Area de oficina

Point A Point B Área de inspección

550
Patio de Carga General

5350
Contenedor vacío / pesado y OGG Patio de Carga General

Control Point Coordinates Table Contenedor Peligroso

Área reservada Área reservada Área reservada


5@4000=20000

Area 01 Area 06 Area 11


29900

28800

Area 02 Area 07 Area 12


1 1

Area 03 Patio de contenedores pesados Area 08 Area 13


Patio de contenedores pesados

Area 04 Area 09 Area 14

Area 05 Area 10 Area 15


4550
550

2 Point C
Point D 7@4000=28000
Índice
3000 1:4000 Área de mantenimiento de patio de contenedores
6981 20000 4019
31000

Slab Division For Container Yard Maintenance Area


1:200

100
3 3
Geotextile(150g/cm -200g/cm )

50~80
Soil Classification First Maintenance
Minimum 254mm Minimum 305mm Expansion joint
Spreading Spreading
320
Sika Dust Seal Sika Dust Seal
260
1/m 2 1/m 2 Structure of expansion joint of
1:20
Mainly dust suppression of cement stabilized crushed stone

- plastic 0.25 - 0.50 0.15 - 0.25

- slightly or non-plastic 0.50 - 0.80 0.25 - 0.40


C32/40 Concrete Slab 350mm
Mainly soil stabilisation 0.80 - 1.60 0.30 - 0.50
Cement Stabilized Crushed Stone 150mm
Detailed plan of dowel in joints 3 3
1:40 Geotextile(150g/cm -200g/cm )
Graded Broken Stone 150mm
Main Technical Parameters of Asphalt Rubber
Two overlapping
construction joint

7@4000=28000 3000
Structure of two overlapping construction joint
1:20
31000 of cement stabilized crushed stone
1-1
Horizonte 1: 100 4000
Vertical 1:40

260
C32/40 Concrete Slab 350mm

5@300=1500
Cement Stabilized Crushed Stone 150mm

Graded Broken Stone 150mm 6


Asphalt Rubber

60
175 175
180
4000

30 dowel Antirust Coating


@300
4550 100
5@4000=20000

6@300=1800
5350

29900 230 230

2-2 Structure of dowel in joints


Horizonte 1: 100 1:20
Vertical 1:40

260
Layout plan of dowel in joints
1:40

0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : 1.Dimensions are in millimeters, except where indicated. A1: 1:20
F For Revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 2.This project should be carried out after the underground construction is completed. A3: 1:40
E For Revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 3.Characteristic yield strength of reinforcement and dowel is not less than 420MPa.
D For Revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng 4.The bending strength of concrete is 5.5MPa, and the bending modulus is 33GPa. Chancay Multipurpose Terminal New First Stage, Peru DATE :
C For Revision 2020-04-09 Zhang Yong Chang Zhanwei Wu Zhefeng 5.Dowels in slabs with other dimensions than 4m X 4m and odd-sized slabs shall be arranged in the same dowel spacing and
Slab Division Drawing 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-30 Zhang Yong Chang Zhanwei Wu Zhefeng length compared with those in 4m X 4m slabs. Detailed Engineering For Container Yard Maintenance Area
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For Revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD. 6.Dowels shall be coated with a bond-breaking substance to prevent bonding to the PCC during the construction period.
The Ports for ALL
7.The need for expansion joints due to the size of the area shall be evaluated ahead of construction and approved by the Engineer. P114143-E-000-RY-DWG-017-R0 R0
REVISIONS