Professional Documents
Culture Documents
HF0802-H0802D1 WGP
HF0802-H0802D1 WGP
HF0802-H0802D1 WGP
1/
HF0802-H0802D1 Geological Proposal
2. Well Summary
2/
HF0802-H0802D1 Geological Proposal
3. Reservoir Features
The oil bearing area of Hartha A reservoir is 103.8sqkm. Strong heterogeneity is identified
both in reservoir and fluid properties with high GOR volatile oil in the crest area and normal
black oil in the flank.
Average net pay of Hartha A reservoir is 7.7m. Its porosity ranges 8%~32% with averaging
18.3%, while permeability varies between 0.1 mD and 185 mD. Its pore types mainly include
intraparticle pore, moldic pore, intergranular pore and microporosity pore.
Based on wireline logging interpretation, the Hartha A reservoir property (Net
payTVD/Porosity/Sw) of adjacent wells are as follows :
HF081-N081: 10.6m/22.1%/39.8%;
HF0888-M0888D1: 12.1m/22.0%/29.5%;
HF7635-M7635D2: 10.1m/17.8%/46.3%;
HF0726-M0726D5: 11.8m/17.8%/44.7%.
Based on geological model, the prognosis at proposed well: 14.1m/21.7%/36.1%.
3/
HF0802-H0802D1 Geological Proposal
Initial Current
N081 Hartha A 2016.10 36 2,352 3,069 0.16 40 1,451 8,361 0.1 4,164,186
M0967 Hartha A 2019.03 40 1,195 798 0.54 32 647 1,473 0.5 978,947
M0971D1 Hartha A 2022.04 40 1,832 1,204 3.0 40 1,597 1,850 2.1 554,170
H0546H1 Hartha A 2022.04 44 2,425 1,884 0.0 44 2,899 1,205 0.0 1,068,027
4/
HF0802-H0802D1 Geological Proposal
7. Stratigraphic Prognosis
FM Tops (m) FM Estimated FM
Lithological
Formation
feature MDRT TVDSS
Remark Press. Depletion Temp
(psi)/Coef (psi) (OC)
Clay soil, Dominated by claystone, with
Upper claystone, sandstone interbeds. Thin
At surface
Fars sandstone, beds of anhydrite at the
gypseous bottom
Rock salt and silty
Lower Claystone, silty mud,
mudstone,
Fars Anhydrite 1425 -1411 anhydrite and rock salt
Dominated by dolomite and
dolomitic limestone. May have
Dolomite/dolomitic
anhydrite nodules/interbeds.
Jeribe limestone/dolomitic 2937/1.07 120 67-74
Towards the bottom, may have
sandstone dolomitic sandstone.
1938 -1924
Sandstone, Unconsolidated sandstone
Upper claystone interbedded with claystone,
2969/1.07 100 67-74
Kirkuk limestone and limestone/ dolostone at the
dolomite 1944 -1930 bottom.
(Poor consolidated) sandstone
Middle Sandstone, interbedded with
3328/1.11 0 73-78
Kirkuk claystone claystone. May have thin beds
2111 -2095 of limestone/dolostone.
Lower Claystone and Sandstone interbedded with
Kirkuk sandstone 2248 -2220 claystone
Chalky limestone with
Marl, Limestone,
Jaddala alternating marl and with
chalky limestone 2314 -2272 chert at bottom
Aliji Limestone 2748 -2478 Limestone
Limestone at the top, marl in
Shiranish Marl, limestone the middle, bio-clastic
2921 -2546 limestone at the bottom
Dominated by packstone and
Chalky
Hartha A wackestone containing 3505/0.93 850 74-80
limestone 3123 -2626 bioclasts(oil bearing)
TD Limestone 3319 -2703 At Hartha A Limestone
Note: The reference static pressure and MDT pressure are as follows:
Type Well Name Date Tested Formation
JK081D1 2021/6/28 Jeribe
Static pressure JK074D2 2022/8/21 Upper Kirkuk
M0967 2021/7/14 Hartha A
M0726D4 2019/1/23 Hartha A
MDT pressure M0888 2018/7/7 Hartha A
8.TD Criteria
HF0802-H0802D1 is proposed to reach final TD at 3319m MDRT (-2703m TVDSS).
Actual TD may be adjusted depending on real drilling results after communication
between well site geological supervisor (WSG) and subsurface team in town.
5/
HF0802-H0802D1 Geological Proposal
Note: 1. Final casing program should follow the drilling proposal prepared by Operation Department.
Joint communication between well site geologist and drilling supervisor is to be held for real casing
and completion programming during drilling.
2. Effective management and strict quality control for cementing job is required.
6/
HF0802-H0802D1 Geological Proposal
7/
HF0802-H0802D1 Geological Proposal
8/
HF0802-H0802D1 Geological
9 / 21
HF0802-H0802D1 Geological
10 /
HF0802-H0802D1 Geological
11 /
HF0802-H0802D1 Geological
12 /
HF0802-H0802D1 Geological
13 /
HF0802-H0802D1 Geological
14 /
HF0802-H0802D1 Geological
15 /
HF0802-H0802D1 Geological
16 /
HF0802-H0802D1 Geological
17 /
HF0802-H0802D1 Geological
Key Points MD Inc Azi TVD TVDSS NS EW Northing Easting V.Sec Dogleg
(m) (°) (°) (m) (m) (m) (m) (m) (m) (m) (°/30m)
WH 0.00 0.00 0.00 0.00 14.06 0.00 0.00 3502593.05 735287.32 0.00 0.00
KOP 2000.00 0.00 0.00 2000.00 -1985.94 0.00 0.00 3502593.05 735287.32 0.00 0.00
CP (Top
3123.75 66.80 199.16 2640.31 -2626.25 -786.89 -273.41 3501806.16 735013.90 833.04 0.00
Hartha_A)
TD 3318.76 66.80 199.16 2717.13 -2703.03 -956.25 -332.26 3501636.80 734955.06 1012.33 0.00
Note: The trajectory and final TD may be adjusted based on real drilling results, but the actual dogleg of the wellbore trajectory should not be
more than 5o/30m before the holding/tangent section (future ESP setting section) which is about 60m long in order to ensure ESP setting and
smooth running in the future (when necessary).
18 /
HF0802-H0802D1 Geological
19 /
HF0802-H0802D1 Geological
2520.00 66.80 199.16 2402.47 -2388.41 -262.56 -91.23 3502330.49 735196.09 277.95 0.00
2550.00 66.80 199.16 2414.29 -2400.23 -288.61 -100.28 3502304.44 735187.04 305.54 0.00
2580.00 66.80 199.16 2426.11 -2412.05 -314.66 -109.33 3502278.38 735177.98 333.12 0.00
2610.00 66.80 199.16 2437.92 -2423.86 -340.72 -118.38 3502252.33 735168.93 360.70 0.00
2640.00 66.80 199.16 2449.74 -2435.68 -366.77 -127.44 3502226.27 735159.88 388.28 0.00
2670.00 66.80 199.16 2461.56 -2447.50 -392.83 -136.49 3502200.22 735150.83 415.86 0.00
2700.00 66.80 199.16 2473.38 -2459.32 -418.88 -145.54 3502174.17 735141.77 443.44 0.00
2730.00 66.80 199.16 2485.20 -2471.14 -444.93 -154.59 3502148.11 735132.72 471.03 0.00
Aliji 2748.21 66.80 199.16 2492.37 -2478.31 -460.75 -160.09 3502132.30 735127.23 487.77 0.00
2748.34 66.80 199.16 2492.42 -2478.36 -460.86 -160.13 3502132.19 735127.19 487.89 0.00
2760.00 66.80 199.16 2497.02 -2482.96 -470.99 -163.65 3502122.06 735123.67 498.61 0.00
2790.00 66.80 199.16 2508.83 -2494.77 -497.04 -172.70 3502096.01 735114.61 526.19 0.00
2820.00 66.80 199.16 2520.65 -2506.59 -523.10 -181.75 3502069.95 735105.56 553.77 0.00
2850.00 66.80 199.16 2532.47 -2518.41 -549.15 -190.81 3502043.90 735096.51 581.35 0.00
2880.00 66.80 199.16 2544.29 -2530.23 -575.20 -199.86 3502017.84 735087.46 608.94 0.00
2910.00 66.80 199.16 2556.11 -2542.05 -601.26 -208.91 3501991.79 735078.40 636.52 0.00
Shiranish 2920.75 66.80 199.16 2560.34 -2546.28 -610.59 -212.15 3501982.45 735075.16 646.40 0.00
2940.00 66.80 199.16 2567.93 -2553.87 -627.31 -217.96 3501965.74 735069.35 664.10 0.00
2970.00 66.80 199.16 2579.74 -2565.68 -653.37 -227.02 3501939.68 735060.30 691.68 0.00
3000.00 66.80 199.16 2591.56 -2577.50 -679.42 -236.07 3501913.63 735051.25 719.26 0.00
3030.00 66.80 199.16 2603.38 -2589.32 -705.47 -245.12 3501887.57 735042.19 746.84 0.00
3060.00 66.80 199.16 2615.20 -2601.14 -731.53 -254.17 3501861.52 735033.14 774.43 0.00
3090.00 66.80 199.16 2627.02 -2612.96 -757.58 -263.23 3501835.47 735024.09 802.01 0.00
3120.00 66.80 199.16 2638.83 -2624.77 -783.63 -272.28 3501809.41 735015.04 829.59 0.00
3123.31 66.80 199.16 2640.14 -2626.08 -786.51 -273.28 3501806.54 735014.04 832.63 0.00
20 /
HF0802-H0802D1 Geological
CP (Top 3123.75 66.80 199.16 2640.31 -2626.25 -786.89 -273.41 3501806.16 735013.90 833.04 0.00
Hartha_A)
3150.00 66.80 199.16 2650.65 -2636.59 -809.69 -281.33 3501783.36 735005.98 857.17 0.00
Hartha_B 3163.64 66.80 199.16 2656.03 -2641.97 -821.53 -285.45 3501771.51 735001.87 869.71 0.00
3180.00 66.80 199.16 2662.47 -2648.41 -835.74 -290.38 3501757.30 734996.93 884.75 0.00
3210.00 66.80 199.16 2674.29 -2660.23 -861.80 -299.44 3501731.25 734987.88 912.34 0.00
3240.00 66.80 199.16 2686.11 -2672.05 -887.85 -308.49 3501705.20 734978.83 939.92 0.00
Sadi_A 3257.32 66.80 199.16 2692.93 -2678.87 -902.89 -313.72 3501690.15 734973.60 955.84 0.00
3270.00 66.80 199.16 2697.93 -2683.87 -913.90 -317.54 3501679.14 734969.77 967.50 0.00
3300.00 66.80 199.16 2709.74 -2695.68 -939.96 -326.60 3501653.09 734960.72 995.08 0.00
TD 3318.76 66.80 199.16 2717.13 -2703.03 -956.25 -332.26 3501636.80 734955.06 1012.33 0.00
21 /