Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-001
SHT. REV.
COOP Fire Fighting PID Legend 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-002
SHT. REV.
Fire Water Tank & Jockey Pump PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-003
SHT. REV.
Main Fire Water Motor Pump PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-004
SHT. REV.
Main Fire Water Engine Pump PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-005
SHT. REV.
Distribution Network / Foam Skid PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-006
SHT. REV.
FIREWATER NETWORK 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
S-10 S-11
00 28/11/2021 Client Approval QUAD
GASOLINE 92 STORAGE TANK Gasoline 92 Storage Tank
Design Pressure -0.006/1.5 KPa Design Pressure -0.006/1.5 KPa A 11/10/2021 Client Comments QUAD
Design temperature (MIN/MAX) -5/70 C Design temperature (MIN/MAX) -5/70 C
Insulation No REV. DATE FOR BY
Insulation No
Capacity (Net) 5130 M3 Capacity Net 2216 M3 DWG. TITLE:
Tank Dimension. (HIGHT15 M)(DI 24 M) Tank Dimension. (HIGHT13.75 M)(DI 16 M) P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-007
SHT. REV.
Gasoline Tank Cooling Water PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
S-2 S-3 A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY
GASOLINE 80 STORAGE TANK GASOLINE 95 STORAGE TANK
Tank Dimension. (HIGHT 7.5 M)(DI 20 M) Tank Dimension. (HIGHT13.75 M)(DI 16 M) DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
K-1 DWG. NO:
COOP-2021-15-D-3-FF-PI-008
Gas Oil Storage Tank SHT. REV.
Tank Dimension. (HEIGHT 13.215 M)(DI 24 M) Gasoline Tank Cooling Water PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY
S-4 S-5 X-07 DWG. TITLE:
Gas Oil CALIBRATION TANK P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
GASOLINE 95 STORAGE TANK Summer Diesel Storage Tank INNER DIAMETER : 0.35m DWG. NO:
Tank Dimension. (HIGHT13.75 M)(DI 16 M) HEIGHT : 0.55m COOP-2021-15-D-3-FF-PI-009
TOTAL CAPACITY : 5000 LITER SHT. REV.
Gasoline Tank Cooling Water PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
SB-1 SA-1 REV. DATE FOR BY

DWG. TITLE:
Bunker Gas Oil Storage Tank Bunker Gas Oil Storage Tank P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
Design Pressure : ATMOSPHERIC Design Pressure : ATMOSPHERIC
DWG. NO:
Design temperature : -5/70 C Design temperature : -5/70 C COOP-2021-15-D-3-FF-PI-010
INNER DIAMETER : 12 m INNER DIAMETER : 8.98 m Gasoline Tank Cooling Water PID SHT. REV.
1/1 04
HEIGHT : 12 m 3 HEIGHT : 10.5 m3
TOTAL CAPACITY : 1020 m TOTAL CAPACITY : 450 m PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
S-6 S-7 A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY
Bunker Gas Oil Storage Tank Bunker Gas Oil Storage Tank
DWG. TITLE:
Design Pressure : ATMOSPHERIC Design Pressure : ATMOSPHERIC P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
Design temperature : -5/70 C Design temperature : -5/70 C DWG. NO:
INNER DIAMETER : 16 m INNER DIAMETER : 16 m
COOP-2021-15-D-3-FF-PI-011
SHT. REV.
HEIGHT : 13.75 m 3
HEIGHT : 13.75 m Gasoline Tank Cooling Water PID 1/1 04
TOTAL CAPACITY : 2150 m TOTAL CAPACITY : 2150 m
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
S-1 K-2 A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY
Gas Oil Storage Tank GASOLINE 80 Storage Tank
DWG. TITLE:
Design Pressure : ATMOSPHERIC Design Pressure : ATMOSPHERIC P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
Design temperature : -5/70 C Design temperature : -5/70 C
DWG. NO:
INNER DIAMETER : 24m INNER DIAMETER : 20m COOP-2021-15-D-3-FF-PI-012
HEIGHT : 13.2153m HEIGHT : 7.5 m 3 SHT. REV.
Gasoline Tank Cooling Water PID 1/1 04
TOTAL CAPACITY : 4600 m TOTAL CAPACITY : 1700 m
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-013
SHT. REV.
FOAM NETWORK 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-014
SHT. REV.
Process Tanks Foam Chamber PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-015
SHT. REV.
Process Tanks Foam Chamber PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-016
SHT. REV.
Process Tanks Foam Chamber PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-017
SHT. REV.
FOAM MONITORS NETWORK PID 1/1 04
PIPING AND INSTRUMENT DIAGRAM
FIRE PUMPS ROOM

WARE HOUSE-01

Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-018
SHT. REV.
FOAM/FIRE PUMPS ROOM 1/1 04
PIPING AND INSTRUMENT DIAGRAM
Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-019
SHT. REV.
FOAM/ PROCESS PUMPS 1/1 04
PIPING AND INSTRUMENT DIAGRAM
WARE HOUSE-02

Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-020
SHT. REV.
FOAM/ WARE HOUSE -2 1/1 04
PIPING AND INSTRUMENT DIAGRAM
EXISTING BUILDING HAZARD WASTE BUILDING

Client Contractor/ Subcontractor

Fire Fighting System for


Upgrading CO OPERATION Storage Tank Farm at Suez
04 30/01/2022 Client Approval QUAD
03 16/03/2022 Client Approval QUAD
02 08/03/2022 Client Approval QUAD
01 31/01/2022 Client Approval QUAD
00 28/11/2021 Client Approval QUAD
A 11/10/2021 Client Comments QUAD
REV. DATE FOR BY

DWG. TITLE:
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
DWG. NO:
COOP-2021-15-D-3-FF-PI-021
SHT. REV.
FOAM/ HAZARD BUILDING 1/1 04
PIPING AND INSTRUMENT DIAGRAM
X-1 X-3 X- 4A X- 4B X- 5A X- 5B X- 06 X- 3A/B/C/D
Bunker Gas Oil Summer Diesel Gasoline 92 Gasoline 92 Gasoline 95 Gasoline 95 Calibration Gas Oil
Metering Skid Metering Skid Metering Skid Metering Skid Unit
Metering Skid Metering Skid Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Metering Skid
Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr
Design Pressure 8 Barg Design Pressure 8 Barg Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Pressure 8 Barg Design Pressure 8 Barg
Design Temperature 70 C Design Temperature 70 C
Design Temperature 70 C Design Temperature 70 C

LA- 4B LA- 4B LA- 4A LA- 5B LA- 5A LA- 3

X- 12 X- 4B X- 4A X- 5B X- 5A X- 3

LA- 3A LA- 3B LA- 3C LA- 3D LA- 1


LA- 3E

CALIBRATION
X- 3A X- 3B X- 3C X- 3D UNIT X- 1

X- 06

Client Contractor/ Subcontractor

Fire Fighting System for


LA- 1 LA- 3 LA- 4A LA- 4B LA- 5A LA- 5B Upgrading CO OPERATION Storage Tank Farm at Suez

Bunker Gas Oil Summer Diesel Gasoline 92 Gasoline 92 Gasoline 95 Gasoline 95 04 30/01/2022 Client Approval QUAD

Loading Arm Loading Arm Loading Arm Loading Arm Loading Arm Loading Arm 03 16/03/2022 Client Approval QUAD
Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr 02 08/03/2022 Client Approval
Design Pressure 8 Barg Design Pressure 8 Barg Design Flowrate 125 m3/hr Design Pressure 8 Barg Design Flowrate 125 m3/hr QUAD
Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg 01 Client Approval
Design Temperature 70 C 31/01/2022 QUAD
Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C
Design Temperature 70 C Design Temperature 70 C 00 28/11/2021 Client Approval QUAD
A
LA- 3A LA- 3B LA- 3C LA- 3D LA- 3E X- 12 11/10/2021 Client Comments QUAD
BY
REV. DATE FOR
Gas Oil Gas Oil Gas Oil Gas Oil Calibration Unit Gas Oil DWG. TITLE:
Loading Arm Loading Arm Loading Arm Loading Arm Loading Arm Metering Skid
Design Flowrate 125 m3/hr
P&ID OF FIRE FIGHTING SYSTEM FOR PROCESS AREA
Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr Design Flowrate 125 m3/hr DWG. NO:
COOP-2021-15-D-3-FF-PI-022
Design Pressure 8 Barg
Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Pressure 8 Barg Design Temperature 70 C SHT. REV.
Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C Design Temperature 70 C FOAM/ LOADING ARM AREA 1/1 04
PIPING AND INSTRUMENT DIAGRAM

You might also like