Operating manual

TSC 1

english
Contents
1. Safety ..................................................................................4

2. Description .........................................................................5
2.1 Intended use ........................................................................6
2.2 Technical data .....................................................................7

3. Setting work .......................................................................9


3.1 Changing the speed.............................................................9
3.2 Selecting rollers .................................................................10
3.3 Install handles....................................................................11
3.4 Set up cable carrier (optional) ...........................................12
3.5 Pedestal for the TSC 1 ......................................................14

4. Operation ..........................................................................15
4.1 Switching the machine on and off......................................16
4.2 Working with the TSC 1 .....................................................17

5. Maintenance .....................................................................19
5.1 Lubricate rollers .................................................................20
5.2 Change rollers ...................................................................21
5.3 Replace guard plate...........................................................23
5.4 Replace stripping plate ......................................................24
5.5 Cleaning the tool................................................................25

6. Original accessories and wearing parts........................26

Guarantee

Spare parts list

Addresses

TSC1_E569EN_04.DOC 3
1. Safety

USA/CAN ¾ Before putting the machine into service, read the operator's
manual and the safety information (mat. no. 1239438) in its
entirety and carefully follow the instructions given.

Other countries ¾ Before putting the machine into service, read the operator's
manual and the safety information (mat. no. 125699) in its
entirety and carefully follow the instructions given.
¾ Comply with the safety regulations in accordance with DIN
VDE, CEE, AFNOR as well as any other regulations that apply
in the individual countries.

Risk of fatal injury from electric shock!


¾ Pull the plug from plug socket before undertaking any
maintenance work at the machine.
Danger ¾ Check the plug, cable and machine for damage each time
before using the machine.
¾ Keep the machine dry and do not operate it in damp rooms.
¾ Lift the cable up with suitable tools (e.g. with an optional
cable carrier).

Risk of injury due to improper handling!


¾ Wear safety glasses, hearing protection, protective gloves
and work shoes when working at the machine.
Warning ¾ Do not insert the plug unless the machine is switched off.
After use, pull out the mains plug.
¾ Keep hands away from the processing line of the machine.
¾ Hold the machine with both hands on the handles.

Damage to property due to improper handling!


Machine will be damaged or destroyed.
¾ Do not use the power cable to carry the machine.
Caution
¾ Remove machine and cable carrier before changing pallets.
¾ Do not insert machine upside-down or horizontally.
¾ Have servicing and inspections of hand-held electric tools
carried out by a qualified specialist. Only use original
accessories provided by TRUMPF.

4 Safety TSC1_E569EN_04.DOC
Risk of injury from falling machinery!
¾ After cleaning hold the machine by the handles.

Warning

2. Description

1
3

4
6

6 7

1 Handles 4 Gearbox 6 Grease nipples


2 Motor 5 Tool 7 Guide shoe
3 Turning handle
Fig. 44815

TSC1_E569EN_04.DOC Description 5
2.1 Intended use

Risk of injury!
¾ Use machine only for the processing and materials that are
described under "Correct use".
Warning

The TRUMPF Slat Cleaner TSC 1 is an electric hand tool used for
the following applications:
• Removing the slag on the slats of laser flatbed machines.
• Cleaning installed slats in upright position.
• Cleaning slats made of steel, stainless steel, and copper.

6 Description TSC1_E569EN_04.DOC
2.2 Technical data

Other countries USA

Value Value Value Value

Voltage 230 V 120 V 100 V 120 V

Frequency 50/60 Hz 50/60 Hz 50/60 Hz 50/60 Hz

Max. slag application (See Fig. 52411, (See Fig. 52411, (See Fig. 52411, (See Fig. 52411,
Total width p. 8) p. 8) p. 8) p. 8)

Slat thickness
With no. 3 flat rollers (standard) 3-3.9 mm 3-3.9 mm 3-3.9 mm 0.12-0.15 in
With no. 2 flat rollers (optional) 2-2.9 mm 2-2.9 mm 2-2.9 mm 0.08-0.12 in

Working speed 10 m/min 10 m/min 10 m/min 32 ft/min

Nominal power consumption 1400 W 1200 W 1000 W 1200 W

Idle speed 150/min 150/min 150/min 150/min

Weight 13 kg 13 kg 13 kg 28.7 lbs

Safety class II II II II

Technical data Table 1

TSC1_E569EN_04.DOC Description 7
Maximum slag application Slag application is affected by the following factors:
• The laser power at the laser flatbed machine.
• The laser machining with or without nitrogen.
• Proportion of cut Cr steels.
Depending on the composition of these factors, slags of different
widths can be cut away (see following diagram).

Fig. 52411en

Noise and vibration Measured values in accordance with


EN 60745
A-class sound pressure level Typically 84 dB (A)
A-class acoustic power level Typically 85 dB (A)
Hand-arm vibration Typically less than or equal to 8.3 m/s²
Measured noise and vibration values Table 2

Note
The measured values specified above may be exceeded while
working.

8 Description TSC1_E569EN_04.DOC
3. Setting work

3.1 Changing the speed

6
1 Setting wheel for speed
controller at motor
Fig. 27948

¾ Always set the setting wheel for the speed controller on the
motor to level 6.

TSC1_E569EN_04.DOC Setting work 9


3.2 Selecting rollers

Damage to property due to the wrong roller selection!


The cleaning power is greatly reduced and the machine
becomes overloaded.
Caution ¾ Use suitable rollers only.

Depending on the thickness of the slats, certain rollers must be


selected:

Slat thickness Roughing-down roller Flat roller (rear)


(front)

2.0 - 2.9 mm

(Order no. 1339325) (Order no. 1382978)

3.0 - 3.9 mm

(Order no. 1339325) (Order no. 1335366)

Table 3

10 Setting work TSC1_E569EN_04.DOC


3.3 Install handles

1(2x)

2(4x) 3

1 Upper screws 3 Direction of movement


2 Lower screws
Fig. 45451

1. Position the handles in the direction of movement


(see Fig. 45451, p. 11).
2. Install and tighten upper screws (1).
3. Install and tighten lower screws (2).

TSC1_E569EN_04.DOC Setting work 11


3.4 Set up cable carrier (optional)

Damage to property due to improper handling!


Cable carrier is damaged.
¾ Do not put a load on a completely extended telescopic rod.
Caution Always push the part piece at least 10 cm into each other.

1 2

1 TSC 1 2 Cable carrier


Fig. 45452

1. Fasten the base plate to the plate frame with two screw
clamps.
2. Extend telescopic rod to the required length.
3. Attach the extension cord to the telescopic rod.
4. Make a loop in the electric cord to hang it up.

12 Setting work TSC1_E569EN_04.DOC


5. Hang the loop on the carabiner.

Loop on the carabiner Fig. 44195

6. Connect the machine to the extension cord and place it on the


pallet.
7. Set up telescopic rod.

Note
The length of cable between the hook and the machine must be
slightly taut.

TSC1_E569EN_04.DOC Setting work 13


3.5 Pedestal for the TSC 1

The TSC 1 can be installed in the pedestal to store the machine


safely. This pedestal can also be mounted on the wall.

TSC 1 with pedestal Fig. 52377

14 Setting work TSC1_E569EN_04.DOC


4. Operation

Risk of injury due to improper handling!


¾ Make sure the machine is always in a stable position when
operating it.
Warning ¾ Keep hands away from the processing line of the machine.

Risk of possible injury from cable damage!


Electric shock
¾ Do not bring the cable near the roller.
Warning

Damage to property due to high power-supply voltage!


Motor damage.
¾ Check the power supply voltage. The power-supply voltage
Caution must correspond to the information on the nameplate of the
machine.

The following pictograms are displayed on the pedestal for safe


use of the TSC 1:

Observe maximum slag thickness (see Fig. 52411, p. 8).

After each pallet has been cleaned, the roller bearings must be
relubricated with lubricating grease "G1".

If there is a loud rasping noise, the machine is overloaded. Switch


it off immediately!

The TSC 1 must not be inserted upside down or horizontally.

Tip
Frequent cleaning with little slag application protects the machine.

TSC1_E569EN_04.DOC Operation 15
Electromagnetic The appliance may switch off prematurely when affected by
interference electromagnetic interference. The appliance will resume operation
when the faults have been cleared.

Motor overload If the motor temperature is too high, the motor will switch off. The
protection red indicator light (LED) with the motor lights up.
¾ Allow the machine to run in idle until it has cooled down.

The machine can be operated again normally after it has cooled


down.

4.1 Switching the machine on and off

1 On/Off switch
Fig. 45458

Switch on TSC 1 ¾ Move the On/Off switch downwards.

Switch off TSC 1 ¾ Move the On/Off switch upwards.

16 Operation TSC1_E569EN_04.DOC
4.2 Working with the TSC 1

Fig. 44820

Condition
• Two people are required for the cleaning.

1. Switch machine on.


2. Place machine on a slat.

Note
The cleaning can be performed parallel to the laser processing.

3. Move the machine from side of the beam to the other side.

1 2 3 2 1

1 Machine backgauge 2 Crossbeam 3 Travel sequence


Fig. 45453

TSC1_E569EN_04.DOC Operation 17
Travel over crossbeams 4. To overcome the crossbeams, make a see-saw motion with
the machine.
Turn the machine 5. To turn the machine after cleaning a beam, take hold of the
machine by the front handle.

Turn the machine Fig. 45455

6. With your free hand grab the turning handle and turn the
machine around its own axis.

Information
• Always turn the machine in alternating directions so that the
cable does not get twisted.
• For machines with a pallet changer, the scraps of slag must be
removed from the frame after cleaning.

What to do in case of Reasons why the machine could be overloaded:


excess load • Bent slats.
• Waste pieces after cutting.
• Overly wide slag application.
• Overly hard/tough slag.

The machine has an excess load coupling. In case of increased


load (e.g. blocked rollers) it makes a noise and starts to slip.

If the machine is jammed:


1. Briefly shake the machine by both handles until the jam is
cleared.
2. If the machine cannot be cleared, switch off the motor after 5 s
at the latest.
3. Remove machine from the slats.

18 Operation TSC1_E569EN_04.DOC
5. Maintenance

Risk of injury due to repair work not being carried out


properly!
Machine does not work properly.
Warning ¾ Repair work may only be carried out by a qualified technician.

Damage to property due to insufficient lubrication!


¾ When lubricating the machine observe the maintenance
intervals.
Caution

Maintenance point Procedure and interval Lubricant Lubricant order no.


Rollers After each pallet has been cleaned, Lubricating grease "G1" 0139440 (900 g)
the roller bearings must be relubri- 1446686 (250 g)
cated with lubricating grease "G1".
Rollers Replace as necessary - -
Guard plates Align in case of deformation - -
Guard plates Replace as necessary - -
Stripping plates Replace as necessary - -
Tool Check the interspaces of the tool - -
for dirt and clean if necessary.
Table 4

TSC1_E569EN_04.DOC Maintenance 19
5.1 Lubricate rollers

After each pallet has been cleaned, the roller bearings must be
relubricated with lubricating grease "G1".

1 2

1 Grease gun 2 Grease nipple


Fig. 44818

1. Lubricate rollers over grease nipples (2) on both sides of the


machine with the grease gun (1).
2. Fill the grease nipples until no more grease fits.

20 Maintenance TSC1_E569EN_04.DOC
5.2 Change rollers

Maintenance interval: as needed.

1
1

1 Grease nipples (4x) 3 Guide shoe


2 Rollers 4 Screws
Fig. 44816

1. Undo the screws (4) on the guide shoe.


2. Remove guide shoe (3).
3. Pull out rollers (2).

Note
The rollers can also be pulled out using the threading on the
grinding surface.

TSC1_E569EN_04.DOC Maintenance 21
1

1 Roughing-down rollers 3 Stripping plate


2 Flat rollers
Guide shoe Fig. 45456

4. Install roughing-down rollers (1) (large diameter) in front in the


direction of movement.
5. Install flat rollers (2) (small diameter) behind.

Note
Fasten the guide shoe with the new screws included in the
delivery.

22 Maintenance TSC1_E569EN_04.DOC
5.3 Replace guard plate

1
(5x)

1 Screws 2 Guard plate


Fig. 48506

1. Undo the screws on the guard plate.


2. Replace guard plate.
3. Repeat for the other side of the guide shoe.

TSC1_E569EN_04.DOC Maintenance 23
5.4 Replace stripping plate

1 Screws 2 Stripping plate


Fig. 44819

¾ Undo screws and replace stripping plate.

24 Maintenance TSC1_E569EN_04.DOC
5.5 Cleaning the tool

Maintenance interval: as needed.

1 Spring assembly 3 Tool


2 Guide shoe with rollers
Fig. 52815

1. Loosen screws on the guide shoe.


2. Remove guide shoe and rollers (2).
3. Loosen and remove screws on the spring assemblies (1).
4. Swivel up the clamp body on the tool (3).
5. Clean the interspaces of the tool with a cloth.
6. Reinstall the spring assemblies and tighten the screws as far
as they will go.

Note
When installing the spring assemblies, make sure the spring
elements are aligned correctly (see spare parts list).

7. Reinstall rollers and guide shoe.

TSC1_E569EN_04.DOC Maintenance 25
6. Original accessories and wearing parts

TSC 1 Supplied original Wearing parts Options Order no.


accessories
Stripping plate + + 1355175
Flat roller no. 2 + + 1382978
Flat roller no. 3 + + 1335366
Roughing-down roller + + 1339325
Pedestal + 1443533
Screwdriver + 0369003
Guard plate:
– Left + + 1355174
– Right + + 1355173
Grease gun + 1369906
Lubricating grease "G1" + 1446686
can (250 g)
Lubricating grease "G1" + 0139440
can (900 g)
Cable carrier + 1358686
Table 5

Ordering original parts and To ensure the correct and fast delivery of original parts and
expendable parts wearing parts:

1. Specify the order number.


2. Enter further order information:
– Voltage data
– Quantity
– Machine type
3. Provide complete shipping information:
– Correct address
– Desired delivery type (e.g. air mail, courier, express mail,
ordinary freight, parcel post).
4. Send the order to your TRUMPF representative. Refer to the
address list at the end of the document for TRUMPF service
addresses.

26 Original accessories and wearing parts TSC1_E569EN_04.DOC

You might also like