Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


NORTHERN SAMAR
SECOND DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VIII
Brgy.Burabod, Laoang, Northern Samar

PUNCHLIST

DATE : November 5, 2018


CONTRACT ID NO. : 17II0108
Construction of One (1) Storey Three (3) Classroom
NAME OF PROJECT :
School Building at Cagamutan Central School
LOCATION : Gamay, Northern Samar
CONTRACTOR : ADB Dynamic Builders & Supply
IMPLEMENTING OFFICE : N.Samar Second DEO, Construction Section

The following is the PUNCHLIST of noted defects/deficiencies during inspection held on


July 12, 2019. All items on this PUNCHLIST MUST BE CORRECTED prior to FINAL
COMPLETION/INSPECTION to be conducted by the District Inspectorate Team (DIT).

ITEM LOCATION/PART OF
DESCRIPTION DEFECTS/DEFICIENCES
NUMBER STRUCTURE
1. Project Billboard was
Project
B.5 removed during pre-final
Billboard/Signboard
inspection.

Painting Works
1032(1)a CHB Wall 1. Insufficient paint coat.
(Concrete)

Painting Works
1032(1)c Railings 1. Insufficient paint coat
(Steel)

Note: All other items of work in the contract impleFmented conforms with the standard
specifications based on their submitted materials test results.

ELEOVAR C. TENEDERO BRYAN M. FORTES


Resident Engineer Materials Engineer In - Charge

GENARO C. PINCA, JR.


Project Engineer

Conforme:

ANDRES D. BALAJADIA, JR.


Proprietor
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
NORTHERN SAMAR
SECOND DISTRICT ENGINEERING OFFICE
REGIONAL OFFICE VIII
Brgy.Burabod, Laoang, Northern Samar

PUNCHLIST

DATE : May 14, 2018


CONTRACT ID NO. : 17II0113
Construction of One (1) Storey Two (2) Classroom
NAME OF PROJECT :
School Building at Lourdes Elementaryl School
LOCATION : Las Navas, Northern Samar
CONTRACTOR : ADB Dynamic Builders & Supply
IMPLEMENTING OFFICE : N.Samar Second DEO, Construction Section

The following is the PUNCHLIST of noted defects/deficiencies during inspection held on


July 12, 2019. All items on this PUNCHLIST MUST BE CORRECTED prior to FINAL
COMPLETION/INSPECTION to be conducted by the District Inspectorate Team (DIT).

ITEM LOCATION/PART OF
DESCRIPTION DEFECTS/DEFICIENCES
NUMBER STRUCTURE
Angular clips Roof (end wall) 1. No angular clips installed.

Painting Works
1032(1)a CHB Wall 2. Insufficient paint coat.
(Concrete)

Painting Works
1032(1)c Railings 2. Insufficient paint coat
(Steel)

Note: All other items of work in the contract impleFmented conforms with the standard
specifications based on their submitted materials test results.

ELISEO B. ALLADO, JR.


Materials Engineer In - Charge

GENARO C. PINCA, JR.


Project Engineer

Conforme:

ANDRES D. BALAJADIA, JR.


Proprietor