Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

QUOTATION

April 26, 2023 ADMIN2023-134

Client : TOTOPS HOME BUILDERS


Attention : Engr. AJ Brobo
Contact Number : 0938-379-7997

Project : Totops Basketball Court


Project Location : Minantok Kanluran, Amadeo Cavite

Dear Ma’am/Sir,

We are pleased to offer you our proposal for the supply of Ready-mix Concrete.

Following are the price(s) of our concrete to deliver at your site under Straight Contract
Scheme, as per your required mix design and specification(s):

G-1 ORDINARY 28 DAYS 14 DAYS 7 DAYS

2500 PSI PHP 5,150.00 PHP 5,300.00 PHP 5,450.00

3000 PSI PHP 5,200.00 PHP 5,350.00 PHP 5,500.00

3500 PSI PHP 5,300.00 PHP 5,450.00 PHP 5,600.00

4000 PSI PHP 5,350.00 PHP 5,500.00 PHP 5,650.00

G-3/4 ORDINARY 28 DAYS 14 DAYS 7 DAYS

2000 PSI PHP 5,110.00 PHP 5,260.00 PHP 5,410.00

2500 PSI PHP 5,210.00 PHP 5,360.00 PHP 5,510.00

3000 PSI PHP 5,270.00 PHP 5,420.00 PHP 5,570.00

3500 PSI PHP 5,320.00 PHP 5,470.00 PHP 5,620.00

4000 PSI PHP 5,470.00 PHP 5,620.00 PHP 5,770.00

5000 PSI PHP 5,650.00 PHP 5,800.00 PHP 5,950.00


G-3/4 PCD
28 DAYS 14 DAYS 7 DAYS
(Pumpcrete Design)
2500 PSI PHP 5,260.00 PHP 5,410.00 PHP 5,560.00

3000 PSI PHP 5,330.00 PHP 5,480.00 PHP 5,630.00

3500 PSI PHP 5,400.00 PHP 5,550.00 PHP 5,700.00

4000 PSI PHP 5,550.00 PHP 5,700.00 PHP 5,850.00

5000 PSI PHP 5,650.00 PHP 5,800.00 PHP 5,950.00

6000 PSI PHP 6,000.00 PHP 6,150.00 PHP 6,300.00

7000 PSI PHP 6,450.00 PHP 6,600.00 PHP 6,750.00

8000 PSI PHP 6,900.00 PHP 7,050.00 PHP 7,200.00

PRICE
PUMPCRETE RENTAL
(Php / lot)
LINE PUMP
Basement to 5th floor free of 20pcs pipes, in
excess charge will be 15pesos/pipe Php. 18,000.00
multiplied by volume delivered.
(minimum of 50 m³)
Boom Pump (43 meters)
Php. 20,000.00
(minimum of 50 m³)

Terms and Conditions:


• Prices quoted are INCLUSIVE of 12% value added tax.
• Prices are subjected to change without prior notice.
• This offer shall be valid for Thirty (30) Days from the date of this proposal.
• Jobsite conditions are subjected to ocular inspection prior to pouring.
• Schedule of RMC pouring must be advised at least three days in advance.
• A “No Purchase Order, No Delivery” is strictly implemented.
• All permits and other fees such as pass way, entry pass, barangay pass, parking fees,
etc. shall be for the account of the client.
• Customer will provide, safety road ways; including lighting, traffic sign, traffic
personnel assistance & waste disposal areas within site premises.
• Prices are applicable for clients who are on a 20km. radius away from our RMC
Plant located at MMG Compound, Sitio Malipa, Brgy. Maguyam Silang Cavite.
• Compressive Strength testing, are free of charge (with in minimum volume of 50m3),
however, other testing not included at pre- pouring agreement will be liable to the
requesting party.
• Minimum delivery is 8cubic meter and an additional amount of Php. 1,500.00/ m3
will be charged for any single load delivered below the minimum requirement.
• Adjustment on payment, if any, shall be settled after the pouring proper.
• A separate three percent (3%) interest rate will be charge monthly for every
corresponding late payment.
Payment Terms:

(Cash/ Dated Check Before Delivery)

For check deposit other than BDO, clearing days must be observed prior to delivery.

For new clients, CIS (Customer Information Sheet) must be filled up credit term
approval prior to pouring. Non-compliance of CIS will be charged full payment
before pouring.

Bank Details:
Bank Name: BDO- Banco De Oro
Account Name: ICON READY MIX CONCRETE INC.
Account Number: 0132-8800-0987

Prepared by: Approved by:

REBECCA GAGWIS EUGENE H. SALAR


Sales Coordinator General Manager

CONFORME:

_____________________________
Signature Over Printed Name / Date

You might also like