A can do a work in 20 days and B can do a work in 30 days.How many days will both take together to
complete the work?
(A) 6 (B) 8 (C) 4 (D) 12

2.A B

A can do a work in 12 days and B can do awork in 24 days.How many days will both take together to
complete the work?
(A) 6 (B) 8 (C) 4 (D) 12

3. A can do a work in 6 days and B in 9 days. How many days will both take together to complete the
work?

A B कर सकता है ।

(1) 7.5 days


(2)5.4 days
(3) 3.6 days
(4)3 days

(SSC CGL Prelim Exam. 27.02.2000 (Second Sitting)

4. A and B can separately do a piece of work in 6 days and 12 days respectively. How long will they work
together to complete the work ?

A और B क्रमशः 6 ददनों और 12 ददनों में अऱग-अऱग काम कर सकते हैं ।

(1) 9 days
(2) 18 days
(3) 6 days
(4) 4 days

(SSC Graduate Level Tier-I Exam. 11.11.2012 (IstSitting)

5. A can do a piece of work in 20 days and B can do the same piece of work in 30 days. Find in how
many days both can do the work ?

A B ददनों में कर सकता है ।

(1)16 days
(2) 14 days
(3)10 days
(4)12 days

(SSC Constable (GD) Exam. 12.05.2013)

(SSCCHSL DEO& LDC Exam. 20.10.2013)

1
6. A can complete a work in ‘m’ days and B can complete it in ‘n’ days. How many days will it take to
complete the work if both A and B work together ?
A दकसी कायय को ‘m’ ददनों में पूरा कर सकता है और B इसे ‘n’ ददनों में पूरा कर सकता है । यदद A और B दोनों एक साथ
काम करते हैं तो कायय को पूरा करने में दकतने ददन ऱगेंगे?

(1)(m + n) days
(2)1/m X 1/n days
(3)m+n/mn days
(4)mn/m+n days

(SSC CGL Tier-I Exam. 19.10.2014 (Ist Sitting)

7. A can do a piece of work in 4 days and B can do it in 12 days. In how many days will they finish the work, both
working together ?
A 4 ददनों में एक काम कर सकता है और B इसे 12 ददनों में कर सकता है ।
(1) 4 days (2)6days
(3) 2 days (4)3 days

(SSC CGL Tier-IExam. 26.10.2014)

8. If x can finish a job in4 hours andycan finish the same job in8hours independently, then they together will finish
the job in
यदद x दकसी कायय को घंटे में समाप्त कर सकता है और y समान कायय को घंटे में स्वतंत्र रूप से समाप्त कर सकता है , तो वे एक साथ
कायय समाप्त करें गे
(1)140 minutes
(2)160 minutes
(3) 120 minutes
(4)150 minutes
(SSC CGL Tier-II Exam. 12.04.2015 TF No. 567 TL 9)

9. A can do a piece of work in 30 days while B can do it in 40 days. In how many days can A and B working together
do it ?
A 30 ददनों में एक काम कर सकता है जबदक B इसे 40 ददनों में कर सकता है । A और B एक साथ दकतने ददनों में काम कर सकते हैं ?

(1) 33 days (2)27 days

(3)17 days (4)70 days


(SSC Multi-Tasking Staff
Exam. 30.04.2017)

2
1.A, B C

A,B and C can do a work alone in 20,12 and 15 days respectively.In how many days they complete the work
together?
(1)16days (2)5days

(3)4days (4)2 days

2. A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same
work in?
A, B और C क्रमशः 24, 6 और12ददनों में एक काम पूरा कर सकते हैं ।
(1) ¼day (2) 7/24day

(3) 3 days (4) 4 days

(SSC CPO S.I. Exam. 12.01.2003)


3. A, B and C individually can do a work in 10 days, 12 days and 15 days respectively. If they start working together, then
the number of days required to finish the work is

A, B & C व्यक्तिगत रूप से क्रमशः 10 ददन, 12 ददन और 15 ददन में एक काम कर सकते हैं । यदद वे एक साथ काम करना शुरू करते हैं , तो काम
खत्म करने के लऱए आवश्यक ददनों की संख्या है
(1) 16 days (2)8 days
(3)4 days (4)2 days
(SSC Constable (GD) & Rifleman (GD) Exam. 22.04.2012 (IInd Sitting)

4. A, B and C can complete a piece of work in 12, 24 and 36 days respectively. In how many days will they together com-
plete the same work ?
A,B & C क्रमशः 12, 24 और
36 ददनों में एक काम पूरा कर
सकते हैं ।

(1) 5 days (2)4 days

(3) 6 days (4)6 days

(SSC CHSL DEO & LDC Exam. 28.10.2012 (IstSitting)

5.A, B and C can complete a piece of work in 24, 5 an 12 days respectively. Working together, they will complete the
same work in :
A, B और C क्रमश: 24, 5 को 12 ददनों में पूरा कर सकते हैं । एक साथ काम करना, वे उसी काम को पूरा करें गे

(1) days (2)3 days

(3)4 days (4) days

1.

A man can complete a task in 5 days. But with the help of his son, he can complete it in 3 days. How long
will his son take to complete the task alone?

3
(1) 7 days (2) 6 days

(3) days (4) 20 days

2-A B A
B

A and B can complete a work in 4 days. If alone, ‘A’can complete a work in 6 days,In how many days
‘B’alone will the same work be completed?
(1) 10 days (2) 12 days

(3) 15 days (4) 20 days

3. A and B together can do a piece of work in 10 days. A alone can do it in 30 days. The time in which B alone
can do it is
A और B लमऱकर 10 ददनों में
एक काम कर सकते हैं ।A अकेऱा
इसे 30 ददनों में कर सकताहै ।

B
(1) 10 days (2) 12 days
(3) 15 days (4) 20 days
(SSC CPO S.I. Exam. 05.09.2004)

4.‘A’ alone can complete a work in 12 days. A and B together can complete it in 8 days. How long will B alone take to
complete the work ?
A ’अकेले एक कार्य को 12 ददनों में पूरा कर सकता है । A और B एक साथ इसे 8 ददनों में पूरा कर सकते हैं । B

(1) 24 days(2) 18 days


(3) 16 days(4) 20 days
(SSC CGL Prelim Exam. 04.02.2007 (Second Sitting)

5. If A and B together can complete a piece of work in 15 days and B alone in 20 days, in how many days can A alone
complete the work ?
यदद A और B लमऱकर 15 ददनों में एक काम पूरा कर सकते हैं और B 20 ददनों में अकेऱे कर सकते हैं , तो A अकेऱे दकतने ददनों में काम पूरा कर
सकता है ?
(1)60 days (2)45 days
(3)40 days (4)30 days
(SSC CGL Tier-I Exam. 16.05.2010 (First Sitting)

4
6. A and B together can do a piece of work in 5 days and A alone can do it in 8 days. B alone can do the same piece of work
in
A और B लमऱकर 5 ददनों में एक काम कर सकते हैं और A अकेऱे इसे 8 ददनों में कर सकता है । B अकेऱे उसी कायय को कर
सकता है

(1) 11 days (2) 12 day

13
(3) days (4) 16 days
(SSC Data Entry Operator Exam. 31.08.2008)

7.A and B together can do a piece of work in 12 days, while B alone can finish it in 30 days. A alone can finish
the work in
A और B लमऱकर 12 ददनों में एक काम कर सकते हैं , जबदक B अकेऱे इसे 30 ददनों में पूरा कर सकता है ।‘A’

(1) 20 days (2) 25 days


(3) 15 days (4) 18 days
(SSC CHSL DEO & LDC Exam. 21.10.2012 (IstSitting)

8.A and B together can dig a trench in 12 days, which A alone can dig in 28 days; B alone can dig it in
A और B लमऱकर 12 ददनों में एक खाई खोद सकते हैं , जजसे A अकेऱे 28 ददनों में खोद सकता है ; B अकेऱे इसे खोद
सकता है ?
(1)20 days (2)21 days
(3)22 days (4)23 days
(SSC CGL Tier-I Re-Exam. (2013) 20.07.2014 (Ist Sitting)

9.Raj and Ram working together do a piece of work in 10 days. Raj alone can do it in 12 days. Ram alone will do the work in
राज और राम साथ लमऱकर 10 ददनों में एक काम करते हैं । राज अकेऱे इसे 12 ददनों में कर सकता है ।राम अकेऱे

(1)20 days (2) 40 days


(3)50 days (4)60 days
SSC CGL Tier-II Exam. 21.09.2014)

10. A and B together can do a piece of work in 6 days. If A can alone do the work in 18 days, then the number of days required for
B to finish the work is

A और B लमऱकर 6 ददनों में एक काम कर सकते हैं ।यदद A अकेऱे कायय 18 ददनों में कर सकता है , तो B अकेऱे
(1)10 (2)12

(3)9 (4)15

(SSC CGL Tier-I Exam, 09.08.2015 (Ist Sitting) TF No. 1443088)

11. A man can do a piece of work in 30 hours. If he works with his son then the same piece of work is finished in 20 hours.
If the son works alone he can do the work in

एक आदमी 30 घंटे में एक काम कर सकता है । अगर वह अपने बेटे के साथ काम करता है तो 20 घंटे में एक ही काम खत्म हो जाता है । अगर
बेटा अकेऱे काम करता है तो वह काम कर सकता है
(1) 60 hours (2) 50hours
(3) 25 hours (4) 10hours

5
(SSC CGL Tier-II Online
Exam.01.12.2016)

12. A and B together can do a piece of work in 6 days and A alone can do it in 9 days. The number of days B will take to do
it alone is

A और B लमऱकर 6 ददनों में एक काम कर सकते हैं और A अकेऱे इसे 9 ददनों में कर सकता है । बी को अकेऱे करने में जजतने ददन ऱगेंगे
(1) 18 days (2) 24 days
(3) 9 days (4) 12 days
(SSC CGL Tier-I (CBE)
Exam. 27.08.2016) (Ist Sitting)

(SSC CHSL (10+2) LDC, DEO


& PA/SA Exam, 15.11.2015
(IInd Sitting) TF No. 7203752)

1. A and B can do a work in 12 days, B and C in 15 days and C and A in 20 days. If A, B and C work together, they will
complete the work in :
A और B 12 ददनों में एक काम कर सकते हैं , B और C 15 ददनों में और C और A 20 ददनों में काम कर सकते हैं । यदद A, B और C एक साथ काम
करते हैं , तो वे काम पूरा करें गे:

(1)5 days (2) 7 days

(3)10 days (4)15 days


(SSC CGL Prelim Exam. 04.07.1999
(Ist Sitting) & (SSC CPO S.I. Exam. 07.09.2003 & 03.09.2006) &
(SSC CGL Prelim Exam. 19.06.2011) (Ist Sitting) & (SSC GL Tier-I Exam. 19.05.2013) (Ist Sitting)

2. A and B can do a piece of work in 72 days. B and C can do it in 120 days, A and C can do it in 90 days. In how many
days all the three together can do the work ?
A और B 72 ददनों में एक काम कर सकते हैं । B और C 120 ददनों में कर सकते हैं , A और C 90 ददनों में कर सकते हैं । दकतने ददनों में तीनों
लमऱकर काम कर सकते हैं ?
(1)80 days(2)100 days
(3)60 days(4)150 days
(SSC CGL Prelim Exam. 04.07.1999 (IInd Sitting) & (SSC MTS (Non-Technical) Exam. 27.02.2011)

3.A and B together can do a work in 8 days, B and C together in 6 days while C and A together in 10 days, if they all work
together, the work will be completed in :
A और B लमऱकर 8 ददनों में एक काम कर सकते हैं , B और C एकसाथ 6 ददनों में कर सकते हैं जबदक C और A एकसाथ 10 ददनों में, यदद वे सभी
एक साथ काम करते हैं , तो काम पूरा हो जाएगा:
3 3
(1) 3 4 days (2) 3 7 days
5 4
5 4
(3) 47 days (4) 9 days
(SSC CGL Prelim Exam. 13.11.2005

6
4.A and B can complete a piece of work in 30 days, B and C in 20 days, while C and A in 15 days. If all of them work
together, the time taken in completing the work will be
A और B 30 ददनों में, B और C 20 ददनों में, जबदक C और A 15 ददनों में पूरा कर सकते हैं ।यदद वे सभी एक साथ काम करते हैं , तो काम पूरा करने
में ऱगने वाऱा समय होगा
(1) 10 days (2) 12 days
(3)12 2/3days(4)131/3days
(SSC CGL Prelim Exam. 13.11.2005 (Second Sitting)

5.A and B can complete a piece of work in 8 days, B and C can do it in 12 days, C and A can do it in 8 days. A, B and C
together can complete it in
A और B 8 ददनों में एक काम पूरा कर सकते हैं , B और C इसे 12 ददनों में कर सकते हैं , C और A इसे 8 ददनों में कर सकते हैं । A, B और C इसे लमऱकर
पूरा कर सकते हैं
(1)4 days (2)5 days
(3)6 days (4)7 days
(SSC CGL Tier-1 Exam
26.06.2011 (First Sitting)

6.A and B together can do a work in 10 days. B and C together can do the same work in 6 days. A and C together can do
the work in 12 days. Then A, B and C together can do the work in
A और B लमऱकर 10 ददनों में एक काम कर सकते हैं । B और C एक साथ 6 ददनों में कर सकते हैं । A और C लमऱकर 12 ददनों में कायय कर सकते हैं ।
तब A, B और C एकसाथ काम कर सकतेहैं
(1)28 days (2)14 days

5
(3) days 8
(4) days
(SSC CGL Tier-1 Exam
26.06.2011 (Second Sitting)

7.A and B working together; can do a piece of work in 4 hours. B and C working together can do it in 3 hours. C and A
working together can do it in 2hours. All of them begin the work at the same time. Find how much time they will take to
finish the piece of work.
A और B एक साथ काम करना; 4 घंटे में एक काम कर सकते हैं । B और C एक साथ काम करते हुए इसे 3 घंटे में कर सकते हैं । C और A एकसाथ
लमऱकर इसे 2hours में कर सकते हैं । सभी एक ही समय में काम शुरू करते हैं । काम का टु कडा खत्म करने में उन्हें दकतना समय ऱगेगा।
(1) 3 hours (2)2hours
(3) 2·5 hours (4)3·25hours
(SSC CPO (SI, ASI & Intelligence Officer) Exam 28.08.2011 (Paper-I)
8.A and B together can complete a piece of work in 18 days, B and C in 24 days and A and C in 36 days. In how many days,
will all of them together complete the work ?
A और B एक साथ 18 ददनों में, B और C 24 ददनों में और A और C 36 ददनों में एक काम पूरा कर सकते हैं । दकतने ददनों में सभी लमऱकर काम पूरा
करें गे?
(1) 16 days (2) 15 days
(3) 12 days (4) 10 days
(SSC CISF ASI Exam
29.08.2010 (Paper-1)

9.If A and B together can finish a piece of work in 20 days, B and C in 10 days and C and A in 12 days, then A, B, C jointly
can finish the same work in
यदद A और B एक साथ लमऱकर 20 ददनों में, B और C को 10 ददनों में और C और A को 12 ददनों में पूरा कर सकते हैं , तो A, B, C संयुि रूप से उसी
काम को पूरा कर सकते हैं ?
(1) 2/7 days (2) 30 days
(3)8 4/7 days (4)7/60days

10.A and B can do a piece of work in 15 days. B and C can do the same work in 10 days and A and C can do the same in
12 days. Time taken by A, B and C together to do the job is

7
A और B 15 ददनों में एक काम कर सकते हैं । B और C एक ही काम को 10 ददनों में कर सकते हैं और A और C 12 ददनों में एक काम कर सकते
हैं ।A,B C
(1)4 days (2)9 days
(3) 8 days (4) 5 days
(SSC CHSL (10+2) LDC, DEO &
PA/SA Exam, 01.11.2015,
IInd Sitting)
11. A and B together can do a piece of work in 36 days, B and C together can do it in 24 days. A and C together can do it in
18 days. The three working together can finish the work in
A और B लमऱकर 36 ददनों में एक काम कर सकते हैं , B और C लमऱकर 24 ददनों में कर सकते हैं । A और C लमऱकर इसे 18 ददनों में कर
सकते हैं । एक साथ काम करने वाऱे तीनों में काम खत्म हो सकता है
(1) 8 days (2) 16 days
(3) 30 days (4) 32 days
(SSC CGL Tier-I (CBE)
Exam. 07.09.2016) (Ist Sitting)

12. A and B can do a piece of work in 18 days, B and C in 24 days, A and C in 36 days. Working together they can do the
work in
A और B 18 ददनों में, B और C 24 ददनों में, A और C 36 ददनों में एक काम कर सकते हैं । एक साथ काम करने से वे काम अंदर कर सकते हैं
(1) 12 days (2) 13 days
(3) 16 days (4) 26 days
(SSC CGL Tier-II (CBE)
Exam. 30.11.2016)

1.A and B can do a piece of work in 12 days, B and C in 8 days and C and A in 6 days. How long would B take to do the
same work alone ?
A और B 12 ददनों में, 8 ददनों में B और C और 6 ददनों में C और A काम कर सकते हैं ।अकेऱे उसी काम को करने में B को दकतना समय
ऱगेगा?
(1) 24 days (2) 32 days
(3) 40 days (4) 48 days
(SSC CGL Prelim Exam. 24.02.2002 (Middle Zone) & (SSC CGL Prelim
Exam. 13.11.2005 (Ist Sitting)

2.A and B can do a piece of work in 10 days, B and C in 15 days and C and A in 20 days. C alone can do the work in :
A B B C C A C
(1) 60 days (2) 120days
(3) 80 days (4) 30 days
(SSC CGL Prelim Exam. 24.02.2002 (First Sitting)

3.A and B can do a piece of work in 15 days. B and C can do a similar work in 12 days and C and A in 10 days. How
many days will A take to do the work by himself ?
A और B 15 ददनों में एक काम कर सकते हैं । B और C एक समान कायय 12 ददन और C और A 10 ददनों में कर सकते हैं । A को कायय करने
में दकतने ददन ऱगेंगे?
(1)13 (2) 24
(3) 40 (4) 8
(SSC CGL Tier-II Exam, 2014
12.04.2015 (Kolkata Region)
TF No. 789 TH 7)

8
4.A and B can do a piece of work in 10 days. B and C can do it in 12 days. A and C can do it in 15 days. How long will A
take to do it alone ?
A और B 10 ददनों में एक काम कर सकते हैं । B और C इसे 12 ददनों में कर सकते हैं । A और C इसे 15 ददनों में कर सकते हैं । A इसे अकेऱे करने में
दकतना समय ऱेगा?
(1) 24 days (2) 20 days
(3) 40 days (4) 30 days
(SSC CHSL DEO & LDC Exam. 04.12.2011(IInd Sitting (North Zone)

5.A and B can do a piece of work in 36 days, B and C can do it in 60 days, A and C can do it in 45 days. C alone can do it in
A और B 36 ददनों में एक काम कर सकते हैं , B और C इसे 60 ददनों में कर सकते हैं , A और C इसे 45 ददनों में कर सकते हैं । C अकेऱे
में कर सकताहै
(1)90 days (2)180 days
(3)120 days (4)150 days
(SSC CHSL DEO & LDC Exam.
04.11.2012, IInd Sitting)

6.A can do a piece of work in 4 hours; B and C can do it in 3 hours. A and C can do it in 2 hours. How long will B
alone take to do it ?
A काम का एक टु कडा 4 घंटे में कर सकता है ; B और C इसे 3 घंटे में कर सकते हैं । A और C इसे 2 घंटे में कर सकते हैं । B अकेऱे इसे
करने में दकतना समय ऱेगा?

(1)10 hours(2)12 hours


(3)8 hours (4)24 hours
(SSC CGL Prelim Exam. 24.02.2002 (IInd Sitting) (SSC CGL Prelim Exam. 13.11.2005 (IInd Sitting)

7.If A and B together can complete a work in 18 days, A and C together in 12 days and B and C together in 9 days, then B
alone can do the work in
यदद A और B लमऱकर 18 ददनों में A और C एकसाथ 12 ददनों में पूरा कर सकते हैं और B और C एकसाथ 9 ददनों में पूरा कर सकते हैं , तो B अकेऱे
काम को पूरा कर सकता है ।
(1)18 days (2)24days
(3)30 days (4)40 days
(SSC Section Officer (Commercial Audit) Exam. 30.09.2007 (IInd Sitting)

8.A and B can do a piece of work in 10 days. B and C can do it in 12 days. C and A in 15 days. In how many days will C
finish it alone ?
A और B 10 ददनों में एक काम कर सकते हैं । B और C इसे 12 ददनों में कर सकते हैं । 15 ददनों में C औरA. C अकेऱे इसे दकतने ददनों में पूरा करे गा?
(1)24 days (2)30days
(3)40 days (4)60 days
(SSC CPO S.I. Exam. 06.09.2009)

9.If A and B together can complete a work in 12 days, B and C together in 15 days and C and A together in 20 days, then B
alone can complete the work in
यदद A और B एक साथ 12 ददनों में काम पूरा कर सकते हैं , B और C एक साथ 15 ददनों में और C और A एक साथ 20 ददनों में पूरा कर सकते हैं , तो
B अकेऱे ही काम पूरा कर सकते हैं
(1)30 days (2)25 days
(3)24 days (4)20days
(SSC (South Zone) InvestigatorExam 12.09.2010)

10.A work can be completed by P and Q in 12 days, Q and R in 15 days, R and P in 20 days. In how many days P alone can
finish the work?
एक काम P और Q 12 ददनों में, Q और R 15 ददनों में, R और P 20 ददनों में पूरा दकया जा सकता है । P दकतने ददनों में अकेऱे काम पूरा कर सकता
है ?
(1) 10 days (2) 20 days
(3)30 days (4) 60days

9
(SSC CGL Tier-1 Exam
19.06.2011 (Second Sitting) &
(SSC GL Tier-I Exam.
19.05.2013)

11. A and B can do a piece of work in 72 days. B and C can do it in 120 days and A and C can do it in 90 days. A alone can
do it in :
A और B 72 ददनों में एक काम कर सकते हैं । बी और सी 120 ददनों में कर सकते हैं और ए और सी 90 ददनों में कर सकते हैं । Aअकेऱे में कर
सकते हैं
(1) 120 days (2) 130days
(3) 150 days (4) 100days
(SSC CGL Tier-I (CBE)
12. A and B together can complete a piece of work in 72 days, B and C together can complete it in 120 days, and A and C
together in 90 days. In what time can A alone complete the work ?
A और B लमऱकर 72 ददनों में एक काम पूरा कर सकते हैं , B और C लमऱकर इसे 120 ददनों में पूरा कर सकते हैं , और A और C एकसाथ 90 ददनों में
पूरा कर सकते हैं । A अकेऱे समय में काम पूरा कर सकता है ?
(1) 80 days (2) 100days
(3) 120 days(4)150 days
(SSC CPO S.I. Exam.
26.05.2005)

13.A and B can do a piece of work in 8 days, B and C can do it in 24 days, while C and A can do it in 8 days. In how
many days can C do it alone?
A और B 8 ददनों में एक काम कर सकते हैं , B और C इसे 24 ददनों में कर सकते हैं , जबदक C और A इसे 8 ददनों में कर सकतेहैं। C अकेऱे इसे
दकतने ददनों में कर सकता है ?
(1) 60 days (2) 40 days
(3) 30 days (4)10 days
(SSC Multi-Tasking (Non-
Technical) Staff Exam.
20.02.2011)

1-A B B C
A C
A and B can complete 8 days and B and C in 12 days Together all three can complete it in 6 days. How long will A
and C take to accomplish that task?

(1)8 days (2)10 days


(3)12 days (4)20 days
(SSC Section Officer (Commercial Audit) Exam. 26.11.2006 (IInd Sitting) & (SSC CHSL DEO & LDC Exam. 11.12.2011) (Delhi )

2.A and B can do a given piece of work in 8 days, B and C can do the same work in 12 days and A, B, C complete it
in 6 days. Number of days required to finish the work by A and C is
A और B काम को 8 ददनों में कर सकते हैं , B और C काम को 12 ददनों में कर सकते हैं और A, B, C इसे 6 ददनों
में पूरा कर सकते हैं । A और C द्वारा कायय पूरा करने के लऱए आवश्यक ददनों की संख्या है

(1)16 (2) 8
(3)12 (4)24
(SSC CGL Tier-II Exam, 25.10.2015, TF No. 1099685)

10
3.A, B and C together can complete a piece of work in 30 minutes. A and B together can complete the same work in 50
minutes. C alone can complete the work in
A, B और C लमऱकर 30 लमनट में एक काम पूरा कर सकते हैं । A और B एक साथ काम को 50 लमनट में पूरा कर सकते हैं । C अकेऱे काम को पूरा
कर सकता है

(1)60 minutes (2)75 minutes


(3)80 minutes (4)150minutes
(SSC CHSL DEO & LDC Exam. 28.11.2010 (IInd Sitting)

11