Llenado de Datos Resultados

Tiempo de
op Descripción Datos Qty operators Standard time Metrics Data
Ciclo
1 75 OEE META: 90% 3 22.5 OEE estimated = 82% 24 The OEE will below the goal

2 57 Produccion requerida x dia= 1200 2 25.7 IP (index / productivity) = 0.04 24

3 131 Días por semana= 1 6 23.6 Time available (sec)= 28800 24

4 66 Hr Shifts 1= 8 2 29.7 Lead Time (sec) = 434 24

5 50 Hr Shifts 2= 0 2 22.5 Tkt time (sec) = 24 24 24 24 24 24 24 24

6 55 Hr Shifts 3= 0 2 24.8 Qty operator required = 18 24

Qty stations required = 18 24

Process Balanced Vs Std Time


35.0

29.7
30.0
25.7 24.8
25.0 23.6
22.5 22.5
20.0

15.0

10.0

5.0

0.0
1 2 3 4 5 6