Professional Documents
Culture Documents
Conduit Work Installation Checklist
Conduit Work Installation Checklist
SYSTEM
SCHEDULE
SPECIFICATION
REF. DRWG
ACTION
No. DESIGNATION
YES NO N/A DATE
1 Trunking routes and sizes are all in accordance with approved drawing.
11 Trunking is fitted with fixed lid section and fire barrier where passing
12 Copper/brass earthing continuity link are fitted across all trunking joints.
REMARK