OBJECT:-
given condition.
A B C L
off off off off
on off off on
on on off off
on on on on
on off on off
off off on on
off on on off
off on off on
MATERIALS REQUIRED:-
THEORY:-
1) First turn OFF the power supply and then connect the circuit diagram as show in fig
using the (PLC base unit: SEIMENS S7-200).
2) Connect the program cable: (USB PPP ). makes sure the toggle switches are set on
input and output.
6) Connect the LAMP between the pole and n/o contact of the relay switch .
Study the program you just entered, but do not test it yet. How will this program
operate?
1) Turn ON the power supply and set the RUN/STOP switch of the PC to RUN.
2) Test the operation of the program. Explain how this program operates.
RESULT: The ladder diagram was successfully checked in the PLC simulator and all
the prescribed conditions were observed completely.
PRECATION:
Confirm that RUN/STOP switch of the PC is set to STOP before Continuing
Do not detach USB cable during downloading.
Do not remove memory module in on condition.
Do not over load the relay beyond that rating current.