Date :

Project : PROPOSED BULACAN TOWN CENTER - MALL


Location : McArthur Highway, Brgy. Bulihan, Malolos , Bulacan
Subject S CURVE

DESCRIPTION Duration Start Finish M1 M2 M4 M5

I General Requirements
A Mobilization lot -
B Temporary Facilities
1. Conference Room lot -
2. Site Offices including RLC Leasing lot -
3. Owner & CM quarters lot -
4. Warehouse lot -
5. Staging Area lot -
6. Temporary Fence / Board-ups lot -
7. Temporary Plants, storage, workshops lot -
C Temporary Utilities -
1. Temporary Power Supply & Fixtures (with provision for other lot -
trade contractors) -
2. Lighting ( All Areas) lot -
3. Water lot -
4. Toilets lot -
5. Telephone / Communication / Internet lot -
D Site Safety, Protective nets/Deflectors, Security, Health & Sanitation lot -
E Housekeeping & Adequate Protection for completed works lot -
F Daily disposal of const. debris / waste to include other contractors / OSM lot -
G Preparation of construction / contract documents lot -
1. coordination (e-file/hard copy) plans, shop drawings lot -
2. shop drawings, RFAs, RFIs lot -
3. as built drawings lot -
H Project meetings & conferences lot -
I Supervision & coordination lot -
J Material Testing (conc specimen, rebars, chb, FDT, and others called lot -
for in the specs) -
K Project ID and Signages lot -
L Contract Close out (processing / documentation) lot -
M Service Equipment, tools, vehicles lot -
N Demobilization lot -
O General Professional Cleaning (Prior to Mall Opening) lot -
P Accelerograph lot -
Q Other items (specify)

Bid Breakdown_RPLaUnion_CSA
Page 1/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

TOTAL FOR GENERAL REQUIREMENTS


II Permits, Bonds and Clearances
A Surety Bond lot -
B Performance Bond lot -
C Guarantee Bond lot -
D Contractor's All Risk Insurance (CARI) lot -
E Barangay Permit lot -
F Building Permit lot -
G Occupancy Permit lot -
H Locational Clearance lot -
I Other Local Government Permits / Clearances lot -
J Contractor's Tax lot -
K Other items necessary
TOTAL FOR BONDS & INSURANCES
III Site Development Works
A. Perimeter Fence
1. Staking and Lay-out lot -
2. Structural Excavation m³ -
3. Excavated soil Disposal m³ -
4. Backfilling & Compaction m³ -
5. Gravel bed m³ -
6. Footings
a. Formworks m² -
b. Rebars kgs -
c. Concrete m³ -
7. 150mm CHB m² -
8. Lintel beams / Stiffener Concrete columns m² -
9. CHB Rebars, Gr 40 kgs -
10. Tool Joint Finish m² -
11. Painting of fence m² -
12. Night Gate
13. Other Items necessary

B. Driveway & Sidewalk


1. Staking and Lay-out lot -
2. Clearing of Site lot -
3. Removal / excavation of soft soil (Approximately 1000mm depth) m³ -
4. Disposal of unsuitable soil / soft soil m³ -
5. Earthfill and compaction m³ -
6. Subgrade Preparation m³ -
7. Gravel base m³ -
8. Forms
i. Sidewalk m² -
Bid Breakdown_RPLaUnion_CSA
Page 2/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

ii. Curbs & gutter m² -


iii. Driveway m² -
9. Rebars
i. Sidewalk kgs -
ii. Curbs & gutter kgs -
iii. Driveway kgs -
10. Concrete
i. Sidewalk m³ -
ii. Curbs & gutter m³ -
iii. Driveway m³ -
11. Broom finish of driveway, sidewalk & ramp m² -
12. Paver floor tiles m² -
13. Finishing of curbs & gutter lm -
14. Traffic paint lm -
15. Concrete wheel guards sets -
16. Bollards sets -
17. Trench Gratings lm -
18. Stainless Railings lm -
19 Plantboxes lm -
20. Other Items necessary

C. Drainage System
1. Catch Basin sets -
2. Reinforced Concrete Pipes lm -
3. CB/CIM -
4. CB/AD -
5. Tapping to existing drainage lot -
6. Other Items necessary

Sub - Total Site Devt. And Earth Works


IV Civil & Structural
A Site works
1 Staking and Lay-out (including independent survey of the lot) lot -
2 Clearing of Site m³ -
3 Scraping m³ -
4 Structural Excavation m³ -
5 Excavated soil Disposal (including cleaning system) m³ -
6 Backfilling & Compaction m³ -
7 Earthfill (Building area) m³ -
8 Soil Poisoning/Anti-termite reticulation m² -
8 Gravel Bedding m³ -
9 Dampproofing m² -
10 Cutting & Asphalt Sealant
Bid Breakdown_RPLaUnion_CSA
Page 3/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

11 Temporary Fence inc frames / supports m² -


12 Disposal of Debris lot -
13 Pile Hacking pcs -
14 Other Items necessary

Sub - Total Site Works


B Formworks ( Including accessories )
1 Pile Caps m² -
2 Grade beams m² -
3 Concrete Walls m² -
4 Columns m² -
5 Slabs on grade m² -
6 Suspended Slabs, (including roof slab ) m² -
7 Beams / Girders m² -
8 Roof Beams m² -
9 Stairs m² -
10 Concrete Ramps m² -
11 MEP Equipment pad (incl. Cooling tower pedestal) m² -
12 Grease Tank / Oil interceptors for genset & machine room m² -
13 Cistern/Fire Tank m² -
14 Sewage Treatment Plant m² -
15 Fuel Storage Tank m² -
16 Wall footing m² -
17 Concrete gutter m² -
18 Parapet m² -
19 Trench at Loading Dock m² -
20 Pylon m² -
21 Other items called for in the plans & specs m² -

Sub - Total Formworks


C Reinforcing Steel Bars
1 Pile Caps kgs -
2 Grade beams kgs -
3 Concrete Walls kgs -
4 Columns kgs -
5 Slabs on grade kgs -
6 Suspended Slabs, (including roof slab ) kgs -
7 Beams / Girders kgs -
8 Roof Beams kgs -
9 Stairs kgs -
10 Concrete Ramps kgs -
11 MEP Equipment pad (incl. Cooling tower pedestal) kgs -

Bid Breakdown_RPLaUnion_CSA
Page 4/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

12 Grease Tank / Oil interceptors for genset & machine room kgs -
13 Sump / Sewage Pits kgs -
14 Cistern/Fire Tank kgs -
15 Sewage Treatment Plant kgs -
16 Fuel Storage Tank kgs -
17 Wall footing kgs -
18 Concrete gutter kgs -
19 Parapet kgs -
20 Pylon kgs -
21 Trench at Loading Dock kgs -
22 Other items called for in the plans & specs -

Sub - Total Reinforcing Steel Bars


D Concrete Works
1 Pile Caps m³ -
2 Grade beams m³ -
3 Concrete Walls m³ -
4 Columns m³ -
5 Slabs on grade m³ -
6 Suspended Slabs, (including roof slab ) m³ -
7 Beams / Girders m³ -
8 Roof Beams m³ -
9 Stairs m³ -
10 Concrete Ramps m³ -
11 MEP Equipment pad (incl. Cooling tower pedestal) m³ -
12 Grease Tank / Oil interceptors for genset & machine room m³ -
13 Sump / Sewage Pits m³ -
14 Cistern/Fire Tank m³ -
15 Sewage Treatment Plant m³ -
16 Fuel Storage Tank m³ -
17 Wall footing m³ -
18 Concrete gutter m³ -
19 Parapet m³ -
20 Pylon m³ -
21 Trench at Loading Dock m³ -
22 Other items called for in the plans & specs

Sub - Total Concrete Works


E Metal/Steel works ( Including accessories )
1 Trusses kgs -
2 Purlins kgs -
3 Anchor bolts (specify sizes) pcs -

Bid Breakdown_RPLaUnion_CSA
Page 5/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

4 Bottom Chord Strut kgs -


5 Lateral Braces kgs -
6 Angle Bar/Sag rods, connectors and other accessories kgs -
7 Billboard Frames sets -
8 Plates, Anchors etc for billboard frames kgs -
9 50mmØ BI pipe wall mounted handrail sets -
10 3-20mmØ railings in enamel finish (Stairs 1)
11 Canopy frames kgs -
12 Power Center / MECO Stairs lot -
13 PWD ramp railings - 50mmØ SS railings sets -
14 PWD wall mounted railings sets -
15 Delivery ramp railings sets -
16 Manhole covers sets -
17 SS Ladder rungs sets -
18 Angle bar nosing lm -
19 Brass nosing lm -
20 Steel trench gratings sets -
23 Building ID Frame kgs -
24 Pylon Steel Framing kgs -
25 Other items to complete / called for in the plans & specs

Sub - Total Steel & Metal Works


F Masonry Works (exterior/perimeter & below grade walls)
1 150mm CHB m² -
2 100mm CHB m² -
3 Lintel beams / Stiffener Concrete columns lm -
4 Rebars, Gr 40 kgs -
Rebars, Gr 60 kgs -
5 CHB Wall Top support, anchoring to slab/beam lm -
6 Precast Wall m² -
7 Other items called for in the plan & specs
zocallo lm -

Sub - Total Masonry Works


G Miscellaneous Works
1 Construction and Expansion Joints lm -
2 Water stop lm -
3 Rubber & Wheel Bumper @ Loading Dock lm -
4 Column guards lm -
5 Conduiting of Grounding System lgt -
5 Other items called for in the plans & specs

Bid Breakdown_RPLaUnion_CSA
Page 6/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

Sub - Total Miscellaneous


H Thermal & Moisture Protection
1 Ga.24 Preformed Prepainted High Rib Long-span m² -
Flourocarbon polymer coated G.I. roofing
2 Roofing accessories (end cap, end/wall flashings, ridge rolls, bird stop etc.) lot -
3 Ga.24 Stainless Gutter on metal support lm -
4 Vandex Super Capilliary (STP, Cistern & Water Tanks) lm -
5 Epoxy Tank Lining (Cistern) m² -
Elastomeric Fluid Applied (Exterior Wall & R.C. Gutter) -
6 Exposed/Outdoor Type Polyurethane (Decks & Exposed Parking) m² -
7 Cementitious Capillary m² -
Flexible Cementitious Capillary
8 3.5kg. Mineral Polybond Torch-on (Toilerts and AHU m² -
9 Vandex Super Capilliary (Grease, Fuel storage, filter Tanks) m² -
10 Caulking & Sealing
a Expansion Joints lot
b Exterior sealants (Doors, windows, louvers etc) lot
11 Other items called for in the plans & specs

Sub - Total Thermal & Moisture Protection


TOTAL FOR CIVIL/STRUCTURAL WORKS
V Architectural Finishing Works
A. Finishes
1 Floor Finishes
a Plain Cement w/ Hardener/Dustproofing m² -
b Plain Cement w/ Hardener m² -
c Plain Cement w/ Epoxy Floor Coating Smooth Finish m² -
d Plain Cement w/ Epoxy Floor Coating Rough Finish m² -
e Concrete Broom Finish m² -
f Concrete Broom Finish w/ 10mm Grooves - m² -
g. 200x1200mm Soho Wood Design Polished Porcelain tile m² -
h 300x600mm Polished Homogenous Tiles m² -
i 600x600mm Polished Homogenous Tiles m² -
j 600x600mm Matte Homogenous Tiles m² -
k 100x100mm Paver Tile m² -
l 300x300mm Vitrified Non-Skid Ceramic Floor Tiles m² -
m Bare Concrete Slab m² -
n 600x600mmx4mm thk. Vinyl Floor Tiles m² -
o Straight to finish Poured Concrete m² -
p Hexagonal shape Porcelain tiles m² -
r 6mm thk. Broadloom Carpet w/ 12mm thk. Carpet underlay w/ m² -
aluminum edge termination & "TSOKITURA" Nosing strip w/

Bid Breakdown_RPLaUnion_CSA
Page 7/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

rubber inset in all steps and anti-microbil treatment.


2 Wall Finishes
a Plain Cement Plastered Finish m² -
b Bare CHB Wall Finish (Tooled Joint)
c Aluminum Composite Panel (ACP) 4mm thk. m² -
d 600x600mm Polished Homogenous Tiles m² -
e 300x600mm Polished Porcelain Wall Tiles m² -
f 575x286mm Polished Ceramic Wall tiles m² -
g. Half-Therm EIFS w/ 25x50mm PVC U-shape Groves m² -
h Full-Therm EIFS w/ 25x50mm PVC U-shape Groves m² -
i Direct Applied EIFS m² -
j Fiber Cement Board on Standard Metal Framing m² -
k Gypsum Wall Finish on Standard Metal Framing m² -
l Veneer Wall Cladding on 2-6mm Marine Plywood Backing m² -
m Laminate Wall Cladding on 20mm Marine Plywood Backing m² -
n 150mmx300mm Thk. Black Granite m² -
o PVC wall panels m² -
p "Walls in Motion" w/ 150mm thk. 60kg density Rockwool insulation m² -
q 100mm high S/S Ga24 Baseboard hairline finish m² -
r Wall Slab at Ticketing Booth m² -
3 Ceiling Finishes
a Poured Concrete m² -
b Poured Concrete off Form (Rubbed Concreting of Formworks Joint) m² -
c 12 mm thk Water Resistant Gypsum Board Painted Finish m² -
d 12mm thk. Fire Resistant Gypsum Board m² -
e 12mm thk. Gypsum Board Painted Finish m² -
f 6mm thk Ficem Board Ceiling m² -
g. 600x600mm Acoustic Tile ceiling m² -
h Ceiling Cove m² -
i Ceiling Manhole m² -
j Ceiling Accent (Common Hallway) lot -
k Ceiling Accent (Food Court) lot -
3 Painting Works
a. Masonry painting
Interior Wall m² -
Exterior Wall m² -
b. Ceiling Painting m² -
c. Metal Painting (incl. Metal doors) m² -
d. Drywall Painting m² -
e. Railing Painting m² -
f. Directional Traffic Signs lot -
g. Yellow Reflectorized Paint m² -

Bid Breakdown_RPLaUnion_CSA
Page 8/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

h Other items called for in the plans & specs m² -


4 Other Finishes
a. Escalator Cladding (ACP) m² -
b. Drop wall (Atrium) m² -
c. Toilet
Toilet Partition sets -
Urinal Partition sets -
Quartz Stone Granite Countertop m² -
Facial Mirror m² -
Built-up Facial Mirror m² -
Full Height Mirror m² -
PWD Grab Bar
d. Billboard, Logo & Exterior Façade lot -
e. Tenant Board-up (Drywall and Painting) m² -
f. Cinema Signage sets -
g. Snack Bar Front & Back Counter and Signage overhead Built-up lot -
h. Snack Bar and Ticketing Signage lot -
i. Ticketing Counter lot -

Sub - Total A Finishes


B Doors and Windows

1 GD-01 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
2 GD-02 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
3 GD-04 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
4 GD-05 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
5 GD-06 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
6 W-1 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
7 W-2 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
8 W-3 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
9 W-4 12mm thk. tempered glass on standard aluminum frame in sets -

Bid Breakdown_RPLaUnion_CSA
Page 9/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

powder coat finish


10 W-5 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
11 W-6 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
12 W-7 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
13 W-8 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
14 W-9 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
15 W-10 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
16 RUD-1 Ga. 18 Galvalume motorized roll-up door sets -

17 RUD-2 Ga. 18 Galvalume motorized roll-up door sets -

18 RUD-2 Ga. 18 Galvalume motorized roll-up door sets -

19 RUD-5 Ga. 18 Galvalume motorized roll-up door sets -


20 SD-1 sets -
21 SD-2 sets -
22 SD-2a sets -
23 SD-3 sets -
24 SD-4 sets -
25 SD-5 sets -
26 SD-6 sets -
27 SD-7 sets -
28 LD-1 sets -
29 LD-2 sets -
30 LD-2a sets -
31 LD-3 sets -
32 LD-4 sets -
33 FD-1 sets -
34 Other items called for in the plans & specs

Sub - Total Doors and windows

Bid Breakdown_RPLaUnion_CSA
Page 10/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

C Hardware and Accessories


1 Glass door handles sets -
2 Steel barrel bolt sets -
3 112 x 112 x 3 mm S.S. Ball Bearing hinges sets -
4 Foot bolt sets -
5 SS Lever lockset (Mortise type) sets -
6 87 x 87 x 3 mm S.S. Loose Pin hinges sets -
7 S.S. padlock sets -
8 Flush bolt sets -
9 Door closer sets -
10 Other items

Sub - Total Hardware and Accessories


TOTAL FOR PARTIAL ARCHITECTURAL WORKS
TOTAL BID COST (TAKE-OUT)
VI A. Owner Supplied Materials
a. Cement-in-Bulk bags -
b. Cement-in-bags bags -
c. Rebars
Grade 60 kgs. -
Grade 40 kgs. -
d. Tiles
200x1200mm Soho Wood Design Polished Porcelain tile pcs -
600x600mm Polished Homogenous Tiles pcs -
600x600mm Matte Homogenous Tiles pcs -
300x600mm Polished Homogenous Tiles pcs -
Note: On tiles, Bidders to consider only wastage, Attic stock shall be determined by RLC
TOTAL OSM COST
TOTAL BID COST (ALL-IN)

II. PROJECT COMPLETION


ii.a We (I), the undersigned, agree to start the work immediately upon issuance of the Notice To Proceed. We (I) agree to have all work completed in accordance with the contract
documents. Time of completion shall be _________________ (____) calendar days from date of receipt of Notice of Award/To Proceed.
ii.b A detailed schedule indicating construction activities, manpower and equipment assignment shall be submitted within five (5) calendar days following the receipt of the Notice of Award
/ To Proceed.
III. TERMS OF PAYMENT
iii.a The Owner shall pay the Contract Price to the Contractor in the form of advance payment and progress payments based on an agreed schedule.
iii.b The Owner will make an interest-free advance payment for the Works equal to FIFTEEN percent (15%) of the Contract Price, upon our delivery of the required advance payment bond
equivalent to the amount of the advance payment.
iii.c The advance payment shall be deducted from the progress payments due the contractor with respect to the works. Deductions shall be made at the rate of Fifteen (15%) of the
amount of all progress payments due the contractor until such time as the advance payment shall have been fully liquidated.
iii.d The Owner shall deduct from each progress payment an amount corresponding to ten (10%) percent of such payment. Release of retention money shall be upon issuance of
Bid Breakdown_RPLaUnion_CSA
Page 11/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

Certificate of Acceptance and delivery of warranty bond in the amount equivalent to the retained amount.
IV. VALIDITY OF PROPOSAL
iv.a The prices in this proposal will be held for a period of ________ (___) days from the date hereof.
iv.b All prices in this proposal is inclusive of taxes.

Submitted by:
Company Name
Authorized Representative
Title of Position

Bid Breakdown_RPLaUnion_CSA
Page 12/24
Date :

Project : PROPOSED BULACAN TOWN CENTER - MALL


Location : McArthur Highway, Brgy. Bulihan, Malolos , Bulacan
Subject S CURVE

DESCRIPTION Duration Start Finish M1 M2 M4 M5

I General Requirements
A Mobilization lot -
B Temporary Facilities
1. Conference Room lot -
2. Site Offices including RLC Leasing lot -
3. Owner & CM quarters lot -
4. Warehouse lot -
5. Staging Area lot -
6. Temporary Fence / Board-ups lot -
7. Temporary Plants, storage, workshops lot -
C Temporary Utilities -
1. Temporary Power Supply & Fixtures (with provision for other lot -
trade contractors) -
2. Lighting ( All Areas) lot -
3. Water lot -
4. Toilets lot -
5. Telephone / Communication / Internet lot -
D Site Safety, Protective nets/Deflectors, Security, Health & Sanitation lot -
E Housekeeping & Adequate Protection for completed works lot -
F Daily disposal of const. debris / waste to include other contractors / OSM lot -
G Preparation of construction / contract documents lot -
1. coordination (e-file/hard copy) plans, shop drawings lot -
2. shop drawings, RFAs, RFIs lot -
3. as built drawings lot -
H Project meetings & conferences lot -
I Supervision & coordination lot -
J Material Testing (conc specimen, rebars, chb, FDT, and others called lot -
for in the specs) -
K Project ID and Signages lot -
L Contract Close out (processing / documentation) lot -
M Service Equipment, tools, vehicles lot -
N Demobilization lot -
O General Professional Cleaning (Prior to Mall Opening) lot -
P Accelerograph lot -
Q Other items (specify)

Bid Breakdown_RPLaUnion_CSA
Page 13/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

TOTAL FOR GENERAL REQUIREMENTS


II Permits, Bonds and Clearances
A Surety Bond lot -
B Performance Bond lot -
C Guarantee Bond lot -
D Contractor's All Risk Insurance (CARI) lot -
E Barangay Permit lot -
F Building Permit lot -
G Occupancy Permit lot -
H Locational Clearance lot -
I Other Local Government Permits / Clearances lot -
J Contractor's Tax lot -
K Other items necessary
TOTAL FOR BONDS & INSURANCES
III Site Development Works
A. Perimeter Fence
1. Staking and Lay-out lot -
2. Structural Excavation m³ -
3. Excavated soil Disposal m³ -
4. Backfilling & Compaction m³ -
5. Gravel bed m³ -
6. Footings
a. Formworks m² -
b. Rebars kgs -
c. Concrete m³ -
7. 150mm CHB m² -
8. Lintel beams / Stiffener Concrete columns m² -
9. CHB Rebars, Gr 40 kgs -
10. Tool Joint Finish m² -
11. Painting of fence m² -
12. Night Gate
13. Other Items necessary

B. Driveway & Sidewalk


1. Staking and Lay-out lot -
2. Clearing of Site lot -
3. Removal / excavation of soft soil (Approximately 1000mm depth) m³ -
4. Disposal of unsuitable soil / soft soil m³ -
5. Earthfill and compaction m³ -
6. Subgrade Preparation m³ -
7. Gravel base m³ -
8. Forms
i. Sidewalk m² -
Bid Breakdown_RPLaUnion_CSA
Page 14/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

ii. Curbs & gutter m² -


iii. Driveway m² -
9. Rebars
i. Sidewalk kgs -
ii. Curbs & gutter kgs -
iii. Driveway kgs -
10. Concrete
i. Sidewalk m³ -
ii. Curbs & gutter m³ -
iii. Driveway m³ -
11. Broom finish of driveway, sidewalk & ramp m² -
12. Paver floor tiles m² -
13. Finishing of curbs & gutter lm -
14. Traffic paint lm -
15. Concrete wheel guards sets -
16. Bollards sets -
17. Trench Gratings lm -
18. Stainless Railings lm -
19 Plantboxes lm -
20. Other Items necessary

C. Drainage System
1. Catch Basin sets -
2. Reinforced Concrete Pipes lm -
3. CB/CIM -
4. CB/AD -
5. Tapping to existing drainage lot -
6. Other Items necessary

Sub - Total Site Devt. And Earth Works


IV Civil & Structural
A Site works
1 Staking and Lay-out (including independent survey of the lot) lot -
2 Clearing of Site m³ -
3 Scraping m³ -
4 Structural Excavation m³ -
5 Excavated soil Disposal (including cleaning system) m³ -
6 Backfilling & Compaction m³ -
7 Earthfill (Building area) m³ -
8 Soil Poisoning/Anti-termite reticulation m² -
8 Gravel Bedding m³ -
9 Dampproofing m² -
10 Cutting & Asphalt Sealant
Bid Breakdown_RPLaUnion_CSA
Page 15/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

11 Temporary Fence inc frames / supports m² -


12 Disposal of Debris lot -
13 Pile Hacking pcs -
14 Other Items necessary

Sub - Total Site Works


B Formworks ( Including accessories )
1 Pile Caps m² -
2 Grade beams m² -
3 Concrete Walls m² -
4 Columns m² -
5 Slabs on grade m² -
6 Suspended Slabs, (including roof slab ) m² -
7 Beams / Girders m² -
8 Roof Beams m² -
9 Stairs m² -
10 Concrete Ramps m² -
11 MEP Equipment pad (incl. Cooling tower pedestal) m² -
12 Grease Tank / Oil interceptors for genset & machine room m² -
13 Cistern/Fire Tank m² -
14 Sewage Treatment Plant m² -
15 Fuel Storage Tank m² -
16 Wall footing m² -
17 Concrete gutter m² -
18 Parapet m² -
19 Trench at Loading Dock m² -
20 Pylon m² -
21 Other items called for in the plans & specs m² -

Sub - Total Formworks


C Reinforcing Steel Bars
1 Pile Caps kgs -
2 Grade beams kgs -
3 Concrete Walls kgs -
4 Columns kgs -
5 Slabs on grade kgs -
6 Suspended Slabs, (including roof slab ) kgs -
7 Beams / Girders kgs -
8 Roof Beams kgs -
9 Stairs kgs -
10 Concrete Ramps kgs -
11 MEP Equipment pad (incl. Cooling tower pedestal) kgs -

Bid Breakdown_RPLaUnion_CSA
Page 16/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

12 Grease Tank / Oil interceptors for genset & machine room kgs -
13 Sump / Sewage Pits kgs -
14 Cistern/Fire Tank kgs -
15 Sewage Treatment Plant kgs -
16 Fuel Storage Tank kgs -
17 Wall footing kgs -
18 Concrete gutter kgs -
19 Parapet kgs -
20 Pylon kgs -
21 Trench at Loading Dock kgs -
22 Other items called for in the plans & specs -

Sub - Total Reinforcing Steel Bars


D Concrete Works
1 Pile Caps m³ -
2 Grade beams m³ -
3 Concrete Walls m³ -
4 Columns m³ -
5 Slabs on grade m³ -
6 Suspended Slabs, (including roof slab ) m³ -
7 Beams / Girders m³ -
8 Roof Beams m³ -
9 Stairs m³ -
10 Concrete Ramps m³ -
11 MEP Equipment pad (incl. Cooling tower pedestal) m³ -
12 Grease Tank / Oil interceptors for genset & machine room m³ -
13 Sump / Sewage Pits m³ -
14 Cistern/Fire Tank m³ -
15 Sewage Treatment Plant m³ -
16 Fuel Storage Tank m³ -
17 Wall footing m³ -
18 Concrete gutter m³ -
19 Parapet m³ -
20 Pylon m³ -
21 Trench at Loading Dock m³ -
22 Other items called for in the plans & specs

Sub - Total Concrete Works


E Metal/Steel works ( Including accessories )
1 Trusses kgs -
2 Purlins kgs -
3 Anchor bolts (specify sizes) pcs -

Bid Breakdown_RPLaUnion_CSA
Page 17/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

4 Bottom Chord Strut kgs -


5 Lateral Braces kgs -
6 Angle Bar/Sag rods, connectors and other accessories kgs -
7 Billboard Frames sets -
8 Plates, Anchors etc for billboard frames kgs -
9 50mmØ BI pipe wall mounted handrail sets -
10 3-20mmØ railings in enamel finish (Stairs 1)
11 Canopy frames kgs -
12 Power Center / MECO Stairs lot -
13 PWD ramp railings - 50mmØ SS railings sets -
14 PWD wall mounted railings sets -
15 Delivery ramp railings sets -
16 Manhole covers sets -
17 SS Ladder rungs sets -
18 Angle bar nosing lm -
19 Brass nosing lm -
20 Steel trench gratings sets -
23 Building ID Frame kgs -
24 Pylon Steel Framing kgs -
25 Other items to complete / called for in the plans & specs

Sub - Total Steel & Metal Works


F Masonry Works (exterior/perimeter & below grade walls)
1 150mm CHB m² -
2 100mm CHB m² -
3 Lintel beams / Stiffener Concrete columns lm -
4 Rebars, Gr 40 kgs -
Rebars, Gr 60 kgs -
5 CHB Wall Top support, anchoring to slab/beam lm -
6 Precast Wall m² -
7 Other items called for in the plan & specs
zocallo lm -

Sub - Total Masonry Works


G Miscellaneous Works
1 Construction and Expansion Joints lm -
2 Water stop lm -
3 Rubber & Wheel Bumper @ Loading Dock lm -
4 Column guards lm -
5 Conduiting of Grounding System lgt -
5 Other items called for in the plans & specs

Bid Breakdown_RPLaUnion_CSA
Page 18/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

Sub - Total Miscellaneous


H Thermal & Moisture Protection
1 Ga.24 Preformed Prepainted High Rib Long-span m² -
Flourocarbon polymer coated G.I. roofing
2 Roofing accessories (end cap, end/wall flashings, ridge rolls, bird stop etc.) lot -
3 Ga.24 Stainless Gutter on metal support lm -
4 Vandex Super Capilliary (STP, Cistern & Water Tanks) lm -
5 Epoxy Tank Lining (Cistern) m² -
Elastomeric Fluid Applied (Exterior Wall & R.C. Gutter) -
6 Exposed/Outdoor Type Polyurethane (Decks & Exposed Parking) m² -
7 Cementitious Capillary m² -
Flexible Cementitious Capillary
8 3.5kg. Mineral Polybond Torch-on (Toilerts and AHU m² -
9 Vandex Super Capilliary (Grease, Fuel storage, filter Tanks) m² -
10 Caulking & Sealing
a Expansion Joints lot
b Exterior sealants (Doors, windows, louvers etc) lot
11 Other items called for in the plans & specs

Sub - Total Thermal & Moisture Protection


TOTAL FOR CIVIL/STRUCTURAL WORKS
V Architectural Finishing Works
A. Finishes
1 Floor Finishes
a Plain Cement w/ Hardener/Dustproofing m² -
b Plain Cement w/ Hardener m² -
c Plain Cement w/ Epoxy Floor Coating Smooth Finish m² -
d Plain Cement w/ Epoxy Floor Coating Rough Finish m² -
e Concrete Broom Finish m² -
f Concrete Broom Finish w/ 10mm Grooves - m² -
g. 200x1200mm Soho Wood Design Polished Porcelain tile m² -
h 300x600mm Polished Homogenous Tiles m² -
i 600x600mm Polished Homogenous Tiles m² -
j 600x600mm Matte Homogenous Tiles m² -
k 100x100mm Paver Tile m² -
l 300x300mm Vitrified Non-Skid Ceramic Floor Tiles m² -
m Bare Concrete Slab m² -
n 600x600mmx4mm thk. Vinyl Floor Tiles m² -
o Straight to finish Poured Concrete m² -
p Hexagonal shape Porcelain tiles m² -
r 6mm thk. Broadloom Carpet w/ 12mm thk. Carpet underlay w/ m² -
aluminum edge termination & "TSOKITURA" Nosing strip w/

Bid Breakdown_RPLaUnion_CSA
Page 19/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

rubber inset in all steps and anti-microbil treatment.


2 Wall Finishes
a Plain Cement Plastered Finish m² -
b Bare CHB Wall Finish (Tooled Joint)
c Aluminum Composite Panel (ACP) 4mm thk. m² -
d 600x600mm Polished Homogenous Tiles m² -
e 300x600mm Polished Porcelain Wall Tiles m² -
f 575x286mm Polished Ceramic Wall tiles m² -
g. Half-Therm EIFS w/ 25x50mm PVC U-shape Groves m² -
h Full-Therm EIFS w/ 25x50mm PVC U-shape Groves m² -
i Direct Applied EIFS m² -
j Fiber Cement Board on Standard Metal Framing m² -
k Gypsum Wall Finish on Standard Metal Framing m² -
l Veneer Wall Cladding on 2-6mm Marine Plywood Backing m² -
m Laminate Wall Cladding on 20mm Marine Plywood Backing m² -
n 150mmx300mm Thk. Black Granite m² -
o PVC wall panels m² -
p "Walls in Motion" w/ 150mm thk. 60kg density Rockwool insulation m² -
q 100mm high S/S Ga24 Baseboard hairline finish m² -
r Wall Slab at Ticketing Booth m² -
3 Ceiling Finishes
a Poured Concrete m² -
b Poured Concrete off Form (Rubbed Concreting of Formworks Joint) m² -
c 12 mm thk Water Resistant Gypsum Board Painted Finish m² -
d 12mm thk. Fire Resistant Gypsum Board m² -
e 12mm thk. Gypsum Board Painted Finish m² -
f 6mm thk Ficem Board Ceiling m² -
g. 600x600mm Acoustic Tile ceiling m² -
h Ceiling Cove m² -
i Ceiling Manhole m² -
j Ceiling Accent (Common Hallway) lot -
k Ceiling Accent (Food Court) lot -
3 Painting Works
a. Masonry painting
Interior Wall m² -
Exterior Wall m² -
b. Ceiling Painting m² -
c. Metal Painting (incl. Metal doors) m² -
d. Drywall Painting m² -
e. Railing Painting m² -
f. Directional Traffic Signs lot -
g. Yellow Reflectorized Paint m² -

Bid Breakdown_RPLaUnion_CSA
Page 20/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

h Other items called for in the plans & specs m² -


4 Other Finishes
a. Escalator Cladding (ACP) m² -
b. Drop wall (Atrium) m² -
c. Toilet
Toilet Partition sets -
Urinal Partition sets -
Quartz Stone Granite Countertop m² -
Facial Mirror m² -
Built-up Facial Mirror m² -
Full Height Mirror m² -
PWD Grab Bar
d. Billboard, Logo & Exterior Façade lot -
e. Tenant Board-up (Drywall and Painting) m² -
f. Cinema Signage sets -
g. Snack Bar Front & Back Counter and Signage overhead Built-up lot -
h. Snack Bar and Ticketing Signage lot -
i. Ticketing Counter lot -

Sub - Total A Finishes


B Doors and Windows

1 GD-01 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
2 GD-02 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
3 GD-04 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
4 GD-05 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
5 GD-06 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
6 W-1 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
7 W-2 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
8 W-3 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
9 W-4 12mm thk. tempered glass on standard aluminum frame in sets -

Bid Breakdown_RPLaUnion_CSA
Page 21/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

powder coat finish


10 W-5 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
11 W-6 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
12 W-7 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
13 W-8 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
14 W-9 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
15 W-10 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
16 RUD-1 Ga. 18 Galvalume motorized roll-up door sets -

17 RUD-2 Ga. 18 Galvalume motorized roll-up door sets -

18 RUD-2 Ga. 18 Galvalume motorized roll-up door sets -

19 RUD-5 Ga. 18 Galvalume motorized roll-up door sets -


20 SD-1 sets -
21 SD-2 sets -
22 SD-2a sets -
23 SD-3 sets -
24 SD-4 sets -
25 SD-5 sets -
26 SD-6 sets -
27 SD-7 sets -
28 LD-1 sets -
29 LD-2 sets -
30 LD-2a sets -
31 LD-3 sets -
32 LD-4 sets -
33 FD-1 sets -
34 Other items called for in the plans & specs

Sub - Total Doors and windows

Bid Breakdown_RPLaUnion_CSA
Page 22/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

C Hardware and Accessories


1 Glass door handles sets -
2 Steel barrel bolt sets -
3 112 x 112 x 3 mm S.S. Ball Bearing hinges sets -
4 Foot bolt sets -
5 SS Lever lockset (Mortise type) sets -
6 87 x 87 x 3 mm S.S. Loose Pin hinges sets -
7 S.S. padlock sets -
8 Flush bolt sets -
9 Door closer sets -
10 Other items

Sub - Total Hardware and Accessories


TOTAL FOR PARTIAL ARCHITECTURAL WORKS
TOTAL BID COST (TAKE-OUT)
VI A. Owner Supplied Materials
a. Cement-in-Bulk bags -
b. Cement-in-bags bags -
c. Rebars
Grade 60 kgs. -
Grade 40 kgs. -
d. Tiles
200x1200mm Soho Wood Design Polished Porcelain tile pcs -
600x600mm Polished Homogenous Tiles pcs -
600x600mm Matte Homogenous Tiles pcs -
300x600mm Polished Homogenous Tiles pcs -
Note: On tiles, Bidders to consider only wastage, Attic stock shall be determined by RLC
TOTAL OSM COST
TOTAL BID COST (ALL-IN)

II. PROJECT COMPLETION


ii.a We (I), the undersigned, agree to start the work immediately upon issuance of the Notice To Proceed. We (I) agree to have all work completed in accordance with the contract
documents. Time of completion shall be _________________ (____) calendar days from date of receipt of Notice of Award/To Proceed.
ii.b A detailed schedule indicating construction activities, manpower and equipment assignment shall be submitted within five (5) calendar days following the receipt of the Notice of Award
/ To Proceed.
III. TERMS OF PAYMENT
iii.a The Owner shall pay the Contract Price to the Contractor in the form of advance payment and progress payments based on an agreed schedule.
iii.b The Owner will make an interest-free advance payment for the Works equal to FIFTEEN percent (15%) of the Contract Price, upon our delivery of the required advance payment bond
equivalent to the amount of the advance payment.
iii.c The advance payment shall be deducted from the progress payments due the contractor with respect to the works. Deductions shall be made at the rate of Fifteen (15%) of the
amount of all progress payments due the contractor until such time as the advance payment shall have been fully liquidated.
iii.d The Owner shall deduct from each progress payment an amount corresponding to ten (10%) percent of such payment. Release of retention money shall be upon issuance of
Bid Breakdown_RPLaUnion_CSA
Page 23/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5

Certificate of Acceptance and delivery of warranty bond in the amount equivalent to the retained amount.
IV. VALIDITY OF PROPOSAL
iv.a The prices in this proposal will be held for a period of ________ (___) days from the date hereof.
iv.b All prices in this proposal is inclusive of taxes.

Submitted by:
Company Name
Authorized Representative
Title of Position

Bid Breakdown_RPLaUnion_CSA
Page 24/24