Professional Documents
Culture Documents
2 Rooms Revised 181030 - 1547964439
2 Rooms Revised 181030 - 1547964439
INTERMEDIATE
STITCHING
SILL BAND
INTERMEDIATE INTERMEDIATE
STITCHING STITCHING
2,100
RAMP
SILL BAND SILL BAND
600
T
T 6,250 1,375 1,100 0.5T 0.5T 1,100 1,375 6,250 T
02
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PARTITION BETWEEN CLASSROOMS; PLYWOOD(9mm)-BOTH SIDES
875
4,14
TRANSLUCENT SHEETS 1 GAP FOR VENTILATION
8
4,98
TRANSLUCENT SHEETS
750
750
715
815
150
1,500
100 150 mm PCC (1:1.5:3)
GRILL WINDOW
INTERMEDIATE
1,350
STITCHING
1,250
BLACKBOARD
2,250
2,250
DOOR
2,100
750
750
SLOPE 1/37
75
600
525
125
T T T
G.L. G.L.
300
340
150
1.5T 1.5T
515
150
65
1.5T 2T 2T APRON
65
OUTER EDGE OF VERANDA
03
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
715 1,050 1,050 1,025 1,025 1,050 1,050 704 796
875
1 PCC (1:3:6)
4,14 4,98
8 300x300x10 MS BASE PLATE
770
GABLE RUNNER 25L
MS TUBULAR POST NB 80 M
903
755
750
715 0 3,37
815 3,37 150 mm PCC(1:1.5:3) 0
0.5T 1,000 0.5T
150
1,500
MS BASE PLATE 100
(200x200x10) INTERMEDIATE
STITCHING
2,546
BLACKBOARD
2,250
2,100
MS POST NB 80M
3,385
3,385
PCC (1:3:6)
T
SLOPE 1/37 300 300 300 BRICK
1,000
540
600
600
600
T
T
T T
125
PCC (1:3:6) T T
150
535
1,000
635
MS BASE PLATE (300x300x10)
1,000
65
1.5T
100
300
PCC (1:2:4)
BRICK WORK IN (1:6) CM
65
T 540 T T 540 T
1,000 1,000
6,250 1,500
PCC (1:3:6)
04
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
900
900
35
125
125.5
200 LONG FLAT 25X4 HOLD FAST
250 LONG FLAT 25X5 HOLD
WELDED TO FRAME
FAST WELDED TO FRAME
147
85X25X3TH. PLATE
147
147
TOWER BOLT
1350
1350
147
100x20x3 FLAT HANDLE
147
SHUTTER
0.7 MM GI SHEET
40X40X3 ANGLE FRAME
147
35X35X3 ANGLE FRAME
147
250 LONG FLAT 25X5 HOLD FAST
WELDED TO FRAME
125.5
ISNT 40
20X3 FLAT
(FRAME ELEVATION LOOKING FROM OUTSIDE)
WINDOW (W) (FRAME ELEVATION LOOKING FROM INSIDE)
432 432
25 191 191 25 25 191 191 25
12.5
12.5
250
250
327
327
100 LONG HINGE 100 LONG HINGE
HOLE FOR 6 Ø ALUMINIUM RIVET HOLE FOR 6 Ø ALUMINIUM RIVET
TOWER BOLT
327
327
217.5 220
25X25X3 ANGLE SHUTTER 25X25X3 ANGLE SHUTTER
TOWER BOLT
1334
1334
100x20x3 FLAT HANDLE
25X4 FLAT 25X4 FLAT
327
327
100 LONG HINGE 0.7 MM GI SHEET 100 LONG HINGE 0.7 MM GI SHEET
327
327
250
250
12.5
12.5
25X25X3 ANGLE SHUTTER 25X25X3 ANGLE SHUTTER
432 432
12.5
12.5
125
125
250 LONG
250
FLAT 25X5
267
267
HOLD FAST
WELDED TO
FRAME HOLE FOR 6 Ø HOLE FOR 6 Ø
ALUMINIUM RIVET ALUMINIUM RIVET
129
129
A
279
279
FRAME 50 X
50 X 5 ANGLE
300
279
279
180
TOWER BOLT
2100
200 40
2084
2084
279
279
50X50 FLAT 100x20x3 FLAT
50X50 FLAT HANDLE
HANDLE
100x20x3 "L" SHAPED
FLAT HANDLE PLATE WELDED 85
40X5 FLAT WITH FRAME
279
279
40 X 40 X 3 40X40X3 ANGLE
ANGLE
279
279
0.7MM GI SHEET
267
250
250
SHUTTER SHUTTER
125
125
FRAME FRAME
12.5
12.5
40 X 4 FLAT
25 277 276.5 277 25 25 277 276.5 277 25
40 X 40 X 3 40X 40 X 3
ANGLE ANGLE
(FRAME ELEVATION LOOKING FROM (LOOKING FROM OUTSIDE) (LOOKING FROM INTSIDE)
OUTSIDE) SHUTTER ELEVATION SHUTTER ELEVATION
DOOR (D1)
12.5
12.5
125
125
250 LONG
250
FLAT 25X5
267
267
HOLD
FAST
WELDED HOLE HOLE
TO FRAME FOR 6 Ø FOR 6 Ø
129
129
ALUMINUM ALUMINUM
RIVET RIVET
279
279
FRAME
50 X 50 X 5
ANGLE
300
279
279
180
TOWER BOLT
2100
200 40
2084
2084
279
279
50X50 FLAT 100x20x3 FLAT
50X50 FLAT HANDLE
HANDLE
100x20x3 "L" SHAPED
FLAT PLATE 85
40X5 FLAT HANDLE WELDED
279
279
WITH FRAME
40 X 40 X 3 40X40X3
ANGLE ANGLE
279
279
0.7MM GI SHEET
267
250
250
TO TO
125
125
SHUTTER SHUTTER
12.5
12.5
FRAME FRAME
40 X 4 FLAT
25 477 276.5 277 25 25 277 276.5 477 25
40 X 40 X 3 40 X 40 X 3
ANGLE ANGLE
(FRAME ELEVATION LOOKING FROM (LOOKING FROM OUTSIDE) (LOOKING FROM INTSIDE)
OUTSIDE) SHUTTER ELEVATION SHUTTER ELEVATION
DOOR (D)
1,000
1,000
1,625
3 9,5
.2 .9 5
97.6 3
6,250
6,250
34 77
2
,4 , 6 4.2
642
9,5 12 1 5 8
7,990
7,2
12.
27
1,625
1,000
1,000
1,385
1,385
1,100
08
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
CEMENT PUNNING (1:2)
50 MM PCC (1:2:4) 115 115 CEMENT PUNNING (1:2)
65 MM FLAT DRY BRICK SOLING 50 MM PCC (1:2:4)
100 MM SAND FILLING 65 MM FLAT DRY BRICK SOLING
75 MM THICK DPC 100 MM SAND FILLING
RAMMED EARTH FILLING 75 MM THICK DPC
RAMMED EARTH FILLING
75 20
75
0.5T T
500 500
GROUND LEVEL T
65 125 50
65 125
GROUND LEVEL
300
0.5T 0.5T
535
PCC 1:3:6
1.5T
515
PCC 1:2:4
65 150
1,000
100
BRICK SOLING
2T
T 500 T
300
F2 TYPE
65
1,000
F1 TYPE
150
100 MM SAND FILLING 300 300 300
50 MM THICK DPC
RAMMED EARTH FILLING
150
T
50
150
T
125 150
620
570
GROUND LEVEL
65 150 125
65
340
GROUND LEVEL
65 150 125
BRICK SOLING
0.75T 0.75T
340
1.5T
BRICK SOLING
0.75T 0.75T
1.5T
DETAIL OF STEPS
F3 TYPE
09
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
MS DOOR FRAME WITH PIPE
T 0.5T T
SLOPE 1:37
55
20
20
70
50
T
0.5T 0.5T
620
600
550
0.5T 0.5T
300
340
65 150
1.5T
515
65 150
1.5T
1.5T 2T
1,100 1,500
0.75T 0.75T
1,100 1,385
B
DETAIL AT BUTTRESS C' C
DETAIL OF VERANDAH
0.5T
1.5T
T
1.5T
T
0.5T
1.5T
0.75T 0.75T
0.5T T
1.5T
10
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PLAN FOR DPC AND GABLE BAND
3 NOS. OF 10 DIA BARS
T
75
4.75 BARS AT 150 C/C
T
T
1.5T
DPC AND GABLE BAND SECTION
1.5T 1.5T
150
T
1.5T
T
STICHING BAND
2T
75
1.5T
1.5T
4.75 BARS AT 150 C/C
T
1.5T 2T
2T 1.5T 2T STITCHING AND SILL BAND SECTION
AT 4 CORNERS & AT 2 LEVELS AT THE JUNCTION OF MID WALL
11
Designed by :
Revised (Oct 2017) BAND DETAILS
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PURLINS
PROJECTION OF TRUSS
715
BRACING
VERGE PURLIN
SLOPE
G.I. SHEET
3,125
ROOF COVERING
RIDGE
6,250
BRACING TRUSS GABLE (END)
SLOPE
3,125
TRUSS
TURNBUCKLE TURNBUCKLE
PROJECTION OF ROOF
1,385
1,500
715 3,600 3,600 3,600 3,600 715
15,830
12
Designed by :
Revised (Oct 2017) TRUSS
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
796 704 1,050 1,050 1,025 1,025
228
B 228
GI SHEET RIDGE
90 90
9 5 1,01
2,43 1,01 5
414
MS PLATE 40X40X5
A 2
875
1,13
424
8
4,98
GAP FOR VENTILATION
2
8 1,13
3,04
424
TRANSLUCENT SHEET
MS ANGLE 40x40x5
759
B WEB MEMBER 25Ø M
F
284
758
TYP. PURLIN 65 Ø L 0
3,37 WEB MEMBER 32Ø L
100
321
903
450
750
BOTTOM RAFTER 40Ø L
150
100 1,500
MS BASE PLATE
TYP. POST NB 80 M
200x200x10
2,536.73
2,250
2,250
2,100
3,385
C
600
PCC (1:3:6)
T
65149.53125
MS BASE PLATE
340.3
300x300x10
535
PCC (1:3:6)
1.5T PCC (1:2:4)
100
SCALE=1:30
65
13
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
1,025 1,050 1,050 A 715
228
228 1,050 1,050 941 106
GI SHEET RIDGE 90 90
CGI SHEET COVERING
1,01 2,43
TOP RAFTER 40 Ø L 5 9
414
E 1,13
875
2 4,14
1 C
424
TIMBER 40x40
875
2,13 0
1,13
4
B 1,22
2
10 J HOOK 7.5φ
424
BOLT / NUT
D 671
0
100 1,22
A
289
3,37 10
0
450
TRANSLUCENT SHEET
750
920 PLYWOOD t=6 1840x920
715 100
150
TIMBER 40x40
MS BASE PLATE
TYP. POST NB 80 M
200x200x10
2,250
2,100
PURLIN 65 Ø L
J HOOK 7.5φ
BOLT / NUT 40
40x
BER 40
TIM R 40x
BE
TIM
BORDER(TIMBER 40x6)
DETAIL C
SCALE=1:15
600
BORDER(TIMBER 150x6)
PLYWOOD t=6 2140/1840x920
DETAIL A
SCALE=1:15 PURLIN 65 Ø L
90
1
2 BRICK THICK WALL
535
10
PCC (1:3:6)
1,000
SCALE=1:30
BORDER(TIMBER 40x6) DETAIL (TRUSS)
65
DETAIL B SCALE=1:15
SCALE=1:15
250 500 250
14
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
BORDER(TIMBER) 40x6
BORDER(TIMBER) 40x6
3,125
TIMBER 40x40
TIMBER 40x40
6,250
BORDER(TIMBER) 40x6
PLYWOOD t=6 1840x1220 J HOOK
3,125
PURLIN 65φ
PLYWOOD t=6 1840(1650)x1220
TRUSS
TRUSS
TRUSS
TRUSS
TRUSS
15
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
240
160
50 70 70 50
75
65
150
85
815
715
92.72
100
200
49.76
875.29
300
450
720 720 720 720 720
co
37.5 37.5
16
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
160
75
160
160
100
75
75
160
25 55 55 25
33
75
42
160
25 55 55 25
37.5 37.5
75
120
25 35 35 25
20.5
40
19.5
17
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
SB-2/S6 SB-2/S6 SB-3/S6 SB-3/S6 SB-3/S6
L1 L1 L2 L2 L2
L1 L2 L2
36 w FTL
L1
SB-2/S1 SB-2/S2 SB-3/S1 SB-3/S2
L1 L2 L2
L1 L2
SB-2/S6 L1 SB-2/S3 L3
SB-2/S4 SB-2/S5 SB-3/S3
L1
SB-3/S4 SB-3/S6
SB-3/S5
L1 L2 L2
SB-2/S1 SB-2/S2 SB-3/S2
SB-3/S1
L1
10M 10M
SB-2/DB SB-3/DB
SB-1/DB 2 2 SB-1/DB
DB
L3 L3 L3 L3 L3
Floor MCB distribution board(DB)
1. PVC PIPE OF 20 mm dia 2MM THICK FOR CONCEALED WIRING SHOULD 2 Floor MCB distribution board(DB)
BE USED 3 One way modular switch(Multi-gang) 1
2. LIGHT/FAN/5A/16A SOCKET POINT 2X2.5 SQ. MM+1X 1.5 SQ MM(LNE)
4 Two way modular switch 2
5 6/16A 5 Pin switch socket outlet
6 Ceiling Fan
7 9W Square type LED Light
E1
Designed by :
Revised (OCT 2018) (LIGHT LAYOUT)
Central Level Project Implementation Unit (EDU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PS PS
PS PS PS PS
P1/DB P2/DB
PS PS
DB
Floor MCB distribution board(DB)
LEGEND
S.N. Particulars Symbol
POWER POINT LAYOUT PLAN 1 24 W LED Panel Light
2 Floor MCB distribution board(DB)
3 One way modular switch(Multi-gang) 1
4 Two way modular switch 2
5 6/16A 5 Pin switch socket outlet
6 Ceiling Fan
7 9W Square type LED Light
E2
Designed by :
Revised (OCT 2018) (POWER LAYOUT)
Central Level Project Implementation Unit (EDU) Checked by :
Gyaneshwor, Kathmandu Approved by :
Date : OCT 2018 Sheet No:
Government of Nepal PROJECT : TITLE :
Scale : 1:75
National Reconstruction Authority 1 Storey 2 Classrooms DISTRIBUTION SYSTEM
E3
Designed by :
Revised (OCT 2018)
Central Level Project Implementation Unit (EDU) Checked by :
Gyaneshwor, Kathmandu Approved by :