HF0802-H0802D1 Geological Proposal

1. Introduction & Objectives


Hartha A limestone reservoir is proven oil-bearing in Halfaya Field by first test in
HF001-M267 in February 2012. According to FDPR1, its OOIP is 299 MMB which
accounts for 1.6% of the total OOIP of Halfaya oilfield.
Based on development plan in FDPR1, horizontal producers and corresponding injectors
are recommended for Hartha A reservoir.
According to the well pattern of Hartha reservoir recommended in FDPR1 and recent
technical study, HF0802-H0802D1 is planned as a producer with the following
objectives:
1. To produce oil from Hartha A reservoir;
2. To systematically collect data from all penetrated oil-bearing reservoirs for reservoir
study.
As a cluster well, HF0802-H0802D1 is designed as a deviated hole to penetrate
the main Hartha reservoir with a total depth of 3319m MDRT (-2703m TVDSS).

1/
HF0802-H0802D1 Geological Proposal

2. Well Summary

Well Name HF0802-H0802D1


Well type Development well (deviated)
Location SW flank of the anticline. Pad HF0802, Slot C.

Northing (Y) 3502593.05


Surface Coordinates Easting (X) 735287.32
(UTM Zone 38N, GL elevation: 4.46m (Based on survey report dated
WGS84, EGM2008) Dec. 12, 2021)
RT elevation: 14.06 (Rig DQ1205)
CP (Top Hartha A) :
Northing 3501806.16
Easting 735013.90
Depth -2626.2m TVDSS
Subsurface Targets
(UTM Zone 38N, TD :
WGS84, EGM2008) Northing 3501636.80
Easting 734955.06
Depth -2703.0m TVDSS
Target Radius: 30m.

Proposed TD 3319m MDRT (-2703m TVDSS)


Well head: H0802D1 is the 3rd well at pad HF0802, same
pads as wells S0802H1 and S0802H2.
Distance from offset Hartha producers at top Hartha A:
Key Offset Wells
HF081-N081 @1085m to NEE;
HF0967-M0967 @2220m to SE;
HF0546-H0546H1 @3130m to NW.
Est. Spud Date May. 2023

2/
HF0802-H0802D1 Geological Proposal

3. Reservoir Features
The oil bearing area of Hartha A reservoir is 103.8sqkm. Strong heterogeneity is identified
both in reservoir and fluid properties with high GOR volatile oil in the crest area and normal
black oil in the flank.
Average net pay of Hartha A reservoir is 7.7m. Its porosity ranges 8%~32% with averaging
18.3%, while permeability varies between 0.1 mD and 185 mD. Its pore types mainly include
intraparticle pore, moldic pore, intergranular pore and microporosity pore.
Based on wireline logging interpretation, the Hartha A reservoir property (Net
payTVD/Porosity/Sw) of adjacent wells are as follows :
HF081-N081: 10.6m/22.1%/39.8%;
HF0888-M0888D1: 12.1m/22.0%/29.5%;
HF7635-M7635D2: 10.1m/17.8%/46.3%;
HF0726-M0726D5: 11.8m/17.8%/44.7%.
Based on geological model, the prognosis at proposed well: 14.1m/21.7%/36.1%.

3/
HF0802-H0802D1 Geological Proposal

4. Production and Injection of Adjacent Wells


There are four adjacent wells producing oil from Hartha A reservoir. The detailed production status at th

Initial Current

Well Name Unit Choke Choke


Tie-in Oil Rate GOR WCT Oil Rate GOR WCT Np
Size Size
Date (BOPD) (scf/stb) (%) (BOPD) (scf/stb) (%) (STB)
(1/64”) (1/64”)

N081 Hartha A 2016.10 36 2,352 3,069 0.16 40 1,451 8,361 0.1 4,164,186

M0967 Hartha A 2019.03 40 1,195 798 0.54 32 647 1,473 0.5 978,947

M0971D1 Hartha A 2022.04 40 1,832 1,204 3.0 40 1,597 1,850 2.1 554,170

H0546H1 Hartha A 2022.04 44 2,425 1,884 0.0 44 2,899 1,205 0.0 1,068,027

5. Reservoir Pressure and Production Estimation


This well will be completed in Hartha A reservoir and the estimated formation pressure and
production are as below:
The nearby producers may result in pressure depletion in H0802D1. Based on the MDT
pressure, static pressure and simulation results, the estimated formation pressure around
H0802D1 is about 3,500psi currently.
Based on GGRE understanding, production performance of adjacent wells and
simulation results, the estimated initial oil rate is 1000-1500 BOPD.

6. Risk and Uncertainties


There are uncertainties in structure depth, reservoir heterogeneity and the estimated initial oil
production rate.

4/
HF0802-H0802D1 Geological Proposal

7. Stratigraphic Prognosis
FM Tops (m) FM Estimated FM
Lithological
Formation
feature MDRT TVDSS
Remark Press. Depletion Temp
(psi)/Coef (psi) (OC)
Clay soil, Dominated by claystone, with
Upper claystone, sandstone interbeds. Thin
At surface
Fars sandstone, beds of anhydrite at the
gypseous bottom
Rock salt and silty
Lower Claystone, silty mud,
mudstone,
Fars Anhydrite 1425 -1411 anhydrite and rock salt
Dominated by dolomite and
dolomitic limestone. May have
Dolomite/dolomitic
anhydrite nodules/interbeds.
Jeribe limestone/dolomitic 2937/1.07 120 67-74
Towards the bottom, may have
sandstone dolomitic sandstone.
1938 -1924
Sandstone, Unconsolidated sandstone
Upper claystone interbedded with claystone,
2969/1.07 100 67-74
Kirkuk limestone and limestone/ dolostone at the
dolomite 1944 -1930 bottom.
(Poor consolidated) sandstone
Middle Sandstone, interbedded with
3328/1.11 0 73-78
Kirkuk claystone claystone. May have thin beds
2111 -2095 of limestone/dolostone.
Lower Claystone and Sandstone interbedded with
Kirkuk sandstone 2248 -2220 claystone
Chalky limestone with
Marl, Limestone,
Jaddala alternating marl and with
chalky limestone 2314 -2272 chert at bottom
Aliji Limestone 2748 -2478 Limestone
Limestone at the top, marl in
Shiranish Marl, limestone the middle, bio-clastic
2921 -2546 limestone at the bottom
Dominated by packstone and
Chalky
Hartha A wackestone containing 3505/0.93 850 74-80
limestone 3123 -2626 bioclasts(oil bearing)
TD Limestone 3319 -2703 At Hartha A Limestone
Note: The reference static pressure and MDT pressure are as follows:
Type Well Name Date Tested Formation
JK081D1 2021/6/28 Jeribe
Static pressure JK074D2 2022/8/21 Upper Kirkuk
M0967 2021/7/14 Hartha A
M0726D4 2019/1/23 Hartha A
MDT pressure M0888 2018/7/7 Hartha A

8.TD Criteria
HF0802-H0802D1 is proposed to reach final TD at 3319m MDRT (-2703m TVDSS).
Actual TD may be adjusted depending on real drilling results after communication
between well site geological supervisor (WSG) and subsurface team in town.

5/
HF0802-H0802D1 Geological Proposal

9. Casing Program and Completion


Shoe Depth
Size Remark
MDRT (m) TVDSS (m)
30" 23 -9 Reference to well HF0802-S0802H1

20" 147 -133 Reference to well HF0802-S0802H1


13 At the top part of Lower Fars (5m below top
1430 -1416
3/8" Lower Fars)
9 The first meter of mb1 anhydrite of Lower
1923 -1909
5/8” Fars.
7” Set at 8½" hole TD Cement for perforation.

Note: 1. Final casing program should follow the drilling proposal prepared by Operation Department.
Joint communication between well site geologist and drilling supervisor is to be held for real casing
and completion programming during drilling.
2. Effective management and strict quality control for cementing job is required.

10. Mud-logging & Geological Sampling Program


1). Continuous monitoring, recording and graphic presentation of drilling data, drilling
fluids, hydrocarbon shows, CO2, H2S concentration.
2). Report any unexpected events and help find the solution to any problem encountered
during drilling.
E&D office contact information: Mr. Muhammad Saleem or Mr. Musab Ibrahim Telephone:
29510 or 07834957698. Email: Geosupi@petrochina-hfy.com
3). Cutting sample: Not required.

6/
HF0802-H0802D1 Geological Proposal

11. Wire-line Logging Program


Open hole formation evaluation:
For 8-1/2” open hole: SGR-DLL-MSFL-DT-RHOB-NPHI-SP-DEV-CAL.
For 6” open hole (option): SGR-DLL-MSFL-DT-SP-DEV -CAL.
Cased hole cementing quality evaluation (in 13-3/8”, 9-5/8”, and 7” casings):
CBL/VDL-CCL-GR (CCL not required in 13-3/8” casing)
Note: 1.Specific logging interval is to be decided upon communication between well site
geologist and subsurface team in town during drilling.
2. Well site geological supervisor shall send/share the wireline logging deviation
survey data (real time or records) to/with well site drilling supervisor for drilling
management.

12. Formation Test & Fluid sampling


Nil.

7/
HF0802-H0802D1 Geological Proposal

13. Well Control Specification and Risk Identification


1). Well Site Environment: H0802D1 is the 3rd well drilling from pad HF0802,which is far
away from village, school, public road and power line, and outside of buffer zone.
2). Wellbore Structure: refer to section 9 for casing program depth design. For more details
regarding wellbore structure design please refer to drilling program report.
3). Stratigraphic Lithology: refer to the table in section 7 for formation top prognosis and
lithology distribution. Section 14.6 provides the detailed designed well trajectory data.
4). Formation Pressure and Temperature: refer to the table in section 7. 5).
Production and Fluid Properties: refer to section 4.
6). Relevant HSSE procedures must be followed when drilling begin. During drilling the
8½” main holes with 1.23-1.24 mud weight, partial to severe mud loss and well flowing were
often observed beginning from Jaddala. Therefore, precautions and proper measures should
be considered during drilling design and operation to
ensure safety.

8/
HF0802-H0802D1 Geological

14. Maps & Charts


14.1 Depth Structural Map

9 / 21
HF0802-H0802D1 Geological

14.2 Seismic Section (Depth, m)

10 /
HF0802-H0802D1 Geological

14.3 Reservoir Cross Section

11 /
HF0802-H0802D1 Geological

12 /
HF0802-H0802D1 Geological

13 /
HF0802-H0802D1 Geological

14.4 Figures for Attribute Distribution

14 /
HF0802-H0802D1 Geological

15 /
HF0802-H0802D1 Geological

16 /
HF0802-H0802D1 Geological

14.5 Wellbore Trajectory Design

17 /
HF0802-H0802D1 Geological

14.6 Proposed Well Trajectory

HF0802-H0802D1 key points:

Key Points MD Inc Azi TVD TVDSS NS EW Northing Easting V.Sec Dogleg
(m) (°) (°) (m) (m) (m) (m) (m) (m) (m) (°/30m)
WH 0.00 0.00 0.00 0.00 14.06 0.00 0.00 3502593.05 735287.32 0.00 0.00
KOP 2000.00 0.00 0.00 2000.00 -1985.94 0.00 0.00 3502593.05 735287.32 0.00 0.00

CP (Top
3123.75 66.80 199.16 2640.31 -2626.25 -786.89 -273.41 3501806.16 735013.90 833.04 0.00
Hartha_A)

TD 3318.76 66.80 199.16 2717.13 -2703.03 -956.25 -332.26 3501636.80 734955.06 1012.33 0.00

Note: The trajectory and final TD may be adjusted based on real drilling results, but the actual dogleg of the wellbore trajectory should not be
more than 5o/30m before the holding/tangent section (future ESP setting section) which is about 60m long in order to ensure ESP setting and
smooth running in the future (when necessary).

18 /
HF0802-H0802D1 Geological

HF0802-H0802D1 Detailed Trajectory Data:


Key MD Inc Azi TVD TVDSS NS EW Northing Easting V.Sec Dogleg
Points (m) (°) (°) (m) (m) (m) (m) (m) (m) (m) (°/30m)
WH 0.00 0.00 0.00 0.00 14.06 0.00 0.00 3502593.05 735287.32 0.00 0.00
30.00 0.00 0.00 30.00 -15.94 0.00 0.00 3502593.05 735287.32 0.00 0.00
KOP 2000.00 0.00 0.00 2000.00 -1985.94 0.00 0.00 3502593.05 735287.32 0.00 0.00
2010.00 1.33 199.16 2010.00 -1995.94 -0.11 -0.04 3502592.94 735287.28 0.12 3.99
2040.00 5.33 199.16 2039.94 -2025.88 -1.76 -0.61 3502591.29 735286.70 1.86 4.00
2070.00 9.33 199.16 2069.69 -2055.63 -5.37 -1.87 3502587.68 735285.45 5.69 4.00
2100.00 13.33 199.16 2099.10 -2085.04 -10.94 -3.80 3502582.11 735283.51 11.58 4.00
2130.00 17.33 199.16 2128.03 -2113.97 -18.43 -6.40 3502574.62 735280.91 19.51 4.00
2160.00 21.33 199.16 2156.33 -2142.27 -27.81 -9.66 3502565.23 735277.65 29.44 4.00
2190.00 25.33 199.16 2183.87 -2169.81 -39.04 -13.56 3502554.01 735273.75 41.33 4.00
2220.00 29.33 199.16 2210.52 -2196.46 -52.05 -18.08 3502541.00 735269.23 55.10 4.00
2250.00 33.33 199.16 2236.14 -2222.08 -66.78 -23.20 3502526.26 735264.11 70.70 4.00
2280.00 37.33 199.16 2260.61 -2246.55 -83.17 -28.90 3502509.87 735258.42 88.05 4.00
2310.00 41.33 199.16 2283.81 -2269.75 -101.13 -35.14 3502491.91 735252.18 107.07 4.00
Jaddala 2313.54 41.80 199.16 2286.46 -2272.40 -103.35 -35.91 3502489.69 735251.40 109.41 3.98
2340.00 45.33 199.16 2305.63 -2291.57 -120.58 -41.90 3502472.47 735245.42 127.65 4.00
2370.00 49.33 199.16 2325.96 -2311.90 -141.42 -49.14 3502451.63 735238.18 149.71 4.00
2400.00 53.33 199.16 2344.70 -2330.64 -163.55 -56.82 3502429.50 735230.49 173.14 4.00
2430.00 57.33 199.16 2361.76 -2347.70 -186.85 -64.92 3502406.19 735222.39 197.81 4.00
2460.00 61.33 199.16 2377.06 -2363.00 -211.23 -73.39 3502381.82 735213.92 223.62 4.00
2490.00 65.33 199.16 2390.52 -2376.46 -236.56 -82.19 3502356.49 735205.12 250.43 4.00
2501.01 66.80 199.16 2394.99 -2380.93 -246.06 -85.50 3502346.98 735201.82 260.49 4.01

19 /
HF0802-H0802D1 Geological

2520.00 66.80 199.16 2402.47 -2388.41 -262.56 -91.23 3502330.49 735196.09 277.95 0.00
2550.00 66.80 199.16 2414.29 -2400.23 -288.61 -100.28 3502304.44 735187.04 305.54 0.00
2580.00 66.80 199.16 2426.11 -2412.05 -314.66 -109.33 3502278.38 735177.98 333.12 0.00
2610.00 66.80 199.16 2437.92 -2423.86 -340.72 -118.38 3502252.33 735168.93 360.70 0.00
2640.00 66.80 199.16 2449.74 -2435.68 -366.77 -127.44 3502226.27 735159.88 388.28 0.00
2670.00 66.80 199.16 2461.56 -2447.50 -392.83 -136.49 3502200.22 735150.83 415.86 0.00
2700.00 66.80 199.16 2473.38 -2459.32 -418.88 -145.54 3502174.17 735141.77 443.44 0.00
2730.00 66.80 199.16 2485.20 -2471.14 -444.93 -154.59 3502148.11 735132.72 471.03 0.00
Aliji 2748.21 66.80 199.16 2492.37 -2478.31 -460.75 -160.09 3502132.30 735127.23 487.77 0.00
2748.34 66.80 199.16 2492.42 -2478.36 -460.86 -160.13 3502132.19 735127.19 487.89 0.00
2760.00 66.80 199.16 2497.02 -2482.96 -470.99 -163.65 3502122.06 735123.67 498.61 0.00
2790.00 66.80 199.16 2508.83 -2494.77 -497.04 -172.70 3502096.01 735114.61 526.19 0.00
2820.00 66.80 199.16 2520.65 -2506.59 -523.10 -181.75 3502069.95 735105.56 553.77 0.00
2850.00 66.80 199.16 2532.47 -2518.41 -549.15 -190.81 3502043.90 735096.51 581.35 0.00
2880.00 66.80 199.16 2544.29 -2530.23 -575.20 -199.86 3502017.84 735087.46 608.94 0.00
2910.00 66.80 199.16 2556.11 -2542.05 -601.26 -208.91 3501991.79 735078.40 636.52 0.00
Shiranish 2920.75 66.80 199.16 2560.34 -2546.28 -610.59 -212.15 3501982.45 735075.16 646.40 0.00
2940.00 66.80 199.16 2567.93 -2553.87 -627.31 -217.96 3501965.74 735069.35 664.10 0.00
2970.00 66.80 199.16 2579.74 -2565.68 -653.37 -227.02 3501939.68 735060.30 691.68 0.00
3000.00 66.80 199.16 2591.56 -2577.50 -679.42 -236.07 3501913.63 735051.25 719.26 0.00
3030.00 66.80 199.16 2603.38 -2589.32 -705.47 -245.12 3501887.57 735042.19 746.84 0.00
3060.00 66.80 199.16 2615.20 -2601.14 -731.53 -254.17 3501861.52 735033.14 774.43 0.00
3090.00 66.80 199.16 2627.02 -2612.96 -757.58 -263.23 3501835.47 735024.09 802.01 0.00
3120.00 66.80 199.16 2638.83 -2624.77 -783.63 -272.28 3501809.41 735015.04 829.59 0.00
3123.31 66.80 199.16 2640.14 -2626.08 -786.51 -273.28 3501806.54 735014.04 832.63 0.00

20 /
HF0802-H0802D1 Geological

CP (Top 3123.75 66.80 199.16 2640.31 -2626.25 -786.89 -273.41 3501806.16 735013.90 833.04 0.00
Hartha_A)

3150.00 66.80 199.16 2650.65 -2636.59 -809.69 -281.33 3501783.36 735005.98 857.17 0.00
Hartha_B 3163.64 66.80 199.16 2656.03 -2641.97 -821.53 -285.45 3501771.51 735001.87 869.71 0.00
3180.00 66.80 199.16 2662.47 -2648.41 -835.74 -290.38 3501757.30 734996.93 884.75 0.00
3210.00 66.80 199.16 2674.29 -2660.23 -861.80 -299.44 3501731.25 734987.88 912.34 0.00
3240.00 66.80 199.16 2686.11 -2672.05 -887.85 -308.49 3501705.20 734978.83 939.92 0.00
Sadi_A 3257.32 66.80 199.16 2692.93 -2678.87 -902.89 -313.72 3501690.15 734973.60 955.84 0.00
3270.00 66.80 199.16 2697.93 -2683.87 -913.90 -317.54 3501679.14 734969.77 967.50 0.00
3300.00 66.80 199.16 2709.74 -2695.68 -939.96 -326.60 3501653.09 734960.72 995.08 0.00
TD 3318.76 66.80 199.16 2717.13 -2703.03 -956.25 -332.26 3501636.80 734955.06 1012.33 0.00