Professional Documents
Culture Documents
CN Lab Ex13
CN Lab Ex13
CN Lab Ex13
NO:
Dake: 19 loy}2023
Simulaticn o topology
Aim: netuork
the network topalogy wing
To implement
fgliation.
Algpnitn hame
that is wsed o
,open a ile
Sep 1: To stant
trace data.
poudue aftey opong dhe ple.
dd finish
shp 2: Atd
3tep 3: Finish .closese hrace file ad stavt
procedure
nam.
enecute ish apten
Step 4: wite she lie of csde to
Step s: Now sawe sthe pile and ty to yun it.
Step &: To depin chd nades connected ew th wnik
inks to Conneot hodes
Create duplex
Btep 7: Set up *he connection , appy CBR traic
oven TCP.
Resulba
Ths he nelwonk topolagy tuing nekwork
Aimulato Aucoup.ly eongigwud.