ASME A112 DOCUMENTS STATUS/TRACKING REPORT

DESIGNATION & TITLE STATUS RESPONSIBILITY


ASME A112.1.2 – 2012 (R2022) Revision S. F. Asay, Chair
Air Gaps in Plumbing Systems (For RC #08-1056, PINS #284 A112.1.2
Plumbing Fixtures and Water-Connected LB #11-1353 – Revision Approved Project Team on Air
Receptors) 12/28/2011 – BSR-8 #1656 Gaps
BSR-9 #1228
ANSI Approved

Reaffirmation
RC #16-3009
LB #16-3676 – Reaffirmation Approved
02/02/2017 – BSR-8 #2254
04/27/2017 – BSR-9 #1726
05/04/2017 – ANSI Approved

Reaffirmation
RC #22-127
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2849
05/13/2022 – BSR-9 #2188
05/17/2022 – ANSI Approved

ASME A112.1.3 – 2000 (R2019) Reaffirmation S. F. Asay, Chair


Air Gap Fittings for Use with Plumbing LB #14-2738 – Reaffirmation Approved A112.1.3
Fixtures, Appliances, and Appurtenances 12/16/2014 – BSR-8 #1997 Project Team on Air
03/10/2015 – BSR-9 #1513 Gap Fitting/Break
03/13/2015 – ANSI Approved Devices

Reaffirmation
RC #19-2015
LB #19-2301 – Reaffirmation Approved
09/09/2019 – BSR-8 #2551
11/26/2019 – BSR-9 #1956
12/02/2019 – ANSI Approved

ASME A112.3.1 – 2007 (R2022) Reaffirmation G. W. Harrison, Chair


Stainless Steel Drainage Systems for LB #16-3676 – Reaffirmation Approved A112.3.1
Sanitary DWV, Storm, and Vacuum 02/02/2017 – BSR-8 #2255 Project Team on
Applications, Above- and Below Ground 04/27/2017 – BSR-9 #1718 Stainless Steel Drain
05/04/2017 – ANSI Approved Systems

Reaffirmation
RC #22-128
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2850
05/13/2022 – BSR-9 #2189
05/17/2022 – ANSI Approved

Page 1 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.3.4 – 2018/CSA B45.9 – 18 Revision/Consolidation/Redesignation J. Ballanco, Chair
(R2023) 05/11/2004 – RC #11-785, PINS #414 A112.3.4
Macerating Toilet Systems and Related LB #13-810 – Revision/Consolidation Project Team on
Components Disapproved Macerating Pumped
LB #13-810RC1 – Revision/Consolidation Waste Systems
Approved
ANSI Forms Processed by ASME 09/23/2013 – BSR-8 #1669
12/12/2013 – BSR-9 #1387
Under Continuous Maintenance (No PINS 12/30/2013 – ANSI Approved
Required)
Revision
Published: June 12, 2018 RC #17-2511, PINS #646
LB #17-3164 – Revision Approved
LB #17-3164RC1 – Recirculation Approved
02/23/2018 – BSR-8 #2366
05/23/2018 – BSR-9 #1799
05/31/2018 – ANSI Approved

Reaffirmation
RC #22-2160
LB #22-3143 – Reaffirmation Approved
11/30/2022 – BSR-8 #2927
02/24/2023 – BSR-9 #2259
02/24/2023 – ANSI Approved

ASME A112.4.1 – 2009 (R2019) Reaffirmation M. Weiss, Chair


Water Heater Relief Valve Drain Tubes LB #14-218 – Reaffirmation Approved A112.4.1
03/05/2014– BSR-8 #1917 Project Team on
05/21/2014– BSR-8 #1443 Relief Valve Drains
05/29/2014 – ANSI Approved Reaffirmation

Reaffirmation
RC #18-2613
LB #18-3314 – Reaffirmation Approved
12/05/2018 – BSR-8 #2463
02/20/2019 – BSR-9 #1880
02/27/2019 – ANSI Approved

Page 2 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.4.2 – 2021/CSA B45.16 – 21 Revision/Consolidation/Redesignation M. Campos, Chair
Personal Hygiene Devices for Water 12/01/2014 – RC #14-2269, PINS #550 A112.4.2
Closets LB #14-2817 – Revision Disapproved Project Team on
LB #14-2817RC1 – Recirculation Approved Water Closet
03/31/2015 – BSR-8 #2044 Personal Hygiene
ANSI Forms Processed by ASME 06/17/2015 – BSR-9 #1549 Devices
06/19/2015 – ANSI Approved
Under Continuous Maintenance (No PINS
Required) Reaffirmation
RC #20-719
Published: July 23, 2021 LB #20-731 – Reaffirmation Approved
02/28/2020 – BSR-8 #2607
05/14/2020 – BSR-9 #1986
05/15/2020 – ANSI Approved

Revision
RC #20-2515
LB #20-2377 – Revision Disapproved
LB #20-2377RC1 – Revision Approved
02/10/2021 – BSR-8 #2700
05/17/2021 – BSR-9 #2076
06/17/2021 – ANSI Approved

ASME A112.4.2 – 2009 (R2014) Revision/Consolidation/Redesignation


Water Closet Personal Hygiene Devices 09/03/2015 –
Revision/Consolidation/Redesignation as
ASME A112.4.2/CSA B45.16

ASME A112.4.3 – 1999 (R2019) Reaffirmation M. Campos, Chair


Plastic Fittings for Connecting Water LB #14-2738 Reaffirmation Approved A112.4.3
Closets to the Sanitary Drainage System 12/16/2014 – BSR-8 #1998 Project Team on
03/10/2015 – BSR-9 #1514 Plastic Fittings for
03/13/2015 – ANSI Approved Connecting Water
Closets to the
Reaffirmation Sanitary Drainage
RC #19-2016 System
LB #19-2301 Reaffirmation Approved
09/09/2019 – BSR-8 #2552
11/26/2019 – BSR-9 #1957
12/02/2019 – ANSI Approved

Page 3 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.4.4 – 2017 New Edition William Morris, Chair
Plastic Push Fit Drain, Waste and Vent 08/4/2016 – RC #16-1833, PINS #601 A112.4.4
(DWV) Fittings LB #16-3694 New Standard Disapproved LB Project Team on
#16-3694RC1 New Standard Recirculation Push-Fit Drain,
ACTION DUE BY: 05/25/2027 Approval (Cancelled) Waste and Vent
LB #16-3694RC101 New Std Approved (DWV) Fittings
03/10/2017 – BSR-8 #2271
05/24/2017 – BSR-9 #1736
05/25/2017 – ANSI Approved
10/12/2017 – Published

Revision
RC #18-2616; PINS #679

ASME A112.4.5 – Draft Project Closed


Hydro-seat Lift

ASME A112.4.6 – Draft Project Closed


Mechanical Tee Tools

ASME A112.4.7-2002 (R2008) WITHDRAWAL


Point of Use and Branch Water Sub- RC #09-136
Metering Systems LB #09-134 Approved
BSR-8 #1253
BSR-9 #940
06/11/2009 – ANSI Approved

ASME A112.4.8 – Draft W. E. Chapin, Chair


Vent Pipe Plastic Membrane Funnels A112.4.8
Project Team on
Vent Pipe Plastic
Membrane Funnels

Page 4 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.4.14 – 2022/CSA B125.14 – New Harmonization M. Campos, Chair
22 11/14/2014 – RC #14-2150, PINS #547 A112.4.14
Manually Operated Valves for Use in LB #16-3071 – New Std Disapproved Project Team on Ball
Plumbing Systems LB #16-3071RC1 – New Std Approved Valves
03/15/2017 – BSR-8 #2275
05/31/2017 – BSR-9 #1738
ANSI Forms Processed by ASME 06/01/2017 – ANSI Approved New
ASME/CSA Edition
Under Continuous Maintenance (No PINS
Required) Revision
RC #21-1906
Published: August 15, 2022 New Title: Manually or Automatically Operated
Shutoff Valves for Use in Plumbing Systems
LB #21-2510 – Revision Disapproved
LB #21-2510RC1 – Recirculation Approved
LB #21-2510RC101 – Recirculation Approved
03/23/2022 – BSR-8 #2862
06/09/2022 – BSR-9 #2202
06/22/2022 – ANSI Approved

ASME A112.4.14 – 2004 (R2010) Revision/Consolidation/Redesignation


Manually Operated Quarter-Turn Shutoff 06/01/2017 –
Valves for Use in Plumbing Systems Revision/Consolidation/Redesignation as
ASME A112.4.14/CSA B125.14

Project Closed

ASME A112.6.1M – 1997 (R2017) Reaffirmation B. Tubaugh, Chair


Supports for Off-the-Floor Plumbing LB #16-3676 – Reaffirmation Approved A112.6.1
Fixtures 02/02/2017 – BSR-8 #2256 Project Team on
04/27/2017 – BSR-9 #1719 Supports for Off-the-
ACTION DUE BY: 05/04/2027 05/04/2017 – ANSI Approved Floor Plumbing
Fixtures
Revision
RC #20-1716, PINS #740

Page 5 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.6.2 – 2017 (R2022) Reaffirmation L. Himmelblau, Chair
Framing-Affixed Supports for Off-the-Floor LB #09-1293 - Approved A112.6.2
Plumbing Fixtures BSR-8 #1328 Project Team on Wall
BSR-9 #992 Affixed Support
01/04/2010 – ANSI Approved

Revision
02/24/2014 – PINS #524
RC #14-393, LB #14-522 Review and
Comment

RC #17-658
LB #17-837 – Revision Disapproved
LB #17-837RC1 – Revision Approved
07/21/2017 – BSR-8 #2308
10/20/2017 – BSR-9 #1767
11/01/2017 – ANSI Approved
12/09/2017 – Published

Reaffirmation
RC #22-129
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2851
05/13/2022 – BSR-9 #2190
05/17/2022 – ANSI Approved

ASME A112.6.3 – 2022/CSA B79.3:22 Revision/Consolidation/Redesignation A. Murra, Chair


Floor Drains ASME A112.6.3/CSA B79.3 A112.6.3
Floor Drains Project Team on
RC #20-1704, PINS #732 Floor Drains
ANSI Forms Processed by ASME LB #21 – 3128 –
Revision/Consolidation/Redesignation
Under Continuous Maintenance (No PINS Disapproved
Required) LB #21-3128RC1 – Recirculation Approved
02/15/2022 – BSR-8 #2845
Published: July 29, 2022 05/06/2022 – BSR-9 #2181
05/09/2022 – ANSI Approved New
ASME/CSA Edition

Page 6 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.6.3 – 2019 Revision
Floor and Trench Drains 06/16/2011 – RC #11-1018, PINS #420
LB #15-1084 – Revision Disapproved
LB #15-1084RC1 – Revision Approved
LB #15-1084RC101 – Revision Approved
11/04/2015 – BSR-8 #2084
01/21/2016 – BSR-9 #1582
01/26/2016 – ANSI Approved Revision

Revision
RC #17-1791, PINS #638
LB #17-2822 – Revision Approved
LB #17-2822RC1 – Revision Approved
11/27/2017 – BSR-8 #2335
12/11/2018 – BSR-9 #1858
01/31/2019 – ANSI Approved Revision

ANSI Public Review Comments


RC #18-1518
LB #18-1871 – Approved

Revision & Redesignation


05/09/2022 – Revised and Redesignated as
ASME A112.6.3/CSA B79.3
Floor Drains

ASME A112.6.4 - 2022/CSA B79.4:22 Revision/Consolidation/Redesignation M. Weiss, Chair


Roof, Deck, and Balcony Drains ASME A112.6.4/CSA B79.4 A112.6.4
Roof, Deck, and Balcony Drains Project Team on
RC #20-1705, PINS #733 Roof Drains
ANSI Forms Processed by ASME LB #21 – 3129
Revision/Consolidation/Redesignation
Under Continuous Maintenance (No PINS Disapproved
Required) LB #21-3129RC1 – Recirculation Approved
03/03/2022 – BSR-8 #2859
Published: July 29, 2022 05/25/2022 – BSR-9 #2198
06/15/2022 – ANSI Approved New
ASME/CSA Edition

Page 7 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.6.4 – 2003 (R2012) Reaffirmation
Roof, Deck, and Balcony Drains LB #12-1984 – Reaffirmation Approved
09/25/2012 – BSR-8 #1734
12/12/2012 – BSR-9 #1292
12/17/2012 – ANSI Approved

Revision
RC #13-242, PINS #483
LB #18-3221 – Review & Comment

Revision & Redesignation


XX/XX/XXXX – Revision and Redesignation
as
ASME A112.6.4/CSA B79.4
Roof, Deck, and Balcony Drains

ASME A112.6.5 – Draft Revision & Redesignation R. Burnham, Chair


Hydrants XX/XX/XXXX – Revision and Redesignation A112.6.5
as Project Team on
ASME A112.21.3-1985 (R2007) Hydrants
08/18/2011 – RC #11-1413, PINS #426

Project Closed
01/26/2017 – Project closed during the A112
Standards Committee meeting in San Juan,
PR

ASME A112.6.6 – Draft Project Closed M. Campos, Chair


Expansion Joints 01/26/2017 – Project closed during the A112 A112.6.6
Standards Committee meeting in San Juan, Project Team on
PR Expansion Joints

ASME A112.6.7 – 2022/CSA B79.7:22 Revision/Redesignation (Joint ASME/CSA) M. Weiss, Chair


Sanitary Floor Sinks ASME A112.6.7/CSA B79.7 A112.6.7
Sanitary Floor Sinks Project Team on
RC #20-1706, PINS #734 Floor Sinks
ANSI Forms Processed by ASME LB #21 – 3130 –
Revision/Consolidation/Redesignation
Under Continuous Maintenance (No PINS Disapproved
Required) LB #21-3130RC1 – Recirculation Approved
02/28/2022 – BSR-8 #2857
Published: July 29, 2022 05/13/2022 – BSR-9 #2196
05/17/2022 – ANSI Approved New
ASME/CSA Edition

Page 8 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.6.7 – 2010 (R2019) Revision
Sanitary Floor Sinks 12/10/2009 – PINS #356
BSR-8 1#476
BSR-9 #1094
10/19/2010 - ANSI Approved

Reaffirmation
LB #14-2738 – Reaffirmation Approved
12/16/2014 – BSR-8 #1999
03/10/2015 – BSR-9 #1515
03/13/2015 – ANSI Approved

Reaffirmation
RC #19-2017
LB #19-2301 Reaffirmation Approved
09/09/2019 – BSR-8 #2553
11/26/2019 – BSR-9 #1958
12/02/2019 – ANSI Approved Reaffirmation

Revision & Redesignation


05/17/2022 – Revised and Redesignated as
ASME A112.6.7/CSA B79.7
Sanitary Floor Sinks

ASME A112.6.8 – 2022/CSA B79.8:22 New Edition (Joint ASME/CSA) Brian Tubaugh, Chair
Trench Drains RC #20-1707, PINS #735 A112.6.8
LB #21-1260 – Review & Comment Project Team on
(Closes 05/13/2021) Trench Drains
ANSI Forms Processed by ASME LB #21 – 3131 –
Revision/Consolidation/Redesignation
Under Continuous Maintenance (No PINS Disapproved
Required) LB #21-3131RC1 – Recirculation Approved
02/17/2022 – BSR-8 #2848
Published: July 29, 2022 05/06/2022 – BSR-9 #2182
05/09/2022 – ANSI Approved New
ASME/CSA Edition

ASME A112.6.8 – Draft New Edition


Trench Drains 06/16/2011 – RC #11-1019, PINS #421
LB #18-3224 – Review & Comment

Redesignation
05/09/2022 – Redesignated as
ASME A112.6.8/CSA B79.8
Trench Drains

Page 9 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.6.9 – 2022/CSA B79.9 – 22 Revision/Consolidation/Redesignation M. Weiss, Chair
Siphonic Roof Drains ASME A112.6.9/CSA B79.9 A112.6.9
Siphonic Roof Drains Project Team on
RC #20-1708, PINS #736 Siphonic Roof Drains
ANSI Forms Processed by ASME LB #21 – 3132 –
Revision/Consolidation/Redesignation
Under Continuous Maintenance (No PINS Disapproved
Required) LB #21-3132RC1 – Recirculation Approved
02/15/2022 – BSR-8 #2846
Published: July 29, 2022 05/06/2022 – BSR-9 #2183
05/09/2022 – ANSI Approved New
ASME/CSA Edition

ASME A112.6.9 – (R2019) Reaffirmation


Siphonic Roof Drains LB #14-2738 – Reaffirmation Approved
12/16/2014 – BSR-8 #2000
03/10/2015 – BSR-9 #1516
03/13/2015 – ANSI Approved Reaffirmation

Reaffirmation
RC #19-2018
LB #19-2301 Reaffirmation Approved
09/09/2019 – BSR-8 #2554
11/26/2019 – BSR-9 #1959
12/02/2019 – ANSI Approved Reaffirmation

Revision & Redesignation


05/09/2022 – Revised and Redesignated as
ASME A112.6.9/CSA B79.9
Siphonic Roof Drains

ASME A112.14.1 – 2003 (R2022) Reaffirmation R. Burnham, Chair


Backwater Valves LB #16-3676 – Reaffirmation Approved A112.14.1
02/02/2017 – BSR-8 #2257 Project Team on
04/27/2017 – BSR-9 #1720 Metallic and Non-
05/04/2017 – ANSI Approved Metallic Backwater
Valves
Reaffirmation
RC #22-130
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2852
05/13/2022 – BSR-9 #2191
05/17/2022 – ANSI Approved

Page 10 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.14.3 – 2022/CSA B481.1 – 22 Revision, Consolidation and Redesignation D. Orton, Chair
Hydromechanical Grease Interceptors ASME A112.14.3/CSA B481.1 A112.14.3
Hydromechanical Grease Interceptors Project Team on
RC #20-1709 PINS #737 Grease Interceptors
ANSI Forms Processed by ASME LB #21-1445 – Review & Comment
LB #21-3177 –
Under Continuous Maintenance (No PINS Revision/Consolidation/Redesignation
Required) Disapproved
LB #21-3177RC1 – Recirculation Approved
Published: July 29, 2022 02/15/2022 – BSR-8 #2843
LB #21-3177RC101 – Recirculation Approved
05/10/2022 – BSR-9 #2186
05/13/2022 – ANSI Approved New
ASME/CSA Edition

Errata
RC #23-31
LB #23-75 Errata Approved

ASME A112.14.3 – 2018 Revision


Grease Interceptors 06/02/2015 – RC #15-1263, PINS #561
LB #15-1538 – Revision Disapproved
LB 15-1538RC1 – Revision Approved
07/12/2017 – BSR-8 #2306
09/27/2017 – BSR-9 #1765
01/10/2018 – ANSI Approved Revision
05/18/2018 – Published

Revision & Redesignation


05/13/2022 – Revised and Redesignated as
ASME A112.14.3/CSA B481.1
Hydromechanical Grease Interceptors

ASME A112.14.4 – 2022/CSA B481.5 - 22 Revision/Consolidation/Redesignation W. C. Whitehead,


Grease Removal Devices ASME A112.14.4/CSA B481.5 Chair
Grease Removal Devices A112.14.4
RC #20-1710 PINS #738 Project Team on
ANSI Forms Processed by ASME LB #21-1446 – Review & Comment Grease Recovery
LB #21 – 3178 Devices
Under Continuous Maintenance (No PINS Revision/Consolidation/Redesignation
Required) Disapproved
LB #21-3178RC1 – Recirculation Approved
Published: July 29, 2022 02/15/2022 – BSR-8 #2844
05/06/2022 – BSR-9 #2184
05/09/2022 – ANSI Approved New
ASME/CSA Edition

Errata
RC #23-32
LB #23-76 Errata Approved

Page 11 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.14.4 – 2001 (R2017) Reaffirmation
Grease Removal Devices LB #16-3676 – Reaffirmation Approved
02/02/2017 – BSR-8 #2258
04/27/2017 – BSR-9 #1721
05/04/2017 – ANSI Approved

Revision & Redesignation


05/09/2022 – Revised and Redesignated as
ASME A112.14.4/CSA B481.5
Grease Removal Devices

ASME A112.14.5 – Draft Project Closed


Oil Separators

ASME A112.14.6 – 2010 (R2019) Revision M. Weiss, Chair


FOG (Fats, Oils & Greases) Disposal 08/11/2009 – RC #09-1284, PINS #337 A112.14.6
Systems LB #09-1474RC1 – Approved Project Team on
BSR-8 #1463 FOG Disposal
06/14/2010 – ANSI Approved Revision Systems

Reaffirmation
LB #14-2738 – Reaffirmation Approved
12/16/2014 – BSR-8 #2001
03/10/2015 – BSR-9 #1517
03/13/2015 – ANSI Approved

Reaffirmation
RC #19-2019
LB #19-2301 Reaffirmation Approved
09/09/2019 – BSR-8 #2555
11/26/2019 – BSR-9 #1960
12/02/2019 – ANSI Approved

ASME A112.14.7 – Draft New Edition Maribel Campos,


Automatic Water Leak Detection and 02/22/2019 – RC #19-485, PINS #688 Chair
Shutoff System A112.14.7 Project
PROJECT DROPPED Team on Automatic
Water Leak Detection
and Shutoff System

Page 12 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.18.1 – 2018/CSA B125.1 – 18 Revision M. Malatesta, Chair
Plumbing Supply Fittings RC #16-2298, RC #16-2299, RC #16-2300 A112.18.1
LB #16-2965 – Revisions Approved Project Team on
ANSI Forms Processed by ASME Plumbing Fixture
Reaffirmation Fittings
Under Continuous Maintenance (No PINS RC #17-783
Required) LB #17-1033 – Reaffirmation Approved
05/01/2017 – BSR-8 #2286
Published: 07/16/2018 07/18/2017 – BSR-9 #1746
07/21/2017 – ANSI Approved

Revision
RC #17-2517
LB #17-2867 – Revision Disapproved
LB #17-2867RC1 – Recirculation Approved
03/05/2018 – BSR-8 #2369
05/23/2018 – BSR-9 #1801
06/22/2018 – ANSI Approved

Update/Errata #1
RC #18-2498

FT-19-07
Resistance to Installation Loading
RC #22-1670
LB #22-2421 – Proposal Approval
(Closes 09/05/2022)

FT-22-01
Add Requirements for Press-Connect Fittings
to the Plumbing Fittings Harmonized
Standards
RC #22-1671
LB #22-2423 – Proposal Disapproved

Page 13 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.18.2 – 2020/CSA B125.2 – 20 Revision W. E. Chapin, Chair
Plumbing Waste Fittings 12/01/2014 – RC #14-2270, PINS #551 A112.18.2
LB #14-2818 – Revision Disapproved Project Team on
ANSI Forms Processed by ASME LB #14-2818RC1 – Recirculation Fixture Waste
Approved Fittings
Under Continuous Maintenance (No PINS 03/31/2015 – BSR-8 #2043
Required) 06/17/2015 – BSR-9 #1548
06/19/2015 – ANSI Approved
Published: July 10, 2020
Reaffirmation
RC #19-2020
LB #19-2301 Reaffirmation Approved
09/09/2019 – BSR-8 #2556
11/26/2019 – BSR-9 #1961
12/02/2019 – ANSI Approved

Revision
RC #19-2701
LB #19-3131 Revision Approved
02/07/2020 – BSR-8 #2598
04/22/2020 – BSR-9 #1982
04/23/2020 – ANSI Approved

ASME A112.18.3 – 2002 (R2022) Reaffirmation Ned Dickey, Chair


Performance Requirements for Backflow LB #16-3676 – Reaffirmation Approved A112.18.3
Protection Devices and Systems in 02/02/2017 – BSR-8 #2259 Project Team on
Plumbing Fixture Fittings 04/27/2017 – BSR-9 #1722 Backflow Devices
05/04/2017 – ANSI Approved

Reaffirmation
RC #22-131
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2853
05/13/2022 – BSR-9 #2192
05/17/2022 – ANSI Approved

Page 14 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.18.6 – 2017/CSA B125.6 – 17 Reaffirmation S. Rawalpindiwala,
(R2021) LB #14-218 – Reaffirmation Approved Chair
Flexible Water Connectors 03/05/2014– BSR-8 #1919 A112.18.6
05/21/2014– BSR-8 #1445 Project Team on
ANSI Forms Processed by ASME 05/29/2014 – ANSI Approved Reaffirmation Flexible Water
Connectors
Under Continuous Maintenance (No PINS Revision
Required) RC #16-1663
LB #16-2281 – Revision Approved
Published: 08/11/2017 03/29/2017 – BSR-8 #2279
06/15/2017 – BSR-9 #1740
06/19/2017 – ANSI Approved

Revision
RC #21-458
LB #21-602 – Review and Comment

Reaffirmation
RC #21-1487
LB #21-2015 – Reaffirmation Approved
08/17/2021 – BSR-8 #2757
11/11/2021 – BSR-9 #2121
11/12/2021 – ANSI Approved

ASME A112.18.6 Revision & Redesignation


Flexible Water Connectors XX/XX/XXXX – Revision and Redesignation
as
ASME A112.18.6/CSA B125.6 – 2009
Flexible Water Connectors

ASME A112.18.7M – 1999 (R2004) WITHDRAWAL


Deck Mounted Bath/Shower Transfer PT and Stds Comm Ballot 11-234 Approved
Valves with Internal Backflow Protection Public Review BSR8 1646 Closed 31 Jan 12
BSR9 1219 ANSI Approved Withdrawal 23
Feb 2012
WITHDRAWN

Page 15 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.18.8 – 2020 Reaffirmation G. S. Duren, Chair
In-Line Sanitary Waste Valves for LB #14-218 – Reaffirmation Disapproved A112.18.8
Plumbing Drainage Systems LB #14-218RC1 – Reaffirmation Approved Project Team on
03/25/2014– BSR-8 #1924 Sanitary Waste
06/11/2014 – BSR-9 #1452 Valves
07/10/2014 – ANSI Approved

Reaffirmation
RC #18-2614
LB #18-3314 – Reaffirmation Disapproved

Revision
RC #19-459; PINS #687
LB #19-2160 – Revision Disapproved
LB #19-2160RC1 – Revision Approved
03/13/2020– BSR-8 #2612
06/03/2020– BSR-8 #1991
06/08/2020 – ANSI Approved

Interpretation Request
RC #21-2537, ASME A112.18.8 - 2020,
Section 3.9.2
LB #22-591 – RFI Disapproved

Case Request
RC #22-1320, Section 3.9.2
LB #22-1970 – Case Request Approved

ASME A112.18.9 – 2011 (R2022) Reaffirmation J. Ballanco, Chair


Protectors/Insulators for Exposed Waste LB #16-2431 – Reaffirmation Disapproved A112.18.9
and Supplies on Accessible Fixtures LB #16-2431RC1 – Reaffirmation Approved Project Team on
10/31/2016 – BSR-8 #2206 Barrier Free
01/31/2017 – BSR-9 #1677 Protection for Traps
02/24/2017 – ANSI Approved and Supplies

Reaffirmation
RC #22-132
LB #22-147 – Reaffirmation Approved
01/21/2022 – BSR-8 #2837
04/19/2022 – BSR-9 #2178
04/25/2022 – ANSI Approved

Page 16 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.1 – 2018/CSA B45.2 – 18 Revision S. Rawalpindiwala,
Enameled Cast Iron and Enameled Steel LB #12-2881 – Revision Disapproved Chair
Plumbing Fixtures LB #12-2881RC1 – Revision Approved A112.19.1
03/26/2013 – BSR-8 #1817 Project Team on
ANSI Forms Processed by ASME 06/13/213 – BSR-9 #1352 Enameled Cast Iron
06/26/2013 – ANSI Approved Plumbing Fixtures
Under Continuous Maintenance (No PINS
Required) Revision
RC #17-2481
Published: 06/16/2018 LB #17-2824 – Revision Disapproved
LB #17-2824RC1 – Recirculation Approved
02/23/2018 – BSR-8 #2365
05/23/2018 – BSR-9 #1800
06/22/2018 – ANSI Approved

ASME A112.19.2 – 2018/CSA B45.1 – 18 Revision C. J. Lagan, Chair


Ceramic Plumbing Fixtures LB #12-2882 – Revision Disapproved A112.19.2
LB #12-2882RC1 – Revision Approved Project Team on
ANSI Forms Processed by ASME 03/26/2013 – BSR8 #1818 Vitreous China
06/13/2013 – BSR-9 #1353 Plumbing Fixtures
Under Continuous Maintenance (No PINS 07/23/2013 – ANSI Approved
Required)
Update/Errata 01
Published: 06/12/2018 Editorial Changes
11/05/2013 – Published

Revision
RC #17-2482
LB #17-2825 – Revision Disapproved
LB #17-2825RC1 – Recirculation Approved
03/20/2018 – BSR-8 #2367
06/07/2018 – BSR-9 #1817
06/15/2018 – ANSI Approved

Update/Errata 01
Editorial Changes
10/16/2018 – RC #18-2498

Revision/Consolidation
Incorporates ASME A112.19.14 – 2013
(R2018)
Six-Liter Water Closets Equipped with a Dual
Flushing Device
RC #22-2571
LB #22-3604 – Approval of FX-22-02 Auger
Test Proposal – Approved

Page 17 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.3 – 2022/CSA B45.4 – 22 Revision S. Rawalpindiwala,
Stainless Steel Plumbing Fixtures RC #16-2365 Chair
LB #16-3075 – Revision Approved A112.19.3
12/19/2016 – BSR-8 #2235 Project Team on
ANSI Forms Processed by ASME 03/001/2017 – BSR-9 #1699 Stainless Steel
03/10/2017 – ANSI Approved Plumbing Fixtures
Under Continuous Maintenance (No PINS
Required) Update/Errata #1
RC #17-1367
Published: August 15, 2022 Issued 05/31/2017

Update/Errata #2
RC #17-2518
Issued 05/31/2017

Revision
RC #21-1907
LB #21-2511 – Revision Disapproved
LB #21-2511RC1 – Revision Approved
02/28/2022 – BSR-8 #2858
05/13/2022 – BSR-9 #2197
05/17/2022 – ANSI Approved

ASME A112.19.4M – 1994 (R2004) Consolidation


Porcelain Enameled Formed Steel XX/XX/XXXX – Consolidated into
Plumbing Fixtures ASME A112.19.1/CSA B45.2-2008
Also included: Supplement 1 and 2 to ASME
A112.19.4M
Errata issued December 96

Page 18 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.5 – 2022/CSA B45.15 – 22 Update/Errata #1 S. Rawalpindiwala,
Flush Valves and Spuds for Water May 2012 Chair
Closets, Urinals, and Tanks Reference to CSA B125.3 - 2011 was missing A112.19.5
in reference section. The year was also A112.19.5 Project
created in section found. Team on Trim for
ANSI Forms Processed by ASME Water Closet
Reaffirmation Bowls/Tanks
LB #16-614 – Reaffirmation Approved
Under Continuous Maintenance (No PINS 04/11/2016 – BSR-8 #2136
Required) 07/05/2016 – BSR-9 #1617
07/14/2016 – ANSI Approved

Published: August 15, 2022 Revision


RC #16-1696
LB #16-2321 – Revision Disapproved
LB #16-2321RC 1 – Revision Approved
02/21/2017 – BSR-8 #2265
05/12/2017 – BSR-8 #2265
05/23/2017 – ANSI Approved

Revision
RC #21-1908
LB #21-2512 – Revision Disapproved
LB #21-2512RC1 – Revision Approved
LB #21-2512RC101 – Recirculation Approved
04/08/2022 – BSR-8 #2870
06/23/2022 – BSR-9 #2205
06/24/2022 – ANSI Approved

ASME A112.19.5 – 2005 Revision & Redesignation


Trim for Water-Closet Bowls, Tanks, and XX/XX/XXXX – Revision and Redesignation
Urinals as
ASME A112.19.5/CSA B45.15 – 2011
Trim for Water-Closet Bowls, Tanks, and
Urinals

Original Publication ANSI approved on


November 29, 2005

ASME A112.19.6 – 1995 Consolidation


Hydraulic Requirements for Water Closets XX/XX/XXXX – Consolidated into
and Urinals ASME A112.19.2/CSA B45.1-2008

Page 19 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.7 – 2020/CSA B45.10 – 20 Revision S. Rawalpindiwala,
Hydromassage Bathtub Systems 08/27/2010 – PINS #385 Chair
LB #11-1042 – Revision Disapproved A112.19.7
ANSI Forms Processed by ASME LB #11-1042RC1 – Revision Approved Project Team on
BSR-8 #1650 Whirlpool Bathtub
Under Continuous Maintenance (No PINS BSR-9 #1223 Appliances
Required) 02/23/2012 – ANSI Approved

Published: April 22, 2020 Reaffirmation


RC #16-2623
LB #16-3344 – Reaffirmation Approved
12/06/2016 – BSR-8 #2228
02/17/2017 – BSR-9 #1685
02/23/2017 – ANSI Approved

Revision
RC #19-2552
LB #19-2960 – Revision Approved
12/11/2019 – BSR-8 #2581
03/05/2020 – BSR-9 #1975
03/05/2020 – ANSI Approved

ASME A112.19.7 – 2006 Revision & Redesignation


Whirlpool Bathtub Appliances XX/XX/XXXX – Revision and Redesignation
as
ASME A112.19.7 / CSA B45.10
Hydromassage Bathtub Systems

Original Publication ANSI approved July 24,


1995

ASME A112.19.8 – 2007 Withdrawal


Suction Fittings for Use in Swimming Pool, SUPERSEDED BY APSP-16 Publish by
Wading Pools, Spas, and Hot Tubs Association of Pool & Spa Professionals

Std Comm & PT Recirculation Ballot 11-


464RC1 APPROVED
Public Review BSR8 1557 closed 17 May 11
BSR9 1174 ANSI Approved 15 Aug 11

ASME A112.19.8 – 2008 BSR-9 #842


Addenda 'a' 08/11/2008 – ANSI Approved

Page 20 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.8 – 2009 Spa Addenda and Editorial Changes
Addenda 'b' Spa Addenda Record 09-389 Stds Comm
APPROVED
Editorial Changes LB #09-815RC1 Stds
Comm APPROVED
Public Review BSR-8 #1319
BSR-9 #982
10/22/2009 – ANSI Approved
PUBLISHED

ASME A112.19.9M (R2008) Consolidation


Non-Vitreous Ceramic Plumbing Fixtures XX/XX/XXXX – Consolidated into
ASME A112.19.2/CSA B45.1-2008
also included: Supplement 1 to ASME
A112.19.9M-1991
Erratum released for publication on 4/26/99

ASME A112.19.10 – 2017 (R2022) Withdrawal M. Campos, Chair


Retrofit Dual Flush Devices for RC #10-480 – Withdrawal Disapproved A112.19.10
Water Closets Project Team on
Revision Dual Flush Devices
02/15/2012 – RC #12.327, PINS #448 for Water Closets
PT LB #12-569 – Revision Disapproved
LB #13-853 – Revision Disapproved
LB #13-853RC1 – Revision Approved
LB #13-853RC101 – Revision Approved
03/13/2017 – BSR-8 #2272
05/24/2017 – BSR-9 #1737
06/19/2017 – ANSI Approved
02/21/2018 – Published

Reaffirmation
RC #22-133
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2854
05/13/2022 – BSR-9 #2193
05/17/2022 – ANSI Approved

ASME A112.19.11 – Draft Project Dropped


Penalware and Special Use Fixtures Project Closed

Page 21 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.12 – 2014 (R2019) Revision M. Campos, Chair
Wall Mounted, Pedestal Mounted, 05/10/2013 – PINS #539; RC #14-1394 A112.19.12
Adjustable, Elevating, Tilting, and Pivoting LB #14-1891 – Revision Approved Project Team on
Lavatory, Sink, and Shampoo Bowl Carrier LB #14-1891RC1 – Revision Approved Movable Lavatory
Systems and Drain Waste Systems 09/18/2014 – Submitted to Publishing Systems
09/18/2014 – BSR-8 #1969
12/05/2014 – BSR-9 #1486
12/09/2014 – ANSI Approved Revision
02/17/2015 – Published

Reaffirmation
RC #18-2615
LB #18-3314 – Reaffirmation Approved
12/05/2018 – BSR-8 #2464
02/20/2019 – BSR-9 #1881
02/27/2019 – ANSI Approved

ASME A112.19.13 – 2001 (R2007) Consolidation


Electrohydraulic Water Closets XX/XX/XXXX – Consolidated into
ASME A112.19.2/CSA B45.1-2008

ASME A112.19.14 – 2013 (R2018) Revision S. Rawalpindiwala,


Six-Liter Water Closets Equipped with a 05/10/2013 – PINS #497; RC #13-851 Chair
Dual Flushing Device LB #13-1312 – Revision Approved A112.19.14
07/08/2013 – BSR8 #1844 Project Team on
12/03/2013 – BSR8 #1385 Dual Flush for 6L
12/12/2013 – ANSI Approved Water Closets

Reaffirmation
RC #18-351
LB # 18-368 – Reaffirmation Approved
02/08/2018 – BSR-8 #2360
05/03/2018 – BSR-9#1792
05/08/2018 – ANSI Approved

Consolidation
Consolidation into ASME A112.19.2/CSA
B45.1

Page 22 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.15 – 2012 (R2022) Revision S. Rawalpindiwala,
Bathtub/Whirlpool Bathtubs with Pressure 04/21/2011 – RC #11-1456, PINS #413 Chair
Sealed Doors LB #11-2160 – Revision Approved A112.19.15
BSR-8 #1640 Project Team on
BSR-9 #1229 Bathtubs and
03/05/2012 – ANSI Approved Whirlpools with
Pressure Sealed
Reaffirmation Door
LB #16-3676 – Reaffirmation Approved
02/02/2017 – BSR-8 #2260
04/27/2017 – BSR-9 #1723
05/04/2017 – ANSI Approved

Reaffirmation
RC #22-134
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2855
05/13/2022 – BSR-9 #2194
05/17/2022 – ANSI Approved

ASME A112.19.16 – 2006 Withdrawal


Terrazzo Plumbing Fixtures 08/23/2006 – ANSI Approved
Stds Com Blt 09-2045 Approved
Board Ballot 10-154 Approved
Public Review BSR8 1455 Closed 08 Jun 10
BSR9 1065 Withdrawal ANSI Approved 07 Jul
10
Published as a harmonized Standard CSA
B45.8-13/IAPMO Z403-2013

Page 23 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.19.17 – 2010 (R2018) Revision G. S. Duren, Chair
Manufactured Safety Vacuum Release 04/08/2009 – RC #03-1629, PINS #325 A112.19.17
Systems (SVRS) For Residential and LB #08-1072RC101 – Revision Approved Project Team on
Commercial Swimming Pool, Spa, Hot Tub BSR-9 #1030 Safety Vacuum
and Wading Pool Suction Systems 04/13/2010 – ANSI Approved Release System
(SVRS)
In the process of being transferred to Reaffirmation
APSP LB #15-364 – Reaffirmation Approved
03/18/2015 – BSR-8 #2039 Cancelled

Extension
03/25/2015 – BSR-11 #150
Extension Granted until 03/25/2018

Reaffirmation
RC #18-352
LB #18-368 – Reaffirmation Approved
02/08/2018 – BSR-8 #2361
05/03/2018 – BSR-9#1793
05/08/2018 – ANSI Approved

Reaffirmation
RC #22-2161
LB #22-3143 – Reaffirmation Disapproved
LB #22-3143RC1 – Reaffirmation Approved
12/16/2022 – BSR-8 #2945

ASME A112.19.18 – Draft PROJECT DROPPED


Glass Lavatory Fixtures PIR Dropped
Project picked up by CSA and IAPMO
CSA B45.11/IAPMO Z401-2011

ASME A112.19.19 – 2016 (R2021) Revision J. M. Koeller, Chair


Vitreous China Nonwater Urinals 01/12/2016 – RC #16-68, PINS #582 A112.19.19
LB #16-1253 – Revision Disapproved Project Team on
LB #16-1253RC1 – Revision Approved Non-Water Urinals
06/10/2016 – BSR-8 #2153
09/26/2016 – BSR-9 #1628
08/31/16 – ANSI Approved

Reaffirmation
RC #21-450
LB #21-589 – Reaffirmation Approved
03/09/2021 – BSR-8 #2721
05/28/2021 – BSR-9 #2086
06/01/2021 – ANSI Approved

ASME A112.20.1 – 2004 Transfer


Qualification of Installers of High Purity ANSI Approved March 18, 2004
Piping Systems TRANSFERRED to ASSE (July 2009 Meeting)

Page 24 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.20.2 – 2004 Transfer
Qualification of Installers of Firestops ANSI Approved March 18, 2004
Systems and Devices for Piping Systems TRANSFERRED to ASSE (July 2009 Meeting)

ASME A112.20.3 – Draft Transfer


Qualification of Installers of Residential TRANSFERRED to ASSE (July 2009 Meeting)
Fire Sprinkler Systems

ASME A112.21.1M – 1991 Revision & Redesignation


Floor Drains XX/XX/XXXX – Revision and Redesignation
as
ASME A112.6.3
Floor and Trench Drains

ASME A112.21.2M – 1983 Revision & Redesignation


Roof Drains XX/XX/XXXX – Revision and Redesignation
as
ASME A112.6.4
Roof, Deck, and Balcony Drains

ASME A112.21.3M – 1985 (R2022) Reaffirmation


Hydrants for Utility and Maintenance Use LB #16-3676 – Reaffirmation Approved
02/02/2017 – BSR-8 #2261
04/27/2017 – BSR-9 #1724
05/04/2017 – ANSI Approved

Reaffirmation
RC #22-135
LB #22-147 – Reaffirmation Approved
02/23/2022 – BSR-8 #2856
05/13/2022 – BSR-9 #2195
05/17/2022 – ANSI Approved

ASME A112.26.1M – Draft Project Closed


Water Hammer Arresters

ASME A112.36.2 – 2022/CSA B79.2 – 22 Revision/Consolidation/Redesignation N. Dickey, Chair


Cleanouts ASME A112.36.2/CSA B79.2 A112.36.2
Cleanouts Project Team on
RC #20-1711 PINS #739 Cleanouts
ANSI Forms Processed by ASME LB #21 – 3133 –
Revision/Consolidation/Redesignation
Under Continuous Maintenance (No PINS Disapproved
Required) LB #21-3133RC1 – Recirculation Approved
02/15/2022 – BSR-8 #2847
Published: July 29, 2022 05/06/2022 – BSR-9 #2185
05/06/2022 – ANSI Approved New
ASME/CSA Edition

Page 25 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASME A112.36.2M – 1991 (R2017) Reaffirmation
Cleanouts LB #16-3676 – Reaffirmation Approved
02/02/2017 – BSR-8 #2262
04/27/2017 – BSR-9 #1725
05/04/2017 – ANSI Approved Reaffirmation

Revision & Redesignation


05/06/2022 – Revised and Redesignated as
ASME A112.36.2/CSA B79.2
Cleanouts

ASSE 1002 – 2020/ASME A112.1002 – Revision/Consolidation/Redesignation D. Marbry


2020/CSA B125.12 – 20 RC #15-913
Performance Requirements for Anti- LB #15-1082 – New Std Disapproved
Siphon Fill Valves (Ballcocks) for Gravity LB #15-1082RC1 New Std Approved
Water Closet Flush Tanks 10/16/2015 – ANSI Approved

Update/Errata #1
ANSI Forms Processed by ASSE September 2017

Under Continuous Maintenance (No PINS Revision


Required) RC #19-2702
LB #19-3132 – Revision Approved
Published: June 25, 2020 02/13/2020 – BSR-8 Submitted by ASSE
04/14/2020 - BSR-9 Submitted by ASSE
04/14/2020 – ANSI Approved

ASSE 1016 – 17/ASME A112.1016 – Revision M. Malatesta


2017/CSA B125.16 – 17 (R2021) RC #16-924
Performance Requirements for Automatic LB #16-1371 – Revision Disapproved
Compensating Valves for Individual LB #16-1371RC1 – Revision Approved
Showers and Tub/Shower Combinations LB #16-3234 – Board Approved
01/06/2017 – ANSI Approved

ANSI Forms Processed by ASSE Reaffirmation


RC #21-451
Under Continuous Maintenance (No PINS LB #21-589 – Reaffirmation Approved
Required) 10/7/2021 – ANSI Approved

Published: 02/17/2017

ASSE 1018/ASME A112.1018/CSA B125. Project Dropped


Performance Requirements for Trap Seal 07/17/2014 – During the A112 Standards
Primer Valves – Potable Water Supplied Committee Meeting in Seattle, WA it was
approved to remove ASME from this
Tri-Harmonized project

Page 26 of 27
ASME A112 DOCUMENTS STATUS/TRACKING REPORT
DESIGNATION & TITLE STATUS RESPONSIBILITY
ASSE 1037 – 20/ASME A112.1037 – Revision/Consolidation/Redesignation M. Malatesta
2020/CSA B125.37 – 20 RC #13-1828
Performance Requirements for LB #13-2375 – New Std Disapproved
Pressurized Flushing Devices for Plumbing LB #13-2375RC1 – New Std Approved
Fixtures LB #13-2375RC101 – New Std Approved
10/09/2014 – BSR-8 Submitted by ASSE
01/07/2015 – BSR-9 Submitted by ASSE
ANSI Forms Processed by ASSE 01/21/2015 – ANSI Approved

Under Continuous Maintenance (No PINS Update #1


Required) September 2017

Published: October 16, 2020 Reaffirmation


RC #20-83
LB #20-96 – Reaffirmation Approved
02/13/2020 – BSR-8 Submitted by ASSE
04/14/2020 - BSR-9 Submitted by ASSE
04/14/2020 – ANSI Approved

Revision
RC #19-2703
LB #19-3132 – Revision Approved
07/16/2020 – ANSI Approved

ASSE 1070 – 20/ASME A112.1070 – Revision/Consolidation/Redesignation L. Himmelblau


2020/CSA B125.70 – 20 RC #13-2164
Performance Requirements for Water LB #13-2771 – New Std Disapproved
Temperature Limiting Devices LB #13-2771RC1 – New Std Approved
LB #13-2771RC101 – New Std Approved
10/30/2015 – ANSI Approved
ANSI Forms Processed by ASSE
Update #1
Under Continuous Maintenance (No PINS September 2017
Required)
Revision
Published: October 16, 2020 RC #19-2705
LB #19-3132 Revision Disapproved
LB #19-3132RC1 Revision Approved
07/17/2020 – ANSI Approved

Legend
Blue: New Standards/Draft Stage
Red: Superseded/Closed/Withdrawn Standards

Revised: 02/24/2023 by A. L. Guzman Rodriguez

Page 27 of 27