Internal Rotary Inspection System (Iris) : Non-Destructive Examination (Final Report)
Internal Rotary Inspection System (Iris) : Non-Destructive Examination (Final Report)
EXAMINATION
REPORT
(Final Report)
INTERNAL
ROTARY
INSPECTION
SYSTEM (IRIS)
GTU GENERATOR REBOILER
SECONDARY INSPECTION
Office :
Semolowaru Selatan 5 / 25, Surabaya – East Java 60119
1 Phone : +62 31 5967609, 5967608
Fax : +62 31 5963810
Email : robutech@robutech.com Website : www.robutech.com
ACKNOWLEDGMENT
TUBING INSPESTION
USING
INTERNAL ROTARY INSPECTION SYSTEM (IRIS)
Requested by:
1. Signed in hardcopy version Only; 2. All attachment (such as: Personnel Certificate, Equipment Certificate) is in hardcopy version only
Report No. : 001-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 May 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
LIST OF CONTENTS
- ACKNOWLADGEMENT
- LIST OF CONTENT
1. INTRODUCTION
1.1. General
1.2. Objective
1.3. Reference
2. SCOPE OF WORK
3. PERSONEL DETAILS
4. INSPECTION OVERVIEW
4.1. Concept of Internal Rotary Inspection System (IRIS)
4.2 IRIS Output
4.3 Advantages of IRIS
4.4 Disadvantages of IRIS
4.5 Calibration
4.5.1 Tube Reference
4.5.2 Calibration record
4.5.3 Calibration control
4.6 Sensitivity setting
5. TUBE IDENTIFICATION
6. EQUIPMENT AND ACCESSORIES
6.1 RAM-4
6.2 MS5800
5. STRENGHT CALCULATION
6. INSPECTION EQUIPMENT
7. INSPECTION RESULT AND SUMMARY
7.1 Cleaning Result
7.2 Inspection Result
8. RECOMMENDATION
9. LIST OF DETAIL REPORT & ATTACHMENT
9.1. IRIS Configuration setting
9.2. Detail Report
9.3. Analysis Record
9.4. Defect mapping
9.5. Photograph activity
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
1. INTRODUCTION
1.1. General
PT AGN has a GTU Reboiler item which is found to have a visual indication in the form of
wall loss due to friction from the support. Internal Rotary Inspection System (IRIS) is the
UT method used by owner to check the indication. PT ROBUTECH was appointed by PT
AGN to carried out inspections using this method. In the first stage the examination was
carried out randomly from row 1 until row 3 on April 16, 2022, the results of 70,73% of
examinations found that there was wall loss due to friction of the support tube more than
50% of the original thickness. Engineer of PT.AGN decided to carried out a further
inspection with the same method to find out to what extent these indications occurred
on his equipment based on the results of the first inspection. This report contains the
results of the inspection and the actual condition of the equipment.
1.2. Objective
The purpose of this examination activity was to determine the condition of tubing and to find any
anomaly(es) such as, general corrosion (ID/OD), pitting corrosion (ID/OD) or/and defect under
baffle/support plate (OD) that may be occurred due to the service conditions and caused wall
thickness degradation and to find out the extent to which the indication of wall loss occurred on
this equipment
1.3. Reference
2. SCOPE OF WORK
2.1 CLEANING
Result of the IRIS method be affected by the cleanliness of the inside of the tube so that
during this inspection cleaning activities are carried out to accommodate the IRIS
inspection so as to get good results. The details are as follows:
Tube Tube OD Total Cleaned
Equipment
Material (mm) Tubes tubes
GTU
Generator SA-179M 19.05 1010 (U) 922
Reboiler
Table 1. Cleaning object
2.2 IRIS INSPECTION
Based on the agreement between robutech and PT AGN, data was taken using IRIS
randomly with the following details:
Tube Inspect
Tube Tube OD Inspected
Equipment Thickness Total Tubes Percent
Material (mm) Tubes
(mm) (%)
GTU
Generator SA-179M 19.05 2.108 1010 (U) 1004 49,7 %
Reboiler
Table 2. Inspection object
Note:
- Inspection was carried out on straight tube portion only
- The previous inspection was carried out on 82 rubes.
3. PERSONNEL DETAILS
4. INSPECTION OVERVIEW
Hole
5. TUBE IDENTIFICATION
In order to be able to identify and locate each tube, and thereby create full traceability the grid
coordinates of row & tube were used. The identification of Row 1 is upper tube of inlet side.
Row 1, Column 1
6.1 RAM-4
Specification of RAM-4
Flexible Shaft Speed: 862.5 rpm
Motor Power: 1/2 HP (0.4 kW)
Input Power: 4.5 amps, 230 V, 50 Hz)
Dimensions: 37" (940mm) high x 20" (510mm) wide x 17" (430mm) deep
Weight: 49 lbs (22 kg) clean dry
7.2.2 Row 2
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.3 Row 3
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row 3
Column 1. All tubes of this row were found wall loss due to friction by tube baffle/support
specially on first tube support/baffle (count from tube sheet/plate).
7.2.4 Row 4
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.5 Row 5
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.6 Row 6
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.7 Row 7
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.8 Row 8
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.9 Row 9
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row 9
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
Column 12. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.10 Row 10
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
10 Column 1. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.11 Row 11
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.12 Row 12
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 2 tube was found deformation (bowing) on several part, it is in Row
12 Column 21 and 43. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.13 Row 13
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube and end tube support/baffle (count from tube
sheet/plate).
7.2.14 Row 14
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
14 Column 45. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.15 Row 15
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 2 tubes were found deformation (bowing) on several part, it is in Row
15 Column 1 and 50. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
7.2.16 Row 16
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube and end tube support/baffle (count from tube
sheet/plate).
7.2.17 Row 17
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube and end tube support/baffle (count from tube
sheet/plate).
7.2.18 Row 18
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
18 Column 52. 1 tube already plugged and replaced other tube. Several tubes of this row
were found wall loss due to friction by tube baffle/support specially on first tube
support/baffle (count from tube sheet/plate).
7.2.19 Row 19
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
19 Column 1. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.20 Row 20
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.21 Row 21
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.22 Row 22
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
7.2.23 Row 23
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.24 Row 24
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.25 Row 25
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.26 Row 26
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.27 Row 27
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.28 Row 28
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.29 Row 29
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
29 Column 52. 1 tube already plugged and replaced other tube. Several tubes of this row
were found wall loss due to friction by tube baffle/support specially on first tube
support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
7.2.30 Row 30
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.31 Row 31
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.32 Row 32
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.33 Row 33
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.34 Row 34
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
34 Column 1. 1 tube already plugged and replaced other tube. Several tubes of this row
were found wall loss due to friction by tube baffle/support specially on first tube
support/baffle (count from tube sheet/plate).
7.2.35 Row 35
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.36 Row 36
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
34 Column 1. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
7.2.37 Row 37
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.38 Row 38
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 2 tubes were found deformation (bowing) on several part, it is in Row
38 Column 5 and Column 33. Several tubes of this row were found wall loss due to friction
by tube baffle/support specially on first tube support/baffle (count from tube
sheet/plate).
7.2.39 Row 39
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
39 Column 1. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.40 Row 40
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 2 tubes were found deformation (bowing) on several part, it is in Row
40 Column 1 and Column 34. Several tubes of this row were found wall loss due to friction
by tube baffle/support specially on first tube support/baffle (count from tube
sheet/plate).
7.2.41 Row 41
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
41 Column 18. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.42 Row 42
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.43 Row 43
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA
43 Column 18. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.44 Row 44
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 3 tubes were found deformation (bowing) on several part, it is in Row
44 Column 1,2, and 32. Several tubes of this row were found wall loss due to friction by
tube baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.45 Row 45
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.46 Row 46
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 8 tubes were found deformation (bowing) on several part, it is in Row
46 Column 3, 8, 9, 10, 12, 14, 15, 17. 1 tube already plugged and replaced other tube.
Several tubes of this row were found wall loss due to friction by tube baffle/support
specially on first tube support/baffle (count from tube sheet/plate).
The picture below is an example of the appearance of the IRIS results compared to the
design image from the GTU Generator Reboiler
8. RECOMMENDATION
There are some recommendations based on the analysis of inspection results that have been carried out:
8.1. The results of the inspection using the IRIS method are influenced by the cleanliness of the inside
of the tube so that a more proper cleaning method is needed so that it can produce maximum
results. The mechanical cleaning method can accommodate the cleaning of this equipment, but
there are some tubes that require other cleaning methods so that the user can choose other
methods such as hydro blasting which may be combined with the currently used method.
8.2. Acceptance criteria for each tubing inspection have never been stated to national or
international standards or codes, so the recommendation to be plugged or replaced is purely
from the point of view of the user’s engineer that considered some factor such as, service
conditions, corrosion rate and service life.
8.3. Thickness reduction (wall loss) due to and corrosion and friction between the baffle plate and
the tube may occur repeatedly if root cause is not found. Deep analysis may be carried out to
find the root cause and how to minimize the occurring of this damage mechanism.
8.4. Inspection program should be carried out periodically as monitoring based on result of previous
inspection for monitoring.
8.5. The inspection technique, observations, and NDE method that carried out on this inspection
should be conducted periodically in the monitoring purpose, as per previous inspection
technique, observations, and NDE method.
9. LIST OF ATTACHMENT
9.1. IRIS Configuration setting
9.2. Detail report
9.3. Analysis record
9.4. Defect mapping
9.5. Photograph activity
SET UP OF IRIS DEVICE
Setup Report
General informations
5/17/2022 1
X-axis probe speed units:
Y-axis probe speed units:
X-axis encoder preset: Acquisition start
Y-axis encoder preset: Acquisition start
X-axis preset: 0,00
Y-axis preset: 0,00
Scan direction: Inlet to outlet
PCU version:
PIM version:
I/O board version:
Alarm board version:
Dual encoder board 1:
Dual encoder board 2:
Number of pod slots:
Key serial number: 292328710
Minimum gain limit: 0,00
Maximum gain limit: 65.535,00
Number of EC frequency: 1
Number of EC time slots: 1
EC frequency accuracy: 10,00
EC current source: 0,00
EC interpolation: False
Pod boards config type: Hardware in unit
EC-Generator boards: 0
EC-Acquisition boards: 0
Quadruple encoder boards: 0
RFT, MFL boards: 0
Dual encoder boards: 0
Ultrasound boards: 0
Scanned channel landmark:
Pod Boards
5/17/2022 2
Installation Options
5/17/2022 3
Alarms
Alarm Outputs
Analog Outputs
Analog Output 32
C-Scan
Name Type Channel name Offset X Offset Y
ID UT ID
US1T0 0,00 mm 0,00 deg
OD UT OD
US1T0 0,00 mm 0,00 deg
US1T1 0,00 mm 0,00 deg
WT UT WT
US1T0 0,00 mm 0,00 deg
US1T1 0,00 mm 0,00 deg
Analysis Codes
Code name Measurement channel Curve Extension
OBS None
PLG None
NO_ACC None
ID_PIT None
OD_PIT None
HOLE None
ID_CORR None
OD_CORR None
Analysis Indications
Analysis Landmarks
Analysis Curves
5/17/2022 4
Ultrasound Setup
Ultrasound Channels
X Y Z Delay Pulser Tx Rx G1 G2 DAC DAC Pulse Filter Trig. Trig. len. Trig. Trig Trig.
(mm) (mm) (mm) slope blank width start blk. unit level
0,00 0,00 0,00 0,00 Echo 0 0 33,00 48,00 0,94 0,50 35 High pass 1,00 3,00 0,70 mm -23
10 MHz
Landmark
5/17/2022 5
DETAIL REPORT
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES‐U1823C‐01/05 Report no. : 001‐UT/RBT‐AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT‐P‐40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A‐179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
IRIS EQUIPMENT IRIS PROBE
Brand Type Serial no. Brand Angle Serial no. Freq. (MHz) length cable (m)
Olympus MS5800 1076393 Olympus 0 ‐ 15 20
IRIS Software Storage Data
Brand Type Version Brand Type Serial no. Filename
RnD MultiView 6.1R0 HP Laptop 5CG1504TZB GTU
IRIS Turbine Turbine Gain
Scanning direction
Brand Size (mm) Serial no. Speed Gain 1 (dB) Gain 2 (dB) Blanking
Olympus 12 ‐ 33 48 0.703 Clockwise
Tube Reference
Thickness Articifial Defect
Material OD (mm) ID (mm)
(mm) 1 2 3 4 5
Carbon steel 19,05 14,83 2,11 Through Hole OD Groove 20 OD Groove 40 OD Groove 60 ‐
Calibration Record
OD Groove
OD Groove
OD Groove
Hole
Summary of work:
Defect Category Range Thickness (mm) Color Identification Number of Tubes Prosentages(%)
0 ‐10% Wall loss 2,11 ≥ Thickness > 1,90 552 54,98%
10 ‐20% Wall loss 1,90 ≥ Thickness > 1,69 122 12,15%
20 ‐ 30% Wall Loss 1,69 ≥ Thickness > 1,48 48 4,78%
30 ‐ 40% Wall Loss 1,48 ≥ Thickness > 1,26 69 6,87%
40 ‐ 50% Wall loss 1,26 ≥ Thickness > 1,05 33 3,29%
More 51% wall loss 1,05 ≥ Thickness > 0,00 64 6,37%
Old Plugged 0 0,00%
Obstacle 0 0,00%
Deformation 34 3,39%
Previous Inspection 82 8,17%
Total Inspected Tube 1004 100,00%
24 5 10 25 30 35 40 45 50
25 5 10 15 20 25 30 35 40 45 50
26 5 10 15 20 25 30 35 40 45 50
27 5 10 15 20 25 30 35 40 45 50
28 5 10 15 20 25 30 35 40 45 50
29 5 10 15 20 25 30 35 40 45 50
30 5 10 15 20 25 30 35 40 45 50
31 5 10 15 20 25 30 35 40 45 50
32 5 10 15 20 25 30 35 40 45 50
33 5 10 15 20 25 30 35 40 45
34 5 10 15 20 25 30 35 40 45
35 5 10 15 20 25 30 35 40 45
36 5 10 15 20 25 30 35 40 45
Color Identification Defect Category Number Of Tubes
37 20 25 30 35 40
38 5 10 15 20 25 30 35 40 0 - 10 % Wall Loss 552
39 5 10 15 20 25 30 35 40 10 - 20 % Wall Loss 122
40 5 10 15 20 25 30 35 40 20 - 30 % Wall Loss 48
41 5 10 15 20 25 30 35
15 30 35
30 - 40 % Wall Loss 77
42 5 10 20
43 5 10 15 20 25 30 40 - 50 % Wall Loss 45
44 5 10 15 20 25 30 More 51% Wall Loss 122
45 5 10 15 20 25 Old Plug 1
46 10 15 20
Obstacle 0
Deformation 35
Inspected Tube 1004
Requested of Tube 1004
Total Tube 2020
PT. ROBUTECH
PHOTOGRAPH ACTIVITY
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
PHOTOGRAPH ACTIVITY
1 2
GTU Reboiler GTU Reboiler
3 4
IRIS Inspection IRIS Inspection
5 6
IRIS Inspection IRIS Inspection
7 8
IRIS Inspection IRIS Inspection