NON-DESTRUCTIVE

EXAMINATION
REPORT
(Final Report)
INTERNAL
ROTARY
INSPECTION
SYSTEM (IRIS)
GTU GENERATOR REBOILER
SECONDARY INSPECTION

TUBING INSPECTION - MAY 2022

PT. ARMADA GEMA NUSANTARA


SAMPANG – MADURA, EAST JAVA

Office :
Semolowaru Selatan 5 / 25, Surabaya – East Java 60119
1 Phone : +62 31 5967609, 5967608
Fax : +62 31 5963810
Email : robutech@robutech.com Website : www.robutech.com
ACKNOWLEDGMENT

NON-DESTRUCTIVE EXAMINATION REPORT


Stage of inspection:

TUBING INSPESTION
USING
INTERNAL ROTARY INSPECTION SYSTEM (IRIS)

Requested by:

PT. ARMADA GEMA NUSANTARA (AGN)

Prepared by Reviewed by Client representative

1. Signed in hardcopy version Only; 2. All attachment (such as: Personnel Certificate, Equipment Certificate) is in hardcopy version only
Report No. : 001-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 May 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

LIST OF CONTENTS

- ACKNOWLADGEMENT
- LIST OF CONTENT
1. INTRODUCTION
1.1. General
1.2. Objective
1.3. Reference
2. SCOPE OF WORK
3. PERSONEL DETAILS
4. INSPECTION OVERVIEW
4.1. Concept of Internal Rotary Inspection System (IRIS)
4.2 IRIS Output
4.3 Advantages of IRIS
4.4 Disadvantages of IRIS
4.5 Calibration
4.5.1 Tube Reference
4.5.2 Calibration record
4.5.3 Calibration control
4.6 Sensitivity setting
5. TUBE IDENTIFICATION
6. EQUIPMENT AND ACCESSORIES
6.1 RAM-4
6.2 MS5800
5. STRENGHT CALCULATION
6. INSPECTION EQUIPMENT
7. INSPECTION RESULT AND SUMMARY
7.1 Cleaning Result
7.2 Inspection Result
8. RECOMMENDATION
9. LIST OF DETAIL REPORT & ATTACHMENT
9.1. IRIS Configuration setting
9.2. Detail Report
9.3. Analysis Record
9.4. Defect mapping
9.5. Photograph activity
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

1. INTRODUCTION

1.1. General

PT AGN has a GTU Reboiler item which is found to have a visual indication in the form of
wall loss due to friction from the support. Internal Rotary Inspection System (IRIS) is the
UT method used by owner to check the indication. PT ROBUTECH was appointed by PT
AGN to carried out inspections using this method. In the first stage the examination was
carried out randomly from row 1 until row 3 on April 16, 2022, the results of 70,73% of
examinations found that there was wall loss due to friction of the support tube more than
50% of the original thickness. Engineer of PT.AGN decided to carried out a further
inspection with the same method to find out to what extent these indications occurred
on his equipment based on the results of the first inspection. This report contains the
results of the inspection and the actual condition of the equipment.

1.2. Objective

The purpose of this examination activity was to determine the condition of tubing and to find any

anomaly(es) such as, general corrosion (ID/OD), pitting corrosion (ID/OD) or/and defect under

baffle/support plate (OD) that may be occurred due to the service conditions and caused wall

thickness degradation and to find out the extent to which the indication of wall loss occurred on

this equipment

1.3. Reference

1.3.1. ASME BPVC Section V, Non-destructive Examination, 2021


1.3.2. IRIS User’s manual Olympus MS.5800
1.3.3. Drawing no. HES-U1823C-01/05
1.3.4. IRIS Procedure RBT-P-40, Revision 0
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

2. SCOPE OF WORK
2.1 CLEANING
Result of the IRIS method be affected by the cleanliness of the inside of the tube so that
during this inspection cleaning activities are carried out to accommodate the IRIS
inspection so as to get good results. The details are as follows:
Tube Tube OD Total Cleaned
Equipment
Material (mm) Tubes tubes
GTU
Generator SA-179M 19.05 1010 (U) 922
Reboiler
Table 1. Cleaning object
2.2 IRIS INSPECTION
Based on the agreement between robutech and PT AGN, data was taken using IRIS
randomly with the following details:
Tube Inspect
Tube Tube OD Inspected
Equipment Thickness Total Tubes Percent
Material (mm) Tubes
(mm) (%)
GTU
Generator SA-179M 19.05 2.108 1010 (U) 1004 49,7 %
Reboiler
Table 2. Inspection object
Note:
- Inspection was carried out on straight tube portion only
- The previous inspection was carried out on 82 rubes.
3. PERSONNEL DETAILS

No. Team members Position Qualification


1. Rizal Hidayatullah Interpreter UT Level II
2. Ahmad Wajih Operator UT Level II
3. Edi Suprapto Operator NDT Level II
4. Ilham Dharma M. Operator NDT Level II
5. Devri ahmad R. Operator NDT Level II
6. Rafiz Skill 3 Helper
7. Dwiki Skill 3 Helper
8. Andi Handoko Skill 3 Helper
Table 3. IRIS Team
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

4. INSPECTION OVERVIEW

4.1. CONCEPT OF INTERNAL ROTARY INSPECTION SYSTEM (IRIS)


Unlike eddy current, remote field and magnetic flux leakage, that operate on magnetic or
electromagnetic. Principles the IRIS technique is based on Ultrasonic’s. As shown in the below
illustration a beam from an ultrasonic transducer is reflected from a mirror set at 45 degrees so
that the reflected ultrasonic beam impinges on the tube I.D. at right angles. Part of this beam is
then reflected from the tube I.D., while the remainder is transmitted through the wall thickness
and is reflected from the tube O.D. The time difference between the two reflected signals is then
used to measure the tube wall thickness. The mirror is mounted on a water driven turbine that
rotates at a speed of about 2000 rpm. Measurements are then made around the full tube
circumference and as the probe head is pulled through the tube the ultrasonic beam maps out a
spiral along the tube length. If the probe pulling speed is sufficiently slow, taking into account the
inspection parameters, 100 % coverage of the tube surface is achieved. With advanced software
results can be displayed in a number of views as illustrated below:

Figure 1. IRIS concept


4.2. IRIS OUTPUT
IRIS can be shown 3 layout, B scan, C scan and D scan (see figure above). The C-scan presentation
provides a plan view of the tube when it has been rolled flat. Colour-coding is used to display the
wall thickness as illustrated by the rainbow of Colours. The B-scan display provides a 2-
dimensional display of a transverse cut through the tube at any desired position along the tube
length, while the D-scan display provides a 2-dimensional display of a longitudinal cut through the
tube at any desired circumferential position on the tube.
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

Figure 2. IRIS Layout


4.3. ADVANTAGES OF IRIS
4.3.1. Very accurate technique. Wall thickness measurements can be made to accuracy
within 0.1mm, with the use of a 15MHz-focused transducer.
4.3.2. Fairly sensitive technique. The sensitivity achieved will depend on tube
dimensions and tube cleanliness. In general it can be stated that it should be
possible to detect a 1.5mm defect in up to 1 inch tubing that has been properly
cleaned.
4.3.3. A three dimensional picture of the defect is obtained. Thus the defect profile in
addition to its depth is obtained.
4.3.4. Interpretation of results is easier than in the other techniques assuming that
acceptable tube cleanliness has been achieved.
4.4.5. Ferromagnetic and non-ferromagnetic tubes can be inspected.
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

4.4. DISADVANTAGES OF IRIS


4.4.1. It is a slow technique. The actual testing speed will depend on a number of
factors, but will generally be of the order of 0.04m/sec. to achieve 100%
coverage. However it must be noted that the tube has to be filled with water
(couplant) every time prior to the actual inspection. This will reduce the typical
production rates to be in the order of 60 - 100 tubes per 8-hour shift. Although
this will depend on the tube length and number of units being inspected as well
as the cleanliness of the tubes and the water pressure supplied at the point of
inspection.
4.4.2. Tubes must be very clean (CRITICAL CLEANING). While all the other techniques
can tolerate some degree of scaling, tubes must be cleaned virtually down to
bare metal for a successful IRIS inspection.
4.4.3. Water must be introduced into the tube to act as a couplant. At times this can
be a problem due to no suitable water outlet being available at the point of
inspection. In other cases the source of water may not be clean enough or may
not be at the ambient temperature required for a successful inspection. In some
cases the introduction of water into the tubes may give rise to corrosion
problems.
4.4.4. Only volumetric defects will be detected. It is not, therefore, sensitive to
cracking.
4.5. CALIBRATION
4.5.1. Tube Reference
The calibration process is carried out using a reference tube, with carbon steel
material and have same dimension tube to be inspected.

Hole

Figure 3. Tube Reference


Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

4.5.2. Calibartion Record


The following is the calibration record for this inspection:

Figure 4. Calibration Record


Note: Detail of calibration is shown on detail report.
4.5.3. Calibartion Control
The general setting and calibration were performed at the beginning of the
inspection and at the beginning of every shift. A check of the calibration was
done after any larger breaks and or changes in any equipment. All calibration
data is stored digitally. Calibration samples are used for initial set-up and also
for the random check of operator settings.
4.6. SENSITIVITY SETTING
The general overview of the inspected areas with its results is presented in the attached colour
scan reports, with wall loss represented in colour classes as below:

Figure 5. C-scan pallete


Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

5. TUBE IDENTIFICATION

In order to be able to identify and locate each tube, and thereby create full traceability the grid
coordinates of row & tube were used. The identification of Row 1 is upper tube of inlet side.

Figure 6. Tube layout/configuration

Row 1, Column 1

Figure 7. GTU Generator Reboiler


Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

6. EQUIPMENT AND ACCESSORIES

6.1 RAM-4

Specification of RAM-4
Flexible Shaft Speed: 862.5 rpm
Motor Power: 1/2 HP (0.4 kW)
Input Power: 4.5 amps, 230 V, 50 Hz)
Dimensions: 37" (940mm) high x 20" (510mm) wide x 17" (430mm) deep
Weight: 49 lbs (22 kg) clean dry

6.2 OLYMPUS MS5800


A computerized multi-function Non-Destructive Examination system of Olympus MS.5800
was used to carry out this inspection. All results were record to laptop’s hard disk with
manual analysis conducted on screen.

Figure 8. Inspection equipment


Equipment and accessories details:
a. Olympus MS5800 with updated software loaded laptop
b. 20 m length of floating cable
c. 15 MHz probe, 12 mm turbine and small size centering turbine
d. Water Pump and filter
e. Electrical roll cable
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

7. INSPECTION RESULT AND SUMMARY

7.1 CLEANING RESULT


Cleaning the inside of the tube is carried out using the mechanical cleaning method with the
following results :
Summary of work :
Category Number of Tubes Percentages
Proper cleaning 267 28,95 %
Cleaning is not proper 655 71,04 %
Tubes was cleaned 922 100,00 %

Table 3. Cleaning Result


The cleaning process is carried out in parallel with the IRIS inspection in each row, but the cleaning
process carried out on the tubes in rows 17 until 46 is not proper using the mechanical cleaning
method to get the maximum IRIS inspection results. However, the results of the inspection using
the IRIS method can be interpreted
7.2 INSPECTION RESULT
From this inspection, Defects were found in almost inspected tubes. The result was described on
table below:

Table 4. Inspection resume


Below is a short summary of each row inspected.
7.2.1 Row 1
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was already plugged. 22 of 23 tubes were found wall loss due
to friction by tube baffle/support specially on first tube support/baffle (count from tube
sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

7.2.2 Row 2
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.3 Row 3
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row 3
Column 1. All tubes of this row were found wall loss due to friction by tube baffle/support
specially on first tube support/baffle (count from tube sheet/plate).
7.2.4 Row 4
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.5 Row 5
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.6 Row 6
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.7 Row 7
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.8 Row 8
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.9 Row 9
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row 9
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

Column 12. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.10 Row 10
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
10 Column 1. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.11 Row 11
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.12 Row 12
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 2 tube was found deformation (bowing) on several part, it is in Row
12 Column 21 and 43. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.13 Row 13
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube and end tube support/baffle (count from tube
sheet/plate).
7.2.14 Row 14
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
14 Column 45. All tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.15 Row 15
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 2 tubes were found deformation (bowing) on several part, it is in Row
15 Column 1 and 50. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

7.2.16 Row 16
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube and end tube support/baffle (count from tube
sheet/plate).
7.2.17 Row 17
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube and end tube support/baffle (count from tube
sheet/plate).
7.2.18 Row 18
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
18 Column 52. 1 tube already plugged and replaced other tube. Several tubes of this row
were found wall loss due to friction by tube baffle/support specially on first tube
support/baffle (count from tube sheet/plate).
7.2.19 Row 19
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
19 Column 1. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.20 Row 20
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.21 Row 21
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.22 Row 22
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

7.2.23 Row 23
Tubes were found to be in a clean condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.24 Row 24
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.25 Row 25
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.26 Row 26
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.27 Row 27
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.28 Row 28
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.29 Row 29
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
29 Column 52. 1 tube already plugged and replaced other tube. Several tubes of this row
were found wall loss due to friction by tube baffle/support specially on first tube
support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

7.2.30 Row 30
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.31 Row 31
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.32 Row 32
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.33 Row 33
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.34 Row 34
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
34 Column 1. 1 tube already plugged and replaced other tube. Several tubes of this row
were found wall loss due to friction by tube baffle/support specially on first tube
support/baffle (count from tube sheet/plate).
7.2.35 Row 35
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.36 Row 36
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
34 Column 1. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

7.2.37 Row 37
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.38 Row 38
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 2 tubes were found deformation (bowing) on several part, it is in Row
38 Column 5 and Column 33. Several tubes of this row were found wall loss due to friction
by tube baffle/support specially on first tube support/baffle (count from tube
sheet/plate).
7.2.39 Row 39
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
39 Column 1. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.40 Row 40
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 2 tubes were found deformation (bowing) on several part, it is in Row
40 Column 1 and Column 34. Several tubes of this row were found wall loss due to friction
by tube baffle/support specially on first tube support/baffle (count from tube
sheet/plate).
7.2.41 Row 41
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
41 Column 18. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.42 Row 42
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.43 Row 43
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 1 tube was found deformation (bowing) on several part, it is in Row
Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

43 Column 18. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.44 Row 44
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 3 tubes were found deformation (bowing) on several part, it is in Row
44 Column 1,2, and 32. Several tubes of this row were found wall loss due to friction by
tube baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.45 Row 45
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. Several tubes of this row were found wall loss due to friction by tube
baffle/support specially on first tube support/baffle (count from tube sheet/plate).
7.2.46 Row 46
Tubes were found to be in a dirt condition. General corrosion was already occurred on
outer side of tubes. 8 tubes were found deformation (bowing) on several part, it is in Row
46 Column 3, 8, 9, 10, 12, 14, 15, 17. 1 tube already plugged and replaced other tube.
Several tubes of this row were found wall loss due to friction by tube baffle/support
specially on first tube support/baffle (count from tube sheet/plate).
The picture below is an example of the appearance of the IRIS results compared to the
design image from the GTU Generator Reboiler

Tubesheet Side UU-Bend Side

Figure 9. sample record of indication due to friction by tube support/baffle


Report No. : 002-UT/RBT-AGN/V/22
NON-DESTRUCTIVE
Date of Inspection : 10 – 15 Mei 2022
EXAMINATION Client : PT. ARMADA GEMA NUSANTARA
REPORT Location : SAMPANG, MADURA, EAST JAVA

8. RECOMMENDATION

There are some recommendations based on the analysis of inspection results that have been carried out:
8.1. The results of the inspection using the IRIS method are influenced by the cleanliness of the inside
of the tube so that a more proper cleaning method is needed so that it can produce maximum
results. The mechanical cleaning method can accommodate the cleaning of this equipment, but
there are some tubes that require other cleaning methods so that the user can choose other
methods such as hydro blasting which may be combined with the currently used method.
8.2. Acceptance criteria for each tubing inspection have never been stated to national or
international standards or codes, so the recommendation to be plugged or replaced is purely
from the point of view of the user’s engineer that considered some factor such as, service
conditions, corrosion rate and service life.
8.3. Thickness reduction (wall loss) due to and corrosion and friction between the baffle plate and
the tube may occur repeatedly if root cause is not found. Deep analysis may be carried out to
find the root cause and how to minimize the occurring of this damage mechanism.
8.4. Inspection program should be carried out periodically as monitoring based on result of previous
inspection for monitoring.
8.5. The inspection technique, observations, and NDE method that carried out on this inspection
should be conducted periodically in the monitoring purpose, as per previous inspection
technique, observations, and NDE method.

9. LIST OF ATTACHMENT
9.1. IRIS Configuration setting
9.2. Detail report
9.3. Analysis record
9.4. Defect mapping
9.5. Photograph activity
SET UP OF IRIS DEVICE
Setup Report
General informations

MultiView version: 6.1R0


Setup file: C:\OlympusNDT\MultiView61\SETUP\IRIS PT.AGN.set
Setup creation date: 5/10/2022
Setup modification date: 5/15/2022
Setup type: Normal
Setup tag: RDT
Setup description: CS 19.05 x 2.11
Data file: C:\Users\hp03\Documents\IRIS PT. AGN\10-05-2022\PAGI\040040
Zone:
Row: 40
Column: 40
Summary layout type: Universal
Measurement units: Metric
Phase origin convention: ASME
No defect code: NDD
Default amplitude measurement: Peak to peak
Default phase measurement: Maximum rate
Save data directory: C:\Users\hp03\Documents\IRIS PT. AGN\14-05-2022\MALAM\
Inspection list: C:\Users\hp03\Desktop\IRIS PT.AGN\GTU\ADDITIONAL
Report file: \ADDITIONAL C:\Users\hp03\Desktop\IRIS PT.AGN\GTU
Synchro mode: \ADDITIONAL\ADDITIONAL Manual
Sampling clock type: Internal clock
Sampling clock: 12.000,00
Sampling clock units: samples/s
Actual sampling clock:
Scan type: 2-axis tube
X-axis position from: Continuous mode
Y-axis position from: Toptour
X-axis encoder:
Y-axis encoder: US1T0
X-axis units: mm
Y-axis units: deg
Scan helicoidal: True
X-axis from: 0,00
Y-axis from: 0.00
X-axis size: 6.000,00
Y-axis size: 360,00
X-axis resolution: 1,00
Y-axis resolution: 2,00
X-axis probe speed: 500,00
Y-axis probe speed: 0,00

5/17/2022 1
X-axis probe speed units:
Y-axis probe speed units:
X-axis encoder preset: Acquisition start
Y-axis encoder preset: Acquisition start
X-axis preset: 0,00
Y-axis preset: 0,00
Scan direction: Inlet to outlet
PCU version:
PIM version:
I/O board version:
Alarm board version:
Dual encoder board 1:
Dual encoder board 2:
Number of pod slots:
Key serial number: 292328710
Minimum gain limit: 0,00
Maximum gain limit: 65.535,00
Number of EC frequency: 1
Number of EC time slots: 1
EC frequency accuracy: 10,00
EC current source: 0,00
EC interpolation: False
Pod boards config type: Hardware in unit
EC-Generator boards: 0
EC-Acquisition boards: 0
Quadruple encoder boards: 0
RFT, MFL boards: 0
Dual encoder boards: 0
Ultrasound boards: 0
Scanned channel landmark:

Pod Boards

5/17/2022 2
Installation Options

Option no Option description Key Select


Option-01 Tube analysis and report package Installed True
Option-02 Report package Installed True
Custom-01 Multichannel C-scan and RPC Not installed False
Custom-02 Ultrasound Standard True
Custom-03 Remote field Standard True
Custom-04 Analog output Standard False
Custom-05 Analog output 32 Standard False
Custom-06 External DDE data transfer Standard False
Option-03 Receive position from external program. Standard False
Custom-07 Analysis access package Not installed False
Custom-08 TC7700 Annual Calibration Kit Not installed False
Custom-09 CESMAN tube inspection in subs Not installed False
Custom-10 EddyNet Not installed False
Custom-11 HP-UX file system Not installed False
Custom-12 Cryospace inspection Not installed False
Option-04 EDF devices Not installed False
Option-05 MOD Standard False
Option-06 EDF headers homogeneity Standard False
Custom-13 Estelle Standard False
Custom-14 Gigadisk Standard False
Custom-15 Gould recorder Standard False
Option-07 Maxtor drive Standard False
Option-08 RCCA inspection Not installed False
Custom-16 QV Condenser Not installed False
Option-09 QV bobbin Not installed False
Option-10 QV TPLR Standard False
Option-11 CDS support Standard False
Option-12 Standard False

Eddy Current Channels

Dual Encoder Channels

Quadruple Encoder Channels

RFT, MFL Channels

Filter Processed Channels

Gain Processed Channels

Mix Processed Channels

Remote Field Processed Channels

5/17/2022 3
Alarms

Alarm Outputs

Analog Outputs

Analog Output 32

C-Scan
Name Type Channel name Offset X Offset Y
ID UT ID
US1T0 0,00 mm 0,00 deg
OD UT OD
US1T0 0,00 mm 0,00 deg
US1T1 0,00 mm 0,00 deg
WT UT WT
US1T0 0,00 mm 0,00 deg
US1T1 0,00 mm 0,00 deg

Analysis Codes
Code name Measurement channel Curve Extension
OBS None
PLG None
NO_ACC None
ID_PIT None
OD_PIT None
HOLE None
ID_CORR None
OD_CORR None

Analysis Calibration Points

Analysis Indications

Analysis Landmarks

Analysis Curves

5/17/2022 4
Ultrasound Setup

Inspection method: WT/immersion


Probe name: iris
Probe frequency: 15.00
Channel number: 1
External module: False
Couplant: Water 24°C 1.483,00 m/s
Outside diameter: 19,05
Outside diameter units: mm
Wall thickness: 2,11
Wall thickness units: mm
Material: Carbon steel 5.860,00 m/s
Pulse level: 200
Trigger function: Trigger on level
WT calculations: T1 - T0
Iris target gate used: True
Iris target gate from: 30,13
Iris target gate to: 30,75
Iris target gate unit: µs
180 degrees channel pairing: False

Ultrasound Channels
X Y Z Delay Pulser Tx Rx G1 G2 DAC DAC Pulse Filter Trig. Trig. len. Trig. Trig Trig.
(mm) (mm) (mm) slope blank width start blk. unit level

0,00 0,00 0,00 0,00 Echo 0 0 33,00 48,00 0,94 0,50 35 High pass 1,00 3,00 0,70 mm -23
10 MHz

Landmark

5/17/2022 5
DETAIL REPORT
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client                       : PT. ARMADA GEMA NUSANTARA Drawing no.              : HES‐U1823C‐01/05 Report no.              : 001‐UT/RBT‐AGN/V/22
Project                    : TUBE INSPECTION Procedure no.          : RBT‐P‐40 Operator                 : EDI SUPRAPTO
Location                  : SAMPANG, MADURA Revision                    : 0 Interpreter             : RIZAL HIDAYATULLAH
Unit                         : GTU REGENERATOR REBOILER Dimension (mm)      : OD 19.05 x 5997 Surface cond.         : SATIFIED
Material spec.        : A‐179M/CARBON STEEL Thickness (mm)       : 2,11 Surface temp.        : AMBIENT
IRIS EQUIPMENT IRIS PROBE
Brand Type Serial no. Brand Angle Serial no. Freq. (MHz) length cable (m)
Olympus MS5800 1076393 Olympus 0 ‐ 15 20
IRIS Software Storage Data
Brand Type Version Brand Type Serial no. Filename
RnD MultiView 6.1R0 HP Laptop 5CG1504TZB GTU
IRIS Turbine Turbine  Gain
Scanning direction
Brand Size (mm) Serial no. Speed Gain 1 (dB) Gain 2 (dB) Blanking
Olympus 12 ‐ 33 48 0.703 Clockwise
Tube Reference
Thickness  Articifial Defect
Material OD (mm) ID (mm)
(mm) 1 2 3 4 5
Carbon steel 19,05 14,83 2,11 Through Hole OD Groove 20 OD Groove 40 OD Groove 60 ‐
Calibration Record

OD Groove
OD Groove

OD Groove
Hole

Summary of work:
Defect Category Range Thickness (mm) Color Identification Number of Tubes Prosentages(%)
0 ‐10% Wall loss 2,11 ≥ Thickness > 1,90 552 54,98%
10 ‐20% Wall loss 1,90 ≥ Thickness > 1,69 122 12,15%
20 ‐ 30% Wall Loss 1,69 ≥ Thickness > 1,48 48 4,78%
30 ‐ 40% Wall Loss 1,48 ≥ Thickness > 1,26 69 6,87%
40 ‐ 50% Wall loss 1,26 ≥ Thickness > 1,05 33 3,29%
More 51% wall loss 1,05 ≥ Thickness > 0,00 64 6,37%
Old Plugged 0 0,00%
Obstacle 0 0,00%
Deformation 34 3,39%
Previous Inspection 82 8,17%
Total Inspected Tube 1004 100,00%

Requested Tube 1004 49,70%


Total Tube 2020 100,00%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client                       : PT. ARMADA GEMA NUSANTARA Drawing no.              : HES‐U1823C‐01/05 Report no.              : 001‐UT/RBT‐AGN/V/22
Project                    : TUBE INSPECTION Procedure no.          : RBT‐P‐40 Operator                 : EDI SUPRAPTO
Location                  : SAMPANG, MADURA Revision                    : 0 Interpreter             : RIZAL HIDAYATULLAH
Unit                         : GTU REGENERATOR REBOILER Dimension (mm)      : OD 19.05 x 5997 Surface cond.         : SATIFIED
Material spec.        : A‐179M/CARBON STEEL Thickness (mm)       : 2,11 Surface temp.        : AMBIENT
Original 
Identification Examination record (mm)
thickness  Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
4 1 2,11 40 1,26 OD Wall loss 30 ‐ 40%
4 2 2,11 29 1,49 OD Wall loss 30 ‐ 40%
4 11 2,11 39 1,29 OD Wall loss 30 ‐ 40%
4 12 2,11 42 1,23 OD Wall loss 40 ‐ 50%
4 13 2,11 39 1,29 OD Wall loss 30 ‐ 40%
4 14 2,11 36 1,35 OD Wall loss 30 ‐ 40%
4 15 2,11 57 0,91 OD Wall loss > 50%
4 16 2,11 55 0,94 OD Wall loss > 50%
4 17 2,11 54 0,97 OD Wall loss > 50%
4 18 2,11 32 1,44 OD Pitting 30 ‐ 40%
4 19 2,11 54 0,97 OD Wall loss > 50%
4 20 2,11 36 1,35 OD Wall loss 30 ‐ 40%
4 21 2,11 31 1,46 OD Pitting 30 ‐ 40%
4 22 2,11 54 0,97 OD Wall loss > 50%
4 23 2,11 39 1,29 OD Wall loss 30 ‐ 40%
4 24 2,11 55 0,94 OD Wall loss > 50%
4 33 2,11 37 1,32 OD Wall loss 30 ‐ 40%
4 34 2,11 31 1,46 OD Wall loss 30 ‐ 40%
5 1 2,11 42 1,23 OD Wall loss 40 ‐ 50%
5 2 2,11 44 1,17 OD Wall loss 40 ‐ 50%
5 9 2,11 36 1,35 OD Wall loss 30 ‐ 40%
5 10 2,11 39 1,29 OD Wall loss 30 ‐ 40%
5 11 2,11 53 1,00 OD Wall loss > 50%
5 15 2,11 51 1,03 OD Wall loss > 50%
5 16 2,11 55 0,94 OD Wall loss > 50%
5 17 2,11 54 0,97 OD Wall loss > 50%
5 18 2,11 54 0,97 OD Wall loss > 50%
5 19 2,11 54 0,97 OD Wall loss > 50%
5 20 2,11 55 0,94 OD Wall loss > 50%
5 21 2,11 42 1,23 OD Wall loss 40 ‐ 50%
5 22 2,11 55 0,94 OD Wall loss > 50%
5 26 2,11 54 0,97 OD Wall loss > 50%
5 27 2,11 51 1,03 OD Wall loss > 50%
5 28 2,11 43 1,20 OD Wall loss 40 ‐ 50%
5 35 2,11 43 1,20 OD Wall loss 40 ‐ 50%
5 36 2,11 54 0,97 OD Wall loss > 50%
6 1 2,11 49 1,08 OD Wall loss 40 ‐ 50%
6 2 2,11 50 1,05 OD Wall loss 40 ‐ 50%
6 7 2,11 58 0,88 OD Wall loss > 50%
6 8 2,11 55 0,94 OD Wall loss > 50%
6 9 2,11 43 1,20 OD Wall loss 40 ‐ 50%
6 13 2,11 49 1,08 OD Wall loss 40 ‐ 50%
6 14 2,11 44 1,17 OD Wall loss 40 ‐ 50%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
6 14IRIS EQUIPMENT
2,11 44 1,17 OD IRIS PROBE
Wall loss 40 - 50%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
6 15 2,11 50 1,05 OD Wall loss 40 - 50%
6 24 2,11 36 1,35 OD Wall loss 30 - 40%
6 25 2,11 55 0,94 OD Wall loss > 50%
6 26 2,11 54 0,97 OD Wall loss > 50%
6 30 2,11 54 0,97 OD Wall loss > 50%
6 31 2,11 40 1,26 OD Wall loss 30 - 40%
6 32 2,11 36 1,35 OD Wall loss 30 - 40%
6 37 2,11 43 1,20 OD Wall loss 40 - 50%
6 38 2,11 32 1,44 OD Wall loss 30 - 40%
7 1 2,11 31 1,46 OD Wall loss 30 - 40%
7 2 2,11 39 1,29 OD Wall loss 30 - 40%
7 5 2,11 49 1,08 OD Wall loss 40 - 50%
7 6 2,11 54 0,97 OD Wall loss > 50%
7 7 2,11 54 0,97 OD Wall loss > 50%
7 11 2,11 40 1,26 OD Wall loss 30 - 40%
7 12 2,11 42 1,23 OD Wall loss 40 - 50%
7 13 2,11 42 1,23 OD Wall loss 40 - 50%
7 19 2,11 29 1,49 OD Wall loss 20 - 30%
7 20 2,11 49 1,08 OD Wall loss 40 - 50%
7 21 2,11 47 1,11 OD Wall loss 40 - 50%
7 22 2,11 47 1,11 OD Wall loss 40 - 50%
7 28 2,11 43 1,20 OD Wall loss 40 - 50%
7 29 2,11 36 1,35 OD Wall loss 30 - 40%
7 30 2,11 29 1,49 OD Wall loss 20 - 30%
7 34 2,11 51 1,03 OD Wall loss > 50%
7 35 2,11 33 1,41 OD Wall loss 30 - 40%
7 36 2,11 31 1,46 OD Wall loss 30 - 40%
7 39 2,11 40 1,26 OD Wall loss 30 - 40%
7 40 2,11 25 1,58 OD Wall loss 20 - 30%
8 3 2,11 17 1,76 OD Wall loss 10 - 20%
8 4 2,11 39 1,29 OD Wall loss 30 - 40%
8 5 2,11 31 1,46 OD Wall loss 30 - 40%
8 9 2,11 39 1,29 OD Wall loss 30 - 40%
8 10 2,11 36 1,35 OD Wall loss 30 - 40%
8 11 2,11 40 1,26 OD Wall loss 30 - 40%
8 14 2,11 37 1,32 OD Wall loss 30 - 40%
8 15 2,11 54 0,97 OD Wall loss > 50%
8 18 2,11 44 1,17 OD Wall loss 40 - 50%
8 19 2,11 42 1,23 OD Wall loss 40 - 50%
8 20 2,11 47 1,11 OD Wall loss 40 - 50% Deformation
8 21 2,11 50 1,05 OD Wall loss 40 - 50%
8 22 2,11 49 1,08 OD Wall loss 40 - 50%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
8 23IRIS EQUIPMENT
2,11 50 1,05 OD IRIS PROBE
Wall loss 40 - 50%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
8 24 2,11 61 0,82 OD Pitting > 50%
8 25 2,11 36 1,35 OD Wall loss 30 - 40%
8 28 2,11 46 1,14 OD Wall loss 40 - 50%
8 29 2,11 36 1,35 OD Wall loss 30 - 40%
8 32 2,11 37 1,32 OD Wall loss 30 - 40%
8 33 2,11 25 1,58 OD Wall loss 20 - 30%
8 34 2,11 24 1,61 OD Wall loss 20 - 30%
8 38 2,11 21 1,67 OD Wall loss 20 - 30%
8 39 2,11 18 1,73 OD Wall loss 10 - 20% Deformation
8 40 2,11 32 1,44 OD Wall loss 30 - 40%
9 1 2,11 28 1,52 OD Wall loss 20 - 30%
9 3 2,11 21 1,67 OD Wall loss 20 - 30%
9 6 2,11 29 1,49 OD Wall loss 20 - 30%
9 8 2,11 39 1,29 OD Wall loss 30 - 40%
9 7 2,11 36 1,35 OD Wall loss 30 - 40%
9 11 2,11 35 1,38 OD Wall loss 30 - 40%
9 12 2,11 37 1,32 OD Wall loss 30 - 40% Deformation
9 15 2,11 63 0,79 OD Pitting > 50%
9 16 2,11 40 1,26 OD Wall loss 30 - 40%
9 17 2,11 50 1,05 OD Wall loss 40 - 50%
9 26 2,11 36 1,35 OD Wall loss 30 - 40%
9 27 2,11 32 1,44 OD Wall loss 30 - 40%
9 28 2,11 65 0,73 OD Pitting > 50%
9 31 2,11 67 0,70 OD Pitting > 50%
9 32 2,11 29 1,49 OD Wall loss 20 - 30%
9 35 2,11 22 1,64 OD Wall loss 20 - 30%
9 36 2,11 17 1,76 OD Wall loss 10 - 20%
9 37 2,11 19 1,70 OD Wall loss 10 - 20%
9 41 2,11 12 1,85 OD Wall loss 10 - 20%
9 42 2,11 14 1,82 OD Wall loss 10 - 20%
10 1 2,11 24 1,61 OD Wall loss 20 - 30% Deformation
10 2 2,11 67 0,70 OD Wall loss > 50%
10 5 2,11 19 1,70 OD Wall loss 10 - 20%
10 6 2,11 44 1,17 OD Wall loss 40 - 50%
10 7 2,11 4 2,02 OD Wall loss 0 - 10%
10 10 2,11 29 1,49 OD Wall loss 20 - 30%
10 11 2,11 36 1,35 OD Wall loss 30 - 40%
10 13 2,11 36 1,35 OD Wall loss 30 - 40%
10 14 2,11 35 1,38 OD Wall loss 30 - 40%
10 15 2,11 36 1,35 OD Wall loss 30 - 40%
10 30 2,11 29 1,49 OD Wall loss 20 - 30%
10 31 2,11 31 1,46 OD Wall loss 30 - 40%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
10 32IRIS EQUIPMENT
2,11 29 1,49 OD IRIS PROBE
Wall loss 30 - 40%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
10 35 2,11 57 0,91 OD Pitting > 50%
10 36 2,11 18 1,73 OD Wall loss 10 - 20%
10 38 2,11 12 1,85 OD Wall loss 10 - 20%
10 39 2,11 15 1,79 OD Wall loss 10 - 20%
10 40 2,11 17 1,76 OD Wall loss 10 - 20%
10 43 2,11 11 1,88 OD Wall loss 10 - 20%
10 44 2,11 11 1,88 OD Wall loss 10 - 20%
11 1 2,11 67 0,70 OD Pitting > 50%
11 2 2,11 12 1,85 OD Wall loss 10 - 20%
11 5 2,11 29 1,49 OD Wall loss 20 - 30%
11 6 2,11 32 1,44 OD Wall loss 30 - 40%
11 8 2,11 29 1,49 OD Wall loss 20 - 30%
11 9 2,11 29 1,49 OD Wall loss 20 - 30%
11 11 2,11 39 1,29 OD Wall loss 30 - 40%
11 12 2,11 35 1,38 OD Wall loss 30 - 40%
11 13 2,11 65 0,73 OD Pitting > 50%
11 34 2,11 25 1,58 OD Wall loss 20 - 30%
11 35 2,11 53 1,00 OD Pitting > 50%
11 36 2,11 14 1,82 OD Wall loss 10 - 20%
11 38 2,11 21 1,67 OD Wall loss 20 - 30%
11 39 2,11 19 1,70 OD Wall loss 10 - 20%
11 41 2,11 22 1,64 OD Wall loss 20 - 30%
11 42 2,11 53 1,00 OD Pitting > 50%
11 45 2,11 10 1,90 OD Wall loss 0 - 10%
11 46 2,11 11 1,88 OD Wall loss 10 - 20%
12 1 2,11 18 1,73 OD Wall loss 10 - 20%
12 2 2,11 67 0,70 OD Pitting > 50%
12 4 2,11 42 1,23 OD Pitting 40 - 50%
12 5 2,11 24 1,61 OD Wall loss 20 - 30%
12 7 2,11 29 1,49 OD Wall loss 20 - 30%
12 8 2,11 21 1,67 OD Wall loss 20 - 30%
12 10 2,11 31 1,46 OD Wall loss 30 - 40%
12 11 2,11 35 1,38 OD Wall loss 30 - 40%
12 20 2,11 35 1,38 OD Wall loss 30 - 40%
12 21 2,11 19 1,70 OD Wall loss 10 - 20% Deformation
12 22 2,11 26 1,55 OD Wall loss 20 - 30%
12 23 2,11 35 1,38 OD Wall loss 30 - 40%
12 24 2,11 33 1,41 OD Wall loss 30 - 40%
12 25 2,11 32 1,44 OD Wall loss 30 - 40%
12 26 2,11 36 1,35 OD Wall loss 30 - 40%
12 27 2,11 29 1,49 OD Wall loss 20 - 30%
12 36 2,11 18 1,73 OD Wall loss 10 - 20%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
12 37IRIS EQUIPMENT
2,11 10 1,90 OD IRIS PROBE
Wall loss 0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
12 39 2,11 12 1,85 OD Wall loss 10 - 20%
12 40 2,11 67 0,70 OD Pitting > 50%
12 42 2,11 14 1,82 OD Wall loss 10 - 20%
12 43 2,11 17 1,76 OD Pitting > 50% Deformation
12 45 2,11 8 1,93 OD Wall loss 0 - 10%
12 46 2,11 11 1,88 OD Wall loss 10 - 20%
13 1 2,11 11 1,88 OD Wall loss 10 - 20%
13 2 2,11 65 0,73 OD Pitting > 50%
13 4 2,11 53 1,00 OD Pitting > 50%
13 5 2,11 54 0,97 OD Pitting > 50%
13 7 2,11 32 1,44 OD Wall loss 30 - 40%
13 8 2,11 21 1,67 OD Wall loss 20 - 30%
13 10 2,11 25 1,58 OD Wall loss 20 - 30%
13 11 2,11 22 1,64 OD Wall loss 20 - 30%
13 18 2,11 36 1,35 OD Wall loss 30 - 40%
13 19 2,11 19 1,70 OD Wall loss 10 - 20%
13 20 2,11 61 0,82 OD Pitting > 50%
13 29 2,11 19 1,70 OD Wall loss 10 - 20%
13 30 2,11 53 1,00 OD Pitting > 50%
13 31 2,11 17 1,76 OD Wall loss 10 - 20%
13 38 2,11 17 1,76 OD Wall loss 10 - 20%
13 39 2,11 8 1,93 OD Wall loss 0 - 10%
13 41 2,11 6 1,99 OD Wall loss 0 - 10%
13 42 2,11 11 1,88 OD Wall loss 10 - 20%
13 44 2,11 8 1,93 OD Wall loss 0 - 10%
13 45 2,11 11 1,88 OD Wall loss 10 - 20%
13 47 2,11 6 1,99 OD Wall loss 0 - 10%
13 48 2,11 53 1,00 OD Pitting > 50%
14 1 2,11 53 1,00 OD Pitting > 50%
14 2 2,11 10 1,90 OD Wall loss 0 - 10%
14 4 2,11 11 1,88 OD Wall loss 10 - 20%
14 5 2,11 15 1,79 OD Wall loss 10 - 20%
14 7 2,11 10 1,90 OD Wall loss 0 - 10%
14 9 2,11 12 1,85 OD Wall loss 10 - 20%
14 10 2,11 11 1,88 OD Wall loss 10 - 20%
14 16 2,11 11 1,88 OD Wall loss 10 - 20%
14 17 2,11 15 1,79 OD Wall loss 10 - 20%
14 18 2,11 15 1,79 OD Wall loss 10 - 20%
14 31 2,11 24 1,61 OD Wall loss 20 - 30%
14 32 2,11 24 1,61 OD Wall loss 20 - 30%
14 33 2,11 18 1,73 OD Wall loss 10 - 20%
14 39 2,11 68 0,67 OD Pitting > 50%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
14 40IRIS EQUIPMENT
2,11 47 1,11 OD PittingIRIS PROBE
40 - 50%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
14 42 2,11 11 1,88 OD Wall loss 10 - 20%
14 44 2,11 67 0,70 OD Pitting > 50%
14 45 2,11 68 0,67 OD Pitting > 50% Deformation
14 47 2,11 1 2,08 OD Wall loss 0 - 10%
14 48 2,11 7 1,96 OD Wall loss 0 - 10%
15 1 2,11 12 1,85 OD Wall loss 10 - 20% Deformation
15 2 2,11 10 1,90 OD Wall loss 0 - 10%
15 5 2,11 11 1,88 OD Wall loss 10 - 20%
15 6 2,11 10 1,90 OD Wall loss 0 - 10%
15 8 2,11 15 1,79 OD Wall loss 10 - 20%
15 10 2,11 11 1,88 OD Wall loss 10 - 20%
15 11 2,11 10 1,90 OD Wall loss 0 - 10%
15 15 2,11 10 1,90 OD Wall loss 0 - 10%
15 16 2,11 11 1,88 OD Wall loss 10 - 20%
15 17 2,11 17 1,76 OD Wall loss 10 - 20%
15 34 2,11 14 1,82 OD Wall loss 10 - 20%
15 35 2,11 4 2,02 OD Wall loss 0 - 10%
15 36 2,11 18 1,73 OD Wall loss 10 - 20%
15 40 2,11 4 2,02 OD Wall loss 0 - 10%
15 41 2,11 53 1,00 OD Pitting > 50%
15 43 2,11 12 1,85 OD Wall loss 10 - 20%
15 45 2,11 8 1,93 OD Wall loss 0 - 10%
15 46 2,11 8 1,93 OD Wall loss 0 - 10%
15 49 2,11 3 2,05 OD Wall loss 0 - 10%
15 50 2,11 4 2,02 OD Wall loss 0 - 10% Deformation
16 1 2,11 7 1,96 OD Wall loss 0 - 10%
16 2 2,11 4 2,02 OD Wall loss 0 - 10%
16 5 2,11 11 1,88 OD Wall loss 10 - 20%
16 6 2,11 11 1,88 OD Wall loss 10 - 20%
16 8 2,11 10 1,90 OD Wall loss 0 - 10%
16 10 2,11 8 1,93 OD Wall loss 0 - 10%
16 11 2,11 10 1,90 OD Wall loss 0 - 10%
16 14 2,11 67 0,70 OD Pitting > 50%
16 15 2,11 11 1,88 OD Wall loss 10 - 20%
16 22 2,11 17 1,76 OD Wall loss 10 - 20%
16 23 2,11 10 1,90 OD Wall loss 0 - 10%
16 24 2,11 17 1,76 OD Wall loss 10 - 20%
16 25 2,11 24 1,61 OD Wall loss 20 - 30%
16 26 2,11 25 1,58 OD Wall loss 20 - 30%
16 27 2,11 28 1,52 OD Wall loss 20 - 30%
16 28 2,11 35 1,38 OD Wall loss 30 - 40%
16 29 2,11 17 1,76 OD Wall loss 10 - 20%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
16 36IRIS EQUIPMENT
2,11 12 1,85 OD IRIS PROBE
Wall loss 10 - 20%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
16 37 2,11 10 1,90 OD Wall loss 0 - 10%
16 40 2,11 10 1,90 OD Wall loss 0 - 10%
16 41 2,11 6 1,99 OD Wall loss 0 - 10%
16 43 2,11 11 1,88 OD Wall loss 10 - 20%
16 45 2,11 4 2,02 OD Wall loss 0 - 10%
16 46 2,11 3 2,05 OD Wall loss 0 - 10%
16 49 2,11 0 2,11 - - 0 - 10%
16 50 2,11 6 1,99 OD Wall loss 0 - 10%
17 1 2,11 0 2,11 - - 0 - 10%
17 2 2,11 0 2,11 - - 0 - 10%
17 5 2,11 0 2,11 - - 0 - 10%
17 6 2,11 1 2,08 OD Wall loss 0 - 10%
17 8 2,11 0 2,11 - - 0 - 10%
17 10 2,11 6 1,99 OD Wall loss 0 - 10%
17 11 2,11 10 1,90 OD Wall loss 0 - 10%
17 14 2,11 11 1,88 OD Wall loss 10 - 20%
17 15 2,11 8 1,93 OD Wall loss 0 - 10%
17 20 2,11 11 1,88 OD Wall loss 10 - 20%
17 21 2,11 17 1,76 OD Wall loss 10 - 20%
17 30 2,11 14 1,82 OD Wall loss 10 - 20%
17 31 2,11 8 1,93 OD Wall loss 0 - 10%
17 36 2,11 8 1,93 OD Wall loss 0 - 10%
17 37 2,11 8 1,93 OD Wall loss 0 - 10%
17 40 2,11 7 1,96 OD Wall loss 0 - 10%
17 41 2,11 7 1,96 OD Wall loss 0 - 10%
17 43 2,11 3 2,05 OD Wall loss 0 - 10%
17 45 2,11 7 1,96 OD Wall loss 0 - 10%
17 46 2,11 4 2,02 OD Wall loss 0 - 10%
17 49 2,11 0 2,11 - - 0 - 10%
17 50 2,11 0 2,11 - - 0 - 10%
18 2 2,11 0 2,11 - - 0 - 10%
18 3 2,11 0 2,11 - - 0 - 10%
18 6 2,11 12 1,85 OD Wall loss 10 - 20%
18 7 2,11 10 1,90 OD Wall loss 0 - 10%
18 9 2,11 0 2,11 - - 0 - 10%
18 11 2,11 8 1,93 OD Wall loss 0 - 10%
18 12 2,11 3 2,05 OD Wall loss 0 - 10%
18 15 2,11 0 2,11 - - 0 - 10%
18 16 2,11 8 1,93 OD Wall loss 0 - 10%
18 20 2,11 6 1,99 OD Wall loss 0 - 10%
18 21 2,11 11 1,88 OD Wall loss 10 - 20%
18 24 2,11 4 2,02 OD Wall loss 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
18 25IRIS EQUIPMENT
2,11 14 1,82 OD IRIS PROBE
Wall loss 10 - 20%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
18 26 2,11 4 2,02 OD Wall loss 0 - 10%
18 27 2,11 3 2,05 OD Wall loss 0 - 10%
18 28 2,11 11 1,88 OD Wall loss 10 - 20%
18 29 2,11 65 0,73 OD Pitting > 50%
18 32 2,11 4 2,02 OD Wall loss 0 - 10%
18 33 2,11 67 0,70 OD Pitting > 50%
18 37 2,11 0 2,11 - - 0 - 10%
18 38 2,11 6 1,99 OD Wall loss 0 - 10%
18 41 2,11 0 2,11 - - 0 - 10%
18 42 2,11 0 2,11 - - 0 - 10%
18 44 2,11 0 2,11 - - 0 - 10%
18 46 2,11 1 2,08 OD Wall loss 0 - 10%
18 47 2,11 0 2,11 - - 0 - 10%
18 51 2,11 0 2,11 - - 0 - 10%
18 52 2,11 0 2,11 - - 0 - 10% Deformation
19 1 2,11 0 2,11 - - 0 - 10% Deformation
19 2 2,11 0 2,11 - - 0 - 10%
19 6 2,11 0 2,11 - - 0 - 10%
19 7 2,11 0 2,11 - - 0 - 10%
19 9 2,11 10 1,90 OD Wall loss 0 - 10%
19 11 2,11 0 2,11 - - 0 - 10%
19 12 2,11 0 2,11 - - 0 - 10%
19 15 2,11 0 2,11 - - 0 - 10%
19 16 2,11 0 2,11 - - 0 - 10%
19 19 2,11 8 1,93 OD Wall loss 0 - 10%
19 20 2,11 6 1,99 OD Wall loss 0 - 10%
19 33 2,11 0 2,11 - - 0 - 10%
19 34 2,11 4 2,02 OD Wall loss 0 - 10%
19 37 2,11 3 2,05 OD Wall loss 0 - 10%
19 38 2,11 0 2,11 - - 0 - 10%
19 41 2,11 0 2,11 - - 0 - 10%
19 42 2,11 0 2,11 - - 0 - 10%
19 44 2,11 0 2,11 - - 0 - 10%
19 46 2,11 0 2,11 - - 0 - 10%
19 47 2,11 0 2,11 - - 0 - 10%
19 51 2,11 0 2,11 - - 0 - 10%
19 52 2,11 0 2,11 - - 0 - 10%
20 1 2,11 0 2,11 - - 0 - 10%
20 2 2,11 0 2,11 - - 0 - 10%
20 6 2,11 0 2,11 - - 0 - 10%
20 7 2,11 0 2,11 - - 0 - 10%
20 9 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
20 11IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
20 12 2,11 0 2,11 - - 0 - 10%
20 15 2,11 0 2,11 - - 0 - 10%
20 16 2,11 54 0,97 OD Pitting > 50%
20 19 2,11 0 2,11 - - 0 - 10%
20 20 2,11 0 2,11 - - 0 - 10%
20 23 2,11 12 1,85 OD Wall loss 10 - 20%
20 24 2,11 14 1,82 OD Wall loss 10 - 20%
20 25 2,11 11 1,88 OD Pitting 10 - 20%
20 26 2,11 12 1,85 OD Wall loss 10 - 20%
20 27 2,11 24 1,61 OD Wall loss 20 - 30%
20 28 2,11 21 1,67 OD Wall loss 20 - 30%
20 29 2,11 7 1,96 OD Wall loss 0 - 10%
20 30 2,11 18 1,73 OD Wall loss 10 - 20%
20 33 2,11 25 1,58 OD Pitting 20 - 30%
20 34 2,11 0 2,11 - - 0 - 10%
20 37 2,11 29 1,49 OD Wall loss 20 - 30%
20 38 2,11 0 2,11 - - 0 - 10%
20 41 2,11 0 2,11 - - 0 - 10%
20 42 2,11 0 2,11 - - 0 - 10%
20 44 2,11 0 2,11 - - 0 - 10%
20 46 2,11 0 2,11 - - 0 - 10%
20 47 2,11 0 2,11 - - 0 - 10%
20 51 2,11 0 2,11 - - 0 - 10%
20 52 2,11 54 0,97 OD Pitting > 50%
21 1 2,11 0 2,11 - - 0 - 10%
21 2 2,11 0 2,11 - - 0 - 10%
21 6 2,11 0 2,11 - - 0 - 10%
21 7 2,11 0 2,11 - - 0 - 10%
21 9 2,11 0 2,11 - - 0 - 10%
21 11 2,11 0 2,11 - - 0 - 10%
21 12 2,11 67 0,70 OD Pitting > 50%
21 15 2,11 0 2,11 - - 0 - 10%
21 16 2,11 0 2,11 - - 0 - 10%
21 19 2,11 0 2,11 - - 0 - 10%
21 20 2,11 0 2,11 - - 0 - 10%
21 33 2,11 0 2,11 - - 0 - 10%
21 34 2,11 0 2,11 - - 0 - 10%
21 37 2,11 0 2,11 - - 0 - 10%
21 38 2,11 50 1,05 OD Pitting 40 - 50%
21 41 2,11 0 2,11 - - 0 - 10%
21 42 2,11 0 2,11 - - 0 - 10%
21 44 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
21 46IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
21 47 2,11 0 2,11 - - 0 - 10%
21 51 2,11 0 2,11 - - 0 - 10%
21 52 2,11 0 2,11 - - 0 - 10%
22 1 2,11 0 2,11 - - 0 - 10%
22 2 2,11 61 0,82 OD Pitting > 50%
22 6 2,11 0 2,11 - - 0 - 10%
22 7 2,11 31 1,46 OD Pitting 30 - 40%
22 9 2,11 0 2,11 - - 0 - 10%
22 11 2,11 0 2,11 - - 0 - 10%
22 12 2,11 0 2,11 - - 0 - 10%
22 15 2,11 0 2,11 - - 0 - 10%
22 16 2,11 53 1,00 OD Pitting > 50%
22 19 2,11 53 1,00 OD Pitting > 50%
22 20 2,11 8 1,93 OD Wall loss 0 - 10%
22 23 2,11 12 1,85 OD Pitting 10 - 20%
22 24 2,11 11 1,88 OD Wall loss 10 - 20%
22 25 2,11 4 2,02 OD Wall loss 0 - 10%
22 26 2,11 18 1,73 OD Wall loss 10 - 20%
22 27 2,11 10 1,90 OD Wall loss 0 - 10%
22 28 2,11 15 1,79 OD Wall loss 10 - 20%
22 29 2,11 10 1,90 OD Wall loss 0 - 10%
22 30 2,11 65 0,73 OD Pitting > 50%
22 33 2,11 0 2,11 - - 0 - 10%
22 34 2,11 0 2,11 - - 0 - 10%
22 37 2,11 0 2,11 - - 0 - 10%
22 38 2,11 35 1,38 OD Pitting 30 - 40%
22 41 2,11 0 2,11 - - 0 - 10%
22 42 2,11 0 2,11 - - 0 - 10%
22 44 2,11 0 2,11 - - 0 - 10%
22 46 2,11 0 2,11 - - 0 - 10%
22 47 2,11 0 2,11 - - 0 - 10%
22 51 2,11 0 2,11 - - 0 - 10%
22 52 2,11 0 2,11 - - 0 - 10%
23 1 2,11 0 2,11 - - 0 - 10%
23 2 2,11 0 2,11 - - 0 - 10%
23 6 2,11 0 2,11 - - 0 - 10%
23 7 2,11 0 2,11 - - 0 - 10%
23 9 2,11 0 2,11 - - 0 - 10%
23 11 2,11 0 2,11 - - 0 - 10%
23 12 2,11 0 2,11 - - 0 - 10%
23 15 2,11 0 2,11 - - 0 - 10%
23 16 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
23 19IRIS EQUIPMENT
2,11 4 2,02 OD IRIS PROBE
Wall loss 0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
23 20 2,11 7 1,96 OD Wall loss 0 - 10%
23 33 2,11 0 2,11 - - 0 - 10%
23 34 2,11 0 2,11 - - 0 - 10%
23 36 2,11 0 2,11 - - 0 - 10%
23 37 2,11 0 2,11 - - 0 - 10%
23 41 2,11 0 2,11 - - 0 - 10%
23 42 2,11 0 2,11 - - 0 - 10%
23 44 2,11 0 2,11 - - 0 - 10%
23 46 2,11 0 2,11 - - 0 - 10%
23 47 2,11 0 2,11 - - 0 - 10%
23 51 2,11 0 2,11 - - 0 - 10%
23 52 2,11 0 2,11 - - 0 - 10%
24 1 2,11 57 0,91 OD Pitting > 50%
24 2 2,11 0 2,11 - - 0 - 10%
24 6 2,11 0 2,11 - - 0 - 10%
24 7 2,11 0 2,11 - - 0 - 10%
24 9 2,11 0 2,11 - - 0 - 10%
24 11 2,11 0 2,11 - - 0 - 10%
24 12 2,11 0 2,11 - - 0 - 10%
24 15 2,11 0 2,11 - - 0 - 10%
24 16 2,11 0 2,11 - - 0 - 10%
24 19 2,11 10 1,90 OD Wall loss 0 - 10%
24 20 2,11 4 2,02 OD Wall loss 0 - 10%
24 33 2,11 10 1,90 OD Wall loss 0 - 10%
24 34 2,11 0 2,11 - - 0 - 10%
24 37 2,11 0 2,11 - - 0 - 10%
24 38 2,11 11 1,88 OD Pitting 10 - 20%
24 41 2,11 0 2,11 - - 0 - 10%
24 42 2,11 0 2,11 - - 0 - 10%
24 44 2,11 0 2,11 - - 0 - 10%
24 46 2,11 4 2,02 OD Pitting 0 - 10%
24 47 2,11 0 2,11 - - 0 - 10%
24 51 2,11 0 2,11 - - 0 - 10%
24 52 2,11 0 2,11 - - 0 - 10%
25 1 2,11 10 1,90 OD Wall loss 0 - 10%
25 2 2,11 7 1,96 OD Wall loss 0 - 10%
25 6 2,11 0 2,11 - - 0 - 10%
25 7 2,11 0 2,11 - - 0 - 10%
25 9 2,11 0 2,11 - - 0 - 10%
25 11 2,11 0 2,11 - - 0 - 10%
25 12 2,11 0 2,11 - - 0 - 10%
25 15 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
25 16IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
25 19 2,11 10 1,90 OD Pitting 0 - 10%
25 20 2,11 4 2,02 OD Pitting 0 - 10%
25 23 2,11 3 2,05 OD Wall loss 0 - 10%
25 24 2,11 11 1,88 OD Wall loss 10 - 20%
25 25 2,11 4 2,02 OD Wall loss 0 - 10%
25 26 2,11 14 1,82 OD Wall loss 10 - 20%
25 27 2,11 18 1,73 OD Wall loss 10 - 20%
25 28 2,11 10 1,90 OD Wall loss 0 - 10%
25 29 2,11 10 1,90 OD Wall loss 0 - 10%
25 30 2,11 8 1,93 OD Wall loss 0 - 10%
25 33 2,11 21 1,67 OD Pitting 20 - 30%
25 34 2,11 0 2,11 - - 0 - 10%
25 37 2,11 65 0,73 OD Pitting > 50%
25 38 2,11 0 2,11 - - 0 - 10%
25 41 2,11 4 2,02 OD Pitting 0 - 10%
25 42 2,11 0 2,11 - - 0 - 10%
25 44 2,11 0 2,11 - - 0 - 10%
25 46 2,11 14 1,82 OD Wall loss 10 - 20%
25 47 2,11 0 2,11 - - 0 - 10%
25 51 2,11 0 2,11 - - 0 - 10%
25 52 2,11 0 2,11 - - 0 - 10%
26 1 2,11 0 2,11 - - 0 - 10%
26 2 2,11 0 2,11 - - 0 - 10%
26 6 2,11 0 2,11 - - 0 - 10%
26 7 2,11 0 2,11 - - 0 - 10%
26 9 2,11 0 2,11 - - 0 - 10%
26 11 2,11 11 1,88 OD Wall loss 10 - 20%
26 12 2,11 0 2,11 - - 0 - 10%
26 15 2,11 65 0,73 OD Pitting > 50%
26 16 2,11 0 2,11 - - 0 - 10%
26 19 2,11 35 1,38 OD Pitting 30 - 40%
26 20 2,11 0 2,11 - - 0 - 10%
26 33 2,11 0 2,11 - - 0 - 10%
26 34 2,11 0 2,11 - - 0 - 10%
26 37 2,11 54 0,97 OD Pitting > 50%
26 38 2,11 0 2,11 - - 0 - 10%
26 41 2,11 0 2,11 - - 0 - 10%
26 42 2,11 10 1,90 OD Pitting 0 - 10%
26 44 2,11 0 2,11 - - 0 - 10%
26 46 2,11 0 2,11 - - 0 - 10%
26 47 2,11 0 2,11 - - 0 - 10%
26 51 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
26 52IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
27 1 2,11 10 1,90 OD Wall loss 0 - 10%
27 2 2,11 0 2,11 - - 0 - 10%
27 6 2,11 0 2,11 - - 0 - 10%
27 7 2,11 8 1,93 OD Wall loss 0 - 10%
27 9 2,11 0 2,11 - - 0 - 10%
27 11 2,11 8 1,93 OD Wall loss 0 - 10%
27 12 2,11 11 1,88 OD Wall loss 10 - 20%
27 15 2,11 0 2,11 - - 0 - 10%
27 16 2,11 0 2,11 - - 0 - 10%
27 19 2,11 18 1,73 OD Wall loss 10 - 20%
27 20 2,11 0 2,11 - - 0 - 10%
27 23 2,11 8 1,93 OD Wall loss 0 - 10%
27 24 2,11 3 2,05 OD Wall loss 0 - 10%
27 25 2,11 0 2,11 - - 0 - 10%
27 26 2,11 28 1,52 OD Wall loss 10 - 20%
27 27 2,11 7 1,96 OD Wall loss 0 - 10%
27 28 2,11 6 1,99 OD Wall loss 0 - 10%
27 29 2,11 6 1,99 OD Wall loss 0 - 10%
27 30 2,11 0 2,11 - - 0 - 10%
27 33 2,11 0 2,11 - - 0 - 10%
27 34 2,11 0 2,11 - - 0 - 10%
27 37 2,11 0 2,11 - - 0 - 10%
27 38 2,11 0 2,11 - - 0 - 10%
27 41 2,11 0 2,11 - - 0 - 10%
27 42 2,11 0 2,11 - - 0 - 10%
27 44 2,11 0 2,11 - - 0 - 10%
27 46 2,11 0 2,11 - - 0 - 10%
27 47 2,11 0 2,11 - - 0 - 10%
27 51 2,11 21 1,67 OD Wall loss 20 - 30%
27 52 2,11 10 1,90 OD Wall loss 0 - 10%
28 1 2,11 14 1,82 OD Wall loss 10 - 20%
28 2 2,11 12 1,85 OD Wall loss 10 - 20%
28 6 2,11 1 2,08 OD Wall loss 0 - 10%
28 7 2,11 0 2,11 - - 0 - 10%
28 9 2,11 0 2,11 - - 0 - 10%
28 11 2,11 0 2,11 - - 0 - 10%
28 12 2,11 63 0,79 OD Pitting > 50%
28 15 2,11 0 2,11 - - 0 - 10%
28 16 2,11 0 2,11 - - 0 - 10%
28 19 2,11 0 2,11 - - 0 - 10%
28 20 2,11 4 2,02 OD Wall loss 0 - 10%
28 33 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
28 34IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
28 37 2,11 0 2,11 - - 0 - 10%
28 38 2,11 0 2,11 - - 0 - 10%
28 41 2,11 0 2,11 - - 0 - 10%
28 42 2,11 0 2,11 - - 0 - 10%
28 44 2,11 0 2,11 - - 0 - 10%
28 46 2,11 8 1,93 OD Wall loss 0 - 10%
28 47 2,11 0 2,11 - - 0 - 10%
28 51 2,11 0 2,11 - - 0 - 10%
28 52 2,11 0 2,11 - - 0 - 10%
29 2 2,11 0 2,11 - - 0 - 10%
29 3 2,11 0 2,11 - - 0 - 10%
29 6 2,11 0 2,11 - - 0 - 10%
29 7 2,11 0 2,11 - - 0 - 10%
29 9 2,11 1 2,08 OD Wall loss 0 - 10%
29 11 2,11 0 2,11 - - 0 - 10%
29 12 2,11 1 2,08 OD Wall loss 0 - 10%
29 15 2,11 0 2,11 - - 0 - 10%
29 16 2,11 6 1,99 OD Wall loss 0 - 10%
29 19 2,11 0 2,11 - - 0 - 10%
29 20 2,11 6 1,99 OD Wall loss 0 - 10%
29 24 2,11 8 1,93 OD Wall loss 0 - 10%
29 25 2,11 0 2,11 - - 0 - 10%
29 26 2,11 8 1,93 OD Wall loss 0 - 10%
29 27 2,11 10 1,90 OD Wall loss 0 - 10%
29 28 2,11 7 1,96 OD Wall loss 0 - 10%
29 29 2,11 7 1,96 OD Wall loss 0 - 10%
29 33 2,11 0 2,11 - - 0 - 10%
29 34 2,11 0 2,11 - - 0 - 10%
29 37 2,11 0 2,11 - - 0 - 10%
29 38 2,11 0 2,11 - - 0 - 10%
29 41 2,11 0 2,11 - - 0 - 10%
29 42 2,11 0 2,11 - - 0 - 10%
29 44 2,11 0 2,11 - - 0 - 10%
29 46 2,11 6 1,99 OD Wall loss 0 - 10%
29 47 2,11 0 2,11 - - 0 - 10%
29 51 2,11 0 2,11 - - 0 - 10%
29 52 2,11 0 2,11 - - 0 - 10% Deformation
30 1 2,11 0 2,11 - - 0 - 10%
30 2 2,11 0 2,11 - - 0 - 10%
30 5 2,11 0 2,11 - - 0 - 10%
30 6 2,11 0 2,11 - - 0 - 10%
30 8 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
30 10IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
30 11 2,11 0 2,11 - - 0 - 10%
30 14 2,11 0 2,11 - - 0 - 10%
30 15 2,11 0 2,11 - - 0 - 10%
30 19 2,11 0 2,11 - - 0 - 10%
30 20 2,11 0 2,11 - - 0 - 10%
30 31 2,11 10 1,90 OD Wall loss 0 - 10%
30 32 2,11 8 1,93 - - 0 - 10%
30 36 2,11 0 2,11 OD Pitting 0 - 10%
30 37 2,11 3 2,05 OD Pitting 0 - 10%
30 40 2,11 0 2,11 - - 0 - 10%
30 41 2,11 0 2,11 - - 0 - 10%
30 43 2,11 1 2,08 OD Wall loss 0 - 10%
30 45 2,11 3 2,05 OD Pitting 0 - 10%
30 46 2,11 1 2,08 OD Pitting 0 - 10%
30 49 2,11 8 1,93 OD Pitting 0 - 10%
30 50 2,11 4 2,02 OD Wall loss 0 - 10%
31 1 2,11 4 2,02 OD Wall loss 0 - 10%
31 2 2,11 0 2,11 - - 0 - 10%
31 5 2,11 7 1,97 OD Wall loss 0 - 10%
31 6 2,11 8 1,93 OD Wall loss 0 - 10%
31 8 2,11 7 1,96 OD Wall loss 0 - 10%
31 10 2,11 44 1,17 OD Pitting 40 - 50%
31 11 2,11 0 2,11 - - 0 - 10%
31 15 2,11 8 1,93 OD Wall loss 0 - 10%
31 16 2,11 10 1,90 OD Wall loss 0 - 10%
31 20 2,11 32 1,44 OD Pitting 30 - 40%
31 21 2,11 10 1,90 OD Wall loss 0 - 10%
31 30 2,11 8 1,93 OD Wall loss 0 - 10%
31 31 2,11 7 1,96 OD Wall loss 0 - 10%
31 35 2,11 6 1,99 OD Pitting 0 - 10%
31 36 2,11 10 1,90 OD Pitting 0 - 10%
31 40 2,11 7 1,96 OD Wall loss 0 - 10%
31 41 2,11 0 2,11 - - 0 - 10%
31 43 2,11 0 2,11 - - 0 - 10%
31 45 2,11 6 1,99 OD Pitting 0 - 10%
31 46 2,11 0 2,11 - - 0 - 10%
31 49 2,11 0 2,11 - - 0 - 10%
31 50 2,11 0 2,11 - - 0 - 10%
32 1 2,11 6 1,99 OD Pitting 0 - 10%
32 2 2,11 6 1,99 OD Pitting 0 - 10%
32 5 2,11 6 1,99 OD Pitting 0 - 10%
32 6 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
32 8 IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
32 12 2,11 0 2,11 - - 0 - 10%
32 13 2,11 0 2,11 - - 0 - 10%
32 16 2,11 0 2,11 - - 0 - 10%
32 17 2,11 0 2,11 - - 0 - 10%
32 21 2,11 0 2,11 - - 0 - 10%
32 22 2,11 7 1,96 OD Wall loss 0 - 10%
32 29 2,11 0 2,11 - - 0 - 10%
32 30 2,11 7 1,96 OD Pitting 0 - 10%
32 34 2,11 10 1,90 OD Pitting 0 - 10%
32 35 2,11 0 2,11 - - 0 - 10%
32 38 2,11 0 2,11 - - 0 - 10%
32 39 2,11 0 2,11 - - 0 - 10%
32 43 2,11 0 2,11 - - 0 - 10%
32 45 2,11 0 2,11 - - 0 - 10%
32 46 2,11 3 2,05 OD Wall loss 0 - 10%
32 49 2,11 0 2,11 - - 0 - 10%
32 50 2,11 0 2,11 - - 0 - 10%
33 1 2,11 0 2,11 - - 0 - 10%
33 2 2,11 0 2,11 - - 0 - 10%
33 5 2,11 0 2,11 - - 0 - 10%
33 6 2,11 0 2,11 - - 0 - 10%
33 8 2,11 0 2,11 - - 0 - 10%
33 9 2,11 11 1,88 OD Wall loss 10 - 20%
33 12 2,11 8 1,93 OD Wall loss 0 - 10%
33 13 2,11 7 1,96 OD Pitting 0 - 10%
33 16 2,11 0 2,11 - - 0 - 10%
33 17 2,11 11 1,88 OD Wall loss 10 - 20%
33 21 2,11 11 1,88 OD Wall loss 10 - 20%
33 22 2,11 0 2,11 - - 0 - 10%
33 27 2,11 10 1,90 OD Wall loss 0 - 10%
33 28 2,11 0 2,11 - - 0 - 10%
33 32 2,11 0 2,11 - - 0 - 10%
33 33 2,11 11 1,88 OD Pitting 10 - 20%
33 36 2,11 0 2,11 - - 0 - 10%
33 37 2,11 17 1,76 OD Pitting 10 - 20%
33 40 2,11 0 2,11 - - 0 - 10%
33 41 2,11 0 2,11 - - 0 - 10%
33 43 2,11 0 2,11 - - 0 - 10%
33 44 2,11 0 2,11 - - 0 - 10%
33 47 2,11 0 2,11 - - 0 - 10%
33 48 2,11 0 2,11 - - 0 - 10%
34 1 2,11 0 2,11 - - 0 - 10% Deformation
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
34 2 IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
34 6 2,11 6 1,99 OD Wall loss 0 - 10%
34 7 2,11 0 2,11 - - 0 - 10%
34 9 2,11 0 2,11 - - 0 - 10%
34 10 2,11 0 2,11 - - 0 - 10%
34 13 2,11 18 1,73 OD Pitting 10 - 20%
34 15 2,11 11 1,88 OD Pitting 10 - 20%
34 17 2,11 8 1,93 OD Wall loss 0 - 10%
34 18 2,11 11 1,88 OD Pitting 10 - 20%
34 22 2,11 3 2,05 OD Wall loss 0 - 10%
34 23 2,11 25 1,58 OD Pitting 20 - 30%
34 24 2,11 3 2,05 OD Wall loss 0 - 10%
34 25 2,11 3 2,05 OD Wall loss 0 - 10%
34 26 2,11 6 1,99 OD Wall loss 0 - 10%
34 27 2,11 8 1,93 OD Wall loss 0 - 10%
34 31 2,11 8 1,93 OD Wall loss 0 - 10%
34 32 2,11 4 2,02 OD Wall loss 0 - 10%
34 35 2,11 7 1,96 OD Wall loss 0 - 10%
34 36 2,11 0 2,11 - - 0 - 10%
34 39 2,11 1 2,08 OD Wall loss 0 - 10%
34 40 2,11 1 2,08 OD Wall loss 0 - 10%
34 42 2,11 8 1,93 OD Wall loss 0 - 10%
34 43 2,11 0 2,11 - - 0 - 10%
34 47 2,11 4 2,02 OD Wall loss 0 - 10%
34 48 2,11 0 2,11 - - 0 - 10%
35 1 2,11 7 1,96 OD Pitting 0 - 10%
35 2 2,11 7 1,96 OD Pitting 0 - 10%
35 6 2,11 3 2,05 OD Pitting 0 - 10%
35 7 2,11 1 2,08 OD Wall loss 0 - 10%
35 9 2,11 4 2,02 OD Wall loss 0 - 10%
35 10 2,11 0 2,11 - - 0 - 10%
35 13 2,11 0 2,11 - - 0 - 10%
35 14 2,11 0 2,11 - - 0 - 10%
35 17 2,11 4 2,02 OD Wall loss 0 - 10%
35 18 2,11 7 1,96 OD Wall loss 0 - 10%
35 29 2,11 8 1,93 OD Wall loss 0 - 10%
35 30 2,11 1 2,08 OD Wall loss 0 - 10%
35 33 2,11 7 1,96 OD Wall loss 0 - 10%
35 34 2,11 0 2,11 - - 0 - 10%
35 37 2,11 4 2,02 OD Pitting 0 - 10%
35 38 2,11 4 2,02 OD Wall loss 0 - 10%
35 40 2,11 0 2,11 - - 0 - 10%
35 41 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
35 45IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
35 46 2,11 6 1,99 OD Wall loss 0 - 10%
36 1 2,11 15 1,79 OD Pitting 10 - 20% Deformation
36 2 2,11 0 2,11 - - 0 - 10%
36 6 2,11 4 2,02 OD Wall loss 0 - 10%
36 7 2,11 0 2,11 - - 0 - 10%
36 10 2,11 4 2,02 OD Wall loss 0 - 10%
36 11 2,11 0 2,11 - - 0 - 10%
36 14 2,11 18 1,73 OD Wall loss 10 - 20%
36 15 2,11 3 2,05 OD Wall loss 0 - 10%
36 18 2,11 1 2,08 OD Wall loss 0 - 10%
36 19 2,11 0 2,11 - - 0 - 10%
36 28 2,11 1 2,08 OD Wall loss 0 - 10%
36 29 2,11 10 1,90 OD Wall loss 0 - 10%
36 32 2,11 8 1,93 OD Wall loss 0 - 10%
36 33 2,11 1 2,08 OD Wall loss 0 - 10%
36 36 2,11 4 2,02 OD Wall loss 0 - 10%
36 37 2,11 8 1,93 OD Wall loss 0 - 10%
36 40 2,11 33 1,41 OD Wall loss 30 - 40%
36 41 2,11 0 2,11 - - 0 - 10%
36 45 2,11 0 2,11 - - 0 - 10%
36 46 2,11 0 2,11 - - 0 - 10%
37 1 2,11 11 1,88 OD Wall loss 10 - 20%
37 2 2,11 1 2,08 OD Wall loss 0 - 10%
37 5 2,11 1 2,08 OD Wall loss 0 - 10%
37 6 2,11 15 1,79 OD Pitting 10 - 20%
37 10 2,11 0 2,11 - - 0 - 10%
37 11 2,11 0 2,11 - - 0 - 10%
37 14 2,11 4 2,02 OD Wall loss 0 - 10%
37 15 2,11 0 2,11 - - 0 - 10%
37 18 2,11 0 2,11 - - 0 - 10%
37 19 2,11 0 2,11 - - 0 - 10%
37 26 2,11 0 2,11 - - 0 - 10%
37 27 2,11 0 2,11 - - 0 - 10%
37 30 2,11 7 1,96 OD Wall loss 0 - 10%
37 31 2,11 3 2,05 OD Wall loss 0 - 10%
37 34 2,11 3 2,05 OD Wall loss 0 - 10%
37 35 2,11 3 2,05 OD Wall loss 0 - 10%
37 39 2,11 4 2,02 OD Wall loss 0 - 10%
37 40 2,11 3 2,05 OD Wall loss 0 - 10%
37 43 2,11 0 2,11 - - 0 - 10%
37 44 2,11 8 1,93 OD Wall loss 0 - 10%
38 1 2,11 11 1,88 OD Wall loss 10 - 20%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
38 3 IRIS EQUIPMENT
2,11 3 2,05 OD IRIS PROBE
Wall loss 0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
38 5 2,11 3 2,05 OD Wall loss 0 - 10% Deformation
38 6 2,11 3 2,05 OD Wall loss 0 - 10%
38 10 2,11 40 1,26 OD Pitting 40 - 50%
38 11 2,11 0 2,11 - - 0 - 10%
38 14 2,11 4 2,02 OD Wall loss 0 - 10%
38 15 2,11 3 2,05 OD Wall loss 0 - 10%
38 18 2,11 4 2,02 OD Wall loss 0 - 10%
38 19 2,11 8 1,93 OD Wall loss 0 - 10% Deformation
38 20 2,11 14 1,82 OD Wall loss 10 - 20%
38 21 2,11 11 1,88 OD Wall loss 10 - 20%
38 22 2,11 0 2,11 - - 0 - 10%
38 23 2,11 0 2,11 - - 0 - 10%
38 24 2,11 6 1,99 OD Wall loss 0 - 10%
38 25 2,11 8 1,93 OD Wall loss 0 - 10%
38 28 2,11 8 1,93 OD Pitting 0 - 10%
38 29 2,11 21 1,67 OD Wall loss 20 - 30%
38 32 2,11 0 2,11 - - 0 - 10%
38 33 2,11 0 2,11 - - 0 - 10% Deformation
38 36 2,11 0 2,11 - - 0 - 10%
38 37 2,11 0 2,11 - - 0 - 10%
38 41 2,11 0 2,11 - - 0 - 10%
38 42 2,11 8 1,93 OD Wall loss 0 - 10%
39 1 2,11 1 2,08 OD Wall loss 0 - 10% Deformation
39 2 2,11 1 2,08 OD Wall loss 0 - 10%
39 6 2,11 6 1,99 OD Wall loss 0 - 10%
39 7 2,11 0 2,11 - - 0 - 10%
39 11 2,11 3 2,05 OD Wall loss 0 - 10%
39 12 2,11 14 1,82 OD Wall loss 10 - 20%
39 15 2,11 40 1,26 OD Wall loss 30 - 40%
39 16 2,11 3 2,05 OD Wall loss 0 - 10%
39 27 2,11 12 1,85 OD Wall loss 10 - 20%
39 28 2,11 18 1,73 OD Wall loss 10 - 20%
39 31 2,11 21 1,67 OD Wall loss 20 - 30%
39 32 2,11 32 1,44 OD Wall loss 30 - 40%
39 35 2,11 0 2,11 - - 0 - 10%
39 36 2,11 0 2,11 - - 0 - 10%
39 41 2,11 0 2,11 - - 0 - 10%
39 42 2,11 3 2,05 OD Wall loss 0 - 10%
40 1 2,11 3 2,05 OD Wall loss 0 - 10% Deformation
40 2 2,11 0 2,11 - - 0 - 10%
40 6 2,11 4 2,02 OD Wall loss 0 - 10%
40 7 2,11 11 1,88 OD Wall loss 10 - 20%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
40 11IRIS EQUIPMENT
2,11 7 1,96 OD IRIS PROBE
Wall loss 0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
40 12 2,11 25 1,58 OD Wall loss 20 - 30%
40 15 2,11 11 1,88 OD Wall loss 10 - 20%
40 16 2,11 28 1,52 OD Wall loss 20 - 30%
40 25 2,11 11 1,88 OD Wall loss 10 - 20%
40 26 2,11 4 2,02 OD Wall loss 0 - 10%
40 29 2,11 8 1,93 OD Wall loss 0 - 10%
40 30 2,11 7 1,96 OD Pitting 0 - 10%
40 34 2,11 3 2,05 OD Pitting 0 - 10% Deformation
40 35 2,11 0 2,11 - - 0 - 10%
40 39 2,11 8 1,93 OD Wall loss 0 - 10%
40 40 2,11 0 2,11 - - 0 - 10%
41 1 2,11 0 2,11 - - 0 - 10%
41 2 2,11 8 1,93 OD Wall loss 0 - 10%
41 6 2,11 4 2,02 OD Wall loss 0 - 10%
41 7 2,11 0 2,11 - - 0 - 10%
41 11 2,11 0 2,11 - - 0 - 10%
41 12 2,11 3 2,05 OD Wall loss 0 - 10%
41 16 2,11 11 1,88 OD Wall loss 10 - 20%
41 17 2,11 6 1,99 OD Wall loss 0 - 10%
41 18 2,11 0 2,11 - - 0 - 10% Deformation
41 19 2,11 12 1,85 OD Wall loss 10 - 20%
41 20 2,11 4 2,02 OD Wall loss 0 - 10%
41 21 2,11 0 2,11 - - 0 - 10%
41 22 2,11 0 2,11 - - 0 - 10%
41 23 2,11 4 2,02 OD Wall loss 0 - 10%
41 27 2,11 4 2,02 OD Wall loss 0 - 10%
41 28 2,11 3 2,05 OD Wall loss 0 - 10%
41 32 2,11 3 2,05 OD Wall loss 0 - 10%
41 33 2,11 3 2,05 OD Wall loss 0 - 10%
41 37 2,11 3 2,05 OD Wall loss 0 - 10%
41 38 2,11 0 2,11 - - 0 - 10%
42 1 2,11 4 2,02 OD Wall loss 0 - 10%
42 2 2,11 0 2,11 - - 0 - 10%
42 6 2,11 7 1,96 OD Wall loss 0 - 10%
42 7 2,11 7 1,96 OD Pitting 0 - 10%
42 11 2,11 12 1,85 OD Wall loss 10 - 20%
42 12 2,11 25 1,58 OD Wall loss 20 - 30%
42 25 2,11 26 1,55 OD Pitting 20 - 30%
42 26 2,11 3 2,05 OD Wall loss 0 - 10%
42 31 2,11 11 1,88 OD Wall loss 10 - 20%
42 32 2,11 0 2,11 - - 0 - 10%
42 35 2,11 0 2,11 - - 0 - 10%
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
42 36IRIS EQUIPMENT
2,11 0 2,11 - - IRIS PROBE
0 - 10%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
43 1 2,11 0 2,11 - - 0 - 10%
43 2 2,11 0 2,11 - - 0 - 10%
43 6 2,11 4 2,02 OD Wall loss 0 - 10%
43 7 2,11 8 1,93 OD Pitting 0 - 10%
43 11 2,11 1 2,08 OD Wall loss 0 - 10%
43 12 2,11 8 1,93 OD Wall loss 0 - 10%
43 13 2,11 19 1,70 OD Wall loss 10 - 20%
43 16 2,11 8 1,93 OD Wall loss 0 - 10%
43 17 2,11 3 2,05 OD Wall loss 0 - 10%
43 18 2,11 4 2,02 OD Wall loss 0 - 10% Deformation
43 19 2,11 7 1,96 OD Wall loss 0 - 10%
43 22 2,11 8 1,93 OD Wall loss 0 - 10%
43 23 2,11 14 1,82 OD Pitting 10 - 20%
43 24 2,11 17 1,76 OD Wall loss 10 - 20%
43 28 2,11 10 1,90 OD Wall loss 0 - 10%
43 29 2,11 6 1,99 OD Wall loss 0 - 10%
43 33 2,11 7 1,96 OD Wall loss 0 - 10%
43 34 2,11 4 2,02 OD Wall loss 0 - 10%
44 1 2,11 18 1,73 OD Wall loss 0 - 10% Deformation
44 2 2,11 11 1,88 OD Wall loss 10 - 20% Deformation
44 6 2,11 14 1,82 OD Wall loss 10 - 20% Deformation
44 7 2,11 8 1,93 OD Wall loss 0 - 10%
44 26 2,11 14 1,82 OD Wall loss 10 - 20%
44 27 2,11 7 1,96 OD Wall loss 0 - 10%
44 31 2,11 3 2,05 OD Wall loss 0 - 10%
44 32 2,11 8 1,93 OD Wall loss 0 - 10% Deformation
45 1 2,11 14 1,82 OD Wall loss 10 - 20%
45 2 2,11 17 1,76 OD Wall loss 10 - 20%
45 11 2,11 14 1,82 OD Wall loss 10 - 20%
45 12 2,11 0 2,11 - - 0 - 10%
45 13 2,11 0 2,11 - - 0 - 10%
45 14 2,11 4 2,02 OD Wall loss 0 - 10%
45 15 2,11 1 2,08 OD Wall loss 0 - 10%
45 16 2,11 8 1,93 OD Wall loss 0 - 10%
45 17 2,11 14 1,82 OD Wall loss 10 - 20%
45 18 2,11 15 1,79 OD Wall loss 10 - 20%
45 26 2,11 18 1,73 OD Wall loss 10 - 20%
45 27 2,11 11 1,88 OD Wall loss 10 - 20%
45 28 2,11 12 1,85 OD Wall loss 10 - 20%
46 1 2,11 7 1,96 OD Wall loss 0 - 10%
46 2 2,11 12 1,85 OD Wall loss 10 - 20%
46 3 2,11 17 1,76 OD Wall loss 10 - 20% Deformation
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Client : PT. ARMADA GEMA NUSANTARA Drawing no. : HES-U1823C-01/05 Report no. : 001-UT/RBT-AGN/V/22
Project : TUBE INSPECTION Procedure no. : RBT-P-40 Operator : EDI SUPRAPTO
Location : SAMPANG, MADURA Revision : 0 Interpreter : RIZAL HIDAYATULLAH
Unit : GTU REGENERATOR REBOILER Dimension (mm) : OD 19.05 x 5997 Surface cond. : SATIFIED
Material spec. : A-179M/CARBON STEEL Thickness (mm) : 2,11 Surface temp. : AMBIENT
46 4 IRIS EQUIPMENT
2,11 17 1,76 OD IRIS PROBE
Wall loss 10 - 20%
Original
Identification Examination record (mm)
thickness Result Remark
Row Column (mm) wall loss (%) Remaining Position (ID/OD) Type
46 5 2,11 28 1,52 OD Wall loss 20 - 30%
46 6 2,11 29 1,49 OD Wall loss 20 - 30%
46 7 2,11 19 1,70 OD Wall loss 10 - 20%
46 8 2,11 14 1,82 OD Wall loss 10 - 20% Deformation
46 9 2,11 10 1,90 OD Wall loss 0 - 10% Deformation
46 10 2,11 11 1,88 OD Wall loss 10 - 20% Deformation
46 11 2,11 51 1,03 OD Pitting > 50%
46 12 2,11 3 2,05 OD Wall loss 0 - 10% Deformation
46 13 2,11 11 1,88 OD Wall loss 10 - 20%
46 14 2,11 10 1,90 OD Wall loss 0 - 10% Deformation
46 15 2,11 10 1,90 OD Wall loss 0 - 10% Deformation
46 16 2,11 10 1,90 OD Wall loss 0 - 10%
46 17 2,11 12 1,85 OD Wall loss 0 - 10% Deformation
46 18 2,11 25 1,58 OD Wall loss 20 - 30%
46 19 2,11 33 1,41 OD Wall loss 30 - 40%
46 20 2,11 32 1,44 OD Wall loss 30 - 40%
46 21 2,11 31 1,46 OD Wall loss 30 - 40%
46 22 2,11 14 1,82 OD Wall loss 10 - 20%
46 23 2,11 10 1,90 OD Wall loss 0 - 10%
IRIS DISPLAY / ANALYSIS RECORD
ROW 4
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 4 Column no. : 1

Picture 2 Row no : 4 Column no. : 2

Picture 3 Row no : 4 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 4 Column no. : 12

Picture 5 Row no : 4 Column no. : 13

Picture 6 Row no : 4 Column no. : 14


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 4 Column no. : 15

Picture 8 Row no : 4 Column no. : 16

Picture 8 Row no : 4 Column no. : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 4 Column no. : 18

Picture 11 Row no : 4 Column no. : 19

Picture 12 Row no : 4 Column no. : 20


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 4 Column no. : 21

Picture 14 Row no : 4 Column no. : 22

Picture 15 Row no : 4 Column no. : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 4 Column no. : 24

Picture 17 Row no : 4 Column no. : 33

Picture 18 Row no : 4 Column no. : 34


ROW 5
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 5 Column no. : 1

Picture 2 Row no : 5 Column no. : 2

Picture 3 Row no : 5 Column no. : 9


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 5 Column no. : 10

Picture 5 Row no : 5 Column no. : 11

Picture 6 Row no : 5 Column no. : 15


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 5 Column no. : 16

Picture 8 Row no : 5 Column no. : 17

Picture 8 Row no : 5 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 5 Column no. : 19

Picture 11 Row no : 5 Column no. : 20

Picture 12 Row no : 5 Column no. : 21


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 5 Column no. : 22

Picture 14 Row no : 5 Column no. : 26

Picture 15 Row no : 5 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 5 Column no. : 28

Picture 17 Row no : 5 Column no. : 35

Picture 18 Row no : 5 Column no. : 36


ROW 6
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 6 Column no. : 1

Picture 2 Row no : 6 Column no. : 2

Picture 3 Row no : 6 Column no. : 7


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 6 Column no. : 8

Picture 5 Row no : 6 Column no. : 9

Picture 6 Row no : 6 Column no. : 13


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 6 Column no. : 14

Picture 8 Row no : 6 Column no. : 15

Picture 8 Row no : 6 Column no. : 24


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 6 Column no. : 25

Picture 11 Row no : 6 Column no. : 26

Picture 12 Row no : 6 Column no. : 30


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 6 Column no. : 31

Picture 14 Row no : 6 Column no. : 32

Picture 15 Row no : 6 Column no. : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 6 Column no. : 38

Picture 17 Row no : - Column no. : -

Picture 18 Row no : - Column no. : -


ROW 7
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 7 Column no. : 1

Picture 2 Row no : 7 Column no. : 2

Picture 3 Row no : 7 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 7 Column no. : 6

Picture 5 Row no : 7 Column no. : 7

Picture 6 Row no : 7 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 7 Column no. : 12

Picture 8 Row no : 7 Column no. : 13

Picture 8 Row no : 7 Column no. : 19


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 7 Column no. : 20

Picture 11 Row no : 7 Column no. : 21

Picture 12 Row no : 7 Column no. : 22


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 7 Column no. : 28

Picture 14 Row no : 7 Column no. : 29

Picture 15 Row no : 7 Column no. : 30


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 7 Column no. : 34

Picture 17 Row no : 7 Column no. : 35

Picture 18 Row no : 7 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 7 Column no. : 39

Picture 20 Row no : 7 Column no. : 40

Picture 21 Row no : - Column no. : -


ROW 8
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 8 Column no. : 3

Picture 2 Row no : 8 Column no. : 4

Picture 3 Row no : 8 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 8 Column no. : 9

Picture 5 Row no : 8 Column no. : 10

Picture 6 Row no : 8 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 8 Column no. : 14

Picture 8 Row no : 8 Column no. : 15

Picture 8 Row no : 8 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 8 Column no. : 19

Picture 11 Row no : 8 Column no. : 20

Picture 12 Row no : 8 Column no. : 21


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 8 Column no. : 22

Picture 14 Row no : 8 Column no. : 23

Picture 15 Row no : 8 Column no. : 24


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 8 Column no. : 25

Picture 17 Row no : 8 Column no. : 28

Picture 18 Row no : 8 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 8 Column no. : 32

Picture 20 Row no : 8 Column no. : 33

Picture 21 Row no : 8 Column no. : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 8 Column no. : 38

Picture 23 Row no : 8 Column no. : 39

Picture 24 Row no : 8 Column no. : 40


ROW 9
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 9 Column no. : 1

Picture 2 Row no : 9 Column no. : 6

Picture 3 Row no : 9 Column no. : 7


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 9 Column no. : 11

Picture 5 Row no : 9 Column no. : 12

Picture 6 Row no : 9 Column no. : 15


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 9 Column no. : 16

Picture 8 Row no : 9 Column no. : 17

Picture 8 Row no : 9 Column no. : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 9 Column no. : 27

Picture 11 Row no : 9 Column no. : 28

Picture 12 Row no : 9 Column no. : 31


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 9 Column no. : 32

Picture 14 Row no : 9 Column no. : 35

Picture 15 Row no : 9 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 9 Column no. : 37

Picture 17 Row no : 9 Column no. : 41

Picture 18 Row no : 9 Column no. : 42


ROW 10
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 10 Column no. : 1

Picture 2 Row no : 10 Column no. : 2

Picture 3 Row no : 10 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 10 Column no. : 6

Picture 5 Row no : 10 Column no. : 7

Picture 6 Row no : 10 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 10 Column no. : 11

Picture 8 Row no : 10 Column no. : 13

Picture 8 Row no : 10 Column no. : 14


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 10 Column no. : 15

Picture 11 Row no : 10 Column no. : 30

Picture 12 Row no : 10 Column no. : 31


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 10 Column no. : 32

Picture 14 Row no : 10 Column no. : 35

Picture 15 Row no : 10 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 10 Column no. : 38

Picture 17 Row no : 10 Column no. : 39

Picture 18 Row no : 10 Column no. : 40


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 10 Column no. : 43

Picture 20 Row no : 10 Column no. : 44

Picture 21 Row no : - Column no. : -


ROW 11
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 11 Column no. : 1

Picture 2 Row no : 11 Column no. : 2

Picture 3 Row no : 11 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 11 Column no. : 6

Picture 5 Row no : 11 Column no. : 8

Picture 6 Row no : 11 Column no. : 9


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 11 Column no. : 11

Picture 8 Row no : 11 Column no. : 12

Picture 8 Row no : 11 Column no. : 13


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 11 Column no. : 34

Picture 11 Row no : 11 Column no. : 35

Picture 12 Row no : 11 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 11 Column no. : 38

Picture 14 Row no : 11 Column no. : 39

Picture 15 Row no : 11 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 11 Column no. : 42

Picture 17 Row no : 11 Column no. : 45

Picture 18 Row no : 11 Column no. : 46


ROW 12
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 12 Column no. : 1

Picture 2 Row no : 12 Column no. : 2

Picture 3 Row no : 12 Column no. : 4


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 12 Column no. : 5

Picture 5 Row no : 12 Column no. : 7

Picture 6 Row no : 12 Column no. : 8


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 12 Column no. : 10

Picture 8 Row no : 12 Column no. : 11

Picture 8 Row no : 12 Column no. : 20


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 12 Column no. : 21

Picture 11 Row no : 12 Column no. : 22

Picture 12 Row no : 12 Column no. : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 12 Column no. : 24

Picture 14 Row no : 12 Column no. : 25

Picture 15 Row no : 12 Column no. : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 12 Column no. : 27

Picture 17 Row no : 12 Column no. : 36

Picture 18 Row no : 12 Column no. : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 12 Column no. : 39

Picture 20 Row no : 12 Column no. : 40

Picture 21 Row no : 12 Column no. : 42


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 12 Column no. : 43

Picture 23 Row no : 12 Column no. : 45

Picture 24 Row no : 12 Column no. : 46


ROW 13
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 13 Column no. : 1

Picture 2 Row no : 13 Column no. : 2

Picture 3 Row no : 13 Column no. : 4


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 13 Column no. : 5

Picture 5 Row no : 13 Column no. : 7

Picture 6 Row no : 13 Column no. : 8


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 13 Column no. : 10

Picture 8 Row no : 13 Column no. : 11

Picture 8 Row no : 13 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 13 Column no. : 19

Picture 11 Row no : 13 Column no. : 20

Picture 12 Row no : 13 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 13 Column no. : 30

Picture 14 Row no : 13 Column no. : 31

Picture 15 Row no : 13 Column no. : 38


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 13 Column no. : 39

Picture 17 Row no : 13 Column no. : 41

Picture 18 Row no : 13 Column no. : 42


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 13 Column no. : 44

Picture 20 Row no : 13 Column no. : 45

Picture 21 Row no : 13 Column no. : 47


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 13 Column no. : 48

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 14
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 14 Column no. : 1

Picture 2 Row no : 14 Column no. : 2

Picture 3 Row no : 14 Column no. : 4


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 14 Column no. : 5

Picture 5 Row no : 14 Column no. : 7

Picture 6 Row no : 14 Column no. : 9


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 14 Column no. : 10

Picture 8 Row no : 14 Column no. : 16

Picture 8 Row no : 14 Column no. : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 14 Column no. : 18

Picture 11 Row no : 14 Column no. : 31

Picture 12 Row no : 14 Column no. : 32


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 14 Column no. : 33

Picture 14 Row no : 14 Column no. : 39

Picture 15 Row no : 14 Column no. : 40


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 14 Column no. : 42

Picture 17 Row no : 14 Column no. : 44

Picture 18 Row no : 14 Column no. : 45


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 14 Column no. : 47

Picture 20 Row no : 14 Column no. : 48

Picture 21 Row no : - Column no. : -


ROW 15
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 15 Column no. : 1

Picture 2 Row no : 15 Column no. : 2

Picture 3 Row no : 15 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 15 Column no. : 6

Picture 5 Row no : 15 Column no. : 8

Picture 6 Row no : 15 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 15 Column no. : 11

Picture 8 Row no : 15 Column no. : 15

Picture 8 Row no : 15 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 15 Column no. : 17

Picture 11 Row no : 15 Column no. : 34

Picture 12 Row no : 15 Column no. : 35


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 15 Column no. : 36

Picture 14 Row no : 15 Column no. : 40

Picture 15 Row no : 15 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 15 Column no. : 43

Picture 17 Row no : 15 Column no. : 45

Picture 18 Row no : 15 Column no. : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 15 Column no. : 49

Picture 20 Row no : 15 Column no. : 50

Picture 21 Row no : - Column no. : -


ROW 16
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 16 Column no. : 1

Picture 2 Row no : 16 Column no. : 2

Picture 3 Row no : 16 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 16 Column no. : 6

Picture 5 Row no : 16 Column no. : 8

Picture 6 Row no : 16 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 16 Column no. : 11

Picture 8 Row no : 16 Column no. : 14

Picture 8 Row no : 16 Column no. : 15


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 16 Column no. : 22

Picture 11 Row no : 16 Column no. : 23

Picture 12 Row no : 16 Column no. : 24


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 16 Column no. : 25

Picture 14 Row no : 16 Column no. : 26

Picture 15 Row no : 16 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 16 Column no. : 28

Picture 17 Row no : 16 Column no. : 29

Picture 18 Row no : 16 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 16 Column no. : 37

Picture 20 Row no : 16 Column no. : 40

Picture 21 Row no : 16 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 16 Column no. : 43

Picture 20 Row no : 16 Column no. : 45

Picture 21 Row no : 16 Column no. : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 16 Column no. : 49

Picture 23 Row no : 16 Column no. : 50

Picture 24 Row no : - Column no. : -


ROW 17
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 17 Column no. : 1

Picture 2 Row no : 17 Column no. : 2

Picture 3 Row no : 17 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 17 Column no. : 6

Picture 5 Row no : 17 Column no. : 8

Picture 6 Row no : 17 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 17 Column no. : 11

Picture 8 Row no : 17 Column no. : 14

Picture 8 Row no : 17 Column no. : 15


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 17 Column no. : 20

Picture 11 Row no : 17 Column no. : 21

Picture 12 Row no : 17 Column no. : 30


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 17 Column no. : 31

Picture 14 Row no : 17 Column no. : 36

Picture 15 Row no : 17 Column no. : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 17 Column no. : 40

Picture 17 Row no : 17 Column no. : 41

Picture 18 Row no : 17 Column no. : 43


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 17 Column no. : 45

Picture 20 Row no : 17 Column no. : 46

Picture 21 Row no : 17 Column no. : 49


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 17 Column no. : 50

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 18
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 18 Column no. : 2

Picture 2 Row no : 18 Column no. : 6

Picture 3 Row no : 18 Column no. : 7


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 18 Column no. : 9

Picture 5 Row no : 18 Column no. : 11

Picture 6 Row no : 18 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 18 Column no. : 15

Picture 8 Row no : 18 Column no. : 16

Picture 8 Row no : 18 Column no. : 20


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 18 Column no. : 21

Picture 11 Row no : 18 Column no. : 24

Picture 12 Row no : 18 Column no. : 25


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 18 Column no. : 26

Picture 14 Row no : 18 Column no. : 27

Picture 15 Row no : 18 Column no. : 28


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 18 Column no. : 29

Picture 17 Row no : 18 Column no. : 32

Picture 18 Row no : 18 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 18 Column no. : 37

Picture 20 Row no : 18 Column no. : 38

Picture 21 Row no : 18 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 18 Column no. : 42

Picture 20 Row no : 18 Column no. : 44

Picture 21 Row no : 18 Column no. : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 18 Column no. : 47

Picture 23 Row no : 18 Column no. : 51

Picture 24 Row no : 18 Column no. : 52


ROW 19
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 19 Column no. : 1

Picture 2 Row no : 19 Column no. : 2

Picture 3 Row no : 19 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 19 Column no. : 9

Picture 5 Row no : 19 Column no. : 11

Picture 6 Row no : 19 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 19 Column no. : 15

Picture 8 Row no : 19 Column no. : 16

Picture 8 Row no : 19 Column no. : 19


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 19 Column no. : 20

Picture 11 Row no : 19 Column no. : 33

Picture 12 Row no : 19 Column no. : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 19 Column no. : 37

Picture 14 Row no : 19 Column no. : 38

Picture 15 Row no : 19 Column no. : 39


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 19 Column no. : 41

Picture 17 Row no : 19 Column no. : 42

Picture 18 Row no : 19 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 19 Column no. : 46

Picture 20 Row no : 19 Column no. : 47

Picture 21 Row no : 19 Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 19 Column no. : 52

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 20
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 20 Column no. : 1

Picture 2 Row no : 20 Column no. : 2

Picture 3 Row no : 20 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 20 Column no. : 7

Picture 5 Row no : 20 Column no. : 9

Picture 6 Row no : 20 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 20 Column no. : 12

Picture 8 Row no : 20 Column no. : 15

Picture 8 Row no : 20 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 20 Column no. : 19

Picture 11 Row no : 20 Column no. : 20

Picture 12 Row no : 20 Column no. : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 20 Column no. : 24

Picture 14 Row no : 20 Column no. : 25

Picture 15 Row no : 20 Column no. : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 20 Column no. : 27

Picture 17 Row no : 20 Column no. : 28

Picture 18 Row no : 20 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 20 Column no. : 30

Picture 20 Row no : 20 Column no. : 33

Picture 21 Row no : - Column no. : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 20 Column no. : 37

Picture 23 Row no : 20 Column no. : 38

Picture 24 Row no : 20 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 25 Row no : 20 Column no. : 42

Picture 26 Row no : 20 Column no. : 44

Picture 27 Row no : 20 Column no. : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 28 Row no : 20 Column no. : 47

Picture 29 Row no : 20 Column no. : 51

Picture 30 Row no : 20 Column no. : 52


ROW 21
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 21 Column no. : 1

Picture 2 Row no : 21 Column no. : 2

Picture 3 Row no : 21 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 21 Column no. : 7

Picture 5 Row no : 21 Column no. : 9

Picture 6 Row no : 21 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 21 Column no. : 12

Picture 8 Row no : 21 Column no. : 15

Picture 9 Row no : 21 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 21 Column no. : 19

Picture 11 Row no : 21 Column no. : 20

Picture 12 Row no : 21 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 21 Column no. : 34

Picture 14 Row no : 21 Column no. : 37

Picture 15 Row no : 21 Column no. : 38


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 21 Column no. : 41

Picture 17 Row no : 21 Column no. : 42

Picture 18 Row no : 21 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 21 Column no. : 46

Picture 20 Row no : 21 Column no. : 47

Picture 21 Row no : - Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 21 Column no. : 52

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 22
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no                            :  22 Column no.                      : 1

Picture 2 Row no                            :  22 Column no.                      : 2

Picture 3 Row no                            :  22 Column no.                      : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no                            :  22 Column no.                      : 7

Picture 5 Row no                            :  22 Column no.                      : 9

Picture 6 Row no                            :  22 Column no.                      : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no                            :  22 Column no.                      : 12

Picture 8 Row no                            :  22 Column no.                      : 15

Picture 9 Row no                            :  22 Column no.                      : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no                            :  22 Column no.                      : 19

Picture 11 Row no                            :  22 Column no.                      : 20

Picture 12 Row no                            :  22 Column no.                      : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no                            :  22 Column no.                      : 24

Picture 14 Row no                            :  22 Column no.                      : 25

Picture 15 Row no                            :  22 Column no.                      : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no                            :  22 Column no.                      : 27

Picture 17 Row no                            :  22 Column no.                      : 28

Picture 18 Row no                            :  22 Column no.                      : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no                            :  22 Column no.                      : 30

Picture 20 Row no                            :  22 Column no.                      : 33

Picture 21 Row no                            :  ‐ Column no.                      : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no                            :  22 Column no.                      : 37

Picture 23 Row no                            :  22 Column no.                      : 38

Picture 24 Row no                            :  22 Column no.                      : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 25 Row no                            :  22 Column no.                      : 42

Picture 26 Row no                            :  22 Column no.                      : 44

Picture 27 Row no                            :  22 Column no.                      : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 28 Row no                            :  22 Column no.                      : 47

Picture 29 Row no                            :  22 Column no.                      : 51

Picture 30 Row no                            :  22 Column no.                      : 52


ROW 23
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 23 Column no. : 1

Picture 2 Row no : 23 Column no. : 2

Picture 3 Row no : 23 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 23 Column no. : 7

Picture 5 Row no : 23 Column no. : 9

Picture 6 Row no : 23 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 23 Column no. : 12

Picture 8 Row no : 23 Column no. : 15

Picture 9 Row no : 23 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 23 Column no. : 19

Picture 11 Row no : 23 Column no. : 20

Picture 12 Row no : 23 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 23 Column no. : 34

Picture 14 Row no : 23 Column no. : 36

Picture 15 Row no : 23 Column no. : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 23 Column no. : 41

Picture 17 Row no : 23 Column no. : 42

Picture 18 Row no : 23 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 23 Column no. : 46

Picture 20 Row no : 23 Column no. : 47

Picture 21 Row no : - Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 23 Column no. : 52

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 24
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 24 Column no. : 1

Picture 2 Row no : 24 Column no. : 2

Picture 3 Row no : 24 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 24 Column no. : 7

Picture 5 Row no : 24 Column no. : 9

Picture 6 Row no : 24 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 24 Column no. : 12

Picture 8 Row no : 24 Column no. : 15

Picture 9 Row no : 24 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 24 Column no. : 19

Picture 11 Row no : 24 Column no. : 20

Picture 12 Row no : 24 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 24 Column no. : 34

Picture 14 Row no : 24 Column no. : 37

Picture 15 Row no : 24 Column no. : 38


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 24 Column no. : 41

Picture 17 Row no : 24 Column no. : 42

Picture 18 Row no : 24 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 24 Column no. : 46

Picture 20 Row no : 24 Column no. : 47

Picture 21 Row no : - Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 24 Column no. : 52

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 25
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 25 Column no. : 1

Picture 2 Row no : 25 Column no. : 2

Picture 3 Row no : 25 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 25 Column no. : 7

Picture 5 Row no : 25 Column no. : 9

Picture 6 Row no : 25 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 25 Column no. : 12

Picture 8 Row no : 25 Column no. : 15

Picture 9 Row no : 25 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 25 Column no. : 19

Picture 11 Row no : 25 Column no. : 20

Picture 12 Row no : 25 Column no. : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 25 Column no. : 24

Picture 14 Row no : 25 Column no. : 25

Picture 15 Row no : 25 Column no. : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 25 Column no. : 27

Picture 17 Row no : 25 Column no. : 28

Picture 18 Row no : 25 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 25 Column no. : 30

Picture 20 Row no : 25 Column no. : 33

Picture 21 Row no : - Column no. : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 25 Column no. : 37

Picture 23 Row no : 25 Column no. : 38

Picture 24 Row no : 25 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 25 Row no : 25 Column no. : 42

Picture 26 Row no : 25 Column no. : 44

Picture 27 Row no : 25 Column no. : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 28 Row no : 25 Column no. : 47

Picture 29 Row no : 25 Column no. : 51

Picture 30 Row no : 25 Column no. : 52


ROW 26
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 26 Column no. : 1

Picture 2 Row no : 26 Column no. : 2

Picture 3 Row no : 26 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 26 Column no. : 7

Picture 5 Row no : 26 Column no. : 9

Picture 6 Row no : 26 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 26 Column no. : 12

Picture 8 Row no : 26 Column no. : 15

Picture 9 Row no : 26 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 26 Column no. : 19

Picture 11 Row no : 26 Column no. : 20

Picture 12 Row no : 26 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 26 Column no. : 34

Picture 14 Row no : 26 Column no. : 37

Picture 15 Row no : 26 Column no. : 38


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 26 Column no. : 41

Picture 17 Row no : 26 Column no. : 42

Picture 18 Row no : 26 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 26 Column no. : 46

Picture 20 Row no : 26 Column no. : 47

Picture 21 Row no : - Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 26 Column no. : 52

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 27
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 27 Column no. : 1

Picture 2 Row no : 27 Column no. : 2

Picture 3 Row no : 27 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 27 Column no. : 7

Picture 5 Row no : 27 Column no. : 9

Picture 6 Row no : 27 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 27 Column no. : 12

Picture 8 Row no : 27 Column no. : 15

Picture 9 Row no : 27 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 27 Column no. : 19

Picture 11 Row no : 27 Column no. : 20

Picture 12 Row no : 27 Column no. : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 27 Column no. : 24

Picture 14 Row no : 27 Column no. : 25

Picture 15 Row no : 27 Column no. : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 27 Column no. : 27

Picture 17 Row no : 27 Column no. : 28

Picture 18 Row no : 27 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 27 Column no. : 30

Picture 20 Row no : 27 Column no. : 33

Picture 21 Row no : - Column no. : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 27 Column no. : 37

Picture 23 Row no : 27 Column no. : 38

Picture 24 Row no : 27 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 25 Row no : 27 Column no. : 42

Picture 26 Row no : 27 Column no. : 44

Picture 27 Row no : 27 Column no. : 46


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 28 Row no : 27 Column no. : 47

Picture 29 Row no : 27 Column no. : 51

Picture 30 Row no : 27 Column no. : 52


ROW 28
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 28 Column no. : 1

Picture 2 Row no : 28 Column no. : 2

Picture 3 Row no : 28 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 28 Column no. : 7

Picture 5 Row no : 28 Column no. : 9

Picture 6 Row no : 28 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 28 Column no. : 12

Picture 8 Row no : 28 Column no. : 15

Picture 9 Row no : 28 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 28 Column no. : 19

Picture 11 Row no : 28 Column no. : 20

Picture 12 Row no : 28 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 28 Column no. : 34

Picture 14 Row no : 28 Column no. : 37

Picture 15 Row no : 28 Column no. : 38


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 28 Column no. : 41

Picture 17 Row no : 28 Column no. : 42

Picture 18 Row no : 28 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 28 Column no. : 46

Picture 20 Row no : 28 Column no. : 47

Picture 21 Row no : - Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 28 Column no. : 52

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 29
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 29 Column no. : 2

Picture 2 Row no : 29 Column no. : 3

Picture 3 Row no : 29 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 29 Column no. : 7

Picture 5 Row no : 29 Column no. : 9

Picture 6 Row no : 29 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 29 Column no. : 12

Picture 8 Row no : 29 Column no. : 15

Picture 9 Row no : 29 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 29 Column no. : 19

Picture 11 Row no : 29 Column no. : 20

Picture 12 Row no : 29 Column no. : 24


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 29 Column no. : 25

Picture 14 Row no : 29 Column no. : 26

Picture 15 Row no : 29 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 29 Column no. : 28

Picture 17 Row no : 29 Column no. : 29

Picture 18 Row no : 29 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 29 Column no. : 34

Picture 20 Row no : 29 Column no. : 37

Picture 21 Row no : - Column no. : 38


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 29 Column no. : 41

Picture 23 Row no : 29 Column no. : 42

Picture 24 Row no : 29 Column no. : 44


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 25 Row no : 29 Column no. : 46

Picture 26 Row no : 29 Column no. : 47

Picture 27 Row no : 29 Column no. : 51


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 28 Row no : 29 Column no. : 52

Picture 29 Row no : - Column no. : -

Picture 30 Row no : - Column no. : -


ROW 30
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 30 Column no. : 1

Picture 2 Row no : 30 Column no. : 2

Picture 3 Row no : 30 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 30 Column no. : 6

Picture 5 Row no : 30 Column no. : 8

Picture 6 Row no : 30 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 30 Column no. : 11

Picture 8 Row no : 30 Column no. : 14

Picture 8 Row no : 30 Column no. : 15


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 30 Column no. : 19

Picture 11 Row no : 30 Column no. : 20

Picture 12 Row no : 30 Column no. : 31


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 30 Column no. : 32

Picture 14 Row no : 30 Column no. : 36

Picture 15 Row no : 30 Column no. : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 30 Column no. : 40

Picture 17 Row no : 30 Column no. : 41

Picture 18 Row no : 30 Column no. : 43


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 30 Column no. : 45

Picture 20 Row no : 30 Column no. : 46

Picture 21 Row no : 30 Column no. : 49


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 30 Column no. : 50

Picture 23 Row no : - Column no. : -

Picture 24 Row no : - Column no. : -


ROW 31
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 31 Column no. : 1

Picture 2 Row no : 31 Column no. : 2

Picture 3 Row no : 31 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 31 Column no. : 6

Picture 5 Row no : 31 Column no. : 8

Picture 6 Row no : 31 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 31 Column no. : 11

Picture 8 Row no : 31 Column no. : 15

Picture 8 Row no : 31 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 31 Column no. : 20

Picture 11 Row no : 31 Column no. : 21

Picture 12 Row no : 31 Column no. : 30


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 31 Column no. : 31

Picture 14 Row no : 31 Column no. : 35

Picture 15 Row no : 31 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 31 Column no. : 40

Picture 17 Row no : 31 Column no. : 41

Picture 18 Row no : 31 Column no. : 43


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 31 Column no. : 45

Picture 20 Row no : 31 Column no. : 46

Picture 21 Row no : 31 Column no. : 49


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 31 Column no. : 50

Picture 20 Row no : - Column no. : -

Picture 21 Row no : - Column no. : -


ROW 32
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 32 Column no. : 1

Picture 2 Row no : 32 Column no. : 2

Picture 3 Row no : 32 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 32 Column no. : 6

Picture 5 Row no : 32 Column no. : 8

Picture 6 Row no : 32 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 32 Column no. : 13

Picture 8 Row no : 32 Column no. : 16

Picture 8 Row no : 32 Column no. : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 32 Column no. : 21

Picture 11 Row no : 32 Column no. : 22

Picture 12 Row no : 32 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 32 Column no. : 30

Picture 14 Row no : 32 Column no. : 34

Picture 15 Row no : 32 Column no. : 35


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 32 Column no. : 38

Picture 17 Row no : 32 Column no. : 39

Picture 18 Row no : 32 Column no. : 43


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 32 Column no. : 45

Picture 20 Row no : 32 Column no. : 46

Picture 21 Row no : 32 Column no. : 49


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 32 Column no. : 50

Picture 20 Row no : - Column no. : -

Picture 21 Row no : - Column no. : -


ROW 33
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 33 Column no. : 1

Picture 2 Row no : 33 Column no. : 2

Picture 3 Row no : 33 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 33 Column no. : 6

Picture 5 Row no : 33 Column no. : 8

Picture 6 Row no : 33 Column no. : 9


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 33 Column no. : 12

Picture 8 Row no : 33 Column no. : 13

Picture 8 Row no : 33 Column no. : 16


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 33 Column no. : 17

Picture 11 Row no : 33 Column no. : 21

Picture 12 Row no : 33 Column no. : 22


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 33 Column no. : 27

Picture 14 Row no : 33 Column no. : 28

Picture 15 Row no : 33 Column no. : 32


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 33 Column no. : 33

Picture 17 Row no : 33 Column no. : 36

Picture 18 Row no : 33 Column no. : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 33 Column no. : 40

Picture 20 Row no : 33 Column no. : 41

Picture 21 Row no : 33 Column no. : 43


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 33 Column no. : 44

Picture 20 Row no : - Column no. : 47

Picture 21 Row no : - Column no. : 48


ROW 34
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 34 Column no. : 1

Picture 2 Row no : 34 Column no. : 2

Picture 3 Row no : 34 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 34 Column no. : 7

Picture 5 Row no : 34 Column no. : 9

Picture 6 Row no : 34 Column no. : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 34 Column no. : 13

Picture 8 Row no : 34 Column no. : 15

Picture 8 Row no : 34 Column no. : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 34 Column no. : 18

Picture 11 Row no : 34 Column no. : 22

Picture 12 Row no : 34 Column no. : 23


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 34 Column no. : 24

Picture 14 Row no : 34 Column no. : 25

Picture 15 Row no : 34 Column no. : 26


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 34 Column no. : 27

Picture 17 Row no : 34 Column no. : 31

Picture 18 Row no : 34 Column no. : 32


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 34 Column no. : 35

Picture 20 Row no : 34 Column no. : 36

Picture 21 Row no : 34 Column no. : 39


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 34 Column no. : 40

Picture 23 Row no : - Column no. : 42

Picture 24 Row no : 34 Column no. : 43


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 25 Row no : 34 Column no. : 47

Picture 26 Row no : 34 Column no. : 48

Picture 27 Row no : - Column no. : -


ROW 35
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no                            :  35 Column no.                      : 1

Picture 2 Row no                            :  35 Column no.                      : 2

Picture 3 Row no                            :  35 Column no.                      : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no                            :  35 Column no.                      : 7

Picture 5 Row no                            :  35 Column no.                      : 9

Picture 6 Row no                            :  35 Column no.                      : 10


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no                            :  35 Column no.                      : 13

Picture 8 Row no                            :  35 Column no.                      : 14

Picture 9 Row no                            :  35 Column no.                      : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no                            :  35 Column no.                      : 18

Picture 11 Row no                            :  35 Column no.                      : 29

Picture 12 Row no                            :  35 Column no.                      : 30


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no                            :  35 Column no.                      : 33

Picture 14 Row no                            :  35 Column no.                      : 34

Picture 15 Row no                            :  35 Column no.                      : 37


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no                            :  35 Column no.                      : 38

Picture 17 Row no                            :  35 Column no.                      : 40

Picture 18 Row no                            :  35 Column no.                      : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no                            :  35 Column no.                      : 45

Picture 20 Row no                            :  35 Column no.                      : 46

Picture 21 Row no                            :  ‐ Column no.                      : ‐


ROW 36
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 36 Column no. : 1

Picture 2 Row no : 36 Column no. : 2

Picture 3 Row no : 36 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 36 Column no. : 7

Picture 5 Row no : 36 Column no. : 10

Picture 6 Row no : 36 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 36 Column no. : 14

Picture 8 Row no : 36 Column no. : 15

Picture 9 Row no : 36 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 36 Column no. : 19

Picture 11 Row no : 36 Column no. : 28

Picture 12 Row no : 36 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 36 Column no. : 32

Picture 14 Row no : 36 Column no. : 33

Picture 15 Row no : 36 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 36 Column no. : 37

Picture 17 Row no : 36 Column no. : 40

Picture 18 Row no : 36 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 36 Column no. : 45

Picture 20 Row no : 36 Column no. : 46

Picture 21 Row no : - Column no. : -


ROW 37
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 37 Column no. : 1

Picture 2 Row no : 37 Column no. : 2

Picture 3 Row no : 37 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 37 Column no. : 6

Picture 5 Row no : 37 Column no. : 10

Picture 6 Row no : 37 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 37 Column no. : 14

Picture 8 Row no : 37 Column no. : 15

Picture 9 Row no : 37 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 37 Column no. : 19

Picture 11 Row no : 37 Column no. : 26

Picture 12 Row no : 37 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 37 Column no. : 30

Picture 14 Row no : 37 Column no. : 31

Picture 15 Row no : 37 Column no. : 34


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 37 Column no. : 35

Picture 17 Row no : 37 Column no. : 39

Picture 18 Row no : 37 Column no. : 40


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 37 Column no. : 43

Picture 20 Row no : 37 Column no. : 44

Picture 21 Row no : - Column no. : -


ROW 38
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 38 Column no. : 1

Picture 2 Row no : 38 Column no. : 3

Picture 3 Row no : 38 Column no. : 5


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 38 Column no. : 6

Picture 5 Row no : 38 Column no. : 10

Picture 6 Row no : 38 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 38 Column no. : 14

Picture 8 Row no : 38 Column no. : 15

Picture 9 Row no : 38 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 38 Column no. : 19

Picture 11 Row no : 38 Column no. : 20

Picture 12 Row no : 38 Column no. : 21


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 38 Column no. : 22

Picture 14 Row no : 38 Column no. : 23

Picture 15 Row no : 38 Column no. : 24


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 38 Column no. : 25

Picture 17 Row no : 38 Column no. : 28

Picture 18 Row no : 38 Column no. : 29


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 38 Column no. : 32

Picture 20 Row no : 38 Column no. : 33

Picture 21 Row no : 38 Column no. : 36


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 38 Column no. : 37

Picture 23 Row no : 38 Column no. : 41

Picture 24 Row no : 38 Column no. : 42


ROW 39
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 39 Column no. : 1

Picture 2 Row no : 39 Column no. : 2

Picture 3 Row no : 39 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 39 Column no. : 7

Picture 5 Row no : 39 Column no. : 11

Picture 6 Row no : 39 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 39 Column no. : 15

Picture 8 Row no : 39 Column no. : 16

Picture 9 Row no : 39 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 39 Column no. : 28

Picture 11 Row no : 39 Column no. : 31

Picture 12 Row no : 39 Column no. : 32


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 39 Column no. : 35

Picture 14 Row no : 39 Column no. : 36

Picture 15 Row no : 39 Column no. : 41


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 39 Column no. : 42

Picture 17 Row no : - Column no. : -

Picture 18 Row no : - Column no. : -


ROW 39
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 40 Column no. : 1

Picture 2 Row no : 40 Column no. : 2

Picture 3 Row no : 40 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 40 Column no. : 7

Picture 5 Row no : 40 Column no. : 11

Picture 6 Row no : 40 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 40 Column no. : 15

Picture 8 Row no : 40 Column no. : 16

Picture 9 Row no : 40 Column no. : 25


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 40 Column no. : 26

Picture 11 Row no : 40 Column no. : 29

Picture 12 Row no : 40 Column no. : 30


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 40 Column no. : 34

Picture 14 Row no : 40 Column no. : 35

Picture 15 Row no : 40 Column no. : 39


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 40 Column no. : 40

Picture 17 Row no : - Column no. : -

Picture 18 Row no : - Column no. : -


ROW 40
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 41 Column no. : 1

Picture 2 Row no : 41 Column no. : 2

Picture 3 Row no : 41 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 41 Column no. : 7

Picture 5 Row no : 41 Column no. : 11

Picture 6 Row no : 41 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 41 Column no. : 16

Picture 8 Row no : 41 Column no. : 17

Picture 9 Row no : 41 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 41 Column no. : 19

Picture 11 Row no : 41 Column no. : 20

Picture 12 Row no : 41 Column no. : 21


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 41 Column no. : 22

Picture 14 Row no : 41 Column no. : 23

Picture 15 Row no : 41 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 41 Column no. : 28

Picture 17 Row no : 41 Column no. : 32

Picture 18 Row no : 41 Column no. : 33


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 41 Column no. : 37

Picture 20 Row no : 41 Column no. : 38

Picture 21 Row no : - Column no. : -


ROW 41
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 42 Column no. : 1

Picture 2 Row no : 42 Column no. : 2

Picture 3 Row no : 42 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 42 Column no. : 7

Picture 5 Row no : 42 Column no. : 11

Picture 6 Row no : 42 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 42 Column no. : 25

Picture 8 Row no : 42 Column no. : 26

Picture 9 Row no : 42 Column no. : 31


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 42 Column no. : 32

Picture 11 Row no : 42 Column no. : 35

Picture 12 Row no : 42 Column no. : 36


ROW 42
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 43 Column no. : 1

Picture 2 Row no : 43 Column no. : 2

Picture 3 Row no : 43 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 43 Column no. : 7

Picture 5 Row no : 43 Column no. : 11

Picture 6 Row no : 43 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 43 Column no. : 13

Picture 8 Row no : 43 Column no. : 16

Picture 9 Row no : 43 Column no. : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 43 Column no. : 18

Picture 11 Row no : 43 Column no. : 19

Picture 12 Row no : 43 Column no. : 22


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 43 Column no. : 23

Picture 14 Row no : 43 Column no. : 24

Picture 15 Row no : 43 Column no. : 28


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 43 Column no. : 29

Picture 17 Row no : 43 Column no. : 33

Picture 18 Row no : 43 Column no. : 34


ROW 43
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 44 Column no. : 1

Picture 2 Row no : 44 Column no. : 2

Picture 3 Row no : 44 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 44 Column no. : 7

Picture 5 Row no : 44 Column no. : 26

Picture 6 Row no : 44 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 44 Column no. : 31

Picture 8 Row no : 44 Column no. : 32

Picture 9 Row no : - Column no. : -


ROW 44
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 45 Column no. : 1

Picture 2 Row no : 45 Column no. : 2

Picture 3 Row no : 45 Column no. : 11


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 45 Column no. : 12

Picture 5 Row no : 45 Column no. : 13

Picture 6 Row no : 45 Column no. : 14


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 45 Column no. : 15

Picture 8 Row no : 45 Column no. : 16

Picture 9 Row no : 45 Column no. : 17


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 45 Column no. : 18

Picture 11 Row no : 45 Column no. : 26

Picture 12 Row no : 45 Column no. : 27


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 45 Column no. : 28

Picture 14 Row no : - Column no. : -

Picture 15 Row no : - Column no. : -


ROW 45
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 1 Row no : 46 Column no. : 1

Picture 2 Row no : 46 Column no. : 2

Picture 3 Row no : 46 Column no. : 3


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 4 Row no : 46 Column no. : 4

Picture 5 Row no : 46 Column no. : 5

Picture 6 Row no : 46 Column no. : 6


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 7 Row no : 46 Column no. : 7

Picture 8 Row no : 46 Column no. : 8

Picture 9 Row no : 46 Column no. : 9


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 10 Row no : 46 Column no. : 10

Picture 11 Row no : 46 Column no. : 11

Picture 12 Row no : 46 Column no. : 12


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 13 Row no : 46 Column no. : 13

Picture 14 Row no : 46 Column no. : 14

Picture 15 Row no : 46 Column no. : 15


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 16 Row no : 46 Column no. : 16

Picture 17 Row no : 46 Column no. : 17

Picture 18 Row no : 46 Column no. : 18


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 19 Row no : 46 Column no. : 19

Picture 20 Row no : 46 Column no. : 20

Picture 21 Row no : 46 Column no. : 21


NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
Picture 22 Row no : 46 Column no. : 22

Picture 23 Row no : 46 Column no. : 23

Picture 15 Row no : - Column no. : -


DEFECT MAPPING
1 5 10 15 20
2 5 10 15 20 25
3 5 10 15 20 25 30
4 5 10 15 20 25 30
5 5 10 15 20 25 30 35
6 5 10 15 20 25 30 35
7 5 10 15 20 25 30 35 40
8 5 10 15 20 25 30 35 40
9 5 10 15 20 25 30 35 40
10 5 10 15 20 25 30 35 40
11 5 10 15 20 25 30 35 40 45
12 5 10 15 20 25 30 35 40 45
13 5 10 15 20 25 30 35 40 45
14 5 10 15 20 25 30 35 40 45
15 5 10 15 20 25 30 35 40 45 50
16 5 10 15 20 25 30 35 40 45 50
17 5 10 15 20 25 30 35 40 45 50
18 5 10 15 20 25 30 35 40 45 50
19 5 10 15 20 25 30 35 40 45 50
20 5 10 15 20 25 30 35 40 45 50
21 5 10 15 20 25 30 35 40 45 50
22 5 10 15 20 25 30 35 40 45 50
23 5 10 15 20 25 30 35 40 45 50

24 5 10 25 30 35 40 45 50
25 5 10 15 20 25 30 35 40 45 50
26 5 10 15 20 25 30 35 40 45 50
27 5 10 15 20 25 30 35 40 45 50
28 5 10 15 20 25 30 35 40 45 50
29 5 10 15 20 25 30 35 40 45 50
30 5 10 15 20 25 30 35 40 45 50
31 5 10 15 20 25 30 35 40 45 50
32 5 10 15 20 25 30 35 40 45 50
33 5 10 15 20 25 30 35 40 45
34 5 10 15 20 25 30 35 40 45
35 5 10 15 20 25 30 35 40 45
36 5 10 15 20 25 30 35 40 45
Color Identification Defect Category Number Of Tubes
37 20 25 30 35 40
38 5 10 15 20 25 30 35 40 0 - 10 % Wall Loss 552
39 5 10 15 20 25 30 35 40 10 - 20 % Wall Loss 122
40 5 10 15 20 25 30 35 40 20 - 30 % Wall Loss 48
41 5 10 15 20 25 30 35
15 30 35
30 - 40 % Wall Loss 77
42 5 10 20
43 5 10 15 20 25 30 40 - 50 % Wall Loss 45
44 5 10 15 20 25 30 More 51% Wall Loss 122
45 5 10 15 20 25 Old Plug 1
46 10 15 20
Obstacle 0
Deformation 35
Inspected Tube 1004
Requested of Tube 1004
Total Tube 2020

PT. ROBUTECH
PHOTOGRAPH ACTIVITY
NON DESTRUCTIVE EXAMINATION REPORT
INTERNAL ROTARY INSPECTION SYSTEM
PHOTOGRAPH ACTIVITY

1 2

GTU Reboiler GTU Reboiler

3 4

IRIS Inspection IRIS Inspection

5 6

IRIS Inspection IRIS Inspection

7 8

IRIS Inspection IRIS Inspection

You might also like