General Requirements: Description Duration Finish M1 M2 M4 M5 Start I
General Requirements: Description Duration Finish M1 M2 M4 M5 Start I
I General Requirements
A Mobilization lot -
B Temporary Facilities
1. Conference Room lot -
2. Site Offices including RLC Leasing lot -
3. Owner & CM quarters lot -
4. Warehouse lot -
5. Staging Area lot -
6. Temporary Fence / Board-ups lot -
7. Temporary Plants, storage, workshops lot -
C Temporary Utilities -
1. Temporary Power Supply & Fixtures (with provision for other lot -
trade contractors) -
2. Lighting ( All Areas) lot -
3. Water lot -
4. Toilets lot -
5. Telephone / Communication / Internet lot -
D Site Safety, Protective nets/Deflectors, Security, Health & Sanitation lot -
E Housekeeping & Adequate Protection for completed works lot -
F Daily disposal of const. debris / waste to include other contractors / OSM lot -
G Preparation of construction / contract documents lot -
1. coordination (e-file/hard copy) plans, shop drawings lot -
2. shop drawings, RFAs, RFIs lot -
3. as built drawings lot -
H Project meetings & conferences lot -
I Supervision & coordination lot -
J Material Testing (conc specimen, rebars, chb, FDT, and others called lot -
for in the specs) -
K Project ID and Signages lot -
L Contract Close out (processing / documentation) lot -
M Service Equipment, tools, vehicles lot -
N Demobilization lot -
O General Professional Cleaning (Prior to Mall Opening) lot -
P Accelerograph lot -
Q Other items (specify)
Bid Breakdown_RPLaUnion_CSA
Page 1/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
C. Drainage System
1. Catch Basin sets -
2. Reinforced Concrete Pipes lm -
3. CB/CIM -
4. CB/AD -
5. Tapping to existing drainage lot -
6. Other Items necessary
Bid Breakdown_RPLaUnion_CSA
Page 4/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
12 Grease Tank / Oil interceptors for genset & machine room kgs -
13 Sump / Sewage Pits kgs -
14 Cistern/Fire Tank kgs -
15 Sewage Treatment Plant kgs -
16 Fuel Storage Tank kgs -
17 Wall footing kgs -
18 Concrete gutter kgs -
19 Parapet kgs -
20 Pylon kgs -
21 Trench at Loading Dock kgs -
22 Other items called for in the plans & specs -
Bid Breakdown_RPLaUnion_CSA
Page 5/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 6/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 7/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 8/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
1 GD-01 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
2 GD-02 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
3 GD-04 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
4 GD-05 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
5 GD-06 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
6 W-1 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
7 W-2 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
8 W-3 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
9 W-4 12mm thk. tempered glass on standard aluminum frame in sets -
Bid Breakdown_RPLaUnion_CSA
Page 9/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 10/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Certificate of Acceptance and delivery of warranty bond in the amount equivalent to the retained amount.
IV. VALIDITY OF PROPOSAL
iv.a The prices in this proposal will be held for a period of ________ (___) days from the date hereof.
iv.b All prices in this proposal is inclusive of taxes.
Submitted by:
Company Name
Authorized Representative
Title of Position
Bid Breakdown_RPLaUnion_CSA
Page 12/24
Date :
I General Requirements
A Mobilization lot -
B Temporary Facilities
1. Conference Room lot -
2. Site Offices including RLC Leasing lot -
3. Owner & CM quarters lot -
4. Warehouse lot -
5. Staging Area lot -
6. Temporary Fence / Board-ups lot -
7. Temporary Plants, storage, workshops lot -
C Temporary Utilities -
1. Temporary Power Supply & Fixtures (with provision for other lot -
trade contractors) -
2. Lighting ( All Areas) lot -
3. Water lot -
4. Toilets lot -
5. Telephone / Communication / Internet lot -
D Site Safety, Protective nets/Deflectors, Security, Health & Sanitation lot -
E Housekeeping & Adequate Protection for completed works lot -
F Daily disposal of const. debris / waste to include other contractors / OSM lot -
G Preparation of construction / contract documents lot -
1. coordination (e-file/hard copy) plans, shop drawings lot -
2. shop drawings, RFAs, RFIs lot -
3. as built drawings lot -
H Project meetings & conferences lot -
I Supervision & coordination lot -
J Material Testing (conc specimen, rebars, chb, FDT, and others called lot -
for in the specs) -
K Project ID and Signages lot -
L Contract Close out (processing / documentation) lot -
M Service Equipment, tools, vehicles lot -
N Demobilization lot -
O General Professional Cleaning (Prior to Mall Opening) lot -
P Accelerograph lot -
Q Other items (specify)
Bid Breakdown_RPLaUnion_CSA
Page 13/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
C. Drainage System
1. Catch Basin sets -
2. Reinforced Concrete Pipes lm -
3. CB/CIM -
4. CB/AD -
5. Tapping to existing drainage lot -
6. Other Items necessary
Bid Breakdown_RPLaUnion_CSA
Page 16/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
12 Grease Tank / Oil interceptors for genset & machine room kgs -
13 Sump / Sewage Pits kgs -
14 Cistern/Fire Tank kgs -
15 Sewage Treatment Plant kgs -
16 Fuel Storage Tank kgs -
17 Wall footing kgs -
18 Concrete gutter kgs -
19 Parapet kgs -
20 Pylon kgs -
21 Trench at Loading Dock kgs -
22 Other items called for in the plans & specs -
Bid Breakdown_RPLaUnion_CSA
Page 17/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 18/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 19/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 20/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
1 GD-01 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
2 GD-02 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
3 GD-04 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
4 GD-05 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
5 GD-06 10mm thk. Tempered Glass Door w/ top and bottom patch sets -
fittings
6 W-1 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
7 W-2 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
8 W-3 12mm thk. tempered glass on standard aluminum frame in sets -
powder coat finish
9 W-4 12mm thk. tempered glass on standard aluminum frame in sets -
Bid Breakdown_RPLaUnion_CSA
Page 21/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Bid Breakdown_RPLaUnion_CSA
Page 22/24
DESCRIPTION Duration Start Finish M1 M2 M4 M5
Certificate of Acceptance and delivery of warranty bond in the amount equivalent to the retained amount.
IV. VALIDITY OF PROPOSAL
iv.a The prices in this proposal will be held for a period of ________ (___) days from the date hereof.
iv.b All prices in this proposal is inclusive of taxes.
Submitted by:
Company Name
Authorized Representative
Title of Position
Bid Breakdown_RPLaUnion_CSA