Doc. No.

: COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 1 of 18
Date : 13/03/2022

Foam System Hydraulic Calculation Report

PROJECT NO. : COOP-2021-15-D-3-FF

PROJECT NAME : Upgrading CO-OPERATION Petroleum Company


Fire Fighting and Foam Networks

CLIENT : CO-OPERATION Petroleum Company

SITE : Suez Tank Farm

03 13/03/2022 ISSUED FOR APPROVAL MHA JSI F&A


02 26/02/2022 ISSUED FOR APPROVAL MHA JSI F&A
01 29/01/2022 ISSUED FOR APPROVAL MHA JSI F&A
00 29/11/2021 ISSUED FOR APPROVAL MHA JSI F&A
A 08/11/2021 ISSUED FOR COMMENTS MHA JSI F&A
PREPD CHKD APPR
REV. DATE DESCRIPTION
CONTRACTOR
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 2 of 18
Date : 13/03/2022

TABLE OF CONTENTS

1. INTRODUCTION

2. DEFINITION

3. REFERENCES

4. UNITS

5. CALCULATION BASIS

6. MAXIMUM FOAM DEMAND

7. FIRE WATER DEMAND SCENARIOS

8. ATTACHMENTS
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 3 of 18
Date : 13/03/2022

1. INTRODUCTION

This calculation report covers the foam solution demand estimating for firefighting system to protect
equipment and facilities installed in CO-OPERATION Petroleum Company Suez Tank Farm, Arab
Republic of Egypt.

2. DEFINITIONS

Definitions used in this calculation as follows:


 OWNER: CO-OPERATION Petroleum Company
 PID: Piping and Instrumentation Diagram
 CONTRACTOR: PETROJET / F&A Engineering

3. REFERENCES

3.1 Related Documents


Project Specification

 COOP-2021-15-D-3-FF-FP-01 Fire Fighting Systems Philosophy

 COOP-2021-15-D-3-FF-DS-01 Fire Fighting Equipment Datasheets

3.2 International Code and Standard


 NFPA 11 - Standard for Low-, Medium-, and High-Expansion Foam Systems
 NFPA 14 - Standard for the Installation of Standpipe and Hose Systems
 NFPA 15 - Standard for Water Spray Fixed Systems for Fire Protection
 NFPA 16 - Standard for the Installation of Foam-Water Sprinkler and Foam-Water Spray
Systems
 NFPA 24 - Standard for the Installation of Private Fire Service Mains and Their
Appurtenances
 NFPA 30 - Flammable and Combustible Liquids Code
 API RP 2030 – Application of Fixed Water Spray System for Fire Protection in the
Petroleum and Petrochemical industries

4. UNITS

Unless otherwise specified, metric, Celsius, kilogram and kg/cm2g units will be applied as the
measurement system However, nominal sizes of piping components will be in accordance with inch
system.
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 4 of 18
Date : 13/03/2022

5. CALULATION BASIS

Application Rate for Fixed Foam System

According to COOP-2021-15-D-3-FF-FP-01 Fire Fighting Systems Philosophy for Fire Fighting


System, application rate shall be applied as following.

System Equipment Type Application Remarks


Loading / Offloading Stations & NFPA 11 / 16
Fixed Foam System 6.5 lpm/m²
Arms TABLE 5.6.5.3.1
(Foam Water Spray)
API RP 2030
Pumps Shed 20.4 lpm/m²
TABLE #1
Storage Tanks NFPA 11
Foam Chambers 4.1 lpm/m²
TABLE 5.2.6.5.1
Storage Tanks (dikes) NFPA 11
Water/Foam Monitors 6.5 lpm/m²
General Exposure TABLE 5.2.5.2.2
4.1 lpm/m²

Minimum Discharge Pressure for Foam Systems

Nozzle Type Discharge Pressure Remarks

Foam Water Spray Nozzle 2.1 barg NFPA 16

Foam Chamber 3.5 barg NFPA 11

Water/Foam Monitors 5 barg NFPA 11

Foam Solution Velocity

Foam solution velocity in pipe including deluge valve manifold pipe taken from firewater main shall
not exceed 6 m/sec although 3.5 m/sec (block case 4 m/sec) for firewater main network pipe.

6. MAXIMUM FOAM DEMAND

Foam Demand

The largest foam demand of one of the fire risk areas will be the maximum foam demand based on a single
major fire breaking out in one fire risk area in any one time.

The used foam shall be FP “Fluoroprotein” of 6% concentration” for storage tanks foam chambers only, all
remaining facilities in process areas shall use AFFF “Aqueous Film Forming Foam” of 3% concentration
including fire monitors.
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 5 of 18
Date : 13/03/2022

7. FIRE WATER DEMAND SCENARIOS:

The following table in Attachment#1 “Fire Scenarios and Application Rates”, summarizes different fire
scenarios for fire that could develop in equipment/separate areas and the firefighting equipment used to protect
this equipment/area showing the application flow rates that will be used for the burning equipment as well as
any other adjacent equipment in fire radiation section as detailed in COOP-2021-15-D-3-FF-FP-01 Fire
Fighting Systems Philosophy

Calculation Result

Maximum Foam Demand for 3% AFFF foam type is Scenario # 1 “Storage Tank S-10 same as K-1 & K2” is
maximum foam demand case of maximum capacity of 20 m3 of concentrated foam required for 3 hrs of
operation to cover tank S-10 dike area with 2 fire monitors at 6.5 lpm/m2 application rate.

Maximum Foam Demand for 6% FP foam type is Scenario # 2 “Storage Tank S-10 same as K-1 & K2” is
maximum foam demand case of maximum capacity of 6.5 m3 of concentrated foam required for 60 min to
operate the foam chambers of the burning tank.

This manual calculation result and its required fire main size will be verified by Hydraulic Calculation Report
using (“PIPENET” programmed by SUNRISE SYSTEM LTD.) for flow analysis in pipe network in Hydraulic
Calculation Report.

8. ATTACHMENTS
Attachment # 1 “Foam System Scenarios and Application Rates”
Attachment #2 “Foam System Manual Calculation & Foam Solution Lines Sizing”
Attachment #3 “Spray Nozzles Catalogues”
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 6 of 18
Date : 13/03/2022

Attachment # 1
“Foam System Fire Scenarios and Application Rates”
Fire Water Demands Scenarios
Fire Water Demand Total Foam Total Foam
FP Concentrated AFFF Concentrated Foam
Equipment on Fire Fixed Foam System Solution Solution
Fire Scenarios Firefighting Equipment Water Spray System Fire Monitor (*) Fire Hydrant Foam Demand Demand as Per NFPA 11 Remarks
Tag Activation (Spray / Champer) (6%FP) (3%AFFF)
Activation Device
Method
m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr m3/hr

Worest Case Scenario for AFFF 3% Foam Con.

(*) 2 X Foam Monitors will be used for S-10 dike spillage control (application
1 S-10 Foam Champer (**) FDV-0009 & FDV-0014 Automatic N/A 112 228 57 112 228 6.72 20.52
rate 666 m3/hr/m2) for approximate 3 hrs with AFFF Foam

(**) FP 6% Foam will be used for only 60 min

Worest Case Scenario for FP 6% Foam Con.

(*) 1 X Foam Monitors will be used for K-1 (or) K2 dikes spillage control
2 K-1 (OR) K-2 Foam Champer (**) FDV-0003 & FDV-0015 Automatic N/A 112 114 57 112 114 6.72 6.84
(Application rate I 222 m3/hr/m2) for approximate 2 hrs with AFFF Foam

(**) FP 6% Foam will be used for only 60 min

FDV-0012 Automatic
3 LOADING ARMS Water/Foam Spray System N/A 514.08 114 57 N/A 628 N/A 18.8424
FDV-0013 Automatic

P-1A
P-1B
P-2
P-3A
P-3B
P-3C FDV-0010 Automatic
P-3D
P-3E
P-5
P-6
4 P-7 Water/Foam Spray System N/A 642.60 114 57 N/A 680.60 N/A 20.418
P-8
P-9
P-9A
P-9B
P-9C
FDV-0011 Automatic
P-10A
P-10B
P-10C
P-11
P-12

5 15‫ص‬ Foam Champer (**) FDV-00025 Automatic N/A 18 114 57 18 114 0.54 6.84

6 16‫ص‬ Foam Champer (**) FDV-00028 Automatic N/A 50 114 57 50 114 1.5 6.84
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 8 of 18
Date : 13/03/2022

Attachment #2
“Foam System Manual Calculation & Foam Solution Lines Sizing”
Foam Solution Manual Hydraulic Calculatuion Sheet
Equipment Data
Spray Nozzles Data Ring Pipe Data Foam Data
Minimum Minimum
Total Flow rate
Minimum Water Water Concentrated Foam
required per
Height Surface Application Rate Demand Demand Volume
Zone No. Deluge Valve No. Diameter Length Width Minimum No. of Total Total Total Maximum Actual Pipe Foam Equipment Foam Type
(2) Area (3) Required Required No. of Rings / Nozzle Flow Horz. Distance overlap % Actual Velocity Concentrated
Equipment Type Equipment Tag Equipment Description Spray Nozzle Model Spray Angle K-Factor (4) Discharge Nozzles Per Number of Nozzles Nozzles Ring Circumfrance Velocity Diameter Application
Branches (6,9) Rate (4) Between Nozzles (8) inside Pipe Foam Volume
Pressure (5) Ring (7) Nozzles Flow rate Flow rate Inside Pipe Used Duration (10)

(Meters) (Meters) (Meters) (Meters) (m2) (lpm) (lpm) (m3/h) Type (Degrees) (lpm/barg) (barg) (EA) (EA) (lpm) (EA) (lpm) (m3/h) (m) (m) (%) (m/s) (inches) (m/s) (min) (m3) (m3/h) (m3)

P-1A Bunker Gas Oil Loading Pump

Summer Diesel & Bunker Gas Oil Standby


P-1B
Loading Pump

P-3A Gas Oil Loading Pump

P-3B Gas Oil Loading Pump

P-3C Gas Oil Loading Pump

FDV-0010 P-3D Gas Oil Loading Pump

P-3E Standby Gas Oil Loading Pump

P-6 Summer Diesel Loading Pump

P-9A Gasoline 92 Loading Pump

P-9B Gasoline 92 Loading Pump

Water/Foam Spray 1"


Pumps Shed P-9C Standby Gasoline 92 Loading Pump N/A 58 9 N/A 522 20.4 10648.8 638.928 Pendent / Upright 43.2 2.1 43 4 63 170 10710 642.6 N/A 1.348837209 148.3 4 2 3 30 9.639 642.6 9.639 3% AFFF
System FOAM/WATER SPRAY NOZZLE

P-10A Gasoline 95 Loading Pump

P-10B Gasoline 95 Loading Pump

P-10C Gasoline 95 Loading Pump

P-11 Bunker Gas Oil Off-Loading Pump

P-5 Summer Diesel Off-Loading Pump


FDV-0011
P-2 Gas Oil Off-Loading Pump

P-7 Gasoline 92 Off-Loading Pump

P-8 Gasoline 95 Off-Loading Pump

P-9 Gasoline 92/95 Off-Loading Pump

P-12 Bunker Gas Oil Off-Loading Pump

LA-1 Bunker Gas Oil Loading Arm

LA-3 Summer Diesel Loading Arm

LA-3A Gas Oil Loading Arm


FDV-0012
LA-3B Gas Oil Loading Arm

LA-3C Gas Oil Loading Arm

1"
Laoding Arms Shed LA-3D Gas Oil Loading Arm N/A 65 12 N/A 780 6.5 5070 304.2 Pendent / Upright 43.2 2.1 22 4 63 88 5544 332.64 N/A 3 66.7 4 8 2.9 30 4.9896 332.64 4.9896
FOAM/WATER SPRAY NOZZLE
Water/Foam Spray
3% AFFF
System LA-3E Calibration Unit Loading Arm

LA-4A Gasoline 92 Loading Arm

FDV-0013 LA-4B Gasoline 92 Loading Arm

LA-5A Gasoline 95 Loading Arm

LA-5B Gasoline 95 Loading Arm

1"
Common Metering Skids All All loading Arms N/A 6 1 1 12 6.5 78 56.16 Pendent / Upright 43.2 2.1 2 2 63 4 252 181.44 N/A 3 66.7 4 2 2.1 30 2.7216 181.44 2.7216
FOAM/WATER SPRAY NOZZLE

FDV-0001 FOAM CHAMPER TFC-0001 S-1 Bunker Gas Oil Storage Tank 20 N/A N/A 7.5 314 4.1 1287.4 77.244 N/A N/A Vendor to Confirm 3.5 N/A N/A 1287.4 1 1287.4 78 N/A N/A N/A 4 4 2.7 30 2.34 78 2.34

FDV-0002 FOAM CHAMPER TFC-0002 S-2 Bunker Gas Oil Storage Tank 20 N/A N/A 7.5 314 4.1 1287.4 77.244 N/A N/A Vendor to Confirm 3.5 N/A N/A 1287.4 1 1287.4 78 N/A N/A N/A 4 4 2.7 30 2.34 78 2.34

FDV-0005 FOAM CHAMPER TFC-0003 S-3 Gas Oil Storage Tank 16 N/A N/A 13.75 200.96 4.1 823.936 49.43616 N/A N/A Vendor to Confirm 3.5 N/A N/A 823.936 1 823.936 50 N/A N/A N/A 4 4 1.7 30 1.5 50 1.5

FDV-0006 FOAM CHAMPER TFC-0004 S-4 Gas Oil Storage Tank 16 N/A N/A 13.75 200.96 4.1 823.936 49.43616 N/A N/A Vendor to Confirm 3.5 N/A N/A 823.936 1 823.936 50 N/A N/A N/A 4 4 1.7 30 1.5 50 1.5

FDV-0007 FOAM CHAMPER TFC-0005 S-5 Summer Diesel Storage TanK 16 N/A N/A 13.75 200.96 4.1 823.936 49.43616 N/A N/A Vendor to Confirm 3.5 N/A N/A 823.936 1 823.936 50 N/A N/A N/A 4 4 1.7 30 1.5 50 1.5

FDV-0008 FOAM CHAMPER TFC-0008 S-11 Gasoline 95 Storage Tank 16 N/A N/A 13.75 200.96 4.1 823.936 49.43616 N/A N/A Vendor to Confirm 3.5 N/A N/A 823.936 1 823.936 50 N/A N/A N/A 4 4 1.7 30 1.5 50 1.5
Water/Foam Champers
6% FP
(12)
FDV-0009 FOAM CHAMPER TFC-0009 S-10 Gasoline 92 Storage Tank 24 N/A N/A 15 452.16 4.1 926.928 55.61568 N/A N/A Vendor to Confirm 3.5 N/A N/A 926.928 1 926.928 56 N/A N/A N/A 4 4 2 30 1.68 56
3.36
FDV-0014 FOAM CHAMPER TFC-0009 S-10 Gasoline 92 Storage Tank 24 N/A N/A 15 452.16 4.1 926.928 55.61568 N/A N/A Vendor to Confirm 3.5 N/A N/A 926.928 1 926.928 56 N/A N/A N/A 4 4 2 30 1.68 56

FDV-0003 FOAM CHAMPER TFC-0006 K-1 Gas Oil Storage Tank 24 N/A N/A 13.215 452.16 4.1 926.928 55.61568 N/A N/A Vendor to Confirm 3.5 N/A N/A 926.928 1 926.928 56 N/A N/A N/A 4 4 2 30 1.68 56
3.36
FDV-0015 FOAM CHAMPER TFC-0006A K-1 Gas Oil Storage Tank 24 N/A N/A 13.215 452.16 4.1 926.928 55.61568 N/A N/A Vendor to Confirm 3.5 N/A N/A 926.928 1 926.928 56 N/A N/A N/A 4 4 2 30 1.68 56

FDV-0004 FOAM CHAMPER TFC-0007 K-2 Bunker Gas Oil Storage Tank 24 N/A N/A 13.215 452.16 4.1 926.928 55.61568 N/A N/A Vendor to Confirm 3.5 N/A N/A 926.928 1 926.928 56 N/A N/A N/A 4 4 2 30 1.68 56
3.36
FDV-0016 FOAM CHAMPER TFC-0007A K-2 Bunker Gas Oil Storage Tank 24 N/A N/A 13.215 452.16 4.1 926.928 55.61568 N/A N/A Vendor to Confirm 3.5 N/A N/A 926.928 1 926.928 56 N/A N/A N/A 4 4 2 30 1.68 56
Foam Solution Manual Hydraulic Calculatuion Sheet
Equipment Data
Spray Nozzles Data Ring Pipe Data Foam Data
Minimum
Total Flow rate
Minimum Application Water Minimum Water Concentrated
required per
Height Rate Demand Demand Required Horz. Foam Volume
Zone No. Deluge Valve No. Diameter Length Width Surface Area (3) Minimum Maximum Equipment Foam Type
(2) Required No. of Rings / No. of Nozzles Per Nozzle Flow Rate Total Number Total Nozzles Flow Total Nozzles Flow Distance Actual Pipe Actual Velocity Foam Application Concentrated
Equipment Type Equipment Tag Equipment Description Spray Nozzle Model Spray Angle K-Factor (4) Discharge Ring Circumfrance overlap % (8) Velocity Inside
Branches (6,9) Ring (7) (4) of Nozzles rate rate Between Diameter Used inside Pipe Duration (10) Foam Volume
Pressure (5) Pipe
Nozzles
(Meters) (Meters) (Meters) (Meters) (m2) (lpm) (lpm) (m3/h) (Degrees) (lpm/barg) (barg) (EA) (EA) (lpm) (EA) (lpm) (m3/h) (m) (m) (%) (m/s) (inches) (m/s) (min) (m3) (m3/h) (m3)

FDV-0017 FOAM CHAMPER TFC-0010 1‫ص‬ Oil Storage Tank Roof 6 N/A N/A 7.5 28.26 4.1 115.866 6.95196 N/A N/A Vendor to Confirm 3.5 N/A N/A 115.866 1 115.866 7 N/A N/A N/A 4 2 1.5 30 0.21 7 0.21

FDV-00018 FOAM CHAMPER TFC-0011 2‫ص‬ Oil Storage Tank Roof 6 N/A N/A 7.5 28.26 4.1 115.866 6.95196 N/A N/A Vendor to Confirm 3.5 N/A N/A 115.866 1 115.866 7 N/A N/A N/A 4 2 1.5 30 0.21 7 0.21

FDV-00019 FOAM CHAMPER TFC-0012 6‫ص‬ Oil Storage Tank Roof 9.5 N/A N/A 8.85 70.84625 4.1 290.469625 17.4281775 N/A N/A Vendor to Confirm 3.5 N/A N/A 290.469625 1 290.469625 18 N/A N/A N/A 4 3 1.5 30 0.54 18 0.54

FDV-00020 FOAM CHAMPER TFC-0013 7‫ص‬ Oil Storage Tank Roof 6 N/A N/A 7.5 28.26 4.1 115.866 6.95196 N/A N/A Vendor to Confirm 3.5 N/A N/A 115.866 1 115.866 7 N/A N/A N/A 4 2 1.5 30 0.21 7 0.21

FDV-00021 FOAM CHAMPER TFC-0014 8‫ص‬ Oil Storage Tank Roof 6 N/A N/A 7.5 28.26 4.1 115.866 6.95196 N/A N/A Vendor to Confirm 3.5 N/A N/A 115.866 1 115.866 7 N/A N/A N/A 4 2 1.5 30 0.21 7 0.21

Oil Tanks
Water/Foam Champers FDV-00022 FOAM CHAMPER TFC-0015 12‫ص‬ Oil Storage Tank Roof 9.5 N/A N/A 7.5 70.84625 4.1 290.469625 17.4281775 N/A N/A Vendor to Confirm 3.5 N/A N/A 290.469625 1 290.469625 18 N/A N/A N/A 4 3 1.5 30 0.54 18 0.54 6% FP
(12)

FDV-00023 FOAM CHAMPER TFC-0016 13‫ص‬ Oil Storage Tank Roof 9.5 N/A N/A 7.5 70.84625 4.1 290.469625 17.4281775 N/A N/A Vendor to Confirm 3.5 N/A N/A 290.469625 1 290.469625 18 N/A N/A N/A 4 3 1.5 30 0.54 18 0.54

FDV-00024 FOAM CHAMPER TFC-0017 14‫ص‬ Oil Storage Tank Roof 9.5 N/A N/A 7.5 70.84625 4.1 290.469625 17.4281775 N/A N/A Vendor to Confirm 3.5 N/A N/A 290.469625 1 290.469625 18 N/A N/A N/A 4 3 1.5 30 0.54 18 0.54

FDV-00025 FOAM CHAMPER TFC-0018 15‫ص‬ Oil Storage Tank Roof 9.5 N/A N/A 10 70.84625 4.1 290.469625 17.4281775 N/A N/A Vendor to Confirm 3.5 N/A N/A 290.469625 1 290.469625 18 N/A N/A N/A 4 3 1.5 30 0.54 18 0.54

FDV-00026 FOAM CHAMPER TFC-0019 16‫ص‬ Oil Storage Tank Roof 16 N/A N/A 7.5 200.96 4.1 823.936 49.43616 N/A N/A Vendor to Confirm 3.5 N/A N/A 823.936 1 823.936 50 N/A N/A N/A 4 4 1.7 30 1.5 50 1.5

FDV-00027 FOAM CHAMPER TFC-0020 17‫ص‬ Oil Storage Tank Roof 16 N/A N/A 7.5 200.96 4.1 823.936 49.43616 N/A N/A Vendor to Confirm 3.5 N/A N/A 823.936 1 823.936 50 N/A N/A N/A 4 4 1.7 30 1.5 50 1.5

1"
Oil Tanks Mixer Shed FDV-00028 Mixer Shed All N/A N/A 28 7 N/A 196 20.4 3998.4 239.904 Pendent / Upright 43.2 2.1 16 4 63 64 4032 241.92 N/A 1.8 111.2 4 2 2.1 30 3.6288 241.92 3.6288 3% AFFF
FOAM/WATER SPRAY NOZZLE

1"
Oil Tanks Loading Arms FDV-00029 Loading Arm All N/A N/A 3.5 1 N/A 3.5 4.1 14.35 0.861 Pendent / Upright 43.2 2.1 2 1 63 2 126 7.56 N/A 1.8 90 4 2 2.1 30 0.1134 7.56 0.1134 3% AFFF
FOAM/WATER SPRAY NOZZLE
Foam Solution Manual Hydraulic Calculatuion Sheet
Equipment Data
Spray Nozzles Data Ring Pipe Data Foam Data
Minimum Minimum
Total Flow rate
Minimum Water Water Concentrated Foam
required per
Height Surface Application Rate Demand Demand Volume
Zone No. Deluge Valve No. Diameter Length Width Minimum No. of Total Total Total Maximum Actual Pipe Foam Equipment Foam Type
(2) Area (3) Required Required No. of Rings / Nozzle Flow Horz. Distance overlap % Actual Velocity Concentrated
Equipment Type Equipment Tag Equipment Description Spray Nozzle Model Spray Angle K-Factor (4) Discharge Nozzles Per Number of Nozzles Nozzles Ring Circumfrance Velocity Diameter Application
Branches (6,9) Rate (4) Between Nozzles (8) inside Pipe Foam Volume
Pressure (5) Ring (7) Nozzles Flow rate Flow rate Inside Pipe Used Duration (10)

(Meters) (Meters) (Meters) (Meters) (m2) (lpm) (lpm) (m3/h) Type (Degrees) (lpm/barg) (barg) (EA) (EA) (lpm) (EA) (lpm) (m3/h) (m) (m) (%) (m/s) (inches) (m/s) (min) (m3) (m3/h) (m3)

N/A FM-0001 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0002 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0003 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0004 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0005 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0006 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71
FDV-0010
N/A FM-0007 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0008 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0009 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0010 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0011 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71
Water/Foam Spray 1"
Pumps Shed N/A 58 9 N/A 522 20.4 10648.8 638.928 Pendent / Upright 43.2 2.1 43 4 63 170 10710 642.6 N/A 1.348837209 148.3 4 2 3 30 9.639 642.6 9.639 3% AFFF
System FOAM/WATER SPRAY NOZZLE
N/A FM-0012 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0013 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FOAM MONITOR (11) FM-0014 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0015 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71
Water/Foam Fire
3% AFFF
Monitors
N/A FM-0016 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0017 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0018 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0019 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0020 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0021 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0022 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0023 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0024 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0025 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0026 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A FM-0027 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A EFM-0001 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A ELEVATED FOAM MONITOR EFM-0002 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

N/A EFM-0003 General Coverage N/A N/A N/A N/A 463.41463 4.1 1900 114 Jet / Fog +80 to -15 Vendor to Confirm 5 N/A N/A 1900 1 1900 114 N/A N/A N/A 4 4 4 30 1.71 114 1.71

General Notes
1. Due to the shortage of information provided by COOP, some data have been assumed i.e. Working Volume for some Tanks, Tanks Roof Height,….. Etc.

2. Since the shell to shell distance between tanks complies with NFPA 30 Table # 4.3.2.2, The whole tank height was considered
3. Sufeace Area Equation used for Tanks Shell: ΠDH
Surface area Equation used for Tanks Roof: ΠRL where L is the slant height of the cone
4. K-Factor value can be obtained from the equation in NFPA 15 parag. 5.5.1.5
5. Minimum discharge pressure as per NFPA 15 of any protection nozzles at an outdoor hazard is 1.4bar, accordingly 2.1bar was used as an avarage design pressure to ensure that while including pressure
friction losses due to pipes material roughness and fitting, the nozzles pressure will always be maintane above 1.4bar
6. For estimating the required number of spray rings of each tank please refer to NFPA 15 parag. 4.5.2 and API RP 2030 sec. 7.3.13

7. In oreder to calcuate the number of nozzles per ring, please refer to NFPA 15 parag. 4.1.4

8. Nozzles overlaping shall meet the coverage distances mentioned in NFPA 15 parag. 4.1.4, parag. 4.5.2 & API RP 2030 sec. 7.3.13 with recommended overlap precentage 60%

9. For Pumps area, please consider two branchs instead of rings


10. Refere to NFPA 11 table 5.2.5.2.2

11. Monitor minimum flow rate shall not be less than (250GPM to 500GPM) as per API RP2030 sec. 7.2.1 accordingly for High Expansion system, 500GPM is recommended (refer to Design Basis COOP-2021-
15-D-3-FF-DB-01)
12. Refer to NFPA 11 Annex B table B-1
Doc. No. : COOP-2021-15-D-3-
FF-HR-02
Foam System Hydraulic
Rev. : 03
Calculation Report Page : 12 of 18
Date : 13/03/2022

Attachment #3
“Spray Nozzles Catalogues”
Foam Top
Pourer Set Mk4

The Angus Fire Top Pourer Set (TPS) Foam Tube Length
Mk4 is designed for use in foam
The standard or minimum length of
systems for the protection of fixed roof
the foam dispersal tube projecting
flammable liquid storage tanks with
into the tank interior is shown in the
Nitrogen inerted blankets or where
below table under “E”. It is designed
tank internal pressures may reach 0.35
for pourers mounted (usually using
bar (5 psi) The Mk4 combines foam
the Angus Fire mounting kit) directly
generation, vapour sealing and foam
on to the tank wall. This positions
pouring in a robust, low-maintenance
the deflector plate at the optimum
design and represents over 35 years of
position inside the tank to spread the
product development and operating
foam evenly around the interior.
experience. Each unit is factory
Other lengths of the foam dispersal
calibrated to perform at a fixed flow
tube can be specified by the customer.
and pressure point and can perform
to the precise pressure and flow Glass Vapour Seal Disc
standards laid down by Underwriters
TPS Mk4 units are fitted with a
Laboratories (UL) and NFPA.
replaceable glass bursting disc suitable
Units without a vapour seal are available for tank internal pressures up to
for total flooding of open roof tanks. 0.34 bar (5psi).
Four basic body sizes cover flow ranges Positive Bursting Disc Mechanism
from 75 l/min (20 US gal/min) to
When the Mk4 TPS is activated, the
3,300 l/min (870 US gal/min) at inlet
liquid foam and water mixture is driven
pressures between 3 bar (45 psi) and
up the pourer inlet pipe under full
10 bar (150 psi).
operating pressure. The liquid pressure
The discharge is enhanced by a causes the air inlet flap valves at the ANSI RF #150 inlet / outlet flange sizes*
deflector plate fitted to the outlet which base of the pourer to close. The liquid, Inlet outlet
disperses the finished foam against the still under full pressure, travels up the TPS 50 2” 4”
tank wall. This ensures a rapid spread tube, past the foam maker and bursts TPS 80 3” 6”
across the surface of the fuel, whilst the heavy duty glass vapour seal disc,
TPS100 4” 8”
lowering the application velocity, allowing access to the tank interior.
TPS150 6” 10”
reducing contamination of the foam by
the fuel and minimising splash. *ISO and DIN flanges also available

TPS Mk4 Dimensions (mm)


A B C D E (Min) F G Weight (kg)
TPS 50 917 117 306 106 50 122 114.3 33
TPS 80 1,067 167 306 106 50 156 168.3 55
TPS 100 1,318 168 381 106 65 203 219.1 82
TPS 150 1,667 217 475 175 65 237 273.0 130
Foam Top Pourer Set Mk4
TANK SHELL
Once the vapour seal disc is burst, GLASS DISK RETAINS
VAPOUR INSIDE TANK
VAPOUR PRESSURE
IN TANK
GLASS DISK

pressure on the liquid foam mixture is RUPTURES UNDER


LIQUID PRESSURE

relieved. This causes the air inlet valves


to open and allows air to mix with the
liquid travelling up the inlet tube.
When the air/liquid mixture reaches FOAM
DISCHARGED
the foam maker, at the top of the inlet INTO TANK

tube, high quality foam is produced.


This is guided onto the tank liquid
surface via the deflector plate, which
ensures that the foam flows down the
tank wall and onto the liquid surface AIR VENTS OPEN
TO ALLOW AIR INTO

without splashing. FOAM PRE-MIX

Angus Foam FOAM PRE-MIX


ENTERS UNDER PRESSURE

With the correct foam concentrate, Top


Pourer Sets can be used in applications For applications involving water Low Pressure Tanks
involving either hydrocarbon or water miscible fuels, Alcoseal at 6% or Tridol
miscible fuels. Angus Tankmaster foam The Angus Fire TPS Mk5 is designed for
ATF produces a 25% drainage time of
is recommended for hydrocarbon fuels tanks where the internal pressures will
around 8 – 10 minutes at 5 bar inlet
and Angus Alcoseal or Tridol ATF for not exceed 0.1 bar (1.5 psi) and uses
pressure to the TPS unit.
polar solvent chemicals. a graphite bursting disc to achieve
Recommended application rates will accurate pressure control of the vapour
Foam expansion and drainage rates vary depending on the specific water seal.
When a suitable foam concentrate miscible product(s) involved.
Materials and Finish
is selected, the TPS can be used Approvals
in applications involving either Standard bodies are fabricated
hydrocarbons or water miscible fuels. All Angus flange mounted and split from carbon steel and the orifice
The properties of the finished foam will flange TPS Mk4 sets are Underwriters plate, internal parts and all fixings
be dependent upon the concentrate Laboratory (UL) listed using Angus foam are manufactured from A2 or SS316
used, but typically Angus Tankmaster, at the minimum length of foam inlet stainless steel.
FP70, Alcoseal or Tridol ATF show tube (E) shown above.
expansion ratios of between 5:1 and
7:1 and a 25% drainage time of around Component Material Options
3 minutes at 3 bar inlet pressure up Body and foam generator tube Carbon steel to EN10025 Stainless steel SS316
to around 8 minutes at 10 bar inlet Orifice plate flow controller Stainless steel SS316
pressure. Heavy duty bursting disc Glass
Bursting disc holder Zinc plated steel
Bursting disc holder gasket PTFE
Foam enhancer Stainless steel SS316
Fixings (nuts, bolts, washers) Stainless steel 304, A2 Stainless steel SS316
Outlet flange gasket Neoprene rubber PTFE

Performance Envelope

TPS 50 TPS 80 TPS 100 TPS 150

3000

400

1400 2500 2600

300 1200
FLOW l.p.m.
FLOW l.p.m.

1000 2000
FLOW l.p.m.

2200
FLOW l.p.m.

200 800

600 1500 1800

100 400

200 1000 1400

0 0 0 0
0 1 2 3 4 5 6 7 8 9 10 0 1 2 3 4 5 6 7 8 9 10 0 1 2 3 4 5 6 7 8 9 10 0 1 2 3 4 5 6 7 8 9 10
PRESSURE bar PRESSURE bar PRESSURE bar PRESSURE bar
Foam Top Pourer Set Mk4
Installation Options A hole is cut into the tank side. Then the need for access to the inside of
the Angus mounting kit flange is the tank. The TPS body with its foam
The Angus mounting kit allows the TPS
secured from outside by passing the deflector is then bolted on to the
to be sited without the need for access
stud nuts through the access hole. adapter kit flange in the normal way.
from inside the tank.
They are then tightened on the inside
WARNING: Before any cutting work by reaching through the access hole
is done to the tank wall, which could from outside the tank, removing
cause sparks and hot spots, it must be
ensured that the tank is empty and
purged of any flammable vapour.

Split Flange Installation Options


Angus TPS units can be supplied with a Flanges are welded outside and inside
split flange layout to enable to the unit the tank wall. The TPS body and foam
to be mounted away from the tank side. generator are mounted on to the
This is intended as an option for a new external flange and the foam deflector
tank under construction, due to the on to the internal flange.
requirement to work inside the tank.

Tank Minimum number of Adaptor Kit Datasheet Reference


Diameter foam top pourers (for standard TPS installation. Not
(m) (NFPA11;2010 & required for split flange installation as For detailed installation information
EN13565-2;2009)
described below) refer to technical drawing:
Up to 24 1
24 to 36 2 Datasheet Reference Technical Drawing
36 to 42 3 ANSI Flange DIN Flange Standard Split
TPS 50 D-A3C7729 D-A3C8721 TPS 50 B4627C1 B4644C1
42 to 48 4
TPS 80 D-15833 D-A3C8704 TPS 80 B4628C1 B4646C1
48 to 54 6
TPS 100 D-15829 D-A3C8723 TPS 100 B4629C1 B4648C1
54 to 60 6
TPS 150 D-16057 D-A3C8725 TPS 150 B4630C1 B4650C1
Over 60 m add one inlet for each
additonal 465m2 of
exposed fuel surface area
(exceeding 2827m2)

Notes:
1. All inlets should be positioned equally around the circumference of the tank, but the
distance between any 2 pourers should not exceed 30m on fixed cone roof tanks.
2. Consideration may have to be given to ensuring the foam application does reach
the centre of large tanks.
Worldwide
www.tyco-fire.com
Contacts

Model B-1 — 3.0 K-factor


Upright and Pendent
Foam-Water Sprinklers
General in addition to the standards of any other
authorities having jurisdiction. Failure
Description to do so may impair the performance
of these devices.
TYCO Model B-1 Upright and Pendent The owner is responsible for main-
Foam-Water Sprinklers are air-aspirat- taining their fire protection system
ing foam discharge outlets designed and devices in proper operating con-
for use in foam-water deluge systems. dition. Contact the installing contrac-
They are designed for flammable liquid tor or product manufacturer with any
risks where it is desired to apply foam questions.
from overhead sprinklers (either upright
or pendent) and where follow-up with
plain water in a standard spray sprin-
Technical
kler pattern is necessary as in the case
of NFPA 16, “Standard for the Instal- Data
lation of Foam-Water Sprinkler and Approvals
Foam-Water Spray Systems.” UL and ULC Listed
It is recommended that the end user
be consulted with respect to the suit-
Discharge outlets and foam concentrates
are Listed for use together. Refer to the
Operation
ability of the materials of construction individual foam concentrate Listing for TYCO Model B-1 Foam-Water Sprin-
for any given corrosive environment. operating limitations and compatibility klers are designed with a unique ven-
The effects of ambient temperature, with the B-1 Foam-Water Sprinklers turi-style body. As foam solution (water
concentration of chemicals, and gas/ as provided in the UL Fire Protection and foam concentrate mixture) flows
chemical velocity, should be consid- Equipment Directory. through the inlet of the body, air is
ered, at a minimum, along with the cor- The Model B-1 Upright and Pendent drawn into the body through the open-
rosive nature to which the sprinklers Foam-Water Sprinklers meet the ings adjacent to the wrenching area.
may be exposed. requirements of: The foam solution and air mix is then
agitated to create an air-aspirated
The Model B-1 Foam-Water Sprinkler is MIL-S-901C foam.
a redesignation for the Gem Issue B-1 (for light-weight Grade A shock-proof
and Star Model B-1 Sprinklers. equipment) The B-1 Foam-Water Sprinklers are
designed to discharge foam in a pre-
MIL-H-24146
NOTICE determined discharge pattern, as well
Maximum Working Pressure as to discharge water similar to stan-
The Model B-1 Foam-Water Sprinklers 175 psi (12,1 bar) dard spray sprinklers. To meet the
described herein must be installed and intent of NFPA 16, foam-water sprin-
maintained in compliance with this Discharge Coefficients
K=3.0 GPM/psi½ (43,2 LPM/bar½)
klers must be able to sufficiently dis-
document, as well as with the applica- tribute water after depletion of the foam
ble standards of the NATIONAL FIRE Thread Connection concentrate.
PROTECTION ASSOCIATION (NFPA), 1/2 in. NPT
Finish
Natural Bronze
IMPORTANT
Refer to Technical Data Sheet Physical Characteristics
TFP2300 for warnings pertaining to Body ���������������������������������������������������������Bronze
Deflector �����������������������������������������������������Brass
regulatory and health information. Agitator �������������������������������������������������������Brass
Always refer to Technical Data
Sheet TFP700 for the “INSTALLER
WARNING” that provides cautions
with respect to handling and instal-
lation of sprinkler systems and com-
ponents. Improper handling and
installation can permanently damage
a sprinkler system or its compo-
nents and cause the sprinkler to fail
to operate in a fire situation or cause
it to operate prematurely.

Page 1 of 4 AUGUST 2018 TFP840


TFP840
Page 2 of 4

2-1/8" DIA. WRENCHING


(54,0 mm) AREA 1"
DEFLECTOR 1/2" (25,4 mm)
NPT ACROSS
WRENCH
FLATS
BODY
7/16"
(11,1 mm) 3/8" DIA.
5-13/16" NOMINAL (9,5 mm)
(147,6 mm) MAKE-IN

AGITATOR
AGITATOR

7/16" 5-15/16"
(11,1 mm) 3/8" DIA. (150,8 mm)
NOMINAL (9,5 mm)
MAKE-IN
BODY
1"
(25,4 mm)
1/2" ACROSS
NPT WRENCH DEFLECTOR
WRENCHING FLATS 2-1/8" DIA.
AREA (54,0 mm)

UPRIGHT PENDENT
FIGURE 1
MODEL B-1 FOAM-WATER UPRIGHT AND PENDENT SPRINKLERS
NOMINAL DIMENSIONS

Design The applied density (flow per unit of


area) of foam solution must meet the Installation
Criteria requirements of the authority having
jurisdiction for the type flammable
TYCO Model B-1 Foam-Water Sprin-
klers must be installed in accordance
TYCO Model B-1 Upright and Pendent liquid and occupancy. Per NFPA 16, with this section.
Foam-Water Sprinklers are intended coverage density must not be less
than 0.16 gpm/ft² (6,52 mm/min) of General Instructions
for fire protection systems designed in
floor area with a resulting minimum Obtain a leak-tight 1/2 in. NPT sprin-
accordance with the standard instal-
discharge pressure of not less than kler joint by applying a minimum-to-
lation rules for foam-water sprinklers
30 psi (2,1 bar). maximum torque of 7 to 14 ft-lb (9,5 to
systems recognized by the applicable
19,0 N∙m). Higher levels of torque may
Listing agency (e.g., UL Listing is based Foam-water sprinkler spacing must
distort the sprinkler inlet and cause
on the requirements of NFPA 13 and not exceed the requirements of NFPA
impairment of the sprinkler.
16). 13 for extra hazard occupancies and
Graph A provides the nominal dis- the system must be hydraulically cal- Upright and Pendent Sprinklers
charge patterns for reference use. culated to obtain the required density Note: Pendent sprinklers are to be
and discharge pressure. installed in the pendent position;
Note: The discharge patterns shown in upright sprinklers are to be installed in
Graph A are not to be used for design Note: Discharge outlets and foam con-
centrates are listed for use together. the upright position.
purposes or to disregard standard
installation rules. Refer to the individual foam concen- Step 1. With pipe thread sealant
trate listing for operating limitations and applied to the pipe threads, hand
Not less than two (2) foam-water sprin- compatibility with the B-1 Foam-Water tighten the sprinkler into the sprinkler
klers are to be installed in any area, Sprinklers as provided in the UL Fire fitting.
regardless of size, in order to obtain Protection Equipment Directory.
pattern overlap. Step 2. Tighten the sprinkler into the
sprinkler fitting using an 8 in. or 10 in.
adjustable wrench. With reference to
Figures 1 and 2, the adjustable wrench
is only to be applied to the wrench flats
of the wrenching area.
TFP840
Page 3 of 4

DATA KEY
WATER DISCHARGE FOAM DISCHARGE
8 or 10 INCH
RADIUS, METERS RADIUS, FEET ADJUSTABLE
3,0 2,0 1,0 0 2 4 6 8 10 WRENCH
0 0

DISTANCE BELOW
DISTANCE BELOW
CEILING, METERS

0,5
2

CEILING, FEET
APPLY TO
1,0 WRENCH
4 FLATS
1,5 ONLY
6
2,0

8 FIGURE 2
2,5
UPRIGHT WRENCH FLATS
RADIUS, METERS RADIUS, FEET

0
3,0 2,0 1,0 0 2 4 6 8 10
0
Limited
Warranty

DISTANCE BELOW
DISTANCE BELOW
CEILING, METERS

0,5
2

CEILING, FEET
For warranty terms and conditions, visit
1,0 www.tyco-fire.com.
4
1,5
6
Ordering
2,0
Procedure
2,5 8 Contact your local distributor for avail-
PENDENT
ability. When placing an order, indi-
GRAPH A cate the full product name, including
NOMINAL DISCHARGE PATTERNS description and part number (P/N).
(SHOWN FOR REFERENCE ONLY — NOT SUITABLE FOR DESIGN PURPOSES)
Upright Foam-Water Sprinklers
Specify: Model B-1 Upright Foam-
Care and Frequent visual inspections are recom-
mended to be initially performed for
Water Sprinkler, P/N 49-210-1-001

Maintenance sprinklers installed in potentially cor-


rosive atmospheres to verify the integ-
Pendent Foam-Water Sprinklers
Specify: Model B-1 Pendent Foam-
rity of the materials of construction as Water Sprinkler, P/N 49-211-1-001
TYCO Model B-1 Foam-Water Sprin-
klers must be maintained and serviced they may be affected by the corrosive
in accordance with this section. conditions present for a given installa-
tion. Thereafter, annual inspections per
Before closing a fire protection system NFPA 25 are required.
control valve for maintenance work on
the fire protection system that it con- The owner is responsible for the inspec-
trols, permission to shut down the tion, testing, and maintenance of their
affected fire protection system must fire protection system and devices in
be obtained from the proper authorities compliance with this document, as well
and all personnel who may be affected as with the applicable standards of the
by this action must be notified. NATIONAL FIRE PROTECTION ASSO-
CIATION (e.g., NFPA 25), in addition to
Model B-1 Foam-Water Sprinklers the standards of any other authorities
must never be painted, plated, coated having jurisdiction. Contact the install-
or altered in any way after leaving the ing contractor or product manufacturer
factory; otherwise, the spray perfor- with any questions.
mance may be impaired.
It is recommended that foam-water
Care must be exercised to avoid sprinkler systems be inspected, tested,
damage to the sprinklers before, and maintained by a qualified Inspec-
during, and after installation. Sprin- tion Service in accordance with local
klers damaged by dropping, striking, requirements and/or national codes.
wrench twist/slippage, or the like, must
be replaced.