GENERATOR 2 For Boiler 1 Operation
GENERATOR 2 For Boiler 1 Operation
GENERATOR 2 For Boiler 1 Operation
Ensure physical inspection that the GENERATOR 2 at boiler 1 INLET AND OUTLET
damper are in close position and air pressure at regulator should be 5 bar to 6 bar.
Select the LOCK icon and enter the password 3458 on LOP screen
Press the pressure icon and keep the PID MAN mode
Select the PID MAN and set the value 60% 50% 40% and so on on finally 0%
Press the control icon and press the system off . notice that outlet damper will be closed
Press the control icon and select pump 1 on or pump 2 on and then select the generator
2. also ensure the blowdown set values current values or 20 min @ 15 sec on lop screen
Press the pressure icon and keep the PID man mode and set the value PID man value is
0%
Press the burner ready push button on lop, notice that green indication lamp will glow
and also notice that outlet damper will open immediately ensure physical inspection of
After 1 minute select the pressure icon and set the value for pid man 10% 20% 30% and
Now boiler operation in auto mode as per steam pressure set values (present set value