INSTALLATION REPORT OF CATHODIC JUNCTION BOX

Owner: NTT Doc. No.: BSIN-QAQC-CPJ22105-045FR


Contractor: POWERICA LIMITED.
Project: 8 NOS.75KL CAPACITY FUEL STORAGE Page: 1 of 1
VESSEL

Reference Drawing:

Sl.
Items to Check/ Inspection Status Remarks
No
1 Cathodic Junction Box Tag No.
2 Location of Cathodic Junction Box.
3 Connection scheme.
4 Check the installation of Cathodic Junction Box as
per the procedure and drawing.

5 Check the cable entry is as per the specification

6 Checks the terminations inside the Cathodic


Junction Box are performed perfectly.

7 Check the stress relief loop has been provided for


the cables.

8 Structure to Cathodic Junction Box distance.

9 Incoming and Outgoing cable tag.

10 Observation / comments by site engineer

CP Contractor : Name: Sign: Date:

Main Contractor : Name: Sign: Date:

Client/Consultant: Name: Sign: Date:


INSTALLATION REPORT OF CABLE

Owner: NTT Doc. No: BSIN-QAQC-CPJ22105-005FR


Contractor: POWERICA LIMITED.
Project: 8 NOS.75KL CAPACITY FUEL STORAGE VESSEL Page: 1 of 1
Reference Drawing:

Date:
Sl.
Items to Check/ Inspection Status Remarks
No.

1 Check the tag number of cable.

2 Cable route.

3 Cable details.

Check the cable is free of cuts or any


4
damages.

Check the cable connection has been done


5
properly as per the drawings.

6 Check for any joint has been made.

Check the cable has been terminated inside


8
the junction boxes properly.
Check the cable has been laid with proper
9
spacing as per the procedure.

10 Check the cable route markers are properly


installed.

CP Contractor : Name: Sign: Date:

Main Contractor : Name: Sign: Date:


Client/Consultant: Name: Sign: Date: