Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

0.

10

0.61

0.04

SECTION ELEVATION
TO BE CHIPPED

0.75 0.61
0.10
0.04
0.61

0.04 TO BE CHIPPED

TO BE CHIPPED
3.00

2.13

0.71 0.57

0.04

ELEVATION
SECTION CEMENT PLASTERED
0.04

W/ CONCRETE EPOXY
0.71

0.71 0.57
0.61
CEMENT PLASTERED
W/ CONCRETE EPOXY

CEMENT PLASTERED
3.00
W/ CONCRETE EPOXY
2.17
0.04

PROPOSED
NTS

PROJECT TITLE: PREPARED BY: ARCHITECT : SUBMITTED BY: RECOMMENDING APPROVAL: RECOMMENDING APPROVAL: APPROVED: SHEET NO.
D NG M A DEPARTMENT OF ENGINEERING & PUBLIC WORKS
SO Y
G

NI

CITY ENGINEER'S OFFICE


LU N

LA

CONSTRUCTION OF SAN SEBASTIAN


DESIGNING DIVISION RESIDENCES CAD BY:
PI
LIP I N A S REYNALDO QUIMLAT GECILLE R. MALLILLIN PEPITO D. BALMORIS ARMANDO L. ANDRES FRANCISCO "ISKO MORENO" DOMAGOSO
CITY OF MANILA
LOCATION: ALVAREZ STREET & QUIRICADA STREET, STA. CRUZ, MANILA ARCHITECT ENGINEER III OIC, DESIGNING DIVISION CITY ENGINEER CITY MAYOR

You might also like