You are on page 1of 3

Vaigai Dam Bund D/S

TO WTP U/S D/S TO HEADWORKS

Vaigai Dam Bund


U/S

PLAN

End Cross Beam

DOWN STREAM SIDE UP STREAM SIDE


Location:
SIPHON AQUDECT CROSSING AT VADIPATI PUTHUR

Nature of work:
Scheme for Madurai Municipal Corporation
from Mullai Periyar River at Lower camp including Head works,Raw
water pipe line-period of completion 30 months followed by 6 months
trial and commissioning - package I
Project Title:
CROSS SECTION AT
DEDICATED WATER SUPPLY SCHEME FOR MADURAI
CROSS SECTION AT TRANSVERSE DIRECTION
CORPORATION FROM MULLAI PERIYAR RIVER-PACKAGE - I
LONGITUDINAL DIRECTION
Drawing Title:
ALIGNMENT PLAN,LONGITUDINAL & CROSS SECTION
Client:
MADURAI CORPORATION
ARIGNAR ANNA MAALIGAI,
MADURAI - 625 002

Contractor
The Indian Hume Pipe Co. Ltd.
.\WhatsApp Image 2022-04-11 at 10.22.58 AM.jpeg
Construction House,
APPROVED BY:- 5, Walchand Hirachand Marg,
Mumbai - 400 001, India.
All Dimensions are in "mm" unless otherwise specified
Scale : NTS
Date :

Good for Construction Drawing


Drawn
Checked
17000MM

16# - 8 Nos 16# - 8Nos 16# - 8Nos

SFR-12# - 3Nos EF

a2 - 8460
2L - 8 Ø 150mm C/C
1100

a1 - 4230 a1 - 4230
2L - 8 Ø 150mm C/C 2L - 8 Ø 150mm C/C
END CROSS
BEAM

0.25L - 4230 12# - 2Nos 0.25 L - 4230


12# - 2Nos 25# - 12Nos 12# - 2Nos

25# - 12Nos 25# - 12Nos END CROSS


BEAM
LONGITUDINAL BEAM DETAIL OF 17000 SINGLE SPAN BEAM (LB1)

16# - 8 Nos 16# - 8 Nos


16# - 4 Nos 16# - 4 Nos
Face Equally Spaced

Face Equally Spaced


12Ø - 3 Nos on Each

12Ø - 3 Nos on Each

Face Equally Spaced

Face Equally Spaced


12Ø - 2 Nos on Each

12Ø - 2 Nos on Each


1100

1100

2L - 8Ø 150mm C/C 2L - 8Ø 150mm C/C

850

850
2L - 8Ø 150mm C/C 2L - 8Ø 200mm C/C
Location:
SIPHON AQUDECT CROSSING AT VADIPATI PUTHUR

12# - 2 Nos 12# - 2 Nos

Nature of work:
Scheme for Madurai Municipal Corporation
16# - 4 Nos 16# - 4 Nos from Mullai Periyar River at Lower camp including Head works,Raw
25# - 12 Nos 12# - 6 Nos 400 400 water pipe line-period of completion 30 months followed by 6 months
600 600 trial and commissioning - package I
SUPPORT SPAN MID SPAN
SUPPORT SPAN MID SPAN Project Title:
DEDICATED WATER SUPPLY SCHEME FOR MADURAI
LONGITUDINAL BEAM (LB1) END CROSS BEAM CORPORATION FROM MULLAI PERIYAR RIVER-PACKAGE - I
Drawing Title:
ALIGNMENT PLAN,LONGITUDINAL & CROSS SECTION
Client:
MADURAI CORPORATION
ARIGNAR ANNA MAALIGAI,
MADURAI - 625 002

Contractor
The Indian Hume Pipe Co. Ltd.
.\WhatsApp Image 2022-04-11 at 10.22.58 AM.jpeg
Construction House,
APPROVED BY:- 5, Walchand Hirachand Marg,
Mumbai - 400 001, India.
All Dimensions are in "mm" unless otherwise specified
Scale : NTS
Date :

Good for Construction Drawing


Drawn
Checked
3500
M30 : Fe500 , COVER = 50mm
WALL C-1 2400

850
0M

750 2450
LINKS
TO
T8 @ 300

850
3M

750

T25
DETAILS OF FOOTING WITH
2400
COLUMN
30-T25

COLUMN MARKED C1

#10@ 200mmc/c

2400 #10@ 200mmc/c

400 #16 @ 250mmc/c


900
500
#16 @ 250mmc/c

3500
Section A - A
Footing(F1) on hard rock soil

#10 - 200mmc/c
3500
#10 - 200mmc/c
1500

2 L 8# - 8nos Bed Block


12# 4 Nos R538
Half Plan Top Location:
10#@150 c/c SIPHON AQUDECT CROSSING AT VADIPATI PUTHUR
350

2450
Nature of work:
Scheme for Madurai Municipal Corporation
A A
200

from Mullai Periyar River at Lower camp including Head works,Raw


water pipe line-period of completion 30 months followed by 6 months
Half Plan Bottom trial and commissioning - package I
Project Title:
DEDICATED WATER SUPPLY SCHEME FOR MADURAI
10# - @200 C/C CORPORATION FROM MULLAI PERIYAR RIVER-PACKAGE - I
#16 @ 250mmc/c
#16 @ 250mm c/c Drawing Title:
ALIGNMENT PLAN,LONGITUDINAL & CROSS SECTION
REINFORCEMENT DETAILS OF PIPR SADDLE Client:
MADURAI CORPORATION
FOR (17M SPAN) SINGLE SPAN Plan view ARIGNAR ANNA MAALIGAI,
(in cross section) FOOTING (F1) on hard rock soil MADURAI - 625 002

Contractor
The Indian Hume Pipe Co. Ltd.
.\WhatsApp Image 2022-04-11 at 10.22.58 AM.jpeg
Construction House,
APPROVED BY:- 5, Walchand Hirachand Marg,
Mumbai - 400 001, India.
All Dimensions are in "mm" unless otherwise specified
Scale : NTS
Date :

Good for Construction Drawing


Drawn
Checked

You might also like