DAILY PROGRESS REPORT OF EM/CHP/STAGE-III/Dr.

NTTPS

Date: 07.01.2022

EM/CHP/STG-3 /Dr.NTTPS : -

1) At 16 tail end 4 Nos 70W fittings replaced.


2) At BOBR shed for tower light 10 Nos 400W fittings replaced by active power system.
3) AT WT 6 side module maintenance was done.
4) inmotion weigh bridge-I calibration was in progress.

DYEE/EM/CHP/Dr.NTTPS
IBRAHIMPATNAM