DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-001
SHT. REV.
COOP Fire Fighting PID Legend 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-002
SHT. REV.
Fire Water Tank & Jockey Pump PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-003
SHT. REV.
Main Fire Water Motor Pump PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-004
SHT. REV.
Main Fire Water Engine Pump PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-005
SHT. REV.
Distribution Network / Foam Skid PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-006
SHT. REV.
FIREWATER NETWORK 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
Bunker Gas Oil Storage Tank Bunker Gas Oil Storage Tank P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
Design Pressure : ATMOSPHERIC Design Pressure : ATMOSPHERIC
DWG. NO:
Design temperature : -5/70 C Design temperature : -5/70 C COOP-2021-15-D-3-FF-PI-010
INNER DIAMETER : 12 m INNER DIAMETER : 8.98 m Gasoline Tank Cooling Water PID SHT. REV.
1/1 04
HEIGHT : 12 m 3 HEIGHT : 10.5 m3
TOTAL CAPACITY : 1020 m TOTAL CAPACITY : 450 m PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-013
SHT. REV.
FOAM NETWORK 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-014
SHT. REV.
Process Tanks Foam Chamber PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-015
SHT. REV.
Process Tanks Foam Chamber PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-016
SHT. REV.
Process Tanks Foam Chamber PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-017
SHT. REV.
FOAM MONITORS NETWORK PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
FIRE PUMPS ROOM
WARE HOUSE-01
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-018
SHT. REV.
FOAM/FIRE PUMPS ROOM 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-019
SHT. REV.
FOAM/ PROCESS PUMPS 1/1 04
PIPING AND INSTRUMENT DIAGRAM
WARE HOUSE-02
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-020
SHT. REV.
FOAM/ WARE HOUSE -2 1/1 04
PIPING AND INSTRUMENT DIAGRAM
EXISTING BUILDING HAZARD WASTE BUILDING
DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-021
SHT. REV.
FOAM/ HAZARD BUILDING 1/1 04
PIPING AND INSTRUMENT DIAGRAM
X-1 X-3 X- 4A X- 4B X- 5A X- 5B X- 06 X- 3A/B/C/D
Bunker Gas Oil Summer Diesel Gasoline 92 Gasoline 92 Gasoline 95 Gasoline 95 Calibration Gas Oil
Metering Skid Metering Skid Metering Skid Metering Skid Unit
Metering Skid Metering Skid Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Metering Skid
Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr
Design Pressure 8 Barg Design Pressure 8 Barg Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Pressure 8 Barg Design Pressure 8 Barg
Design Temperature 70 C Design Temperature 70 C
Design Temperature 70 C Design Temperature 70 C
X- 12 X- 4B X- 4A X- 5B X- 5A X- 3
CALIBRATION
X- 3A X- 3B X- 3C X- 3D UNIT X- 1
X- 06
Bunker Gas Oil Summer Diesel Gasoline 92 Gasoline 92 Gasoline 95 Gasoline 95 04 30/01/2022 Client Approval QUAD
Loading Arm Loading Arm Loading Arm Loading Arm Loading Arm Loading Arm 03 16/03/2022 Client Approval QUAD
Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr 02 08/03/2022 Client Approval
Design Pressure 8 Barg Design Pressure 8 Barg Design Flowrate 125 m3/hr Design Pressure 8 Barg Design Flowrate 125 m3/hr QUAD
Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg 01 Client Approval
Design Temperature 70 C 31/01/2022 QUAD
Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C
Design Temperature 70 C Design Temperature 70 C 00 28/11/2021 Client Approval QUAD
A
LA- 3A LA- 3B LA- 3C LA- 3D LA- 3E X- 12 11/10/2021 Client Comments QUAD
BY
REV. DATE FOR
Gas Oil Gas Oil Gas Oil Gas Oil Calibration Unit Gas Oil DWG. TITLE:
Loading Arm Loading Arm Loading Arm Loading Arm Loading Arm Metering Skid
Design Flowrate 125 m3/hr
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr DWG. NO:
COOP-2021-15-D-3-FF-PI-022
Design Pressure 8 Barg
Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Temperature 70 C SHT. REV.
Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C FOAM/ LOADING ARM AREA 1/1 04
PIPING AND INSTRUMENT DIAGRAM