Professional Documents
Culture Documents
Maintain Training Facilities
Maintain Training Facilities
Maintain Training Facilities
Training
Facilities
Template #1
OPERATIONAL PROCEDURE
Equipment Type Diesel Engine Shredder (water cooled)
Equipment Code NO.4
Location Practical Area
Operation Procedure:
1. Check the Shredder/Grinder Operation Log for anomalies or problems
during the previous day’s use.
2. Don PPE before handling any waste or operating the shredder/grinder.
3. For pre-shredding/grinding, check that the equipment’s seals are in good
condition to prevent the escape of bio-aerosols while the machine is in use.
5. Where the shredder/grinder is equipped with air filters, check that they
are operational and replaced within the required time frame.
6. Check that all safety covers that prevent access to moving parts during
operation are in place.
7. Test the shredder/grinder safety equipment (emergency stop buttons,
etc.) prior to use and only use if all safety features are functioning correctly.
8. Ensure the correct positioning of the empty container to capture the
processed material.
9. Commence shredding. Listen for any abnormal noises during operation
and stop the machine if necessary.
10. Ensure the shredder is only stopped when there is no waste in the
system to avoid jamming the moving parts.
11. Clear any blockages according to the manufacturer’s
recommendations. .
er Day
Day
1. Clean workshop Trainees/ X
area Trainer
2. Clean and arrange Trainees/ X
working tables Trainer
according to floor
plan, /lay-out.
Template #3
OAP WORKSHOP HOUSEKEEPING SCHEDULE
DAILY TASK YES NO
Clean workshop area X
Clean and maintain work shop surroundings X
Disposal of waste materials X
(Follow waste segregation system)
Clean and unplugged water dispenser X
EVERY OTHER DAY YES NO
Clean and check workshop ventilation and illumination X
Clean and check floor, walls, windows, ceilings X
Clean and Check Restroom X
WEEKLY TASK YES NO
Clean and arrange working tables according to floor plan, /lay- X
out.
Clean and check wash area: X
MONTHLY TASK YES NO
Conduct Inventory X
Clean and arrange tool room X
Clean instructional materials & modules; arrange and put in X
order
Check and maintain Laptop X
Template #4
OAP EQUIPMENT MAINTENANCE SCHEDULE*
8 HOURS 50 Hours 100 HOURS
Check the fan belt Lubricate all Check the
Check the water moving parts bearings
level and refill if with a light Remove and
necessary machine oil and sharpen blades
Remove debris check for smooth
Check oil and
Clean the screens operation.
change
and the Clear any regularly
shredding/grindin blockages
g surfaces Test the
according to the shredder/grinde
manufacturer’s r safety
recommendation equipment
s. (emergency stop
buttons, etc.)
Signature
Printed name: Glenna C. Tomas Ric C. Narido Villafuerte S. Camat Jr.
Designation: Instructor AC Manager Farm Owner
Date: August 1, 2022 August 1, 2022 August 1, 2022
Appendix 51
Note:
Recycle: Plastic containers and bottles
Compose: Scrap plant cuttings, leaves, excess garden soil, twigs, branches, and concoction residues
in the composting area.
Dispose: Segregate Disposable gloves, papers, used carton box, and plastics (junk food, biscuits etc.).
in a garbage bag and let it be pick up by the municipal waste collectors.
Prepared by: Glenna Grace C. Tomas