National Highways Authority of India Request for Proposal – Bid Documents

SCHEDULE – A
(See Clause 10.1)
SITE OF THE PROJECT

1 The Site
1.1 Site of the Project Highway shall include the land, buildings, structures and road works as
described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Concessionaire, and such inventory shall form part of the
memorandum referred to in Clause 10.3.1 of the Agreement.
1.3 Additional land required for Toll Plazas, Traffic Aid Posts, Medical Aid Posts and vehicle
rescue posts or for construction of works specified in the Change of Scope Order issued under
Clause 16.2.3 of this Agreement shall be acquired in accordance with the provisions of Clause
10.3.6 of this Agreement. Upon acquisition, such land shall form part of the Site and vest in
the Authority.

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-1
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Annex - I
(Schedule-A)
SITE FOR THE PROJECT

1. The Site
1.1 Project Highway
Proposal is for Construction of Highway from Km 20+730 to Km 59+347 (Edamon to
kadampattukonam Section of NH-766) in the State of Kerela on Hybrid Annuity mode under
Bharatmala Pariyojana. The highway is a Greenfield alignment project.
The distribution of alignment among the above provinces is given
Chainage (Km)
District/UT/State
Start End Length (Km)
20+730 49+600 28.87 Kollam/Kerela
49+600 59+347 9.747 Thiruvananthapuram/Kerela
1.2 Alignment
1.2.1 Edamon to Kadampattukonam Section- ICR
The project highway is a Greenfield alignment passing through Edamon (Patthanpuram),
Ayiranallor (Anchal), Eroor (Anchal), Alayamon,Kottukal, Ittiva, Chadayamangalam,
Nilamel, Madavoor, Pallikal, Kudavoor, Navaikullam of Kollam and Thiruvananthapuram
District in Kerela. Latitude and longitude of the project corridor lies between 8°59'20.96"N,
77° 0'48.17"E and 8°47'45.20"N, 76°46'9.77"E. An index map of the Project Highway is
given at Appendix A-I.
In this section the alignment passes through rolling/hilly terrain.
The Proposed center line coordinates are given in Annex II and the alignment plan and profile
is given in Annex III of this schedule.
2. Land
The Site of the Project Highway comprises the land described below:
Chainage (km) ROW
S. No. Remarks
From To (m)

1 20+730 21+055 7 Existing NH-744


Since the project is a Green field alignment, there is no
2 21+055 59+347 Nil Existing ROW.
The details PROW has been given in Schedule B.

3. Carriageway
Since the most part of project is a Green field alignment, there is no existing Carriageway.
Chainage (km)
S. No. Carriageway (m) Remarks
From To
1 20+730 21+055 6.8-7.1 Existing NH-744

4. Major Bridges
The Site includes the following Major Bridges:

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-2
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Type of Structure No. of


Chainage Spans with Width
S. No. Sub- Superstruct span length
(km) Foundation (m)
structure ure (m)
Nil

5. Road Over-Bridges (ROB)/ Road Under-Bridges (RUB)


The Site includes the following ROB (road over railway line)/RUB (road under railway
line):
Type of Structure No. of
Chainage Spans with Width ROB/
S. No.
(km) Foundation Superstructure span length (m) RUB
(m)
Nil
Railway Level Crossings
The Site includes the following railway level crossings:
S. No. Location (km) Remarks
Nil
6. Grade Separators
The Site includes the following grade separators:

S. Chainage Type of Structure No. of Spans with


Width (m)
No. (km) Foundation Superstructure span length (m)

Nil
7. Minor Bridges
The Site includes the following minor bridges:
Type of Structure No. of
S. Chainage Spans with Width
No. (km) Sub- Superstruct span length (m)
Foundation
structure ure (m)
1 20+938 RCC Girder Wall Type Open 1x11.0 7.0
8. Total Number of Structures
The total number of structures on the Site is noted below:
(a) No. of Major Bridges 01
(b) No. of Railway Over Bridges Nil

(c) No. of Grade Separators Nil

(d) No. of Minor Bridges 01

(e) No. of Vehicular and Non Vehicular Underpasses Nil

(f) No. of Box Culverts Nil

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-3
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

(g) No. of Pipe Culverts Nil

(h) No. of Slab Culverts Nil

9. Bus Bays and Truck Lay Byes


The total number of bus bays and truck lay byes on the Project is noted below:
(a) No. of Bus bays on LHS - Nil
(b) No. of Bus bays on RHS - Nil
(c) No. of Truck lay-byes on LHS - Nil
(d) No. of Truck lay-byes on RHS - Nil
10. Permanent Bridge, Bye Pass or Tunnel costing Rs. 50 crore or more
The Site includes the following permanent bridge/ bypass/ tunnel which was Constructed at
the cost noted below:
The project is a green field project hence there is no existing structures. The new structures
shall be constructed as per Schedules.
11. Wayside Amenities / Truck Parking
The Site includes the parcels of land for provision of wayside Amenities / truck parking as
given in Schedule C.
12. Existing utility
The details of existing utility services are given in Annex IV.

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-4
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Appendix A-I

Index Map of Project Highway

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-5
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Annex - II
(Schedule-A)
COORDINATE SYSTEM_ UNIVERSAL TRANSVERSE MERCATOR (UTM)-WGS84
(Zone 43N)

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
1 20+750 721300.328 994272.481
2 20+800 721251.477 994283.14
3 20+850 721202.627 994293.799
4 20+900 721153.776 994304.457
5 20+950 721104.925 994315.116
6 21+000 721055.967 994325.261
7 21+050 721006.518 994332.557
8 21+100 720956.602 994335.079
9 21+150 720906.684 994332.606
10 21+200 720857.262 994325.167
11 21+250 720808.614 994313.649
12 21+300 720760.36 994300.553
13 21+350 720712.128 994287.373
14 21+400 720663.897 994274.193
15 21+450 720615.665 994261.013
16 21+500 720567.434 994247.833
17 21+550 720519.202 994234.653
18 21+600 720470.97 994221.473
19 21+650 720422.739 994208.291
20 21+700 720374.878 994193.859
21 21+750 720329.221 994173.639
22 21+800 720287.669 994145.899
23 21+850 720248.491 994114.836
24 21+900 720208.053 994085.498
25 21+950 720162.432 994065.355
26 22+000 720113.246 994057.125
27 22+050 720063.507 994061.045
28 22+100 720014.584 994071.355
29 22+150 719965.733 994082.012
30 22+200 719916.882 994092.669
31 22+250 719868.031 994103.327
32 22+300 719819.18 994113.984
33 22+350 719770.329 994124.641
34 22+400 719721.478 994135.299
35 22+450 719672.627 994145.956
36 22+500 719623.776 994156.613
37 22+550 719574.925 994167.271
38 22+600 719526.023 994177.687
Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-6
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
39 22+650 719476.53 994184.55
40 22+700 719426.595 994183.715
41 22+750 719377.485 994174.633
42 22+800 719330.552 994157.557
43 22+850 719287.089 994132.955
44 22+900 719248.293 994101.506
45 22+950 719214.856 994064.38
46 23+000 719184.362 994024.756
47 23+050 719154.113 993984.945
48 23+100 719123.863 993945.133
49 23+150 719093.614 993905.322
50 23+200 719063.364 993865.51
51 23+250 719033.115 993825.698
52 23+300 719003.042 993785.754
53 23+350 718975.852 993743.832
54 23+400 718956.158 993697.964
55 23+450 718945.964 993649.1
56 23+500 718945.681 993599.184
57 23+550 718954.871 993550.094
58 23+600 718969.482 993502.284
59 23+650 718984.993 993454.751
60 23+700 718999.89 993407.026
61 23+750 719010.015 993358.113
62 23+800 719010.928 993308.205
63 23+850 719001.907 993259.11
64 23+900 718984.356 993212.334
65 23+950 718963.045 993167.105
66 24+000 718941.409 993122.028
67 24+050 718919.789 993076.944
68 24+100 718899.069 993031.444
69 24+150 718880.741 992984.93
70 24+200 718865.025 992937.471
71 24+250 718851.968 992889.213
72 24+300 718841.612 992840.304
73 24+350 718833.986 992790.895
74 24+400 718829.116 992741.14
75 24+450 718827.017 992691.19
76 24+500 718827.694 992641.201
77 24+550 718831.146 992591.327
78 24+600 718837.362 992541.721
79 24+650 718846.323 992492.537
80 24+700 718858.001 992443.927

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-7
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
81 24+750 718872.36 992396.04
82 24+800 718889.356 992349.024
83 24+850 718908.919 992303.016
84 24+900 718930.102 992257.726
85 24+950 718950.022 992211.906
86 25+000 718953.537 992162.532
87 25+050 718934.396 992116.68
88 25+100 718907.934 992074.258
89 25+150 718889.707 992028.07
90 25+200 718890.519 991978.209
91 25+250 718895.129 991928.422
92 25+300 718899.74 991878.635
93 25+350 718904.351 991828.848
94 25+400 718908.913 991779.057
95 25+450 718911.162 991729.128
96 25+500 718905.961 991679.477
97 25+550 718891.067 991631.834
98 25+600 718867.006 991588.1
99 25+650 718834.735 991550.017
100 25+700 718795.542 991519.104
101 25+750 718751.539 991495.438
102 25+800 718705.819 991475.2
103 25+850 718659.987 991455.216
104 25+900 718614.93 991433.573
105 25+950 718573.228 991406.115
106 26+000 718537.681 991371.072
107 26+050 718509.804 991329.664
108 26+100 718490.709 991283.544
109 26+150 718481.157 991234.55
110 26+200 718481.209 991184.614
111 26+250 718487.458 991135.017
112 26+300 718495.141 991085.611
113 26+350 718502.83 991036.206
114 26+400 718510.518 990986.801
115 26+450 718518.206 990937.395
116 26+500 718525.895 990887.99
117 26+550 718533.583 990838.584
118 26+600 718541.272 990789.179
119 26+650 718548.96 990739.774
120 26+700 718556.648 990690.368
121 26+750 718564.061 990640.922
122 26+800 718567.742 990591.093

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-8
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
123 26+850 718563.634 990541.321
124 26+900 718551.326 990492.919
125 26+950 718531.159 990447.23
126 27+000 718503.715 990405.502
127 27+050 718471.225 990367.512
128 27+100 718437.581 990330.525
129 27+150 718403.932 990293.542
130 27+200 718370.283 990256.559
131 27+250 718336.634 990219.576
132 27+300 718302.985 990182.593
133 27+350 718269.965 990145.055
134 27+400 718241.189 990104.234
135 27+450 718220.621 990058.751
136 27+500 718209.495 990010.09
137 27+550 718206.795 989960.196
138 27+600 718207.647 989910.205
139 27+650 718207.199 989860.219
140 27+700 718200.246 989810.775
141 27+750 718183.814 989763.641
142 27+800 718158.345 989720.71
143 27+850 718124.855 989683.695
144 27+900 718084.679 989654.072
145 27+950 718039.466 989632.898
146 28+000 717991.683 989618.229
147 28+050 717943.362 989605.38
148 28+100 717895.036 989592.55
149 28+150 717846.71 989579.721
150 28+200 717798.384 989566.891
151 28+250 717750.058 989554.062
152 28+300 717701.732 989541.232
153 28+350 717653.406 989528.403
154 28+400 717605.08 989515.573
155 28+450 717556.797 989502.583
156 28+500 717509.477 989486.526
157 28+550 717465.497 989462.913
158 28+600 717427.079 989431.043
159 28+650 717395.758 989392.176
160 28+700 717372.642 989347.922
161 28+750 717355.778 989300.867
162 28+800 717340.443 989253.278
163 28+850 717323.38 989206.287
164 28+900 717303.127 989160.584

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A-9
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
165 28+950 717279.665 989116.443
166 29+000 717253.112 989074.089
167 29+050 717223.603 989033.738
168 29+100 717191.291 988995.596
169 29+150 717156.369 988959.825
170 29+200 717119.827 988925.7
171 29+250 717083.079 988891.794
172 29+300 717046.952 988857.23
173 29+350 717011.7 988821.773
174 29+400 716977.345 988785.446
175 29+450 716943.91 988748.272
176 29+500 716911.414 988710.274
177 29+550 716879.656 988671.655
178 29+600 716847.948 988632.994
179 29+650 716816.241 988594.333
180 29+700 716784.534 988555.673
181 29+750 716752.827 988517.012
182 29+800 716721.12 988478.351
183 29+850 716688.271 988440.684
184 29+900 716649.003 988409.941
185 29+950 716603.878 988388.529
186 30+000 716557.452 988369.966
187 30+050 716511.8 988349.613
188 30+100 716469.326 988323.34
189 30+150 716430.964 988291.305
190 30+200 716394.178 988257.442
191 30+250 716357.431 988223.535
192 30+300 716320.684 988189.628
193 30+350 716283.938 988155.721
194 30+400 716247.117 988121.894
195 30+450 716209.149 988089.373
196 30+500 716168.455 988060.368
197 30+550 716124.583 988036.45
198 30+600 716078.126 988018.047
199 30+650 716029.775 988005.432
200 30+700 715980.249 987998.792
201 30+750 715930.284 987998.227
202 30+800 715880.62 988003.744
203 30+850 715831.997 988015.261
204 30+900 715785.043 988032.382
205 30+950 715739.531 988053.073
206 31+000 715694.519 988074.842

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 10


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
207 31+050 715649.519 988096.637
208 31+100 715604.305 988117.98
209 31+150 715558.082 988137.017
210 31+200 715510.654 988152.815
211 31+250 715462.244 988165.284
212 31+300 715413.085 988174.364
213 31+350 715363.415 988180.012
214 31+400 715313.473 988182.198
215 31+450 715263.5 988180.915
216 31+500 715213.736 988176.166
217 31+550 715164.421 988167.977
218 31+600 715115.794 988156.385
219 31+650 715068.088 988141.446
220 31+700 715021.534 988123.234
221 31+750 714976.355 988101.835
222 31+800 714932.771 988077.353
223 31+850 714890.99 988049.905
224 31+900 714851.215 988019.625
225 31+950 714813.636 987986.657
226 32+000 714778.436 987951.162
227 32+050 714745.783 987913.31
228 32+100 714715.836 987873.283
229 32+150 714688.738 987831.274
230 32+200 714664.6 987787.497
231 32+250 714642.614 987742.592
232 32+300 714621.021 987697.495
233 32+350 714599.428 987652.398
234 32+400 714577.835 987607.301
235 32+450 714556.157 987562.245
236 32+500 714532.973 987517.954
237 32+550 714505.939 987475.926
238 32+600 714473.963 987437.529
239 32+650 714437.45 987403.418
240 32+700 714396.97 987374.126
241 32+750 714353.366 987349.698
242 32+800 714308.175 987328.311
243 32+850 714262.633 987307.671
244 32+900 714217.091 987287.035
245 32+950 714171.548 987266.398
246 33+000 714126.005 987245.762
247 33+050 714080.462 987225.126
248 33+100 714034.919 987204.49

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 11


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
249 33+150 713989.376 987183.854
250 33+200 713943.833 987163.218
251 33+250 713898.291 987142.582
252 33+300 713852.748 987121.946
253 33+350 713807.205 987101.31
254 33+400 713761.662 987080.674
255 33+450 713716.119 987060.038
256 33+500 713670.576 987039.402
257 33+550 713625.033 987018.765
258 33+600 713579.487 986998.136
259 33+650 713533.578 986978.34
260 33+700 713486.395 986961.856
261 33+750 713437.623 986950.989
262 33+800 713387.885 986946.158
263 33+850 713337.894 986945.703
264 33+900 713287.908 986946.856
265 33+950 713237.923 986948.089
266 34+000 713187.938 986949.322
267 34+050 713137.954 986950.555
268 34+100 713087.969 986951.787
269 34+150 713037.984 986953.02
270 34+200 712987.999 986954.253
271 34+250 712938.014 986955.485
272 34+300 712888.03 986956.718
273 34+350 712838.045 986957.951
274 34+400 712788.06 986959.184
275 34+450 712738.075 986960.416
276 34+500 712688.09 986961.632
277 34+550 712638.095 986961.787
278 34+600 712588.215 986958.522
279 34+650 712538.635 986952.086
280 34+700 712489.161 986944.851
281 34+750 712439.688 986937.613
282 34+800 712390.214 986930.374
283 34+850 712340.741 986923.136
284 34+900 712291.268 986915.897
285 34+950 712241.795 986908.659
286 35+000 712192.321 986901.42
287 35+050 712142.848 986894.181
288 35+100 712093.375 986886.943
289 35+150 712043.902 986879.704
290 35+200 711994.428 986872.466

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 12


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
291 35+250 711944.955 986865.227
292 35+300 711895.482 986857.987
293 35+350 711846.124 986850.022
294 35+400 711797.365 986839.011
295 35+450 711749.688 986823.995
296 35+500 711703.427 986805.064
297 35+550 711658.901 986782.347
298 35+600 711616.421 986756.003
299 35+650 711576.281 986726.215
300 35+700 711538.76 986693.189
301 35+750 711504.118 986657.154
302 35+800 711472.584 986618.37
303 35+850 711443.54 986577.675
304 35+900 711415.116 986536.54
305 35+950 711386.694 986495.404
306 36+000 711358.272 986454.267
307 36+050 711329.5 986413.377
308 36+100 711299.728 986373.208
309 36+150 711268.962 986333.796
310 36+200 711237.221 986295.165
311 36+250 711204.55 986257.316
312 36+300 711171.604 986219.706
313 36+350 711138.658 986182.095
314 36+400 711105.712 986144.484
315 36+450 711072.766 986106.874
316 36+500 711039.82 986069.263
317 36+550 711006.874 986031.652
318 36+600 710973.928 985994.042
319 36+650 710940.982 985956.431
320 36+700 710908.036 985918.821
321 36+750 710875.09 985881.21
322 36+800 710842.144 985843.599
323 36+850 710809.198 985805.989
324 36+900 710776.195 985768.428
325 36+950 710742.459 985731.526
326 37+000 710707.811 985695.479
327 37+050 710672.273 985660.309
328 37+100 710635.867 985626.039
329 37+150 710598.616 985592.689
330 37+200 710560.542 985560.281
331 37+250 710521.671 985528.834
332 37+300 710482.025 985498.369

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 13


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
333 37+350 710441.813 985468.654
334 37+400 710401.569 985438.983
335 37+450 710361.325 985409.312
336 37+500 710321.08 985379.64
337 37+550 710280.836 985349.969
338 37+600 710240.591 985320.298
339 37+650 710200.347 985290.626
340 37+700 710160.103 985260.955
341 37+750 710119.858 985231.284
342 37+800 710079.614 985201.612
343 37+850 710039.369 985171.941
344 37+900 709999.125 985142.269
345 37+950 709958.86 985112.626
346 38+000 709917.857 985084.023
347 38+050 709874.705 985058.815
348 38+100 709828.844 985038.977
349 38+150 709780.868 985025.012
350 38+200 709731.525 985017.137
351 38+250 709681.585 985015.475
352 38+300 709631.823 985020.021
353 38+350 709582.744 985029.512
354 38+400 709534.132 985041.21
355 38+450 709485.575 985053.137
356 38+500 709437.019 985065.065
357 38+550 709388.462 985076.992
358 38+600 709339.906 985088.92
359 38+650 709291.349 985100.846
360 38+700 709242.648 985112.156
361 38+750 709193.429 985120.918
362 38+800 709143.76 985126.589
363 38+850 709093.834 985129.146
364 38+900 709043.845 985128.579
365 38+950 708993.99 985124.892
366 39+000 708944.461 985118.098
367 39+050 708895.455 985108.224
368 39+100 708847.16 985095.307
369 39+150 708799.766 985079.4
370 39+200 708753.459 985060.564
371 39+250 708708.419 985038.872
372 39+300 708664.821 985014.409
373 39+350 708622.836 984987.271
374 39+400 708582.629 984957.564

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 14


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
375 39+450 708544.355 984925.403
376 39+500 708508.165 984890.914
377 39+550 708474.199 984854.233
378 39+600 708442.591 984815.501
379 39+650 708413.464 984774.871
380 39+700 708386.932 984732.501
381 39+750 708363.097 984688.557
382 39+800 708342.054 984643.21
383 39+850 708323.885 984596.637
384 39+900 708308.66 984549.02
385 39+950 708296.438 984500.545
386 40+000 708286.83 984451.479
387 40+050 708277.937 984402.277
388 40+100 708269.046 984353.073
389 40+150 708260.155 984303.87
390 40+200 708251.265 984254.667
391 40+250 708242.374 984205.464
392 40+300 708233.484 984156.26
393 40+350 708224.593 984107.057
394 40+400 708215.702 984057.854
395 40+450 708206.812 984008.651
396 40+500 708197.921 983959.448
397 40+550 708189.031 983910.244
398 40+600 708180.14 983861.041
399 40+650 708171.249 983811.838
400 40+700 708162.359 983762.635
401 40+750 708153.468 983713.431
402 40+800 708144.578 983664.228
403 40+850 708135.687 983615.025
404 40+900 708126.796 983565.822
405 40+950 708117.906 983516.619
406 41+000 708109.015 983467.415
407 41+050 708100.125 983418.212
408 41+100 708091.234 983369.009
409 41+150 708082.343 983319.806
410 41+200 708073.453 983270.602
411 41+250 708064.562 983221.399
412 41+300 708055.671 983172.196
413 41+350 708046.226 983123.099
414 41+400 708033.843 983074.673
415 41+450 708016.175 983027.933
416 41+500 707992.82 982983.76

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 15


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
417 41+550 707964.484 982942.59
418 41+600 707933.325 982903.49
419 41+650 707901.486 982864.938
420 41+700 707869.641 982826.39
421 41+750 707837.797 982787.843
422 41+800 707807.521 982748.084
423 41+850 707780.118 982706.262
424 41+900 707752.73 982664.43
425 41+950 707724.247 982623.343
426 42+000 707692.912 982584.398
427 42+050 707658.478 982548.164
428 42+100 707622.017 982513.952
429 42+150 707585.466 982479.843
430 42+200 707552.401 982442.367
431 42+250 707520.556 982403.819
432 42+300 707488.711 982365.272
433 42+350 707456.867 982326.724
434 42+400 707425.022 982288.177
435 42+450 707393.404 982249.444
436 42+500 707363.344 982209.496
437 42+550 707335.319 982168.094
438 42+600 707309.398 982125.344
439 42+650 707285.646 982081.352
440 42+700 707264.123 982036.227
441 42+750 707244.837 981990.101
442 42+800 707226.677 981943.516
443 42+850 707208.551 981896.917
444 42+900 707190.425 981850.318
445 42+950 707172.299 981803.719
446 43+000 707154.174 981757.12
447 43+050 707136.048 981710.521
448 43+100 707117.922 981663.922
449 43+150 707099.797 981617.323
450 43+200 707081.67 981570.725
451 43+250 707062.918 981524.375
452 43+300 707043.014 981478.51
453 43+350 707021.969 981433.156
454 43+400 706999.797 981388.342
455 43+450 706976.512 981344.096
456 43+500 706952.172 981300.422
457 43+550 706927.552 981256.903
458 43+600 706902.932 981213.385

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 16


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
459 43+650 706878.311 981169.867
460 43+700 706853.691 981126.348
461 43+750 706829.071 981082.83
462 43+800 706804.451 981039.311
463 43+850 706779.831 980995.793
464 43+900 706755.211 980952.275
465 43+950 706730.591 980908.756
466 44+000 706705.971 980865.238
467 44+050 706681.351 980821.719
468 44+100 706656.73 980778.201
469 44+150 706631.557 980735.003
470 44+200 706603.855 980693.395
471 44+250 706572.864 980654.174
472 44+300 706539.85 980616.625
473 44+350 706506.528 980579.347
474 44+400 706473.369 980541.925
475 44+450 706441.842 980503.13
476 44+500 706414.187 980461.51
477 44+550 706391.842 980416.815
478 44+600 706374.003 980370.118
479 44+650 706358.318 980322.642
480 44+700 706342.891 980275.082
481 44+750 706327.463 980227.521
482 44+800 706311.986 980179.977
483 44+850 706295.181 980132.893
484 44+900 706274.696 980087.303
485 44+950 706249.776 980043.98
486 45+000 706220.656 980003.361
487 45+050 706187.625 979965.852
488 45+100 706151.016 979931.828
489 45+150 706111.553 979901.14
490 45+200 706070.907 979872.022
491 45+250 706030.166 979843.036
492 45+300 705989.425 979814.051
493 45+350 705948.684 979785.065
494 45+400 705908.041 979755.943
495 45+450 705868.592 979725.238
496 45+500 705831.686 979691.525
497 45+550 705797.714 979654.858
498 45+600 705766.912 979615.491
499 45+650 705739.494 979573.696
500 45+700 705715.57 979529.805

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 17


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
501 45+750 705693.885 979484.753
502 45+800 705672.526 979439.545
503 45+850 705651.166 979394.337
504 45+900 705629.807 979349.129
505 45+950 705608.447 979303.921
506 46+000 705587.087 979258.713
507 46+050 705565.149 979213.785
508 46+100 705540.489 979170.309
509 46+150 705511.735 979129.429
510 46+200 705479.044 979091.625
511 46+250 705442.741 979057.273
512 46+300 705403.218 979026.678
513 46+350 705361.565 978999.028
514 46+400 705319.328 978972.268
515 46+450 705277.082 978945.523
516 46+500 705234.837 978918.778
517 46+550 705192.591 978892.033
518 46+600 705150.444 978865.133
519 46+650 705109.255 978836.797
520 46+700 705069.531 978806.441
521 46+750 705031.373 978774.139
522 46+800 704994.877 978739.97
523 46+850 704960.135 978704.019
524 46+900 704927.134 978666.461
525 46+950 704894.769 978628.349
526 47+000 704860.489 978591.981
527 47+050 704822.515 978559.477
528 47+100 704783.42 978528.307
529 47+150 704744.317 978497.147
530 47+200 704705.214 978465.986
531 47+250 704666.112 978434.826
532 47+300 704627.009 978403.665
533 47+350 704587.906 978372.505
534 47+400 704548.803 978341.345
535 47+450 704509.7 978310.184
536 47+500 704470.598 978279.024
537 47+550 704431.495 978247.863
538 47+600 704392.392 978216.703
539 47+650 704353.289 978185.542
540 47+700 704313.993 978154.629
541 47+750 704273.309 978125.581
542 47+800 704230.429 978099.894

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 18


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
543 47+850 704185.559 978077.865
544 47+900 704139.016 978059.635
545 47+950 704091.386 978044.434
546 48+000 704043.484 978030.103
547 48+050 703995.579 978015.783
548 48+100 703947.673 978001.463
549 48+150 703899.768 977987.143
550 48+200 703851.862 977972.823
551 48+250 703803.957 977958.502
552 48+300 703756.051 977944.182
553 48+350 703708.146 977929.862
554 48+400 703660.24 977915.542
555 48+450 703612.335 977901.222
556 48+500 703564.429 977886.901
557 48+550 703516.524 977872.581
558 48+600 703468.619 977858.261
559 48+650 703420.831 977843.557
560 48+700 703373.417 977827.687
561 48+750 703326.416 977810.637
562 48+800 703279.855 977792.417
563 48+850 703233.76 977773.049
564 48+900 703187.849 977753.244
565 48+950 703141.939 977733.439
566 49+000 703096.029 977713.635
567 49+050 703050.118 977693.83
568 49+100 703004.208 977674.025
569 49+150 702958.297 977654.22
570 49+200 702912.387 977634.415
571 49+250 702866.476 977614.611
572 49+300 702820.566 977594.806
573 49+350 702774.655 977575.001
574 49+400 702728.745 977555.196
575 49+450 702682.834 977535.391
576 49+500 702636.924 977515.587
577 49+550 702591.013 977495.782
578 49+600 702545.103 977475.977
579 49+650 702499.193 977456.172
580 49+700 702453.002 977437.043
581 49+750 702405.529 977421.397
582 49+800 702356.957 977409.571
583 49+850 702308.098 977398.952
584 49+900 702259.238 977388.333

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 19


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
585 49+950 702210.673 977376.483
586 50+000 702163.21 977360.804
587 50+050 702117.217 977341.23
588 50+100 702073.012 977317.895
589 50+150 702030.903 977290.962
590 50+200 701991.183 977260.617
591 50+250 701953.986 977227.218
592 50+300 701917.599 977192.925
593 50+350 701881.213 977158.632
594 50+400 701844.826 977124.339
595 50+450 701808.439 977090.046
596 50+500 701772.053 977055.753
597 50+550 701735.666 977021.46
598 50+600 701699.279 976987.167
599 50+650 701662.892 976952.874
600 50+700 701626.506 976918.581
601 50+750 701590.119 976884.288
602 50+800 701553.732 976849.995
603 50+850 701517.346 976815.702
604 50+900 701480.959 976781.409
605 50+950 701444.572 976747.116
606 51+000 701407.876 976713.157
607 51+050 701370.351 976680.115
608 51+100 701332.012 976648.022
609 51+150 701292.882 976616.897
610 51+200 701252.987 976586.76
611 51+250 701212.391 976557.573
612 51+300 701171.632 976528.612
613 51+350 701130.873 976499.652
614 51+400 701090.114 976470.691
615 51+450 701049.356 976441.73
616 51+500 701008.597 976412.77
617 51+550 700967.838 976383.809
618 51+600 700927.079 976354.848
619 51+650 700886.32 976325.888
620 51+700 700845.562 976296.927
621 51+750 700804.803 976267.966
622 51+800 700764.044 976239.005
623 51+850 700723.285 976210.045
624 51+900 700682.527 976181.084
625 51+950 700641.762 976152.132
626 52+000 700600.452 976123.971

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 20


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
627 52+050 700557.36 976098.639
628 52+100 700512.312 976076.977
629 52+150 700465.617 976059.141
630 52+200 700417.6 976045.253
631 52+250 700368.593 976035.41
632 52+300 700318.945 976029.587
633 52+350 700269.058 976026.253
634 52+400 700219.147 976023.27
635 52+450 700169.236 976020.287
636 52+500 700119.325 976017.304
637 52+550 700069.414 976014.32
638 52+600 700019.503 976011.337
639 52+650 699969.592 976008.354
640 52+700 699919.681 976005.371
641 52+750 699869.77 976002.388
642 52+800 699819.859 975999.405
643 52+850 699769.948 975996.422
644 52+900 699720.038 975993.431
645 52+950 699670.193 975989.537
646 53+000 699620.75 975982.219
647 53+050 699572.269 975970.074
648 53+100 699525.243 975953.15
649 53+150 699480.141 975931.615
650 53+200 699437.414 975905.685
651 53+250 699397.49 975875.62
652 53+300 699360.761 975841.724
653 53+350 699326.914 975804.931
654 53+400 699294.214 975767.106
655 53+450 699261.57 975729.234
656 53+500 699228.925 975691.361
657 53+550 699196.28 975653.489
658 53+600 699163.636 975615.616
659 53+650 699130.991 975577.744
660 53+700 699098.346 975539.871
661 53+750 699065.701 975501.999
662 53+800 699032.578 975464.548
663 53+850 698997.401 975429.03
664 53+900 698959.782 975396.11
665 53+950 698919.909 975365.959
666 54+000 698878.286 975338.261
667 54+050 698836.199 975311.266
668 54+100 698794.109 975284.277

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 21


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
669 54+150 698752.019 975257.288
670 54+200 698709.929 975230.299
671 54+250 698667.865 975203.268
672 54+300 698626.568 975175.091
673 54+350 698587.635 975143.751
674 54+400 698552.013 975108.694
675 54+450 698520.07 975070.255
676 54+500 698492.123 975028.82
677 54+550 698468.449 974984.803
678 54+600 698448.557 974938.939
679 54+650 698430.232 974892.418
680 54+700 698412 974845.861
681 54+750 698393.767 974799.304
682 54+800 698374.838 974753.028
683 54+850 698352.955 974708.091
684 54+900 698326.792 974665.506
685 54+950 698296.509 974625.747
686 55+000 698262.407 974589.209
687 55+050 698224.829 974556.258
688 55+100 698184.157 974527.211
689 55+150 698141.305 974501.46
690 55+200 698097.75 974476.904
691 55+250 698054.171 974452.391
692 55+300 698010.592 974427.878
693 55+350 697967.013 974403.365
694 55+400 697923.434 974378.853
695 55+450 697879.856 974354.34
696 55+500 697836.277 974329.827
697 55+550 697792.698 974305.314
698 55+600 697749.119 974280.801
699 55+650 697705.627 974256.136
700 55+700 697663.174 974229.739
701 55+750 697623.229 974199.701
702 55+800 697586.481 974165.825
703 55+850 697553.3 974128.45
704 55+900 697523.78 974088.111
705 55+950 697496.42 974046.263
706 56+000 697469.392 974004.197
707 56+050 697442.364 973962.132
708 56+100 697415.336 973920.067
709 56+150 697387.987 973878.211
710 56+200 697358.53 973837.825

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 22


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
711 56+250 697325.878 973799.978
712 56+300 697290.188 973764.981
713 56+350 697251.709 973733.076
714 56+400 697210.708 973704.484
715 56+450 697167.472 973679.4
716 56+500 697122.65 973657.251
717 56+550 697077.412 973635.956
718 56+600 697032.169 973614.671
719 56+650 696986.925 973593.386
720 56+700 696941.682 973572.101
721 56+750 696896.439 973550.815
722 56+800 696851.196 973529.53
723 56+850 696805.953 973508.245
724 56+900 696760.71 973486.96
725 56+950 696715.467 973465.675
726 57+000 696670.223 973444.389
727 57+050 696624.98 973423.104
728 57+100 696579.737 973401.819
729 57+150 696534.494 973380.534
730 57+200 696489.251 973359.249
731 57+250 696444.008 973337.964
732 57+300 696398.783 973316.639
733 57+350 696354.161 973294.095
734 57+400 696311.559 973267.969
735 57+450 696272.427 973236.898
736 57+500 696236.899 973201.738
737 57+550 696203.434 973164.591
738 57+600 696170.332 973127.118
739 57+650 696137.229 973089.645
740 57+700 696104.126 973052.173
741 57+750 696071.023 973014.7
742 57+800 696037.92 972977.227
743 57+850 696004.766 972939.8
744 57+900 695970.478 972903.419
745 57+950 695933.196 972870.142
746 58+000 695892.143 972841.656
747 58+050 695847.859 972818.511
748 58+100 695801.035 972801.068
749 58+150 695752.402 972789.599
750 58+200 695702.718 972784.282
751 58+250 695652.759 972785.202
752 58+300 695603.304 972792.342

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 23


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Proposed Centerline Coordinate


S. No. Chainage (Km)
X Y
753 58+350 695555.126 972805.593
754 58+400 695508.918 972824.623
755 58+450 695464.524 972847.611
756 58+500 695420.861 972871.972
757 58+550 695376.68 972895.373
758 58+600 695330.834 972915.266
759 58+650 695282.951 972929.548
760 58+700 695233.661 972937.748
761 58+750 695183.733 972939.738
762 58+800 695133.947 972935.489
763 58+850 695085.075 972925.078
764 58+900 695037.539 972909.618
765 58+950 694990.841 972891.753
766 59+000 694944.265 972873.57
767 59+050 694897.688 972855.386
768 59+100 694851.112 972837.202
769 59+150 694804.536 972819.019
770 59+200 694757.959 972800.835
771 59+250 694711.383 972782.652
772 59+300 694664.806 972764.468
773 59+350 694618.23 972746.284

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 24


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Annex – III
(Schedule-A)
Alignment Plans

The alignment plan of the Project Highway is given in Schedule B.

Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 25


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Annex - IV
(Schedule-A)

a. Electrical Utilities
The site includes the following electrical utilities
a) Extra HighTension lines (EHT Lines)

S. Chainage (Km) Length (in Km) Crossing


No. From To 765kV 400kV 220kV 132kV 765kV 400kV 220kV 132kV
1 21+500 21+600 -- -- -- -- 1 -- -- --
2 23+700 23+750 -- -- -- -- -- -- 1 --
3 32+000 32+100 -- -- -- -- -- -- 1 --
4 41+050 41+900 -- -- -- -- -- -- -- 1
5 50+250 50+550 -- -- -- -- -- 1 -- --
6 53+500 53+600 -- -- -- -- -- -- 1 --

7 53+950 54+050 -- -- -- -- -- -- -- 1

8 59+050 59+347 -- -- -- -- -- -- -- 2

b. HighTension/ Low Tension lines (HT/LT Lines)

Chainage Length of line (In Km) Crossings Transformer


Sr.No. No of 11 /
From To 11/33KV LT LT No./Capacity
Pole 33KV
1 20730 21000 - 0.6 12 - - 1
2 21000 22000 - 0.1 2 - - -
3 22000 23000 - 0 33 - - 1-100kva
4 23000 24000 - - - - - -
5 24000 25000 - - - - - -
6 25000 26000 - - - - - -
7 26000 27000 0.55 0.3 17 5 1 1-100KVA
8 27000 28000 0.8 0.65 29 4 - -
9 28000 29000 0.1 - 2 - - -
10 29000 30000 0.05 0.15 4 1 4 -
11 30000 31000 - 0.3 6 - - -
12 31000 32000 0.7 0.45 23 4 7 1-100KVA
13 32000 33000 - - - 3 - -
14 33000 34000 - 0.15 3 - 5 -
15 34000 35000 - 0.25 5 - 5 -
16 35000 36000 0.8 1 16 - - 1-160KVA
17 36000 37000 - - - - - -
18 37000 38000 - - - - - -
19 38000 39000 - 1.05 21 - 9 -
Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 26
of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana
National Highways Authority of India Request for Proposal – Bid Documents

Chainage Length of line (In Km) Crossings Transformer


Sr.No. No of 11 /
From To 11/33KV LT LT No./Capacity
Pole 33KV
20 39000 40000 - 0.25 5 - - -
21 40000 41000 - 0.05 1 - 2 -
22 41000 42000 - 0.25 5 - 3 -
23 42000 43000 0.55 0.3 17 5 1 1-100KVA
24 43000 44000 0.8 0.65 29 4 - -
25 44000 45000 0.1 - 2 - - -
26 45000 46000 0.05 0.15 4 1 4 -
27 46000 47000 - 0.3 6 - - -
28 47000 48000 0.7 0.45 23 4 7 1-100KVA
29 48000 49000 - - - 3 - -
30 49000 50000 - 0.15 3 - 5 -
31 50000 51000 - 0.25 5 - 5 -
32 51000 52000 0.8 1 16 - - 1-100KVA
33 52000 53000 - 0.25 5 - - -
34 53000 54000 - 0.05 1 - 2 -
35 54000 55000 - 0.25 5 - 3 -
36 55000 56000 - 0.05 1 3 - -
37 56000 57000 - 0.4 8 - - -
38 57000 58000 0.45 - 9 4 - -
39 58000 59000 - 0.2 4 - 2 -
40 59000 59347 0.15 0.15 3 - - -

c. Public Health Utilities (Water/Sewage pipe Lines)

Chainage Length (in Km) Crossing

S. Water Supply Sewage line Water Supply Sewage line


No.
From To
With With With With With With With With
pumping gravity pumping gravity pumping gravity pumping gravity

1 NIL



Construction of four-lane greenfield highway from Edamon (Design km 20+730/Existing km 38.000 A - 27


of NH-744) to Kadampattukonam near Paripally (Design km 59+347/Existing km 517.567 of NH-66)
in the State of Kerala in HAM mode under Bharatmala Pariyojana