Índice Área de Mantenimiento de Patio de Contenedores: Horizonte 1: 100
Índice Área de Mantenimiento de Patio de Contenedores: Horizonte 1: 100
550
Patio de Carga General
5350
Contenedor vacío / pesado y OGG Patio de Carga General
28800
2 Point C
Point D 7@4000=28000
Índice
3000 1:4000 Área de mantenimiento de patio de contenedores
6981 20000 4019
31000
100
3 3
Geotextile(150g/cm -200g/cm )
50~80
Soil Classification First Maintenance
Minimum 254mm Minimum 305mm Expansion joint
Spreading Spreading
320
Sika Dust Seal Sika Dust Seal
260
1/m 2 1/m 2 Structure of expansion joint of
1:20
Mainly dust suppression of cement stabilized crushed stone
7@4000=28000 3000
Structure of two overlapping construction joint
1:20
31000 of cement stabilized crushed stone
1-1
Horizonte 1: 100 4000
Vertical 1:40
260
C32/40 Concrete Slab 350mm
5@300=1500
Cement Stabilized Crushed Stone 150mm
60
175 175
180
4000
6@300=1800
5350
260
Layout plan of dowel in joints
1:40
0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : 1.Dimensions are in millimeters, except where indicated. A1: 1:20
F For Revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 2.This project should be carried out after the underground construction is completed. A3: 1:40
E For Revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 3.Characteristic yield strength of reinforcement and dowel is not less than 420MPa.
D For Revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng 4.The bending strength of concrete is 5.5MPa, and the bending modulus is 33GPa. Chancay Multipurpose Terminal New First Stage, Peru DATE :
C For Revision 2020-04-09 Zhang Yong Chang Zhanwei Wu Zhefeng 5.Dowels in slabs with other dimensions than 4m X 4m and odd-sized slabs shall be arranged in the same dowel spacing and
Slab Division Drawing 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-30 Zhang Yong Chang Zhanwei Wu Zhefeng length compared with those in 4m X 4m slabs. Detailed Engineering For Container Yard Maintenance Area
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For Revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD. 6.Dowels shall be coated with a bond-breaking substance to prevent bonding to the PCC during the construction period.
The Ports for ALL
7.The need for expansion joints due to the size of the area shall be evaluated ahead of construction and approved by the Engineer. P114143-E-000-RY-DWG-017-R0 R0
REVISIONS