MRI ANALYSIS REPORT

Voltages Currents
Date of Joint
Sl.n Name of the Inspection with
SC.No. Make Meter no. Sub-Division Date KWH KVAH Remarks
o. Industry ADE/DPE/PDPL
& ADE/OP/SLB

R Phase Y Phase B Phase R Phase Y Phase B Phase

Date of
25.11.2022 3860665 4155575 5.86 6.77 6.75 9.29 9.36 10.16
Peridiocal

Date of Joint
30.12.2022 3953044 4259450.00 5.76 6.75 6.7 7.32 8.03 6.83
M/s. Inspection
Telanagana
PDL-
1 Super Secure y0304687 ramagundam 30.12.2022
0195
thermal
power plant
DOR 22.02.2022 4071765 4387645 6.69V 6.71V 6.66V 6.48A 5.88A 7.12 as per MRI data

Assistant Divisional Engineer,


HT Meters, Peddapally
FEEDER-1- MAIN FEEDER-1- CHECK
OLD METER NEW METER OLD METERNEW METER
MAKE MAKE

SL.NO SL.NO
TYPE TYPE
CT RATIO CT RATIO
PT RATIO PT RATIO
CLASS CLASS
GWH GWH
GVRH(G) GVRH(G)
GVRH(D) GVRH(D)
GVAH GVAH
GVAH GVAH
CMD CMD
PF PF
V1 V1
V2 V2
V3 V3
I1 I1
I2 I2
I3 I3

FEEDER-1 FEEDER-2

old meter old meter


new meter new meter

MAIN

APZ01062 APZ01063
12288030 12288033
old meter old meter new meter
new meter

CHECK

APZ01064 12288034 APZ01065


12288031
new meter old meter
old meter new meter

STAND BY

APZ01066 APZ01067
12288032
12288048

STAND BY
APMB6292 SUMMATION

CHECK
APMB6291 SUMMATION

MAIN
APMB6290 SUMMATION