PUNCHLIST
ITEM LOCATION/PART OF
DESCRIPTION DEFECTS/DEFICIENCES
NUMBER STRUCTURE
1. Project Billboard was
Project
B.5 removed during pre-final
Billboard/Signboard
inspection.
Painting Works
1032(1)a CHB Wall 1. Insufficient paint coat.
(Concrete)
Painting Works
1032(1)c Railings 1. Insufficient paint coat
(Steel)
Note: All other items of work in the contract impleFmented conforms with the standard
specifications based on their submitted materials test results.
Conforme:
PUNCHLIST
ITEM LOCATION/PART OF
DESCRIPTION DEFECTS/DEFICIENCES
NUMBER STRUCTURE
Angular clips Roof (end wall) 1. No angular clips installed.
Painting Works
1032(1)a CHB Wall 2. Insufficient paint coat.
(Concrete)
Painting Works
1032(1)c Railings 2. Insufficient paint coat
(Steel)
Note: All other items of work in the contract impleFmented conforms with the standard
specifications based on their submitted materials test results.
Conforme: