Control Point Coordinates Table: CCCC Water Transportation Consultants Co - LTD
Control Point Coordinates Table: CCCC Water Transportation Consultants Co - LTD
Patio de Carga
Ro-Ro y General
Point 1 Point 8
3200
10600
Patio de Carga
Point 2 Point 7
Ro-Ro y General
Patio de Carga General
Area de oficina
Área de inspección
1/m 2 1/m 2
Área reservada Área reservada Área reservada
102000
4000
100
3 3
Geotextile(150g/cm -200g/cm )
260
50~80
Expansion joint
5@300=1500
Structure of expansion joint of
1:20
Point 3 Point 6 of cement stabilized crushed stone
10600
180
4000
6@300=1800
Point 4 Point 5
260
3 3
Geotextile(150g/cm -200g/cm )
Two overlapping
Layout plan of dowel in joints construction joint
1:40
260
Asphalt Rubber
12@4000=48000
60
175 175
48000
30 dowel Antirust Coating
@300
1-1 100
Horizon 1:100
Vertical 1:40
230 230
0 ISSUED FOR CONSTRUCTION 2021-05-10 Zhang Yong Chang Zhanwei Wu Zhefeng NOTES: PROJECT: DRAWING TITLE: SCALE :
CLIENT: DESIGNER : 1.Dimensions are in millimeters, except where indicated. A1: 1:20
F For Revision 2020-10-20 Zhang Yong Chang Zhanwei Wu Zhefeng 2.This project should be carried out after the underground construction is completed. A3: 1:40
E For Revision 2020-09-21 Zhang Yong Chang Zhanwei Wu Zhefeng 3.Characteristic yield strength of reinforcement and dowel is not less than 420MPa.
D For Revision 2020-08-18 Zhang Yong Chang Zhanwei Wu Zhefeng 4.The bending strength of concrete is 5.5MPa, and the bending modulus is 33GPa. Chancay Multipurpose Terminal New First Stage, Peru DATE :
C For Revision 2020-04-09 Zhang Yong Chang Zhanwei Wu Zhefeng 5.Dowels in slabs with other dimensions than 4m X 4m and odd-sized slabs shall be arranged in the same dowel spacing and
Slab Division Drawing For Silo Area 2021-05-10
中远海运港口秘鲁钱凯公司 2020-03-30 Zhang Yong Chang Zhanwei Wu Zhefeng length compared with those in 4m X 4m slabs. Detailed Engineering
COSCO SHIPPING Ports Chancay PERÚ S.A. CCCC Water Transportation Consultants Co.Ltd B For Revision CODE : REVISION:
Rev. DESCRIPTION DATE BY. CKD. APD. AUD. 6.Dowels shall be coated with a bond-breaking substance to prevent bonding to the PCC during the construction period.
The Ports for ALL
7.The need for expansion joints due to the size of the area shall be evaluated ahead of construction and approved by the Engineer. P114143-E-000-RY-DWG-023-R0 R0
REVISIONS