TRANSLUCENT SHEETS

INTERMEDIATE
STITCHING

SILL BAND

T 3,600 3,600 3,600 3,600 T

CGI SHEET CGI SHEET


GABLE BAND GABLE BAND
150

INTERMEDIATE INTERMEDIATE
STITCHING STITCHING
2,100

RAMP
SILL BAND SILL BAND
600

T
T 6,250 1,375 1,100 0.5T 0.5T 1,100 1,375 6,250 T

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:100
Ministry of Education 1 Storey 2 Classrooms ELEVATIONS

02
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PARTITION BETWEEN CLASSROOMS; PLYWOOD(9mm)-BOTH SIDES

796 704 1,050 1,050 1,025 1,025 1,050 1,050 715

875
4,14
TRANSLUCENT SHEETS 1 GAP FOR VENTILATION
8
4,98

TRANSLUCENT SHEETS

750

750
715
815

150
1,500
100 150 mm PCC (1:1.5:3)
GRILL WINDOW
INTERMEDIATE

1,350
STITCHING

1,250
BLACKBOARD
2,250

2,250
DOOR

2,100
750

750
SLOPE 1/37

75
600

525
125

T T T
G.L. G.L.

300
340
150

1.5T 1.5T
515

150
65

1.5T 2T 2T APRON

65
OUTER EDGE OF VERANDA

FLAT BRICK SOLING 65 MM


3,000
1,100 1,375 6,250

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:40
Ministry of Education 1 Storey 2 Classrooms SECTION X-X

03
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
715 1,050 1,050 1,025 1,025 1,050 1,050 704 796

OUTER WALL; GI SHEETS

875
1 PCC (1:3:6)
4,14 4,98
8 300x300x10 MS BASE PLATE

0.5T 1,000 0.5T


GAP FOR VENTILATION BRICK
TRANSLUCENT SHEET

770
GABLE RUNNER 25L
MS TUBULAR POST NB 80 M

903
755
750

715 0 3,37
815 3,37 150 mm PCC(1:1.5:3) 0
0.5T 1,000 0.5T
150

1,500
MS BASE PLATE 100
(200x200x10) INTERMEDIATE
STITCHING

2,546
BLACKBOARD
2,250

2,100

MS POST NB 80M
3,385

3,385
PCC (1:3:6)

T
SLOPE 1/37 300 300 300 BRICK

1,000
540
600

600

600
T

T
T T

125
PCC (1:3:6) T T

150
535

1,000

635
MS BASE PLATE (300x300x10)
1,000

65
1.5T
100

300
PCC (1:2:4)
BRICK WORK IN (1:6) CM

65
T 540 T T 540 T
1,000 1,000
6,250 1,500

PCC (1:3:6)

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1: 40
Ministry of Education 1 Storey 2 Classrooms SECTION Y-Y

04
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
900
900

35
125

125.5
200 LONG FLAT 25X4 HOLD FAST
250 LONG FLAT 25X5 HOLD
WELDED TO FRAME
FAST WELDED TO FRAME

147
85X25X3TH. PLATE

147
147
TOWER BOLT

1350

1350
147
100x20x3 FLAT HANDLE

147
SHUTTER
0.7 MM GI SHEET
40X40X3 ANGLE FRAME

147
35X35X3 ANGLE FRAME

147
250 LONG FLAT 25X5 HOLD FAST
WELDED TO FRAME

125.5
ISNT 40

250 LONG FLAT 25X5 HOLD FAST


WELDED TO FRAME
40X40X3 ANGLE FRAME

20X3 FLAT
(FRAME ELEVATION LOOKING FROM OUTSIDE)
WINDOW (W) (FRAME ELEVATION LOOKING FROM INSIDE)

432 432
25 191 191 25 25 191 191 25
12.5

12.5
250

250
327

327
100 LONG HINGE 100 LONG HINGE
HOLE FOR 6 Ø ALUMINIUM RIVET HOLE FOR 6 Ø ALUMINIUM RIVET

TOWER BOLT
327

327
217.5 220
25X25X3 ANGLE SHUTTER 25X25X3 ANGLE SHUTTER
TOWER BOLT
1334

1334
100x20x3 FLAT HANDLE
25X4 FLAT 25X4 FLAT
327

327
100 LONG HINGE 0.7 MM GI SHEET 100 LONG HINGE 0.7 MM GI SHEET
327

327
250

250
12.5

12.5
25X25X3 ANGLE SHUTTER 25X25X3 ANGLE SHUTTER
432 432

BACK VIEW OF WINDOW SHUTTER INSIDE VIEW OF WINDOW SHUTTER


Date : Sheet No:
Government of Nepal PROJECT : TITLE :
Scale : 1:15
Ministry of Education 1 Storey 2 Classrooms DOOR & WINDOW DETAILS
Central Level Project Implementation Unit (CLPIU)
Gyaneshwor, Kathmandu
Revised (Oct 2017) Designed by :
Checked by :
Approved by :
5
900 881 881
25 277 276.5 277 25 25 277 276.5 277 25

12.5

12.5
125

125
250 LONG

250
FLAT 25X5

267

267
HOLD FAST
WELDED TO
FRAME HOLE FOR 6 Ø HOLE FOR 6 Ø
ALUMINIUM RIVET ALUMINIUM RIVET

129

129
A

279

279
FRAME 50 X
50 X 5 ANGLE

300

279

279
180
TOWER BOLT
2100

200 40
2084

2084
279

279
50X50 FLAT 100x20x3 FLAT
50X50 FLAT HANDLE
HANDLE
100x20x3 "L" SHAPED
FLAT HANDLE PLATE WELDED 85
40X5 FLAT WITH FRAME

279

279
40 X 40 X 3 40X40X3 ANGLE
ANGLE

279

279
0.7MM GI SHEET

85X25X3TH. 150 LONG 150 LONG


HINGE 40X5 FLAT HINGE
FLAT
WELDED TO WELDED TO
267

267
250

250
SHUTTER SHUTTER
125

125

FRAME FRAME
12.5

12.5
40 X 4 FLAT
25 277 276.5 277 25 25 277 276.5 277 25
40 X 40 X 3 40X 40 X 3
ANGLE ANGLE
(FRAME ELEVATION LOOKING FROM (LOOKING FROM OUTSIDE) (LOOKING FROM INTSIDE)
OUTSIDE) SHUTTER ELEVATION SHUTTER ELEVATION

DOOR (D1)

Date : Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:15
Ministry of Education 1 Storey 2 Classrooms DOOR & WINDOW DETAILS
Central Level Project Implementation Unit (CLPIU)
Gyaneshwor, Kathmandu
Revised (Oct 2017) Designed by :
Checked by :
Approved by :
6
1081 1081
1100
25 477 276.5 277 25 25 277 276.5 477 25

12.5

12.5
125

125
250 LONG

250
FLAT 25X5

267

267
HOLD
FAST
WELDED HOLE HOLE
TO FRAME FOR 6 Ø FOR 6 Ø

129

129
ALUMINUM ALUMINUM
RIVET RIVET

279

279
FRAME
50 X 50 X 5
ANGLE

300

279

279
180
TOWER BOLT
2100

200 40
2084

2084
279

279
50X50 FLAT 100x20x3 FLAT
50X50 FLAT HANDLE
HANDLE
100x20x3 "L" SHAPED
FLAT PLATE 85
40X5 FLAT HANDLE WELDED

279

279
WITH FRAME

40 X 40 X 3 40X40X3
ANGLE ANGLE

279

279
0.7MM GI SHEET

85X25X3TH. 150 LONG 150 LONG


HINGE 40X5 HINGE
FLAT FLAT
WELDED WELDED
267

267
250

250
TO TO
125

125

SHUTTER SHUTTER
12.5

12.5
FRAME FRAME
40 X 4 FLAT
25 477 276.5 277 25 25 277 276.5 477 25
40 X 40 X 3 40 X 40 X 3
ANGLE ANGLE

(FRAME ELEVATION LOOKING FROM (LOOKING FROM OUTSIDE) (LOOKING FROM INTSIDE)
OUTSIDE) SHUTTER ELEVATION SHUTTER ELEVATION

DOOR (D)

Date : Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:15
Ministry of Education 1 Storey 2 Classrooms DOOR & WINDOW DETAILS
Central Level Project Implementation Unit (CLPIU)
Gyaneshwor, Kathmandu
Revised (Oct 2017) Designed by :
Checked by :
Approved by :
7
14,400
3,600 3,600 3,600 3,600

1,000 1,000 1,000 1,000 1,000

1,000

1,000
1,625
3 9,5
.2 .9 5
97.6 3
6,250

6,250
34 77

2
,4 , 6 4.2

642
9,5 12 1 5 8

7,990
7,2
12.
27

1,625

1,000
1,000

1,385
1,385
1,100

7,200 3,000 5,815

1,562.5 3,600 3,600 3,600


3,600
14,400

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:75
Ministry of Education 1 Storey 2 Classrooms TRENCH PLAN

08
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
CEMENT PUNNING (1:2)
50 MM PCC (1:2:4) 115 115 CEMENT PUNNING (1:2)
65 MM FLAT DRY BRICK SOLING 50 MM PCC (1:2:4)
100 MM SAND FILLING 65 MM FLAT DRY BRICK SOLING
75 MM THICK DPC 100 MM SAND FILLING
RAMMED EARTH FILLING 75 MM THICK DPC
RAMMED EARTH FILLING

75 20

75
0.5T T
500 500

GROUND LEVEL T

65 125 50
65 125
GROUND LEVEL

300
0.5T 0.5T

535
PCC 1:3:6
1.5T

515
PCC 1:2:4

65 150
1,000
100
BRICK SOLING
2T
T 500 T

300
F2 TYPE

65
1,000

F1 TYPE

CEMENT PUNNING (1:2)


50 MM PCC (1:2:4)
65 MM FLAT DRY BRICK SOLING
100 MM SAND FILLING
CEMENT PUNNING (1:2)
RAMMED EARTH FILLING
50 MM PCC (1:2:4)
65 MM FLAT DRY BRICK SOLING

150
100 MM SAND FILLING 300 300 300
50 MM THICK DPC
RAMMED EARTH FILLING

150
T
50

150
T

125 150
620
570

GROUND LEVEL

65 150 125
65

340
GROUND LEVEL
65 150 125

BRICK SOLING
0.75T 0.75T
340

1.5T

BRICK SOLING
0.75T 0.75T
1.5T
DETAIL OF STEPS
F3 TYPE

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:20
Ministry of Education 1 Storey 2 Classrooms FOUNDATION DETAILS

09
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
MS DOOR FRAME WITH PIPE

T 0.5T T
SLOPE 1:37

55
20

20
70
50
T
0.5T 0.5T

620
600
550
0.5T 0.5T

300
340
65 150
1.5T

515
65 150
1.5T

1.5T 2T
1,100 1,500
0.75T 0.75T
1,100 1,385

B
DETAIL AT BUTTRESS C' C

DETAIL OF VERANDAH

0.5T 0.5T 0.5T


0.5T 0.5T

0.5T

0.5T 0.5T 0.5T


T

1.5T

T
1.5T
T
0.5T

1.5T

0.75T 0.75T
0.5T T
1.5T

DETAIL OF FRONT CORNER BUTTRESS DETAIL OF BRICK LAYING


WITH VERANDAH WALL
Date : OCT 2017 Sheet No:
Government of Nepal PROJECT : TITLE :
Scale : 1:20
Ministry of Education 1 Storey 2 Classrooms FOUNDATION DETAILS

10
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PLAN FOR DPC AND GABLE BAND
3 NOS. OF 10 DIA BARS
T

75
4.75 BARS AT 150 C/C
T

T
1.5T
DPC AND GABLE BAND SECTION
1.5T 1.5T

PLAN FOR SILL AND LINTEL BAND


4 NOS. OF 10 DIA BARS
T

150
T
1.5T

4.75 DIA BARS AT 150 C/C

1.5T 1.5T LINTEL BAND SECTION

T
STICHING BAND

2 NOS. OF 10 DIA BARS


2T

2T

75
1.5T

1.5T
4.75 BARS AT 150 C/C
T

1.5T 2T
2T 1.5T 2T STITCHING AND SILL BAND SECTION
AT 4 CORNERS & AT 2 LEVELS AT THE JUNCTION OF MID WALL

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:10
Ministry of Education 1 Storey 2 Classrooms LINTEL BAND & STITCHING

11
Designed by :
Revised (Oct 2017) BAND DETAILS
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PURLINS

PROJECTION OF TRUSS

715
BRACING

VERGE PURLIN

SLOPE
G.I. SHEET

3,125
ROOF COVERING

RIDGE

6,250
BRACING TRUSS GABLE (END)

SLOPE

3,125
TRUSS
TURNBUCKLE TURNBUCKLE
PROJECTION OF ROOF

GABLE (END) GABLE (MIDDLE)

BRACING ON THE TOP

1,385
1,500
715 3,600 3,600 3,600 3,600 715
15,830

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:75
Ministry of Education 1 Storey 2 Classrooms STRUCTURAL PLAN OF

12
Designed by :
Revised (Oct 2017) TRUSS
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
796 704 1,050 1,050 1,025 1,025
228
B 228
GI SHEET RIDGE
90 90

9 5 1,01
2,43 1,01 5

414
MS PLATE 40X40X5
A 2

875
1,13

424
8
4,98
GAP FOR VENTILATION
2
8 1,13
3,04

424
TRANSLUCENT SHEET
MS ANGLE 40x40x5
759
B WEB MEMBER 25Ø M
F

284
758
TYP. PURLIN 65 Ø L 0
3,37 WEB MEMBER 32Ø L
100

321

903

450
750
BOTTOM RAFTER 40Ø L

WEB MEMBER 40Ø L

150
100 1,500

MS BASE PLATE
TYP. POST NB 80 M
200x200x10
2,536.73

2,250

2,250

2,100
3,385
C

300 300 300 1,385


150 150 150 150

600
PCC (1:3:6)

T
65149.53125

MS BASE PLATE
340.3

300x300x10

535
PCC (1:3:6)
1.5T PCC (1:2:4)
100

TRUSSES ALONG AXIS 2,3 & 4 ONLY


DETAIL SECTION
465
300

SCALE=1:30
65

250.31 499.69 250

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:30
Ministry of Education 1 Storey 2 Classrooms DETAIL SECTION OF TRUSS

13
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
1,025 1,050 1,050 A 715
228
228 1,050 1,050 941 106
GI SHEET RIDGE 90 90
CGI SHEET COVERING
1,01 2,43
TOP RAFTER 40 Ø L 5 9

TYP. PURLIN 65Ø L

414
E 1,13

875
2 4,14
1 C

424
TIMBER 40x40

875
2,13 0
1,13
4
B 1,22
2

10 J HOOK 7.5φ

424
BOLT / NUT
D 671
0
100 1,22
A

289
3,37 10
0

450
TRANSLUCENT SHEET

750
920 PLYWOOD t=6 1840x920
715 100
150

TIMBER 40x40

MS BASE PLATE
TYP. POST NB 80 M
200x200x10

2,250
2,100

PURLIN 65 Ø L

J HOOK 7.5φ
BOLT / NUT 40
40x
BER 40
TIM R 40x
BE
TIM

BORDER(TIMBER 40x6)

DETAIL C
SCALE=1:15

600
BORDER(TIMBER 150x6)
PLYWOOD t=6 2140/1840x920
DETAIL A
SCALE=1:15 PURLIN 65 Ø L
90
1
2 BRICK THICK WALL
535

10
PCC (1:3:6)
1,000

TRUSSES ALONG AXIS 1 & 5 ONLY PCC (1:2:4)


100

DETAIL SECTION MS BASE PLATE


300x300x10 PLYWOOD t=6 1840x920
50
BORDER(TIMBER 80x6)
300

SCALE=1:30
BORDER(TIMBER 40x6) DETAIL (TRUSS)
65

DETAIL B SCALE=1:15
SCALE=1:15
250 500 250

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : AS MENTIONED
Ministry of Education 1 Storey 2 Classrooms DETAIL SECTION OF TRUSS

14
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
BORDER(TIMBER) 40x6

1,705 1,895 1,895 1,705

BORDER(TIMBER) 40x6
3,125

TIMBER 40x40

TIMBER 40x40
6,250

BORDER(TIMBER) 40x6
PLYWOOD t=6 1840x1220 J HOOK
3,125

PURLIN 65φ
PLYWOOD t=6 1840(1650)x1220

PLYWOOD t=6 1840x920

1,705 1,895 1,895 1,705


1,385

TRUSS

TRUSS
TRUSS
TRUSS

TRUSS

3,600 3,600 3,600 3,600

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:50
Ministry of Education 1 Storey 2 Classrooms DETAIL SECTION OF TRUSS

15
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
240
160
50 70 70 50

75

65
150

85
815
715
92.72

100
200

49.76

875.29
300

450
720 720 720 720 720
co
37.5 37.5

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : AS MENTIONED
Ministry of Education 1 Storey 2 Classrooms DETAIL SECTION OF TRUSS

16
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
160

75
160
160

100

75
75
160

25 55 55 25
33
75

42

160

25 55 55 25
37.5 37.5
75

120

25 35 35 25
20.5
40

19.5

Date : OCT 2017 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : AS MENTIONED
Ministry of Education 1 Storey 2 Classrooms DETAIL SECTION OF TRUSS

17
Designed by :
Revised (Oct 2017)
Central Level Project Implementation Unit (CLPIU) Checked by :
Gyaneshwor, Kathmandu Approved by :
SB-2/S6 SB-2/S6 SB-3/S6 SB-3/S6 SB-3/S6

L1 L1 L2 L2 L2

L1 L2 L2

36 w FTL
L1
SB-2/S1 SB-2/S2 SB-3/S1 SB-3/S2

L1 L2 L2
L1 L2
SB-2/S6 L1 SB-2/S3 L3
SB-2/S4 SB-2/S5 SB-3/S3
L1
SB-3/S4 SB-3/S6
SB-3/S5

L1 L2 L2
SB-2/S1 SB-2/S2 SB-3/S2

SB-3/S1
L1

10M 10M
SB-2/DB SB-3/DB
SB-1/DB 2 2 SB-1/DB
DB
L3 L3 L3 L3 L3
Floor MCB distribution board(DB)

LIGHT POINT LAYOUT PLAN LEGEND


S.N. Particulars Symbol
1 24 W LED Panel Light

1. PVC PIPE OF 20 mm dia 2MM THICK FOR CONCEALED WIRING SHOULD 2 Floor MCB distribution board(DB)
BE USED 3 One way modular switch(Multi-gang) 1
2. LIGHT/FAN/5A/16A SOCKET POINT 2X2.5 SQ. MM+1X 1.5 SQ MM(LNE)
4 Two way modular switch 2
5 6/16A 5 Pin switch socket outlet
6 Ceiling Fan
7 9W Square type LED Light

Date : OCT 2018 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:75
National Reconstruction Authority 1 Storey 2 Classrooms PLAN

E1
Designed by :
Revised (OCT 2018) (LIGHT LAYOUT)
Central Level Project Implementation Unit (EDU) Checked by :
Gyaneshwor, Kathmandu Approved by :
PS PS

PS PS PS PS

P1/DB P2/DB

PS PS

DB
Floor MCB distribution board(DB)

LEGEND
S.N. Particulars Symbol
POWER POINT LAYOUT PLAN 1 24 W LED Panel Light
2 Floor MCB distribution board(DB)
3 One way modular switch(Multi-gang) 1
4 Two way modular switch 2
5 6/16A 5 Pin switch socket outlet
6 Ceiling Fan
7 9W Square type LED Light

Date : OCT 2018 Sheet No:


Government of Nepal PROJECT : TITLE :
Scale : 1:75
National Reconstruction Authority 1 Storey 2 Classrooms PLAN

E2
Designed by :
Revised (OCT 2018) (POWER LAYOUT)
Central Level Project Implementation Unit (EDU) Checked by :
Gyaneshwor, Kathmandu Approved by :
Date : OCT 2018 Sheet No:
Government of Nepal PROJECT : TITLE :
Scale : 1:75
National Reconstruction Authority 1 Storey 2 Classrooms DISTRIBUTION SYSTEM

E3
Designed by :
Revised (OCT 2018)
Central Level Project Implementation Unit (EDU) Checked by :
Gyaneshwor, Kathmandu Approved by :