Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

OCBO Form No. 5 CEO.OCBO.F.005 REV.

00 24JUN2022
Series of 2022

Occupancy Application
(Guide for Printing)
1. Checklist of Requirements (Certificate of Occupancy) (1 copy)
[Front Page Only] [Long Bond Paper]
2. Application Letter (1 copy)
[Front Page Only] [Short Bond Paper]

3. Application for Certificate of Occupancy (2 copies)


[Front Page Only] [Short Bond Paper]

4. Fire Safety Inspection Certificate (2 copies)


[Front Page Only] [Short Bond Paper]

5. Certificate of Occupancy (5 copies)


[Front Page Only] [Short Bond Paper]

6. Certificate of Completion (Building) (5 copies)


[Front Page Only] [Long Bond Paper]

7. Certificate of Completion (Sanitary/Plumbing) (3 copies)


[Front Page Only] [Long Bond Paper]

8. Certificate of Final Electrical Inspection/Completion (3 copies)


[Front Page Only] [Long Bond Paper]

9. Letter to Davao Light (2 copies)


[Front Page Only] [Short Bond Paper]

10. Request for Inspection (1 copy)


[Front Page Only] [Long Bond Paper]

11. Certificate of Completion (Electrical Works) (3 copies)


[Front Page Only] [Long Bond Paper]

12. Certificate of Completion (Electronics) (3 copies)


[FOR COMMERCIAL OR INSTITUTIONAL]
[Front Page Only] [Long Bond Paper]

13. Certificate of Completion (Mechanical) (3 copies)


[FOR COMMERCIAL OR INSTITUTIONAL]
[Front Page Only] [Long Bond Paper]

14. Certificate of Use (3 copies)


[FOR TOWER OR BILLBOARD]
[Front Page Only] [Long Bond Paper]

15. Occupancy Inspection Sheet (3 copies)


[Front Page Only] [Long Bond Paper]

16. Application for Change of Use or Occupancy (3 copies)


[FOR TOWERS AND CELLSITES]
[Front Page Only] [Long Bond Paper]
OCBO Form No. 6 CEO.OCBO.F.006 REV.00 24JUN2022
Series of 2022
Republic of the Philippines
Davao City
Province of Davao Del Sur
OFFICE OF THE BUILDING OFFICIAL

Name of Application: __________________________________________________________________________


Project Location: ______________________________________________________________________________
Use of Type of Occupancy: _____________________________________________________________________
Contact Person: ________________________________________________________________________________
Phone No.: ____________________________________________________________________________________
Email Address: _________________________________________________________________________________

CHECKLIST OF REQUIREMENTS
CERTIFICATE OF OCCUPANCY
(ALL FORMS SHOULD BE FILLED-UP)

1. Application Letter; Photocopy of owner’s ID with three (3) specimen signatures;


authorization letter.

2. Zoning Validated Certificate of Occupancy for 1,500 m 2


and below (Fill-up Location of
Clearance for as-built)

3. Accomplished Certificate of Completion for:


- Building Construction (5 copies)
- Sanitary / Plumbing Installation (3 copies)
- Electrical Installation (3 copies)
- Mechanical Installation (3 copies)
- Electronics Installation (3 copies)

4. Fire Safety Inspection Certificate

5. Picture/s of the subject showing four (4) elevations (3 copies sets each)

6. Photocopy of approved permits (1 copy each including back)


- Building Construction
- Sanitary / Plumbing Installation
- Electrical Installation
- Mechanical Installation
- Electronics Installation

7. Copy of Approved Building Plans (1 set)

8. Waiver from the previous professional in-charge, if project is assigned to other


professional in-charge.

9. Stuctures with CAAP clearance (submit structural survey for the actual bldg. height)
signed and sealed by Geodetic Engineer

NOTE: Please print legibly / avoid erasures. (Use BLACK Ink only)

Evaluated by: __________________________________________________________________________


Date : _________________________________________________________________________________
OCBO Form No. 3 CEO.OCBO.F.003 REV.00 24JUN2022
Series of 2022

APPLICATION LETTER

Date
ARCH. KHASHAYAR L. TOGHYANI
Officer-In-Charge
Davao City

Dear Ma’am,

I
(First Name) (Middle Name) (Family Name)

would like to apply for for my

located at

I also authorize
(Authorized Representative of the Company)

to transact the application with your Office in my behalf.

I/We hereby certify that the documents submitted herein are all true and correct,
therefore falsification on the supporting document in any way will cause disapproval of the
permit application without prejudice further action that may be undertaken pursuant to Article
171 & 172 of R.A 3815, otherwise known as the Revised Penal Code of the Philippines.

(Signature over Printed Name of Owner) (Signature over Printed Name of Authorized Representative)

Address Address

Contact Number Contact Number

OCBO @ 2021
OCBO Form No. 7 CEO.OCBO.F.007 REV.00 24JUN2022
Series of 2022

Republic of the PI.llipplnes

Cfty/Municipality of

Provlnce of

OFFICE OF TIIE BuILDING OFFllCIAL


APPLICATION FOR CERTIFICATE OF OCCUPANCY

| FULL I PARTIAL

Building Perry, * No:

Date Issued:

(DATE)

Name of Owner/Applicant:

Address of Owner/Applicant: ZIP Code:

Tel.NQ:

Requirement SuI)mltted:

D As-Built PIans and Specifications, duly singe and


H Others: (Specify)
sealed by respective professional discipline
E Daily Construction Works Logbook
H certificate of completlon, duly notarized

Name of Project:

location:
(lot No-) (Blk No.) (Street) (Barangay) (Otyth.A midpallty)

Use/Character of Occupancy:

No. of Storeys:

No. of Units:

Total Floor Area (Square Meters):

Date of Completion:

Submitted by..

OWNER /APPLICANT
(stTnature O\^er Prlmed Namel

Community Taa( Certiflcat® No.

Place ELed:
NBC Form No. B-18

Republic of the Philippines


City Municipality ____________________
Province of _____________________________

OFFICE OF THE BUILDING OFFICIAL


TO : CITY / MUNICIPAL FIRE MARSHALL
Bureau of Fire Protection, DILG

SUBJECT : COMPLETION OF CONSTRUCTION

Pursuant to the provision of Section 309.2 of the Revised Implementing Rules and
Regulations of PD 1096, please conduct a final inspection of the building owned by
_______________________________ located at ___________________________________
for fire safety and control requirements.

“A notification to conduct final inspection shall be endorse by the Office of the


Building Official to the City/Municipality Fire Marshall (C/MFM), Bureau of Fire Protection
(BFP), who shall issue a fire safety inspection Certificate within five (5) working days if the
fire safety requirement shall have been complied. If after the prescribed period no action
taken by the C/MFM, the Building Official may issue the Certificate of Occupancy with the
condition that the Fire Safety requirements shall be complied with, within the prescribed
period set forth in the Fire Code of the Philippines (PD 9514).”

ARCH. KHASHAYAR L. TOGHYANI


Officer-In-Charge

Date referred to C/MFM Date returned to Building Official

Date referred by C/MFM Date returned by Building Official

OCBO @ 2021
OCBO Form No. 8 CEO.OCBO.F.008 REV.00 24JUN2022
Series of 2022

Certificate of Final Inspection REPUBLIC OF THE PHILIPPINES


OFFICE OF THE BUILDING OFFICIAL
CITY OF DAVAO
Certificate of Completion Number

AREA CODE
Date Submitted Date Issued

Owner / Applicant CERTIFICATE OF OCCUPANCY


Building Permit No. Date Issued Number

Location of Construction

Use or Type of Occupancy Date Issued

Date of Completion Cost as Built This certifies that the building structure which has been designed and
Inspected as to the following requirements: constructed as a ____________________________________________ under
As-Built Plan Construction Logbook Building Permit No. __________________ dated ________________ issued under the
name of ____________________________________________ has been inspected
and found to be in conformity with the approved plans and specifications on the file in
ARCH. KHASHAYAR L. TOGHYANI
________________________ ENGR. REY DHANNEL O. RIOS
____________________
Architectural / Accessibility Line and Grade this office and the provisions of the National Building Code (P.D. 1096) and its
implementing rules and regulations and therefore the building / structure may now be
occupied or used.
ENGR. DINDO C. CORDA ENGR. REY S. ABIERA
Electrical / Electronics Sanitary / Plumbing The owner shall properly maintain this building structure to enhance its
architectural well-being, structural stability, sanitation, and fire-protection property and
ENGR. GILBERT G. BRIGOLI shall not be occupied or used for purposes other than its intended use as stated above.
Head Mechanical Permit Section
The construction of the building descibed above was found to be in order and This certificate is issued in accordance with Section 309, Chapter 3 of
therefore the “Certificate of Occupancy” is hereby recommended for approval. P.D. 1096.

ENGR. RAUL P. MIGUE


Civil / Structural ARCH. KHASHAYAR L. TOGHYANI
Chief, Inspection and Enforcement Division Officer-in-Charge
FILING FEE :
CERTIFICATE OF OCCUPANCY :
ELECTRICAL INSPECTION FEE : NOTE:
PLUMBING INSPECTION FEE : A certified copy herof shall be posted within the premises of the building and shall not be removed
FIRE SAFETY INSPECTION FEE : without authority from the Building Official
lSSuED ON HAS BEEN COMPLETED IN
ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS ON FILE WITH THE OFFICE OF THE

OF THE "CERTIFICATE OF OCCUPANCY".NAMEOFOWNER

(IAST NAME) (GIVEN NAME) (MlOD|E NAME)ADDRESSOFOWNER

LOCATION OF CONSTRUCTION
USE OR TYPE OF OCCUPATIONDATEOFSTARTOFCONSTRUCTION :

PROPOSED ACTUAL
DATE OF COMPLETION:

EXPECTED ACTUAL
TOTAL FLOOR AREA (sq. meters) /
ESTIMATED ACTUAL
NO. OF STOREYS ACTUAL HEIGHT
ESTIMATED COST P
ACTUAL COST P (For statistical purposes Only)

a. MATERIALS (TOTAL COST) P

1. CEMENT (bags)
2. LUMBER (cubic meter)3.REINFORCINGBARS(kg.)4.NO.OFG.I.SHEETS

5. PRE-FAB STRUCTURAL STEEL (kg)

b. DIRRECT LABOR (TOTAL COST) P

This include compensation whether by salary or contract for project Architect/Engineers down to laborers.

c. RENTAL EQUIPMENT (lF ANY)

D. OTHER COST P

THIS INCLuDES PF(OFESSIONALSERVICES FEES, PERMITS AND OTHER FEES,


lF CONSTRUCTION IS UNDERTAKEN BY CONTRACT.At{LHlIECl/LIVILENGINttH |uN I I(All ur(

(lN{HARGE OF CONSTRUCTION)

CONFORME: PRC RES. NO. CLASS


TIN RES. CERT.

ADDRESS
OCBO Form No. 9 CEO.OCBO.F.009 REV.00 24JUN2022
Series of 2022

REPUBLIC OF "E PHILIPPINES


OFFICE OF THE BUILDING OFFICIAl-
DAVAO Crrv
OCBO Form No. 10 CEO.OCBO.F.010 REV.00 24JUN2022
Series of 2022
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
OFFICE OF THE CITY BUILDING OFFICIAL
Davao City

CERTIFICATE OF FINAL ELECTRICAL INSPECTION / COMPLETION


THIS IS TO CERTIFY THAT FINAL INSPECTION OF THE ELECTRICAL INSTALLATION HAD BEEN CONDUCTED ON BUILDING AND/OR
PREMISES CONVERED BY THE BUILDING PERMIT NO. _________________ ISSUED ON ________________ AND THE SAME WERE FOUND
COMPLETED IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND FILE WITH THE BUILDING OFFICIAL, AND IN
ACCORDANCE WITH THE ELECTRICAL CODE OF THE PHILIPPINES.
NAME OF OWNER / APPLICANT : LASTNAME FIRSTNAME MIDDLE NAME

ADDRESS : NO STREET BARANGAY CITY / MUNICIPALITY

LOCATION OF INSTALLATION : NO STREET BARANGAY CITY / MUNICIPALITY

TYPE OF OCCUPANCY OR USE :

RESIDENTIAL DWELLING BUSINESS AND MERCANTILE ASSEMBLY OCCUPANT LOAD 1000 OR MORE

RESIDENTIAL HOTEL APARTMENT INDUSTRIAL ACCESSORY

EDUCATION AND RECREATION STORAGE AND HAZARDOUS OTHERS (SPECIFY)

INSTITUTIONAL ASSEMBLY OTHER THAN GROUP 1

START OF INSTALLATION : DATE OF COMPLETION :

OUTLET/S | DEVICES EQUIPMENT


NUMBER OF OUTLETS :

LIGHT SPO. COOKING UNIT TOGGLE SWITCH FE DETECTORS


CONVINIENCE / RECEPTACLE SPO. WATER HEATER BELLS / BUZZER OTHERS (SPECIFY)
SPO. AIRCON SPO. WATER PUMP PUSH BUTTONS

PERSON INCHARGE OF INSTALLATION

PROFESSIONAL ELECTRICAL ENGINEER REGISTERED ELECTRICAL ENGINEER REGISTERED MASTER ELECTRICIAN


(not exceeding 600 volts and 600 kVA)
NAME :

SIGNATURE :

ADDRESS :

PTR NO. : DATE ISSUED : PLACE ISSUED :

CTC NO. : DATE ISSUED : TIN :

ELECTRICAL CONTRACTOR ( 200 AMPERE MAIN AND ABOVE )


NAME :

PCAB LICENSE NO. : (SPECIFICALLY ELECTRICAL) VALIDITY :

ADDRESS : TEL. / FAX NO. :

TYPE OF INSTALLATION :
TEMPORARY NEW REMODEL / ALTERATION

TYPE OF WIRING :

OPEN WIRING CONDUITS CABLE ARMORED CABLE RACEWAYS

OTHERS (SPECIFY) :

INSPECTED BY : APPROVED BY : NOTED BY :

ARCH. KHASHAYAR L. TOGHYANI


ELECTRICAL INSPECTOR CHIEF, ELECTRICAL SECTION Officer-In-Charge
(Signature over Printed Name) (Signature over Printed Name)

PRC REG. NO VALIDITY PRC REG. NO VALIDITY


AMOUNT PAID O.R. NO. DATE
OCBO Form No. 11 CEO.OCBO.F.011 REV.00 24JUN2022
Series of 2022

Republic of the Philippines


OFFICE OF THE BUILDING OFFICIAL
City of Davao

Date:

The Resident Manager


Davao u'ght & Power Company
DavaoCity

Sir/Maam:

Pursuant to the provision of pD IO96 otherwise known as the National Building


Code of the Philippines and its Ancillary, the Electrical Code of the PhilI.PPineS, you are
hereby authorized to supply kilowatt-hour meter and service connection/s to Mr./Mrs.

(Given Name) (Middle Name) (Family Name)

a resident of
after they had been issued Building and Electrical Permit, as well as its Cerificate of
Final Inspection and Occupancy of his/her building located at,

(House /Bldg./Purok No.) (Street Name) (Barangav)


this City, his/her Electrical Installation is found to be in accordance with the EIectrical Code
of the Philippines and its lmplementing Rules and Regulations.

Your favorable action on this matter is highly appreciated.

LONGITUDE : Very truly yours,


LATITUDE
ARCH. KHASHAYAR L. TOGHYANI
__________________________________

C-|n-
Officer-in-Charge
ENGR:
ENGR. CIRINIA GRACEI.I CATUBIG
CIRINIA GRACE CATUBIG
Officer -In-Charge

Alpha Numeric

Date Issued
OCBO Form No. 12 CEO.OCBO.F.012 REV.00 24JUN2022
Series of 2022

Republic of the philippines


OFFICE OF THE BUILDING OFFICIAL
City of Davao
(ELECTRICAL DIVISION)

REQUEST FOR INSPECTION

DATE :

NAME OF APPuCANT :
ADDRESS :

LOCATION OF INSTALLATION :

TOTAL NUMBER OF OuTLErs AND EQUIPMENT INSTALLED

LIGHTS: swlTCHES: CONVINIENCE OUTLET: MAIN SWITCH:


BELL SYSTEM: ELECTRIC RANGE: K.W.: WATEFi HEATER: K.W. :
AIRCONDITIONING SYSTEM: H.P.: TELEPHONE: MOTORS: H.P. :
OTHERS (SPECIFY):

NATURE OF WORKS:

P.E.E/R.E.E/R.M,I.

OWNER/APPLICANT SIGNATuRE PRC REG.#


P_T.R.#
RES.CERT,#
ISSUED AT:
DATE ISSUED:
T.I_N.#

lNSPECTION REPORT

REMARKS:

INSPECTOR DATE..

TIME :
-_mderluJ^Ol
"Jaau!Bu3 6u!ub!s fo ud pub oI Sod Jcl ^do9 XOJaX LPOnO aSOald
a8JeV3ruI-Ja3ulO
Officer-in-Charge

C-|n-
olonlV3 '| a3Vtl9 VINltlI3 'tl9N3
__________________________________
ARCH. KHASHAYAR L. TOGHYANI
:^q pa^oJddV
auJeN Pa|ul.Jd Ja^O aJnleu8!s) (1ue3I.lddV/JauMO JO aoueN Pa}u!Jd Ja^O aJn|eu8!s)
:^q pa|3adSul : aWtiOJNO3
'SSaJPPV 'SS3JPPV
'ON tlJ_d 'ON t]|d
'N'l'1 'N'l-I_
'PanSSl e}Ea 'PanSSl a}eO
"oN '8ati 3tld "oN.8a¥ 3tid
'PanSSl a}ea 'PanSSl a|BCI
'ON ti|d 'ON tlld
JJad }O aueN Pal}ul.Jd Je^O aJn}eu8!s aJ3d )a aureN Palu!JCI Ja^O eJn}eu8!s
UOJ)E.llda= l!uued S.]uOJ}Jala all| PaaulS OVM JJ3d alLJeS a`]l :uo!|amlSuO3 elI} JO a8Jell3-ul
(.J8ua s9!uOuOala ,JOJd 3q lSnur) Jeu8!sacI uO!|EJu!uaJ S!u} leas ISnlu SJaau!8ua 8u!u8!s
Wpads) sJau|O
: Hod OeP!^ : JaMO|/euua}uV : Sa|P}!MS/Ja}nOti : Hod OaP!^
: }el|nO e|eCl : sa8eu8!s le}!8!a :sura}s^s lens!^-o!pnv : tI^a uno
: lueJ AI33 :SIOJ}uOJ SSa9JV : sJaHeadS : Sl3aa
: S}al}nO 'la1 : S,3d : SJeAIaS : SJO}Jalaa
palle}sul }uaurd!nbJ Pug S}alnO JO JaquJnN lt!}O|
uo.l|alduloJ len}JV JO a}ea uO!PnJ}SuOJ JO ue}S a)eCI
I ^3uednJ3O )a ad^L/ash
uO!]3nJ}SuOJ ]O uO!}eJO|
JauMO JO SSaJPPV
: al}!1}3a!OJd
: JauMOJO euleN
"uo!}3adSu! lea.lJ JOJ ^PeaJ S! S¥JOM/uO.llelle}Su.I P!eS au] }euJ-.(960| Cld).aPOJ gu!mnq
leuo!}eN ,awl Pug lE"1O8u!pl!n8 JO a"O au} t1}!M aI.ll uO SuO!}e3gPadS Pup Sueld P3^OJdde eu}
u}!M e3ut!PJOJ3e u! Pa}aldluO3 uaeq Sell uO PanSSl 'ON }!quJad
s3!uOJ}3ala a|l} ^q FaJa^OJ 8u!pl!nq all} ]o sxpoM/uO!1elle]Su! S3!uOJ],ela eu] }eu| dy!uaJ O} S! S!uJ_
: lep!JJO 8u!pl!n8 awl
( SquOM SOIuou13alH J
4D OEIAea
|VOl±JO 9NICl|ln8 AID aH|±O aJlj±O
S^YMH9lH aNY SXtlOM )n¬nd JO LN=VultIVd=a
SaNlddl|llid 3HJ. ±O Jl|8r\datl
Series of 2022
CEO.OCBO.F.013 REV.00 24JUN2022 OCBO Form No. 13
OCBO Form No. 14 CEO.OCBO.F.014 REV.00 24JUN2022
Series of 2022
Repiblic of the philippines
DEPARTMENT OF PUBLIC WORKS a lilGHWAYS
OI=FICE OF THE CITY BuILDING OFFICIAL
Cl'ty of Davao

CERTIFICATE OF COMPLETION
Mechanical Works

"s ls to certify that mechanical Installation/works of the bullding covered by Building Perml. No.
issued on has been completed in accordance with the approved plans
and speclficatlon on file with the Office of the Building Offlclals and the Natlonal Bulldlng Code (P.D. 1096) that the said
installation is ready for partial/final completion.

NAME OF OWNER
(last Name) (Glven Name) (Mlddle Name)

Address:
Location of Construction:
use orType of Occupancy:
Date of Stall of construction:
Date of Completion:

Description and Type of Equipment installed

Descrtotton tlPftons Capaclty


Elevatol.
No. of Floors Served
Escalator, Mts.
rrype) (HP)
Generating Set
Other ICE not registered with
LTO.
WindowType, No. of Units
Mechanical Ventilation Sprinklers/AFE, No. of Heads
No. of units Pressure Vessels, Mt.
Pneumatic Tubes, Conveyors,
Monorails for Materials
Handling L Mts.

Done on this day of Installation is under


contract.

Checked plans, signed and sealed

CONFORM :

CERTIFICATION OF FINAL INSPECTION

This certifies that the mechanical works and the following apparatus Installed at the promises No.
Street Davao City
Owner/Occupied by were inspected and found to be
in accordance with the present management and regulations prescribed by the National Building Code of the
Philippines (P.D. 1096).
Miscellaneous : Kind of Installation
Contl.actor : Permit No.
a.R. No. Amount Paid : Date :
Date of Inspection :

nspector
OCBO Form No. 15 CEO.OCBO.F.015 REV.00 24JUN2022
Series of 2022

Certificate of Final Inspection REPUBLIC OF THE PHILIPPINES


OFFICE OF THE BUILDING OFFICIAL
CITY OF DAVAO
Certificate of Completion Number

AREA CODE

Date Submitted Date Issued

Owner / Applicant
CERTIFICATE OF USE
Number
Building Permit No. Date Issued

Location of Construction

Date Issued
Use or Type of Occupancy

Date of Completion Cost as Built This certifies that the building structure which has been designed and
constructed as a ____________________________________________ under
Inspected as to the following requirements Building Permit No. __________________ dated ________________ issued under the
name of ____________________________________________ has been inspected
and found to be in conformity with the approved plans and specifications on the file in
Line and Grade Civil / Structural this office and the provisions of the National Building Code (P.D. 1096) and its
implementing rules and regulations and therefore the building / structure may now be
occupied or used.
ENGR. DINDO C. CORDA
Electrical / Electronics The owner shall properly maintain this building structure to enhance its
architectural well-being, structural stability, sanitation, and fire-protection property and
The construction of the building descibed above was found to be in order and shall not be occupied or used for purposes other than its intended use as stated above.
therefore the “Certificate of Occupancy” is hereby recommended for approval.
This certificate is issued in accordance with Section 309, Chapter 3 of
P.D. 1096.
ENGR, RAUL P. MIGUE
Chief Inspection and Enforcement Division
ARCH. KHASHAYAR L. TOGHYANI
Officer-in-Charge
FILING FEE :
CERTIFICATE OF OCCUPANCY :
ELECTRICAL INSPECTION FEE :
NOTE:
PLUMBING INSPECTION FEE :
A certified copy hereof shall be posted within the premises of the building and shall not be
FIRE SAFETY INSPECTION FEE : removed without authority from the Building Official
OCBO Form No. 16 CEO.OCBO.F.016 REV.00 24JUN2022
Series of 2022
MPW FORM NO. 77-010-B

Republic of the Philippines


MINISTRY OF PUBLIC WORKS
OFFICE OF THE BUILDING OFFICIAL

DISTRICT/CITY/MUNICIPALITY

Area Code

APPLICATION FOR CHANGE OF USE OR OCCUPANCY

NAME OF APPLICANT :
LAST NAME GIVEN NAME MIDDLE INITIAL
ADDRESS OF APPLICANT :

LOCATION OF BUILDING :
(Attach Photocopy of Building, Sketch Plan/Vicinity)
USE OR TYPE OF OCCUPANCY

EXISTING PROPOSED

OCCUPANCY LOAD

EXISTING PROPOSED

NO OF STORIES

EXISTING ADDITIONAL

FLOOR AREA

EXISTING ADDITIONAL AREA AFFECTED BY CHANGE

TYPE OF CONSTRUCTION

EXISTING PROPOSED

DATE OF COMPLETION OF EXISTING BUILDING :

BUILDING PERMIT (if any) :


DATE ISSUED

ORIGINAL CERTIFICATE OF OCCUPANCY NO. :


DATE ISSUED

Conforme: Submitted By:

OWNER OF BUILDING APPLICANT


Residence Cert. No:
Date Issued:
Place:

BUILDING OFFICIAL

DATE