TRANSFORMER INSTALLATION ADRS


CONTRACTING DIVISION
No 8b, Down Town Road 7,P.O.Box 28, CHECKLIST
Phnom Penh, Kingdom of Cambodia PAGE

SYSTEM

SCHEDULE

SPECIFICATION

REF. DRWG

ACTION
No. DESIGNATION
YES NO N/A DATE

1 Type, quantity

2 Check location as per drawing

3 Check vertical/ horizontal in alignment

4 Check level as per design

5 Spacing with other equipment or service

6 Check Hanger & support

7 Bolt & nut

8 Check phase as per manufacturer's design

9 Check grounded with grounding system

10 Paint

11 Nameplate/ symbol

12 Shop Drawing marked up as per actual installation and filed.

REMARK

INSPECTED BY: APPROVED BY: WITNESSED BY:

DATE: DATE: DATE:


Version Revision Code Nº Issued Page
1 1 EL005B 1-Jan-08 1/1 PROJ.

TRANSFORMER ADRS
CONTRACTING DIVISION
No 8b, Down Town Road 7,P.O.Box 28, PRE-ENERGISATION CHECK
Phnom Penh, Kingdom of Cambodia DATE

SYSTEM

SCHEDULE

SPECIFICATION

REF. DRWG

RESULT
ITEM INSPECTION Remark
OK NO N/A

1 Check the presence of safety items (glove, foot step…)

2 Check the presence Fire extinguisher


3 Check the presence of first aid advice's plate
4 Check the presence of warning plate of high voltage
5 Check the presence of earth cable and properly connected

6 Physical check for mechanical damages

7 Check for oil leakage

8 Check oil level

9 Check for fixing on base (if needed)

10 Check requirement space of transformer

11 Check transformer level

12 Check room temperature during operation

13 Check vertical/horizontal alignment

14 Check name plate and symbol

15 Shop drawing mark up as per actual installation and filed

Remark:

READ BY: APPROVED BY: WITNESSED BY:

DATE: DATE: DATE: