Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REV DWG. NO.

ED-0100-PRS-PID-01005U

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

A NOTES A

1 FOR LEGEND, SYMBOLS, GENERAL NOTES AND


ENGINEERING DESIGN NOTES SEE
DWG. NO. ED-9999-PRS-PID-00001A THRU 00001L.

2 NOT USED.
3 NOT USED.

B 4 NOT USED. B
5 NOT USED.
6 NOT USED.
7 NOT USED.
8 ALARM SHALL BE PROVIDED WHEN TOTALISER INDICATES THAT
1.05 M3 OF GASOLINE TRANSFER IS DONE. OPERATOR SHALL
CHECK THAT PUMP HAS AUTO STOPPED WHEN ALARM OCCUR.
START/STOP
01005S 9 DELETED.
C FROM 2-LI-1010 C
10 FOR SAMPLE CONNECTION DETAILS, SEE DWG NO.
ED-9999-PRS-PID-00001E.
11 DISCHARGE ORIFICE LOOSE SUPPLY BY PUMP VENDOR.

3" P-2-01011-A01A-1-PP GASOLINE RESIDUE 12 HIGH TEMPERATURE TRIP BY THERMOSTAT THROUGH MCC.
01005S
FROM QUENCH TOWER 2-DA-101

D D
6" PW-2-01026-A01A-2-HC PROCESS WATER
01005S
FROM QUENCH TOWER 2-DA-101

2-KB-1002 2oo3
PROCESS WATER 2-KB-1004
STRIPPER PUMP GASOLINE RESIDUE
AUTOMATIC PUMP START/STOP
E TAKE-OVER
E

H
2-PI
1031A /B/C
L

2-PT 2-PT 2-PT


F 1031A 1031B 1031C F

3/4"

3/4"
3/4"
LO

LO

LO
PROCESS WATER 4" PW-2-01019-A01A-2-HC
01005V
TO 2-PA-106

G G

1" P-2-01017-A01A-1-PP
6" PW-2-01026-A01A-2-HC

4" PW-2-01019-A01A-2-HC

6" PW-2-01028-A01A-2-HC

4" PW-2-01029-A01A-2-HC

3" P-2-01011-A01A-1-PP

2" P-2-01801-A01A-1-PP

3" P-2-01012-A01A-1-PP

2" P-2-01014-A01A-1-PP
NOTE 8
H H
2-FQI H
1005

2-FI
XXXX 2-FT
1005
2-SC
01036
LO LO TYPE "C"

3/4"

3/4"
J NOTE 10 J

MIN.

MIN.
LO LO
2-FO
3/4"

1" P-2-01001-A01A-1-PP
3/4"

2-FT XXXX
MIN.

MIN.

3/4"

3/4"
XXXX 2-GBL 2-GSL
LO

PUMP AUTO-START

3/4" 3/4" 1930 1930


2-PI 2-PI
3/4"

LO

LO

LO
09041C 1027 1028
2-STR 2-GBH 2-GSH
3/4" 1013 3/4"

2"x1-1/2"

2"x1-1/2"
2-PI 2-PI 1930 1930
4"x2"
4"x2"

2-PI 1024 2-PI 1025 2-STR 2-STR


2-STR 1769 1923 1014 1015
K NOTE 11 NOTE 11 K
1012 B.V #300 2-FO #300 2-FO 3/4"

PUMP AUTO-START/STOP
#300
3/4"

B.V #300
3/4"

B.V 2-HV
6"x3"

1041X
#300

1042X
#300

B.V
A01A-1
A01A-2

B.V B.V
B.V 6"x3" 2"x1-1/2"
HC

#300 #300 3/4"x1/2" #3 2-HY 1007


00
3/4" TW-2-09728-A21I-Z 3/4"x1/2"
#300 PP 1007 S
09021B PP

1-1/2"
B.V 3/4
1/2"

EXTERNAL FLUSH

1-1/2"
#300
#300 "x1
A01A-2

LC
B.V
A01A-2
1/2"

#3 2-GA-102A / 2"
HC

B.V 2-GA-102B /2" #300 2-GA-104A 2-GA-104B


HC

00 B.V #300 B.V


"x1
A01A-1
A01A-2

/4 B.V
HC

2-YBH 2-YBH 3 2-YBH 2-YBH


HC

2"x1-1/2"
M M M M

HC
1003 1004 1006 1007
A01A-1
A01A-1

L 2-HC L

3/4"
2-YAM 2-YAM 2-YAM 2-YAM 1007
1003 1004 1006 1007
3/4" CD-2-01013-A01A-1

3/4" CD-2-01015-A01A-1

3/4" CD-2-01014-A01A-1

3/4" CD-2-01012-A01A-1
3/4" TW-2-09729-A21I-Z EXTERNAL FLUSH
3/4" PW-2-01056-A01A-1
3/4" PW-2-01055-A01A-1

3/4" PW-2-01057-A01A-1

3/4" PW-2-01041-A01A-1

M M

INTERMITENT FLOW
HEAVY GASOLINE
C L ,
S V
C L ,
OD OD S V
C L ,
6 FINAL AS BUILT SBR RYR N.D D.A P.C M.U 10 03 17
S V
N N
3/4"

3/4"

TO PYROLYSIS GASOLINE SYSTEN


APPROVED FOR CONSTRUCTION C L

LIGHT OIL FROM 2-FA-151AX/BX


5 AKN RYR D.A P.C R.B H.S 07 24 14
(AFC-1) S V
C L ,
4 APPROVED FOR CONSTRUCTION (AFC) NNS RYR P.C R.B M.K H.S 07 20 13
S V
C L ,
3 APPROVED FOR DESIGN (AFD-1) NNS RYR P.C R.B M.K. H.S 03 15 13

2" P-2-01013-A01A-1-PP
S V

1" P-2-01137-A01A-2
OD OD C L ,
2 APPROVED FOR DESIGN (AFD) SKP RYR P.C R.B M.K. H.S 01 18 13
S V
C L ,
1 APPROVED FOR PLANNING (AFP) ABP SJP P.C T.H K.I H.S 06 22 12
S V
C L ,
0 PRELIMINARY H.A J.S P.G K.O T.H H.S 01 31 12
S V
REV. DESCRIPTION DRWN CHKD DESD CHKD APVD AUTH ISSUE DATE

P P
ETHYDCO ETHYLENE PROJECT

01005V
THE EGYPTIAN ETHYLENE AND

09041C
DERIVATIVES COMPANY (S.A.E)
EL AMERIYA, ALEXANDRIA, EGYPT
THIS DRAWING EMBODIES PROPRIETARY INFORMATION OF TOYO ENGINEERING CORPORATION ABBR. FOR ISSUE
THIS DRAWING OR THE MATERIAL DESCRIBED THEREON MAY NOT BE COPIED OR DISCLOSED C CLIENT
IN ANY FORM OR MEDIUM TO THIRD PARTIES,OR USED FOR OTHER THAN THE PURPOSE FOR L LICENSOR
WHICH IT HAS BEEN PROVIDED,IN WHOLE OR IN PART IN ANY MANNER EXCEPT AS EXPRESSLY S SITE
Q PERMITTED BY TOYO ENGINEERING CORPORATION.
V VENDOR
Q

TOKYO JAPAN
TEC WORK NO. ACCOUNT CLIENT ORDER NO.
BA-1010

2-GA-102A/B 2-GA-104A/B
PROCESS WATER GASOLINE RESIDUE PUMPS
STRIPPER FEED PUMPS
RATED CAPACITY: 58.7 m3/h RATED CAPACITY: 15.0 m3/h
R DIFF. HEAD: 55.00 m DIFF. HEAD: 36.00 m ENGINEERING FOR THE PETROLEUM AND PROCESS INDUSTRIES R
TYPE: CENTRI TYPE: CANNED MOTOR PUMP
MOTOR: 18.5 kw MOTOR: 5.5 kw
NOTE 12
LUMMUS TECHNOLOGY

PIPING AND INSTRUMENT FLOW DIAGRAM


WASH/PROCESS WATER TO
S GASOLINE S
SCALE ED-0100-PRS-PID-01005U

Form: A0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

You might also like