL 16.1
PLASTER WORK
7 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 165.9 Sqm. 241.5 40064.85
2 70 1.185 165.9
TOTAL 165.9
TOTAL 233667.34
DRAIN Page 45 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
EARTH WORK
1 Clearing jungle including uprooting of rank
vegetations grass, bush, wood trees and saplings
of girth upto 30 cm. Measured at a height of 1
metre a.bove ground level & removal of rubbish
upto a distance of 50 metres outside the
periphery of area cleared.
CONCRETE WORK
5 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
3.99375 Cum. 3898.5 15569.634375
Below footing
TRENCH 1 75 0.71 0.075 3.99375
TOTAL 3.99375
DRAIN Page 46 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
DRAIN Page 47 of 58
ATK ENGINEERING SERVICES
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
6 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 4 : 2 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
3.99375 Cum. 4608 18403.2
1 75 0.71 0.075 3.99375
BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
17.25 Cum. 5726.8 98787.3
2 75 0.23 0.5 17.25
TOTAL 17.25
PLASTER WORK
8 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 120 Sqm. 241.5 28980
2 75 0.8 120
TOTAL 120
TOTAL 169001.03
DRAIN Page 48 of 58
ATK ENGINEERING SERVICES
4 S/F brass bib cock/stop cock 15mm dia I.S.I marked of 400gm. 22 Each 570 12540
Weight including supply of all materials,labour T & P etc and
including threading the pipe if required for proper completion of
the work
5 Supplying & Fixing 15mm PVC connection.Heavy quality with 22 Each 95 2090
brass union including supply of all materials,labour,T & P etc. and
for proper completion of the work
7 Supplying & fixing P.V.C. waste pipe for W.H.B./Sink 32 mm dia 12 Each 50 600
8 Supplying & fixing Chlorinated Polyvinyl- chloride (CPVC) pipe- 22 Meter 2980 65560
150 mm dia
9 Supplying & fixing Chlorinated Polyvinyl- chloride (CPVC) pipe-75 50 Meter 1060 53000
mm dia
10 supplying fitting & Fixing European type white glazed earthen 7 Each 1506 10542
ware W.C.pan (Indian Make) of approved 1st quality I.S.I.marked
back lite seat cover & lid with c.P. Brass hinges and rubber
buffers
11 Suplying & Fixing 10 Lts flushing cistren with C.I. or M.S. bracket 7 Each 1750 12250
complete with fitting such as syphonic arrangement,15mm
normal size brass ball valve with polythene float C.P. brass
handle unions & coupllings for connection with inlet outlet and
oveflow pipes,40mm dia.Pore enamelled flush band, including
cutting holes in walls and making the same and connecting the
flush band with cistern and closd. (a) High Level I.S.I. Marked.
12 supplying fitting & fixing Flat back or angular front lipper urinal 5 Each 1055 5275
basin of white glazed earthen ware 465x355x265mm
13 supplying fitting & fixing Wash hand basin 550x400 mm size of 8 Each 1142 9136
white glazed earthen ware (22"x16")
14 supplying fitting & fixing C.P. Brass towel rail 750x20mm 10 Each 527 5270
together with pair of C.P. Brass brackets to fit the towel rail.
15 supplying fitting & fixing S.W. gully trap 150x100mm dia 10 Each 347 3470
16 Providing and placing on terrace (at all floor levels) polyethylene water
storage tank, IS : 12701 marked, with cover and suitable locking
arrangement and making necessary holes for inlet, outlet and overflow
pipes but without fittings and the base support for tank.
Rectangular tank 10000 Litre 7.25 72500
TOTAL 301064.25
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
3 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.3546875 Cum. 3898.5 5281.24921875
SL. NO. DESCRIPTION OF ITEM NO LENGTH BREADTH HEIGHT QUANTITY UNIT RATE AMOUNT
5 Mild steel or iron in plain work such as
reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary including
bending for proper completion of the work and
including supply of all steel and wastage &
overlapping & hooks.
PLASTER WORK
6 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 30 Sqm. 241.5 7245
1 3.5 3 1.5 19.5
1 3.5 3 10.5
TOTAL 30
TOTAL 191862.15
EARTH WORK
1 Excavation in Foundation in ordinary soil (Loam
clay, or sand) including lift upto 1.5 metre (5 fts.)
and lead upto 30 m (100 fts) & including filling,
watering and ramming of excavated earth into
the trenches or into the space between the
building and the sidr s of foundation trenches
or into the plinth and removal and disposal of
surplas earth as directed by the Engineer- in-
charge upto a distance of 30 m. (100 fts) from
the foundation trenches.(Rate is Including
Royality)
CONCRETE WORK
4 Cement concrete with 4 cm (1.5”) gauge
approved stone ballast, approved coarse sand
and cement in the proportion of 6 : 3 : I
including supply of all materials, labour and T &
P etc. required for proper completion of the
work.
1.125 Cum. 3898.5 4385.8125
Below footing
1 5 3 0.075 1.125
TOTAL 1.125
BRICKWORK
7 First class brick work in 1:6 cement and fine
sand of 1.25 FM. mortar in foundation and
plinth including supply of all materials, labour
and T & P etc. required for proper completion of
the work.
2.66708 Cum. 5726.8 15273.833744
2 3.46 0.23 1.3 2.06908
2 1 0.23 1.3 0.598
TOTAL 2.66708
PLASTER WORK
8 15 mm cement plaster on rough side of single or half
brick wall finished with a floating coat of neat cement
of mix :
1:4 (1 cement: 4 fine sand) 18.4 Sqm. 241.5 4443.6
1 3 1 1.3 10.4
1 3 1 8
TOTAL 18.4
9 Supplying and fixing C.I. cover without frame for
manholes :
500 mm diameter C.I. cover (medium duty) the
weight of the cover to be not less than 58 kg
TOTAL 48022.38
ETP Page 55 of 58
ATK ENGINEERING SERVICES
ETP Page 56 of 58
ATK ENGINEERING SERVICES
11 13.18 Neat cement punning Same as Plaaster Area 53.15 Sqm. 42.6 2264.04
ETP Page 57 of 58
FORM - I
B. CIVIL WORKS -WATER SUPPLY , SANITARY WORKS, UG TANK, SEPTIC TANK, ETP